| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 | | {{#Wiki_filter:UNITED STATES |
| December 10, 2009
| | NUCLEAR REGULATORY COMMISSION |
| Florida Power and Light Company ATTN: Mr. Seth Duston Training Manager
| | REGION II |
| St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, FL 34957 | | SAM NUNN ATLANTA FEDERAL CENTER |
| SUBJECT: ST. LUCIE - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000335/2009301, 05000389/2009301 AND 05000335/2009302, 05000389/2009302
| | 61 FORSYTH STREET, SW, SUITE 23T85 |
| Dear Mr. Duston:
| | ATLANTA, GEORGIA 30303-8931 |
| The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing
| | December 10, 2009 |
| examinations at St. Lucie Nuclear Plant. | | Florida Power and Light Company |
| The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to your office. The NRC staff administered operating tests to individuals, as applicable,
| | ATTN: Mr. Seth Duston |
| during the week of October 19, 2009, and the remaining individuals will be tested during the week of January 11, 2010. Note that any examination waivers and application denials have been addressed in separate correspondence. | | Training Manager |
| The NRC has approved the subject written examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," on December 15, 2009.
| | St. Lucie Nuclear Plant |
| | 6501 South Ocean Drive |
| | Jensen Beach, FL 34957 |
| | SUBJECT: ST. LUCIE - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL |
| | 05000335/2009301, 05000389/2009301 AND 05000335/2009302, 05000389/2009302 |
| | Dear Mr. Duston: |
| | The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing |
| | examinations at St. Lucie Nuclear Plant. |
| | The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license |
| | applications submitted in connection with this examination and separately provided a list of approved |
| | applicants to your office. The NRC staff administered operating tests to individuals, as applicable, |
| | during the week of October 19, 2009, and the remaining individuals will be tested during the week of |
| | January 11, 2010. Note that any examination waivers and application denials have been addressed |
| | in separate correspondence. |
| | The NRC has approved the subject written examinations and hereby authorizes you to administer the |
| | written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, Operator |
| | Licensing Examination Standards for Power Reactors, on December 15, 2009. |
| | This examination has undergone extensive review by my staff and representatives responsible for |
| | operator training at your facility. Based on this review I have concluded that the examination meets |
| | the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering |
| | this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for |
| | measuring the qualifications of licensed operators at your facility. If you determine that this |
| | examination is not appropriate for licensing operators at your facility, do not administer the |
| | examination and contact me at (404) 562-4550. |
| | Please contact Mr. Gerard Laska at cell (770) 403-7878 if you have any questions or identify any |
| | errors or changes in license level (RO or SRO) specified for each applicant on the list of approved |
| | applicants. |
| | Sincerely, |
| | /RA/ |
| | Malcolm T. Widmann, Chief |
| | Operations Branch |
| | Division of Reactor Safety |
| | Docket Nos.: 50-335, 50-389 |
| | License Nos.: DPR-67, NPF-16 |
|
| |
|
| This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for
| |
| measuring the qualifications of licensed operators at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (404) 562-4550.
| |
| Please contact Mr. Gerard Laska at cell (770) 403-7878 if you have any questions or identify any
| |
| errors or changes in license level (RO or SRO) specified for each applicant on the list of approved applicants.
| |
| Sincerely, /RA/
| |
|
| |
|
| Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety
| | G SUNSI REVIEW COMPLETE |
| Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
| | OFFICE RII:DRS RII:DRS |
| | | SIGNATURE |
|
| | NAME RBaldwin MWidmann |
| G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE NAME RBaldwin MWidmann DATE 12/ /2009 12/ /2009 12/ /2009 12/ /2009 12/ /2009 12/ /2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO | | DATE 12/ /2009 12/ /2009 12/ /2009 12/ /2009 12/ /2009 12/ /2009 |
| | E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda 2024-09-09
[Table view] Category:License-Operator
MONTHYEARML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment L-2021-146, Change Requested to Schedule of Operator Licensing Examination2021-07-19019 July 2021 Change Requested to Schedule of Operator Licensing Examination ML21137A3652021-05-13013 May 2021 Plan, Unit 1 and 2, Operator Licensing Retake Written Examination Approval 05000335/2021301 and 05000389/2021301 ML21083A1332021-03-19019 March 2021 Notification of Licensed Operator Intake Initial Examination 05000335/2021301 and 05000389/2021301 ML21034A5192021-02-0303 February 2021 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key ML21034A5312021-02-0303 February 2021 1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21193A0872020-12-16016 December 2020 File 2A3 Exam Administrative Items ML21193A1052020-12-16016 December 2020 File 2A2 Exam Final Items ML21193A0522020-12-16016 December 2020 File 2B Normal Release Exam Administrative Items ML20351A2022020-12-15015 December 2020 301 Written Exam Approval Letter ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20115E3532020-04-24024 April 2020 Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111 L-2020-038, Preparation and Scheduling of Operator Licensing Examinations2020-03-0606 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19158A3312019-06-0707 June 2019 SL-2019-301 Exam Administrative Items (ADAMS 2D) ML19100A2442019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for St. Lucie Nuclear Power Plant ML19099A2902019-04-0909 April 2019 2019 Schedule Confirmation for St. Lucie ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18039A9282018-02-0808 February 2018 301 Exam Report Items RO as Given - Delay Release 2 Yrs ML18039A9332018-02-0808 February 2018 301 Exam Report Items SRO as Given - Delay Release 2 Yrs ML17164A0852017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 IR 05000335/20173012017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 L-2016-033, NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update2016-02-22022 February 2016 NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update ML15201A5382015-07-16016 July 2015 301 Draft Simulator Scenarios ML15201A5642015-07-16016 July 2015 301 Other Documents for Retention ML15201A5612015-07-16016 July 2015 301 Final Administrative JPMs ML15201A5602015-07-16016 July 2015 301 Final Simulator and in Plant JPMs ML15201A5582015-07-16016 July 2015 301 Final Simulator Scenarios ML15201A5572015-07-16016 July 2015 301 Final Administrative Documents ML15201A5532015-07-16016 July 2015 301 Draft Administrative JPMs ML15201A5452015-07-16016 July 2015 301 Draft Simulator and in Plant JPMs ML15201A5372015-07-16016 July 2015 301 Draft SRO Written Exam ML15201A4962015-07-13013 July 2015 301 Draft RO Written Exam ML15201A4942015-07-13013 July 2015 301 Draft Administrative Documents ML15142A4002015-05-21021 May 2015 Initial Exam 2009302 Final Admin Documents ML15142A4012015-05-21021 May 2015 Initial Exam 2009302 Draft Admin Documents ML15097A2692015-04-0707 April 2015 301 Post Exam Comments ML15097A2672015-04-0707 April 2015 301 Final SRO Written Exam ML15097A2642015-04-0707 April 2015 301 Final RO Written Exam ML14318A9192014-11-12012 November 2014 Notification of Licensed Operator Initial Examination 05000335/2015301 and 05000389/2015301 ML13225A1322013-08-0808 August 2013 Initial Exam 2012-301 Draft SRO Written Exam ML13225A1352013-08-0808 August 2013 Initial Exam 2012-301 Draft Simulator Scenarios ML13225A1382013-08-0808 August 2013 Initial Exam 2012-301 Draft Sim/In-plant JPMs ML13225A1402013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative JPMs ML13225A1662013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative Documents 2022-04-20
[Table view] Category:Other HQ and Regional Correspondence
MONTHYEARML1000601952010-01-0606 January 2010 Operator Licensing Test Approval 05000335-09-302 and 05000389-09-302 ML1004100282009-12-22022 December 2009 Initial Exam 2009-301 Post NRC Written Exam Facility Comments ML0934504762009-12-10010 December 2009 Operator Licensing Written Examination Approval 05000335/2009301, 05000389/2009301 and 05000335/2009302, 050000389/2009302 2010-01-06
[Table view] |
See also: IR 05000335/2009301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
December 10, 2009
Florida Power and Light Company
ATTN: Mr. Seth Duston
Training Manager
St. Lucie Nuclear Plant
6501 South Ocean Drive
Jensen Beach, FL 34957
SUBJECT: ST. LUCIE - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL
05000335/2009301, 05000389/2009301 AND 05000335/2009302, 05000389/2009302
Dear Mr. Duston:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing
examinations at St. Lucie Nuclear Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license
applications submitted in connection with this examination and separately provided a list of approved
applicants to your office. The NRC staff administered operating tests to individuals, as applicable,
during the week of October 19, 2009, and the remaining individuals will be tested during the week of
January 11, 2010. Note that any examination waivers and application denials have been addressed
in separate correspondence.
The NRC has approved the subject written examinations and hereby authorizes you to administer the
written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, Operator
Licensing Examination Standards for Power Reactors, on December 15, 2009.
This examination has undergone extensive review by my staff and representatives responsible for
operator training at your facility. Based on this review I have concluded that the examination meets
the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering
this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for
measuring the qualifications of licensed operators at your facility. If you determine that this
examination is not appropriate for licensing operators at your facility, do not administer the
examination and contact me at (404) 562-4550.
Please contact Mr. Gerard Laska at cell (770) 403-7878 if you have any questions or identify any
errors or changes in license level (RO or SRO) specified for each applicant on the list of approved
applicants.
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-335, 50-389
License Nos.: DPR-67, NPF-16
G SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS
SIGNATURE
NAME RBaldwin MWidmann
DATE 12/ /2009 12/ /2009 12/ /2009 12/ /2009 12/ /2009 12/ /2009
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO