ML14164A330

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Northern States Power Company, Minnesota to Discuss NRC End-of-Cycle Assessment of Prairie Island, Units 1 & 2 Performance for 2013 Calendar Year
ML14164A330
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/13/2014
From: Kenneth Riemer
NRC/RGN-III
To:
References
Download: ML14164A330 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 13, 2014 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Northern States Power Company, Minnesota Name of Facility: Prairie Island Nuclear Generating Plant, Unit 1 and Unit 2 Docket No: 50-282, 50-306, and 72-010 Date and Time: Thursday, July 17, 2014, 6:00 p.m. to 9:00 p.m. (CDT)

Location: Red Wing Public Library 225 East Ave Community Room, Lower Level Red Wing, MN 55089

Purpose:

Discuss NRC end-of-cycle assessment of Prairie Island Nuclear Generating Plant, Unit 1 and 2, performance for the 2013 calendar year. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Category: This is a Category 3 meeting. The public is invited to participate in this meeting by providing comments and asking questions throughout the meeting.

Contact:

Kenneth Riemer 630-829-9628 Kenneth.Riemer@nrc.gov

Notice of Significant Licensee Meeting NRC Attendees:

K. Riemer, Chief, DRP Branch 2 K. Stoedter, Senior Resident Inspector P. LaFlamme, Resident Inspector Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Kenneth Riemer at 630-829-9628 by Wednesday, July 9, 2014.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact.

Approved By: /RA Nick Shah, Acting for/

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects

Notice of Significant Licensee Meeting NRC Attendees:

K. Riemer, Chief, DRP Branch 2 K. Stoedter, Senior Resident Inspector P. LaFlamme, Resident Inspector Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Kenneth Riemer at 630-829-9628 by Wednesday, July 9, 2014.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact.

Approved By: /RA Nick Shah, Acting for/

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects DISTRIBUTION:

See next page DOCUMENT NAME: Prairie Island 2013 EOC Meeting Notice Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME JMancuso:mt NShah for KRiemer DATE 06/13/14 06/13/14 OFFICIAL RECORD COPY

Notice of Significant Licensee Meeting DISTRIBUTION:

Joseph Nick, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Inspection and Regional Support, NRR RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3-1 Resource Anne Boland, Director, Division of Reactor Projects, RIII Kenneth OBrien, Deputy Director, Division of Reactor Projects, RIII Gary Shear, Director, Division of Reactor Safety, RIII Mohammed Shuaibi, Deputy Director, Division of Reactor Safety, RIII Kenneth Riemer, Branch Chief, Division of Reactor Projects, RIII Karla Stoedter, Senior Resident Inspector, Prairie Island, RIII DRS Branch Chiefs:

Robert Daley Billy Dickson Richard Skokowski David Hills Hironori Peterson Ann Marie Stone Allan Barker, Regional State Liaison Officer, RIII Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil, RIII Public Affairs Patricia Buckley, ORA Carmen Olteanu, ORA Marjorie Zerth, DRP