Line 2: |
Line 2: |
| | number = ML093140329 | | | number = ML093140329 |
| | issue date = 11/10/2009 | | | issue date = 11/10/2009 |
| | title = Prairie Island, Letter to Licensee Regarding Public Meeting on 12/01/09 to Discuss Human Performance Cross-Cutting Issues | | | title = Letter to Licensee Regarding Public Meeting on 12/01/09 to Discuss Human Performance Cross-Cutting Issues |
| | author name = Giessner J B | | | author name = Giessner J |
| | author affiliation = NRC/RGN-III/DRP/B4 | | | author affiliation = NRC/RGN-III/DRP/B4 |
| | addressee name = Schimmel M | | | addressee name = Schimmel M |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 10, 2009 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 10, 2009 Mr. Mark Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089 |
| | |
| Mr. Mark Schimmel Site Vice President Prairie Island Nuclear Generating Plant | |
| | |
| Northern States Power Company, Minnesota | |
| | |
| 1717 Wakonade Drive East | |
| | |
| Welch, MN 55089 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PUBLIC MEETING TO DISCUSS HUMAN PERFORMANCE CROSS-CUTTING ISSUES FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT | | PUBLIC MEETING TO DISCUSS HUMAN PERFORMANCE CROSS-CUTTING ISSUES FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT |
|
| |
|
| ==Dear Mr. Schimmel:== | | ==Dear Mr. Schimmel:== |
|
| |
|
| This letter confirms our plans as discussed between members of our staffs to meet and | | This letter confirms our plans as discussed between members of our staffs to meet and discuss the four cross-cutting themes that were open for Prairie Island Nuclear Generating Plant, Units 1 and 2, during the 2009 Mid-Cycle Assessment. The meeting will begin at 6:00 p.m. CDT on December 1, 2009, in the Red Wing Public Library located at 225 East Avenue, Red Wing, Minnesota. This meeting will be open to the public. |
| | | If you have any questions regarding this meeting, please contact me at (630) 829-9619. |
| discuss the four cross-cutting themes that were open for Prairie Island Nuclear Generating | | Sincerely, |
| | | /RA/ |
| Plant, Units 1 and 2, during the 2009 Mid-Cycle Assessment. The meeting will begin at | | John B Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-282; 50-306; 72-010 License Nos. DPR-42; DPR-60; SNM-2506 cc: Distribution via ListServ |
|
| |
|
| 6:00 p.m. CDT on December 1, 2009, in the Red Wing Public Library located at 225 East
| | November 10, 2009 Mr. Mark Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089 |
| | |
| Avenue, Red Wing, Minnesota. This meeting will be open to the public.
| |
| | |
| If you have any questions regarding this meeting, please contact me at (630) 829-9619.
| |
| | |
| Sincerely,
| |
| /RA/ John B Giessner, Chief Branch 4 Division of Reactor Projects
| |
| | |
| Docket Nos. 50-282; 50-306; 72-010
| |
| | |
| License Nos. DPR-42; DPR-60; SNM-2506
| |
| | |
| cc: Distribution via ListServ
| |
| | |
| November 10, 2009 Mr. Mark Schimmel Site Vice President Prairie Island Nuclear Generating Plant | |
| | |
| Northern States Power Company, Minnesota | |
| | |
| 1717 Wakonade Drive East | |
| | |
| Welch, MN 55089 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PUBLIC MEETING TO DISCUSS HUMAN PERFORMANCE CROSS-CUTTING ISSUES FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT | | PUBLIC MEETING TO DISCUSS HUMAN PERFORMANCE CROSS-CUTTING ISSUES FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT |
|
| |
|
| ==Dear Mr. Schimmel:== | | ==Dear Mr. Schimmel:== |
|
| |
|
| This letter confirms our plans as discussed between members of our staffs to meet and | | This letter confirms our plans as discussed between members of our staffs to meet and discuss the four cross-cutting themes that where open for Prairie Island Nuclear Generating Plant, Units 1 and 2, during the 2009 Mid-Cycle Assessment. The meeting will begin at 6:00 p.m. CDT on December 1, 2009, in the Red Wing Public Library located at 225 East Avenue, Red Wing, Minnesota. This meeting will be open to the public. |
| | | If you have any questions regarding this meeting, please contact me at (630) 829-9619. |
| discuss the four cross-cutting themes that where open for Prairie Island Nuclear Generating | | Sincerely, |
| | | /RA/ |
| Plant, Units 1 and 2, during the 2009 Mid-Cycle Assessment. The meeting will begin at | | John B Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-282; 50-306; 72-010 License Nos. DPR-42; DPR-60; SNM-2506 cc: Distribution via ListServ DOCUMENT NAME: G:\Prai\Prairie Island December 1, 2009 PM letter to licensee.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt- JGiessner Roldan DATE 11/10/09 11/10/09 |
|
| |
|
| 6:00 p.m. CDT on December 1, 2009, in the Red Wing Public Library located at 225 East
| | OFFICIAL RECORD COPY Letter to M. Schimmel from J. Giessner dated November 10, 2009. |
| | |
| Avenue, Red Wing, Minnesota. This meeting will be open to the public.
| |
| | |
| If you have any questions regarding this meeting, please contact me at (630) 829-9619.
| |
| | |
| Sincerely,
| |
| /RA/ John B Giessner, Chief Branch 4 Division of Reactor Projects
| |
| | |
| Docket Nos. 50-282; 50-306; 72-010
| |
| | |
| License Nos. DPR-42; DPR-60; SNM-2506
| |
| | |
| cc: Distribution via ListServ
| |
| | |
| DOCUMENT NAME: G:\Prai\Prairie Island December 1, 2009 PM letter to licensee.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt-Roldan JGiessner
| |
| | |
| DATE 11/10/09 11/10/09 OFFICIAL RECORD COPY Letter to M.
| |
| Schimmel from J. Giessner dated November 10, 2009. | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PUBLIC MEETING TO DISCUSS HUMAN PERFORMANCE CROSS-CUTTING ISSUES FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT | | PUBLIC MEETING TO DISCUSS HUMAN PERFORMANCE CROSS-CUTTING ISSUES FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT DISTRIBUTION: |
| | | Susan Bagley RidsNrrPMPrairieIsland RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}} |
| DISTRIBUTION: | |
| Susan Bagley | |
| | |
| RidsNrrPMPrairieIsland | |
| | |
| RidsNrrDorlLpl3-1 Resource | |
| | |
| RidsNrrDirsIrib Resource | |
| | |
| Cynthia Pederson | |
| | |
| Steven Orth | |
| | |
| Jared Heck | |
| | |
| Allan Barker | |
| | |
| DRPIII DRSIII Patricia Buckley | |
| | |
| Tammy Tomczak | |
| | |
| ROPreports Resource}} | |
|
---|
Category:Letter
MONTHYEARIR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 to Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds ML24081A1532024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves 2024-09-27
[Table view] Category:Meeting Notice
MONTHYEARML24116A2392024-04-25025 April 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Prairie Island Nuclear Plant for Performance for 2023 Calendar Year PMNS20240269, Notice of Meeting with Northern States Power Company - Minnesota, Doing Business as Xcel Energy2024-02-26026 February 2024 Notice of Meeting with Northern States Power Company - Minnesota, Doing Business as Xcel Energy ML24008A0132024-01-0808 January 2024 Notice of Public Meeting with Xcel Energy to Discuss the Prairie Island ISFSI Amendment ML23159A2542023-06-0808 June 2023 Pre-application Meeting with Xcel Energy to Discuss the Amendment Application for the Prairie Island ISFSI PMNS20230663, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-0202 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML23118A1182023-04-28028 April 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Prairie Island Nuclear Plant for Performance for 2022 Calendar Year PMNS20230262, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-04-12012 April 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML22109A0672022-04-20020 April 2022 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant for 2021 Calendar Year ML22109A0802022-04-20020 April 2022 Information Meeting with a Question-And-Answer Session to Discuss NRC 2021 End-Of-Cycle Plant Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant PMNS20220096, Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island)2022-02-0707 February 2022 Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) PMNS20211339, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System2021-10-15015 October 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System PMNS20210949, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-07-21021 July 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request ML21145A3462021-05-25025 May 2021 6/9/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant for Performance for 2020 Calendar Year PMNS20210528, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-05-0505 May 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20280A6092020-10-0606 October 2020 Teleconference to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, (Prairie Island) License Amendment Request to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML20183A2872020-07-0101 July 2020 7/16/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant Performance for the 2019 Calendar Year ML19144A2232019-05-23023 May 2019 6/25/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Prairie Island Nuclear Generating Plant Performance for the 2018 Calendar Year ML19074A1312019-03-11011 March 2019 Revised Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19070A2412019-03-11011 March 2019 Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19045A6682019-02-14014 February 2019 Notice of Meeting with Xcel Energy to Discuss a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island Independent Spent Fuel Storage Installation ML18122A0452018-05-0101 May 2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Prairie Island Nuclear Generating Plant, Units 1 and 2 Performance for the 2017 Calendar Year ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML16162A7112016-06-10010 June 2016 Summary of the May 18, 2016, Prairie Island Public Open House ML16118A4792016-04-26026 April 2016 Notice of Forthcoming Public Open House to Discuss the 2015 End-Of-Cycle Performance Assessment at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML16119A0412016-04-26026 April 2016 5/18/2016 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment for Prairie Island Nuclear Generating Plant Performance for the 2015 Calendar Year ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15181A0202015-07-0101 July 2015 July 9, 2015 Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML15118A0172015-04-28028 April 2015 Meeting Notice with Public to Discuss the Results of the 2014 Biennial Problem Identification and Resolution Inspection ML15113B3712015-04-23023 April 2015 Public Meeting to Discuss Results of 2014 Biennial Problem Identification and Resolution Inspection and to Discuss the 2014 End-Of-Cycle Performance Assessment for Prairie Island Nuclear Generating Plant ML15064A0762015-03-0505 March 2015 PI 2014 EOC Meeting Notice ML15065A1042015-03-0505 March 2015 Public Meeting to Discuss 2014 Biennial Problem Identification and Resolution Inspection and 2014 End-Of-Cycle Performance Assessment at Prairie Island Nuclear Generating Plant ML14328A7812014-11-24024 November 2014 December 15, 2014, Notice of Public Meeting for Prairie Island to Discuss the Licensee'S Actions to Address Issues Identified During the 2014 NRC Biennial Problem Identification and Resolution Inspection ML14205A5242014-07-24024 July 2014 August5, 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14169A5862014-06-13013 June 2014 Operator License Workshop Invitation ML14164A3302014-06-13013 June 2014 Notice of Public Meeting with Northern States Power Company, Minnesota to Discuss NRC End-of-Cycle Assessment of Prairie Island, Units 1 & 2 Performance for 2013 Calendar Year ML14164A2712014-06-13013 June 2014 Public Meeting to Discuss 2013 End-of-Cycle Performance Assessment at Prairie Island Nuclear Generating Plant ML13171A3162013-06-20020 June 2013 7/11/2013, Notice of Meeting with Northern States Power Company, Minnesota to Present the Licensee the Results of NRC End-of-Cycle Assessment Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2 ML13123A4302013-05-0202 May 2013 Ltr 5/2/13 Prairie Island Operator Licensing Workshop ML13035A1412013-02-0404 February 2013 Notice of Significant Licensee Meeting with Northern States Power Company Regarding the Prairie Island Nuclear Generating Plant, Unit 1 ML12318A0572012-11-13013 November 2012 12/6/2012 - Rescheduled Notice of Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2 ML12306A3222012-11-0101 November 2012 Notice of Forthcoming Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2 2024-04-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 10, 2009 Mr. Mark Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PUBLIC MEETING TO DISCUSS HUMAN PERFORMANCE CROSS-CUTTING ISSUES FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT
Dear Mr. Schimmel:
This letter confirms our plans as discussed between members of our staffs to meet and discuss the four cross-cutting themes that were open for Prairie Island Nuclear Generating Plant, Units 1 and 2, during the 2009 Mid-Cycle Assessment. The meeting will begin at 6:00 p.m. CDT on December 1, 2009, in the Red Wing Public Library located at 225 East Avenue, Red Wing, Minnesota. This meeting will be open to the public.
If you have any questions regarding this meeting, please contact me at (630) 829-9619.
Sincerely,
/RA/
John B Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506 cc: Distribution via ListServ
November 10, 2009 Mr. Mark Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PUBLIC MEETING TO DISCUSS HUMAN PERFORMANCE CROSS-CUTTING ISSUES FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT
Dear Mr. Schimmel:
This letter confirms our plans as discussed between members of our staffs to meet and discuss the four cross-cutting themes that where open for Prairie Island Nuclear Generating Plant, Units 1 and 2, during the 2009 Mid-Cycle Assessment. The meeting will begin at 6:00 p.m. CDT on December 1, 2009, in the Red Wing Public Library located at 225 East Avenue, Red Wing, Minnesota. This meeting will be open to the public.
If you have any questions regarding this meeting, please contact me at (630) 829-9619.
Sincerely,
/RA/
John B Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506 cc: Distribution via ListServ DOCUMENT NAME: G:\Prai\Prairie Island December 1, 2009 PM letter to licensee.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt- JGiessner Roldan DATE 11/10/09 11/10/09
OFFICIAL RECORD COPY Letter to M. Schimmel from J. Giessner dated November 10, 2009.
SUBJECT:
PUBLIC MEETING TO DISCUSS HUMAN PERFORMANCE CROSS-CUTTING ISSUES FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT DISTRIBUTION:
Susan Bagley RidsNrrPMPrairieIsland RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource