[Table View]NRR E-mail Capture - Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) Project stage: Other ML20135G8212020-05-14014 May 2020 NRR E-mail Capture - Revision to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) Project stage: Other ML20154K7632020-06-0202 June 2020 NRR E-mail Capture - Revision 2 to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) Project stage: Other ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 Project stage: RAI ML20280A6092020-10-0606 October 2020 Teleconference to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, (Prairie Island) License Amendment Request to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b Project stage: Meeting ML20296A2612020-10-0606 October 2020, 3 November 2020 TSTF-505 Public Meeting Summary Project stage: Request ML20295A4422020-11-0303 November 2020 Regulatory Audit Summary Regarding License Amendment Requests to Permit the Use of Risk Informed Completion Times in Accordance with TSTF 505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B Project stage: Other ML20296A2382020-11-0303 November 2020 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the License Amendment to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Project stage: Meeting ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Project stage: Approval 2020-05-14 |
ML20280A609 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 10/06/2020 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
PMNS20201187 | |
Download: ML20280A609 (3) | |
Similar Documents at Prairie Island | |
---|---|
Category:Meeting Notice
MONTHYEARPMNS20241409, Notice of Meeting with Northern States Power Company2024-11-0707 November 2024
[Table view]Notice of Meeting with Northern States Power Company ML24116A2392024-04-25025 April 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Prairie Island Nuclear Plant for Performance for 2023 Calendar Year PMNS20240269, Notice of Meeting with Northern States Power Company - Minnesota, Doing Business as Xcel Energy2024-02-26026 February 2024 Notice of Meeting with Northern States Power Company - Minnesota, Doing Business as Xcel Energy ML24008A0132024-01-0808 January 2024 Notice of Public Meeting with Xcel Energy to Discuss the Prairie Island ISFSI Amendment ML23159A2542023-06-0808 June 2023 Pre-application Meeting with Xcel Energy to Discuss the Amendment Application for the Prairie Island ISFSI PMNS20230663, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-0202 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML23118A1182023-04-28028 April 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Prairie Island Nuclear Plant for Performance for 2022 Calendar Year PMNS20230262, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-04-12012 April 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML22109A0672022-04-20020 April 2022 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant for 2021 Calendar Year ML22109A0802022-04-20020 April 2022 Information Meeting with a Question-And-Answer Session to Discuss NRC 2021 End-Of-Cycle Plant Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant PMNS20220096, Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island)2022-02-0707 February 2022 Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) PMNS20211339, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System2021-10-15015 October 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System PMNS20210949, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-07-21021 July 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request ML21145A3462021-05-25025 May 2021 6/9/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant for Performance for 2020 Calendar Year PMNS20210528, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-05-0505 May 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20280A6092020-10-0606 October 2020 Teleconference to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, (Prairie Island) License Amendment Request to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML20183A2872020-07-0101 July 2020 7/16/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant Performance for the 2019 Calendar Year ML19144A2232019-05-23023 May 2019 6/25/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Prairie Island Nuclear Generating Plant Performance for the 2018 Calendar Year ML19074A1312019-03-11011 March 2019 Revised Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19070A2412019-03-11011 March 2019 Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19045A6682019-02-14014 February 2019 Notice of Meeting with Xcel Energy to Discuss a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island Independent Spent Fuel Storage Installation ML18122A0452018-05-0101 May 2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Prairie Island Nuclear Generating Plant, Units 1 and 2 Performance for the 2017 Calendar Year ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML16162A7112016-06-10010 June 2016 Summary of the May 18, 2016, Prairie Island Public Open House ML16118A4792016-04-26026 April 2016 Notice of Forthcoming Public Open House to Discuss the 2015 End-Of-Cycle Performance Assessment at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML16119A0412016-04-26026 April 2016 5/18/2016 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment for Prairie Island Nuclear Generating Plant Performance for the 2015 Calendar Year ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15181A0202015-07-0101 July 2015 July 9, 2015 Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML15118A0172015-04-28028 April 2015 Meeting Notice with Public to Discuss the Results of the 2014 Biennial Problem Identification and Resolution Inspection ML15113B3712015-04-23023 April 2015 Public Meeting to Discuss Results of 2014 Biennial Problem Identification and Resolution Inspection and to Discuss the 2014 End-Of-Cycle Performance Assessment for Prairie Island Nuclear Generating Plant ML15065A1042015-03-0505 March 2015 Public Meeting to Discuss 2014 Biennial Problem Identification and Resolution Inspection and 2014 End-Of-Cycle Performance Assessment at Prairie Island Nuclear Generating Plant ML15064A0762015-03-0505 March 2015 PI 2014 EOC Meeting Notice ML14328A7812014-11-24024 November 2014 December 15, 2014, Notice of Public Meeting for Prairie Island to Discuss the Licensee'S Actions to Address Issues Identified During the 2014 NRC Biennial Problem Identification and Resolution Inspection ML14205A5242014-07-24024 July 2014 August5, 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML14164A3302014-06-13013 June 2014 Notice of Public Meeting with Northern States Power Company, Minnesota to Discuss NRC End-of-Cycle Assessment of Prairie Island, Units 1 & 2 Performance for 2013 Calendar Year ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14164A2712014-06-13013 June 2014 Public Meeting to Discuss 2013 End-of-Cycle Performance Assessment at Prairie Island Nuclear Generating Plant ML14169A5862014-06-13013 June 2014 Operator License Workshop Invitation ML13171A3162013-06-20020 June 2013 7/11/2013, Notice of Meeting with Northern States Power Company, Minnesota to Present the Licensee the Results of NRC End-of-Cycle Assessment Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2 ML13123A4302013-05-0202 May 2013 Ltr 5/2/13 Prairie Island Operator Licensing Workshop ML13035A1412013-02-0404 February 2013 Notice of Significant Licensee Meeting with Northern States Power Company Regarding the Prairie Island Nuclear Generating Plant, Unit 1 ML12318A0572012-11-13013 November 2012 12/6/2012 - Rescheduled Notice of Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2 2024-04-25 Category:Meeting Agenda MONTHYEARPMNS20241409, Notice of Meeting with Northern States Power Company2024-11-0707 November 2024
[Table view]Notice of Meeting with Northern States Power Company PMNS20240269, Notice of Meeting with Northern States Power Company - Minnesota, Doing Business as Xcel Energy2024-02-26026 February 2024 Notice of Meeting with Northern States Power Company - Minnesota, Doing Business as Xcel Energy ML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML24008A0132024-01-0808 January 2024 Notice of Public Meeting with Xcel Energy to Discuss the Prairie Island ISFSI Amendment ML23159A2542023-06-0808 June 2023 Pre-application Meeting with Xcel Energy to Discuss the Amendment Application for the Prairie Island ISFSI PMNS20230663, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-0202 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides PMNS20230262, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-04-12012 April 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20220096, Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island)2022-02-0707 February 2022 Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) PMNS20211339, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System2021-10-15015 October 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System ML21221A0202021-08-11011 August 2021 Nis Pr Bypass Test Panel License Amendment Request PMNS20210949, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-07-21021 July 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request PMNS20210528, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-05-0505 May 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20280A6092020-10-0606 October 2020 Teleconference to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, (Prairie Island) License Amendment Request to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19074A1312019-03-11011 March 2019 Revised Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19070A2412019-03-11011 March 2019 Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19045A6682019-02-14014 February 2019 Notice of Meeting with Xcel Energy to Discuss a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island Independent Spent Fuel Storage Installation ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15114A0432015-04-23023 April 2015 PI 2014 PIR and EOC Meeting Notice ML14169A5862014-06-13013 June 2014 Operator License Workshop Invitation ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12326A9702012-11-21021 November 2012 Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 W/ Encl 1 (Attendees) and Encl 2 (Agenda) ML12318A0572012-11-13013 November 2012 12/6/2012 - Rescheduled Notice of Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2 ML12306A3222012-11-0101 November 2012 Notice of Forthcoming Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2 ML12249A2702012-09-11011 September 2012 Notice of Forthcoming Pre-Application Meeting with Xcel Energy, Inc. Concerning Prairie Island Nuclear Generating Plant ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML1208703892012-03-30030 March 2012 Notice of Pre-Application Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2, to Discuss Licensee'S Proposed NFPA 805, Performance Based Standard for Fire Protection for Light Weight Reactor ... ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1121505252011-08-0404 August 2011 Notice of Forthcoming Pre-Application Meeting with Licensee for Prairie Island Nuclear Generating Plant, Units 1 and 2 to Discuss Extended Power Uprate License Amendment Request ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1113703982011-05-20020 May 2011 Notice of Forthcoming Pre-Application Meeting with Licensee for Prairie Island Nuclear Generation Plant, Units 1 and 2, to Discuss Proposed Technical Specification and Licensing Basis Changes to Diesel Fuel Oil System ML1104702792011-02-16016 February 2011 Notice of Forthcoming Meeting with Licensee for Prairie Island Nuclear Generating Plant, Unit 1 to Discuss License Amendment Request to Revise Surveillance Requirement Footnote in Technical Specification 3.8.1, AC Sources - Operating. ML1100502702011-01-0505 January 2011 Notice of Closed Pre-Application Meeting NSPM Staff to Discuss Proposed Physical Security Plan Changes That Will Be Submitted for NRC Review and Approval Via License Amendment Request ML1032603272010-11-24024 November 2010 Notice of Pre-Application Meeting with Licensee for Prairie Island Nuclear Generating Plant, Units 1 and 2 to Discuss Spent Fuel Pool Criticality and Extended Power Uprate ML1023805712010-08-25025 August 2010 Meeting Presentation Alternative Source Term Steam Generator Tube Rupture Margin to Overfill Evaluation - Prairie Island Nuclear Generating Plant ML1022200872010-08-10010 August 2010 Forthcoming Meeting with Northern States Power Company - Minnesota (Nspm), to Discuss the Prairie Island Nuclear Generating Plant Steam Generator Margin-to-Overfill Analysis as It Relates to Pingp'S License Amendment Request to Adopt... ML1009707112010-04-0808 April 2010 Revised Notice of Pre-Application Meeting with Licensee for Prairie Island Nuclear Generating Plant, Units 1 and 2 to Discuss Extended Power Uprate License Amendment Request ML1008205732010-03-26026 March 2010 Notice of Forthcoming Pre-Application Meeting with Licensee for Prairie Island Nuclear Generating Plant, Units 1 and 2 to Discuss Extended Power Uprate License Amendment Request ML0932901282009-12-0101 December 2009 Licensee Slides for Public Meeting 2024-02-26 |
Text
October 06, 2020
Title:
Teleconference to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, (Prairie Island) License Amendment Request to Adopt TSTF-505 "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Date(s) and Time(s): October 19, 2020, 10:30 AM to 11:30 AM The time of the meeting is local to the jurisdiction where the meeting is being held.
Location: Teleconference Category: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion of the meeting but before the meeting is adjourned.
Purpose:
The purpose of this meeting is for Northern States Power Company (NSPM) to provide clarification of the supplemental information provided by letter dated September 1, 2020 (Agencywide Documents Access and Management System ML20245E401) related to the Prairie Island TSTF-505 amendment request.
Contact:
Robert Kuntz 301-415-3733 robert.kuntz@nrc.gov
Participants:
NRC External Robert Kuntz, Office of Nuclear Reactor Peter Gohdes, Northern States Power Regulation Company Docket No: 05000282 05000306 Comments: The public can participate via toll-free audio teleconference. Contact the meeting organizer by October 16, 2020, for teleconference details.
PUBLIC MEETING AGENDA
Teleconference to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, (Prairie Island) License Amendment Request to Adopt TSTF-505 "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b October 19, 2020, 10:30 AM to 11:30 AM Teleconference
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or other information from this meeting is needed in another format (e.g., Braille, large print), please notify the NRC meeting contact.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
ADAMS Accession Number: ML20280A609 Distribution:
Office NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC Name RKuntz SRohrer NSalgado Date 10/06/2020 10/06/2020 10/06/2020 OFFICIAL RECORD COPY Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20201187 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 67 Federal Register 36920, May 28, 2002 The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html