{{#Wiki_filter:FACILITY NAME: ___
{{#Wiki_filter:FACILITY NAME: _ _    __  __ -----,;C-.;a-.;;t.;:;:.;aw:.;;.;b~a::__-----
REPORTNUMBER:
                                ..;;:;C.;;;at=a;.;.;w;..;;:b~a____- - - - -
_____
_____~2~0~0~9-~3~01~------
REPORTNUMBER: ________
FINAL SRO 2009 WRITTEN EXAM CONTENTS:
FINAL SRO 2009 WRITTEN EXAM CONTENTS:
D Final SRO Written Exam (100 'as given' questions with changes made during administration annotated)
o Final SRO Written Exam (100 'as given' questions with changes made D
D Reference Handouts Provided To Applicants D Answer Key Location of Electronic Files: Not applicable.
during administration annotated) o Reference Handouts Provided To Applicants D
FACILITY NAME: ____
o Answer Key D
____ -----REPORTNUMBER:
Location of Electronic Files:
________
Not applicable.
FINAL SRO 2009 WRITTEN EXAM CONTENTS:
 
o Final SRO Written Exam (100 'as given' questions with changes made during administration annotated) o Reference Handouts Provided To Applicants o Answer Key Location of Electronic Files: Not applicable.
CATAWBA NUCLEAR STATION Question:        1 2009 SRO NRC Examination (1 point)
Question:
Unit 1 is operating at 75% power and increasing power following a refueling outage.
1 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 75% power and increasing power following a refueling outage. The following occurs at 1015:
The following occurs at 1015:
* 1AD-1, E/8 "TURB GEN HI VIBRATION" actuates
* 1AD-1, Et8 E/8 "TURB GEN HI VIBRATION" actuates
* Turbine bearing vibration readings on the OAC indicate:
* Turbine bearing vibration readings on the OAC indicate:
o Bearing #9 at 11 mils and stable o Bearing #10 at 13 mils and stable What response is required for these conditions per OP/1/B/61001010B (Alarm Response for PaneI1AD-1)?
o Bearing #9 at 11 mils and stable o Bearing #10 at 13 mils and stable What response is required for these conditions per OP/1/B/61001010B OPt1tBt6100t010B (Alarm Response for PaneI1AD-1)?
A. Immediately trip the turbine only B. Immediately trip the reactor and verify the turbine trips automatically C. Monitor bearing vibrations and if vibration is unchanged at 1017, trip the turbine only D. Monitor bearing vibrations and if vibration is unchanged at 1017, trip the reactor and verify the turbine automatically trips Page 1 of 100 Question:
A.       Immediately trip the turbine only B.       Immediately trip the reactor and verify the turbine trips automatically C.       Monitor bearing vibrations and if vibration is unchanged at 1017, trip the turbine only D.       Monitor bearing vibrations and if vibration is unchanged at 1017, trip the reactor and verify the turbine automatically trips Page 1 of 100
1 CATAWBA NUCLEAR STATION 2009 SRO NRC Examination (1 point) Unit 1 is operating at 75% power and increasing power following a refueling outage. The following occurs at 1015:
 
* 1AD-1, Et8 "TURB GEN HI VIBRATION" actuates
CATAWBA NUCLEAR STATION Question:       2 2009 SRO NRC Examination (1 point)
* Turbine bearing vibration readings on the OAC indicate:
Unit 1 is operating at 100% power. Given the following conditions and sequence of events:
o Bearing #9 at 11 mils and stable o Bearing #10 at 13 mils and stable What response is required for these conditions per OPt1tBt6100t010B (Alarm Response for PaneI1AD-1)?
Initial Conditions
A. Immediately trip the turbine only B. Immediately trip the reactor and verify the turbine trips automatically C. Monitor bearing vibrations and if vibration is unchanged at 1017, trip the turbine only D. Monitor bearing vibrations and if vibration is unchanged at 1017, trip the reactor and verify the turbine automatically trips Page 1 of 100 Question:
* 1NV-294 (NV Pmps A&B Disch Flow Ctrl) is in manual
2 CATAWBA NUCLEAR STATION 2009 SRO NRC Examination (1 point) Unit 1 is operating at 100% power. Given the following conditions and sequence of events: Initial Conditions
* 1 NV-294 (NV Pmps A&B Disch Flow Ctrl) is in manual
* PRT pressure is 6 psig and increasing
* PRT pressure is 6 psig and increasing
* PRT level is 67% and increasing
* PRT level is 67% and increasing
Line 46: Line 45:
* The crew notes pressurizer pressure is 2197 psig and slowly decreasing
* The crew notes pressurizer pressure is 2197 psig and slowly decreasing
* PRT pressure is 15 psig and increasing
* PRT pressure is 15 psig and increasing
* PRT level is 68% and increasing Based on the conditions stated above, and assuming no operator action: 1. How (if at all) is charging flow affected?
* PRT level is 68% and increasing Based on the conditions stated above, and assuming no operator action:
: 1. How (if at all) is charging flow affected?
: 2. How (if at all) is the external leakage rate from the PRT affected?
: 2. How (if at all) is the external leakage rate from the PRT affected?
A. Charging flow is stable PRT external leakage rate will increase B. Charging flow is stable PRT external leakage rate is stable C. Charging flow is increasing PRT external leakage rate is stable D. Charging flow is increasing PRT external leakage rate will increase Page 2 of 100 Question:
A.       Charging flow is stable PRT external leakage rate will increase B.       Charging flow is stable PRT external leakage rate is stable C.       Charging flow is increasing PRT external leakage rate is stable D.       Charging flow is increasing PRT external leakage rate will increase Page 2 of 100
2 CATAWBA NUCLEAR STATION 2009 SRO NRC Examination (1 point) Unit 1 is operating at 100% power. Given the following conditions and sequence of events: Initial Conditions
 
* 1 NV-294 (NV Pmps A&B Disch Flow Ctrl) is in manual
CATAWBA NUCLEAR STATION Question:      3 2009 SRO NRC Examination (1 point)
* PRT pressure is 6 psig and increasing
Unit 1 was operating at 100% power when a LOCA occurred. Given the following conditions:
* PRT level is 67% and increasing
* The PRT has a small external leak (0.05 gpm)
* Pressurizer pressure is 2235 psig Final Conditions 10 minutes later
* The crew notes pressurizer pressure is 2197 psig and slowly decreasing
* PRT pressure is 15 psig and increasing
* PRT level is 68% and increasing Based on the conditions stated above, and assuming no operator action: 1. How (if at all) is charging flow affected?
: 2. How (if at all) is the external leakage rate from the PRT affected?
A. Charging flow is stable PRT external leakage rate will increase B. Charging flow is stable PRT external leakage rate is stable C. Charging flow is increasing PRT external leakage rate is stable D. Charging flow is increasing PRT external leakage rate will increase Page 2 of 100 Question:
3 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a LOCA occurred.
Given the following conditions:
* The crew is in EP/1/A/5000/E-1 (Loss of Reactor or Secondary Coolant)
* The crew is in EP/1/A/5000/E-1 (Loss of Reactor or Secondary Coolant)
* NC pressure is 1200 psig and stable
* NC pressure is 1200 psig and stable
Line 68: Line 58:
* Pressurizer level is 18% and slowly increasing
* Pressurizer level is 18% and slowly increasing
* Total CA flow is 400 gpm and stable
* Total CA flow is 400 gpm and stable
* All S/G NR levels are approximately 21% and slowly increasing Can safety injection be terminated at this time and why or why not? A. Yes, safety injection termination criteria are met B. No, CA flow is too low C. No, NC subcooling is insufficient D. No, pressurizer level is too low Page 3 of 100 Question:
* All S/G NR levels are approximately 21% and slowly increasing Can safety injection be terminated at this time and why or why not?
3 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a LOCA occurred.
A.     Yes, safety injection termination criteria are met B.     No, CA flow is too low C.     No, NC subcooling is insufficient D.     No, pressurizer level is too low Page 3 of 100
Given the following conditions:
 
* The crew is in EP/1/A/5000/E-1 (Loss of Reactor or Secondary Coolant)
CATAWBA NUCLEAR STATION Question:        4 2009 SRO NRC Examination (1 point)
* NC pressure is 1200 psig and stable
Unit 1 was operating at 100% power when a LOGA LOCA occurred. Given the following conditions and sequence of events:
* Containment pressure peaked at 2.8 psig and is slowly decreasing
* EP/1/A15000/E-1 (Loss of Reactor or Secondary Coolant)
* NC subcooling is 2°F and stable
The crew is performing EP/1/A/5000/E-1
* Pressurizer level is 18% and slowly increasing
* 1A train and 18 train ECCS EGGS are RESET
* Total CA flow is 400 gpm and stable
* All S/G NR levels are approximately 21% and slowly increasing Can safety injection be terminated at this time and why or why not? A. Yes, safety injection termination criteria are met B. No, CA flow is too low C. No, NC subcooling is insufficient D. No, pressurizer level is too low Page 3 of 100 Question:
4 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a LOCA occurred.
Given the following conditions and sequence of events:
* The crew is performing EP/1/A15000/E-1 (Loss of Reactor or Secondary Coolant)
* 1A train and 18 train ECCS are RESET
* 1A DIG load sequencer is RESET
* 1A DIG load sequencer is RESET
* The crew can not reset 18 DIG load sequencer
* The crew can not reset 18 DIG load sequencer
* An NLO completes the local action(s) required due to the inability to reset 18 DIG load sequencer from the control room
* An NLO completes the local action(s) required due to the inability to reset 18 DIG load sequencer from the control room
* A complete loss of offsite power occurs
* A complete loss of offsite power occurs
* FWST level is 57% and decreasing Assuming no further operator action, which ECCS pumps are running 1 minute after the loss of offsite power? A. 1A NVonly B. 1A NV and 18 NVonly C. 1A NV, 1A NI and 1A ND only D. 1A NV, 18 NV, 18 NI and 18 ND Page 4 of 100 Question:
* FWST level is 57% and decreasing Assuming no further operator action, which ECCS EGGS pumps are running 1 minute after the loss of offsite power?
4 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a LOGA occurred.
A.       1A NVonly B.       1A NV and 18 NVonly C.
Given the following conditions and sequence of events:
G.      1A NV, 1A NI and 1A NOND only D.       1A NV, 18 NV, 18 NI and 18 NDNO Page 4 of 100
* The crew is performing EP/1/A/5000/E-1 (Loss of Reactor or Secondary Coolant)
 
* 1A train and 18 train EGGS are RESET
CATAWBA NUCLEAR STATION Question:        5 2009 SRO NRC Examination (1 point)
* 1A DIG load sequencer is RESET
Unit 1 is operating in Mode 3. Given the following temperatures on the 1A NCP at 0200 hrs:
* The crew can not reset 18 DIG load sequencer
* An NLO completes the local action(s) required due to the inability to reset 18 DIG load sequencer from the control room
* A complete loss of offsite power occurs
* FWST level is 57% and decreasing Assuming no further operator action, which EGGS pumps are running 1 minute after the loss of offsite power? A. 1A NVonly B. 1A NV and 18 NVonly G. 1A NV, 1A NI and 1A NO only D. 1A NV, 18 NV, 18 NI and 18 NO Page 4 of 100 Question:
5 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating in Mode 3. Given the following temperatures on the 1A NCP at 0200 hrs:
* Motor bearing temperature is 187.2°F
* Motor bearing temperature is 187.2°F
* Lower pump bearing temperature is 211.2°F * #1 seal outlet temperature is 223.2°F
* Lower pump bearing temperature is 211.2°F
* Motor stator winding temperature is 301 .2°F
        *   #1 seal outlet temperature is 223.2°F
* All temperatures are increasing at 1°F per minute What is the earliest time that the 1 A NCP must be secured per OP/1 IA/61501002A (Reactor Coolant Pump Operation)?
* Motor stator winding temperature is 301.2°F 301 .2°F
A. 0208 B. 0210 C. 0212 D. 0214 Page 5 of 100 Question:
* All temperatures are increasing at 1 of per minute 1°F What is the earliest time that the 1A NCP must be secured per OP/1 IA/61501002A (Reactor Coolant Pump Operation)?
5 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating in Mode 3. Given the following temperatures on the 1A NCP at 0200 hrs:
A.       0208 B.       0210 C.       0212 D.       0214 Page 5 of 100
* Motor bearing temperature is 187.2°F
 
* Lower pump bearing temperature is 211.2°F * #1 seal outlet temperature is 223.2°F
CATAWBA NUCLEAR STATION Question:        6 2009 SRO NRC Examination (1 point)
* Motor stator winding temperature is 301.2°F
Unit 1 is in Mode 5 preparing to enter Mode 6 after being shutdown 10 days ago. Given the following conditions and sequence of events:
* All temperatures are increasing at 1 of per minute What is the earliest time that the 1 A NCP must be secured per OP/1 IA/61501002A (Reactor Coolant Pump Operation)?
A. 0208 B. 0210 C. 0212 D. 0214 Page 5 of 100 Question:
6 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 5 preparing to enter Mode 6 after being shutdown 10 days ago. Given the following conditions and sequence of events:
* NC wide range level is 18% and stable
* NC wide range level is 18% and stable
* 1A ND loop is in service
* 1A ND NO loop is in service
* ND Pump A Discharge Temperature is 120°F and stable
* ND NO Pump A Discharge Temperature is 120°F and stable
* ND Hx A Outlet Temperature is 100°F and stable
* ND NO Hx A Outlet Temperature is 100°F and stable
* The 1A ND pump trips
* The 1A ND NO pump trips
* The 1 B ND pump can not be started Based on current conditions, what is the minimum time before core boiling occurs? Reference provided A. 31-32 minutes B. 36-37 minutes C. 47 -48 minutes D. 55-56 minutes Page 6 oflOO Question:
* The 1B ND NO pump can not be started Based on current conditions, what is the minimum time before core boiling occurs?
6 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 5 preparing to enter Mode 6 after being shutdown 10 days ago. Given the following conditions and sequence of events:
Reference provided A.       31-32 minutes B.       36-37 minutes C.       47 -48 minutes D.       55-56 minutes Page 6 oflOO of 100
* NC wide range level is 18% and stable
 
* 1A NO loop is in service
CATAWBA NUCLEAR STATION Question:      7 2009 SRO NRC Examination (1 point)
* NO Pump A Discharge Temperature is 120°F and stable
Unit 1 was operating at 100%. Given the following conditions and sequence of events:
* NO Hx A Outlet Temperature is 100°F and stable
* The 1A NO pump trips
* The 1 B NO pump can not be started Based on current conditions, what is the minimum time before core boiling occurs? Reference provided A. 31-32 minutes B. 36-37 minutes C. 47 -48 minutes D. 55-56 minutes Page 6 of 100 Question:
7 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100%. Given the following conditions and sequence of events:
* A S/G PORV opened momentarily and caused NC pressure to decrease to 2205 psig
* A S/G PORV opened momentarily and caused NC pressure to decrease to 2205 psig
* With NC pressure at 2207 psig, 1AD-2, FIg "DeS Altemate Action" actuates
* With NC pressure at 2207 psig, 1AD-2, FIg "DeS Alternate Altemate Action" actuates
* NC pressure is at 2250 psig and slowly increasing when the crew enters AP/1/A/55001011 (Pressurizer Pressure Anomalies), Case 2, Pressurizer Pressure Increasing Why will manual action be required to control Pzr pressure?
* NC pressure is at 2250 psig and slowly increasing when the crew enters AP/1/A/55001011 (Pressurizer Pressure Anomalies), Case 2, Pressurizer Pressure Increasing Why will manual action be required to control Pzr pressure?
A. All Pzr heaters are on B. To prevent lifting a Pzr PORV C. Automatic Pzr spray actuation only is blocked D. Automatic Pzr spray and automatic PORV actuation are blocked Page 7 of 100 Question:
A.     All Pzr heaters are on B.     To prevent lifting a Pzr PORV C.     Automatic Pzr spray actuation only is blocked D.     Automatic Pzr spray and automatic PORV actuation are blocked Page 7 of 100
7 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100%. Given the following conditions and sequence of events:
 
* A S/G PORV opened momentarily and caused NC pressure to decrease to 2205 psig
CATAWBA NUCLEAR STATION Question:       8 2009 SRO NRC Examination (1 point)
* With NC pressure at 2207 psig, 1AD-2, FIg "DeS Alternate Action" actuates
Unit 1 is operating at 100% power. The basis for manually inserting control rods during an A TWS event is to reduce reactor power to:
* NC pressure is at 2250 psig and slowly increasing when the crew enters AP/1/A/55001011 (Pressurizer Pressure Anomalies), Case 2, Pressurizer Pressure Increasing Why will manual action be required to control Pzr pressure?
A.       prevent exceeding rated thermal power limits defined in Technical S pecificatio pecifi catio ns B.       prevent rapid heatup of the NC system and potential overfill of the pressurizer C.       ensure the only heat being added to the NC system is from core decay heat and NC pump heat D.       ensure there is sufficient steam dump capacity to prevent opening the steam line code cod e safeties Page 8 of 100 oflOO
A. All Pzr heaters are on B. To prevent lifting a Pzr PORV C. Automatic Pzr spray actuation only is blocked D. Automatic Pzr spray and automatic PORV actuation are blocked Page 7 of 100 Question:
 
8 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. The basis for manually inserting control rods during an A TWS event is to reduce reactor power to: A. prevent exceeding rated thermal power limits defined in Technical S pecificatio ns B. prevent rapid heatup of the NC system and potential overfill of the pressurizer C. ensure the only heat being added to the NC system is from core decay heat and NC pump heat D. ensure there is sufficient steam dump capacity to prevent opening the steam line code safeties Page 8 oflOO Question:
CATAWBA NUCLEAR STATION Question:      9 2009 SRO NRC Examination (1 point)
8 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. The basis for manually inserting control rods during an A TWS event is to reduce reactor power to: A. prevent exceeding rated thermal power limits defined in Technical S pecifi catio ns B. prevent rapid heatup of the NC system and potential overfill of the pressurizer C. ensure the only heat being added to the NC system is from core decay heat and NC pump heat D. ensure there is sufficient steam dump capacity to prevent opening the steam line cod e safeties Page 8 of 100 Question:
Given the following:
9 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
* 1A CF pump is out of service for maintenance
* 1A CF pump is out of service for maintenance
* 1 B CF pump trips on low lube oil pressure
* 1B CF pump trips on low lube oil pressure
* The crew enters AP/11A155001006 (Loss of S/G Feedwater), Case I (Loss of CF Supply To S/Gs). What is the minimum power level which requires a manual reactor trip and what is the basis for manually tripping the reactor above that power level? A. 5%; to ensure CA can maintain adequate S/G levels B. 10%; to ensure CA can maintain adequate S/G levels C. 5%; to ensure an inadvertent mode change does not occur D. 10%; to ensure an inadvertent mode change does not occur Page 9 oflOO Question:
* The crew enters AP/11A155001006 AP/1/A/5500/006 (Loss of S/G Feedwater),
9 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
Feedwater). Case I (Loss of CF Supply To S/Gs).
* 1A CF pump is out of service for maintenance
What is the minimum power level which requires a manual reactor trip and what is the basis for manually tripping the reactor above that power level?
* 1 B CF pump trips on low lube oil pressure
A.     5%; to ensure CA can maintain adequate S/G levels B.     10%; to ensure CA can maintain adequate S/G levels C.     5%; to ensure an inadvertent mode change does not occur D.     10%; to ensure an inadvertent mode change does not occur Page 9 of 100 oflOO
* The crew enters AP/1/A/5500/006 (Loss of S/G Feedwater).
 
Case I (Loss of CF Supply To S/Gs). What is the minimum power level which requires a manual reactor trip and what is the basis for manually tripping the reactor above that power level? A. 5%; to ensure CA can maintain adequate S/G levels B. 10%; to ensure CA can maintain adequate S/G levels C. 5%; to ensure an inadvertent mode change does not occur D. 10%; to ensure an inadvertent mode change does not occur Page 9 of 100 Question:
CATAWBA NUCLEAR STATION Question:    10 2009 SRO NRC Examination (1 point)
10 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Regarding the actions of EP/1/A/5000/ECA 0.0 (Loss of All AC Power): 1. What is the basis for rapidly depressurizing intact S/Gs to 165 psig? 2. What is the basis for stopping the depressurization at 165 psig? A. 1. To enhance natural circulation until forced cooling can be restored 2. To prevent injecting N2 from the CLAs B. 1. To enhance natural circulation until forced cooling can be restored 2. To prevent voiding in the reactor vessel upper head C. 1. To reduce NC temperature and pressure to minimize NC system inventory loss 2. To prevent injecting N2 from the CLAs D. 1. To reduce NC temperature and pressure to minimize NC system inventory loss 2. To prevent voiding in the reactor vessel upper head Page 10 of 100 Question:
Regarding the actions of EP/1/A/5000/ECA 0.0 (Loss of All AC Power):
10 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Regarding the actions of EP/1/A/5000/ECA 0.0 (Loss of All AC Power): 1. What is the basis for rapidly depressurizing intact S/Gs to 165 psig? 2. What is the basis for stopping the depressurization at 165 psig? A. 1. To enhance natural circulation until forced cooling can be restored 2. To prevent injecting N2 from the CLAs B. 1. To enhance natural circulation until forced cooling can be restored 2. To prevent voiding in the reactor vessel upper head C. 1. To reduce NC temperature and pressure to minimize NC system inventory loss 2. To prevent injecting N2 from the CLAs D. 1. To reduce NC temperature and pressure to minimize NC system inventory loss 2. To prevent voiding in the reactor vessel upper head Page 10 of 100 Question:
: 1. What is the basis for rapidly depressurizing intact S/Gs to 165 psig?
11 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 75% power and Unit 2 is operating at 100% power when the following switchyard PCBs open:
: 2. What is the basis for stopping the depressurization at 165 psig?
A. 1. To enhance natural circulation until forced cooling can be restored
: 2. To prevent injecting N2 from the CLAs B. 1. To enhance natural circulation until forced cooling can be restored
: 2. To prevent voiding in the reactor vessel upper head C. 1. To reduce NC temperature and pressure to minimize NC system inventory loss
: 2. To prevent injecting N2 from the CLAs D. 1. To reduce NC temperature and pressure to minimize NC system inventory loss
: 2. To prevent voiding in the reactor vessel upper head Page 10 of 100
 
CATAWBA NUCLEAR STATION Question:      11 2009 SRO NRC Examination (1 point)
Unit 1 is operating at 75% power and Unit 2 is operating at 100% power when the following switchyard PCBs open:
* PCB 17
* PCB 17
* PCB 18
* PCB 18
* PCB 19 Which one of the following statements correctly describes the effect on Units 1 and 2? A. Unit 1 remains at 75% power and Unit 2 runs back to 48% power at 18% Imin B. Unit 1 runs back to 48% power at 18% Imin and Unit 2 remains at 100% power C. Unit 1 remains at 75% power and Unit 2 runs back to 23% power at 25% Imin D. Unit 1 runs back to 23% power at 25% Imin and Unit 2 remains at 100% power Page 11 of 100 Question:
* PCB 19 Which one of the following statements correctly describes the effect on Units 1 and 2?
11 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 75% power and Unit 2 is operating at 100% power when the following switchyard PCBs open:
A.       Unit 1 remains at 75% power and Unit 2 runs back to 48% power at 18% Imin B.       Unit 1 runs back to 48% power at 18% Imin and Unit 2 remains at 100% power C.       Unit 1 remains at 75% power and Unit 2 runs back to 23% power at 25% Imin D.       Unit 1 runs back to 23% power at 25% Imin and Unit 2 remains at 100% power Page 11 of 100
* PCB 17
 
* PCB 18
CATAWBA NUCLEAR STATION Question:      12 2009 SRO NRC Examination (1 point)
* PCB 19 Which one of the following statements correctly describes the effect on Units 1 and 2? A. Unit 1 remains at 75% power and Unit 2 runs back to 48% power at 18% Imin B. Unit 1 runs back to 48% power at 18% Imin and Unit 2 remains at 100% power C. Unit 1 remains at 75% power and Unit 2 runs back to 23% power at 25% Imin D. Unit 1 runs back to 23% power at 25% Imin and Unit 2 remains at 100% power Page 11 of 100 Question:
Unit 1 is operating at 30% power when 1ERPA de-energizes.
12 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 30% power when 1 ERPA de-energizes.
Based on the above conditions, which one of the following lists contains operations which would mlall require manual action? (Evaluate each condition separately)
Based on the above conditions, which one of the following lists contains operations which would ml require manual action? (Evaluate each condition separately)
: 1. 1A DIG start on a 1ETA blackout
: 1. 1A DIG start on a 1 ETA blackout 2. 1A DIG FD Day Tank makeup on low level 3. Swap RN to the pond on a Train A Emergency Lo Pit Level 4. Rod withdrawal on a -1.5°F combined error signal 5. Makeup to VCT A. 1 and 2 8. 3 and 4 C. 1,3, and 5 D. 2,4, and 5 Page 12 of 100 Question:
: 2. 1A DIG FD Day Tank makeup on low level
12 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 30% power when 1 ERPA de-energizes.
: 3. Swap RN to the pond on a Train A Emergency Lo Pit Level
Based on the above conditions, which one of the following lists contains operations which would all require manual action? (Evaluate each condition separately)
: 4. Rod withdrawal on a -1.5°F combined error signal
: 1. 1A DIG start on a 1 ETA blackout 2. 1A DIG FD Day Tank makeup on low level 3. Swap RN to the pond on a Train A Emergency Lo Pit Level 4. Rod withdrawal on a -1.5°F combined error signal 5. Makeup to VCT A. 1 and 2 B. 3 and 4 C. 1,3, and 5 D. 2,4, and 5 Page 12 of 100 Question:
: 5. Makeup to VCT A.       1 and 2 B.
13 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 NC system temperature is at 335°F and decreasing for a refueling outage. Given the following:
: 8.       3 and 4 C.       1,3, and 5 D.       2,4, and 5 Page 12 of 100
 
CATAWBA NUCLEAR STATION Question:      13 2009 SRO NRC Examination (1 point)
Unit 1 NC system temperature is at 335°F and decreasing for a refueling outage.
Given the following:
* Vital charger 1 ECC fails
* Vital charger 1 ECC fails
* 1EMXA is unavailable to power spare charger 1ECS 1. What other MCC can provide an alternate supply to 1 ECS? 2. Does OP/11A163501008 (125VDC/120VAC Vital Instrument and Control Power System) allow alignment of the alternate supply to 1 ECSAbased on current Unit 1 conditions?
* 1EMXA is unavailable to power spare charger 1ECS 1EMXA
,",0 TO IE-be.. A. 1. 1EMXC 2. Yes B. 1. 1EMXC 2. No C. 1. 1EMXJ 2. Yes D. 1. 1EMXJ 2. No Page 13 oflOO Question:
: 1. What other MCC can provide an alternate supply to 1ECS?
13 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 NC system temperature is at 335°F and decreasing for a refueling outage. Given the following:
: 2. Does OP/11A163501008 OP/1/Al6350/008 (125VDC/120VAC Vital Instrument and Control Power System) allow alignment of the alternate supply to 1 ECS"based ECSAbased on current Unit 1 conditions?
* Vital charger 1 ECC fails
                                                          ,",0 ~uf'PLy "10 ~1..t'PPt-'1 fl>vJE.e.
* 1 EMXA is unavailable to power spare charger 1ECS 1. What other MCC can provide an alternate supply to 1 ECS? 2. Does OP/1/Al6350/008 (125VDC/120VAC Vital Instrument and Control Power System) allow alignment of the alternate supply to 1 ECS"based on current Unit 1 conditions?  
                                                                            ~w£f'. TO IE-be..
"10 fl>vJE.e.
IEbe.
TO IEbe. A. 1. 1EMXC 2. Yes B. 1. 1EMXC 2. No C. 1. 1EMXJ 2. Yes D. 1. 1EMXJ 2. No Page 13 of 100 Question:
A.     1. 1EMXC
14 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Units 1 and 2 are operating at 100% power with RN pump 2A running. Given the following conditions and indications:
: 2. Yes B.     1. 1EMXC
: 2. No C.     1. 1EMXJ
: 2. Yes D.     1. 1EMXJ
: 2. No Page 13 of oflOO 100
 
CATAWBA NUCLEAR STATION Question:      14 2009 SRO NRC Examination (1 point)
Units 1 and 2 are operating at 100% power with RN pump 2A running. Given the following conditions and indications:
* An Emergency Lo Pit Level actuation occurs
* An Emergency Lo Pit Level actuation occurs
* The crew is performing A P/O/A/55 00102 0 (Loss of Nuclear Service Water), Case 2 (Loss of RN Pit Level)
* The crew is performing A P/O/A/55 00102 0 (Loss of Nuclear Service Water),
* During a board walkdown, the following are noted: o 1 RN-53B (Station RN Disch Hdr X-Over) is open o 1 RN-54A (Station RN Disch Hdr X-Over) is closed 1. Where is RN discharge flow from the DIGs directed based on current conditions?
Case 2 (Loss of RN Pit Level)
* During a board walkdown, the following are noted:
o 1RN-53B (Station RN Disch Hdr X-Over) is open o 1RN-54A (Station RN Disch Hdr X-Over) is closed
: 1. Where is RN discharge flow from the DIGs directed based on current conditions?
: 2. Which of the above RN valves must be realigned per AP/O/A/55001020?
: 2. Which of the above RN valves must be realigned per AP/O/A/55001020?
A. 1. Standby Nuclear Service Water Pond 2.
A.     1. Standby Nuclear Service Water Pond 1RN~53B
B. 1. RL discharge piping to Lake Wylie 2. 1RN-53B C. 1. Standby Nuclear Service Water Pond 2. 1RN-54A D. 1. RL discharge piping to Lake Wylie 2. 1RN-54A Page 14 of 100 Question:
: 2. 1RN-53B B.     1. RL discharge piping to Lake Wylie
14 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Units 1 and 2 are operating at 100% power with RN pump 2A running. Given the following conditions and indications:
: 2. 1RN-53B C.     1. Standby Nuclear Service Water Pond
* An Emergency Lo Pit Level actuation occurs
: 2. 1RN-54A D.     1. RL discharge piping to Lake Wylie
* The crew is performing A P/O/A/55 00102 0 (Loss of Nuclear Service Water), Case 2 (Loss of RN Pit Level)
: 2. 1RN-54A Page 14 of 100
* During a board walkdown, the following are noted: o 1 RN-53B (Station RN Disch Hdr X-Over) is open o 1 RN-54A (Station RN Disch Hdr X-Over) is closed 1. Where is RN discharge flow from the DIGs directed based on current conditions?
 
: 2. Which of the above RN valves must be realigned per AP/O/A/55001020?
CATAWBA NUCLEAR STATION Question:        15 2009 SRO NRC Examination (1 point)
A. 1. Standby Nuclear Service Water Pond 2. 1RN-53B B. 1. RL discharge piping to Lake Wylie 2. 1RN-53B C. 1. Standby Nuclear Service Water Pond 2. 1RN-54A D. 1. RL discharge piping to Lake Wylie 2. 1RN-54A Page 14 of 100 Question:
Unit 1 is in Mode 3. Given the following initial valves and positions/functions:
15 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3. Given the following initial valves and positionslfunctions:
positionslfunctions:
VALVE POSITIONIFUNCTION 1 NV-1A (NC Letdn to Regen Hx Isol) Open 1 CA-149 (S/G 1A CF 8yp To CA Nozzle) Open 1 NV-153A (Letdn Hx OUt 3-Way Vlv) "DEMIN" 1 RN-291 (1A KC HX Outlet Throttle) "MINIFLOW" The Instrument Air (VI) system completely depressurizes.
VALVE                         POSITION/FUNCTION POSITIONIFUNCTION 1NV-1A (NC Letdn to Regen Hx Isol)                         Open 1 CA-149 (S/G 1A CF Byp 8yp To CA Nozzle)                   Open 1 NV-153A (Letdn Hx OUt 3-Way Vlv)                       "DEMIN" 1 RN-291 (1A KC HX Outlet Throttle)                   "MINIFLOW" The Instrument Air (VI) system completely depressurizes.
When the VI system is re-pressurized, which one of the following valves will return to its initial position/function with no operator action? A. 1 NV-1A B. 1 CA-149 C. 1 NV-153A D. 1 RN-291 Page 15 of 100 Question:
When the VI system is re-pressurized, which one of the following valves will return to its initial position/function with no operator action?
15 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3. Given the following initial valves and positions/functions:
A.         1NV-1A B.         1CA-149 1CA-149 C.         1NV-153A D.         1 RN-291 Page 15 of 100
VALVE POSITION/FUNCTION 1 NV-1A (NC Letdn to Regen Hx Isol) Open 1 CA-149 (S/G 1A CF Byp To CA Nozzle) Open 1 NV-153A (Letdn Hx OUt 3-Way Vlv) "DEMIN" 1 RN-291 (1A KC HX Outlet Throttle) "MINIFLOW" The Instrument Air (VI) system completely depressurizes.
 
When the VI system is re-pressurized, which one of the following valves will return to its initial position/function with no operator action? A. 1 NV-1A B. 1CA-149 C. 1 NV-153A D. 1 RN-291 Page 15 of 100 Question:
CATAWBA NUCLEAR STATION Question:    16 2009 SRO NRC Examination (1 point)
16 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Which one of the following indications is used in EPI1/A/5000/ECA-1.2 (LOCA Outside Containment) to verify that a leak outside containment has been successfully isolated?
Which one of the following indications is used in EP/1/A/5000/ECA-1.2 EPI1/A/5000/ECA-1.2 (LOCA Outside Containment) to verify that a leak outside containment has been successfully isolated?
A. ND Pump discharge pressure increasing B. Pressurizer level increasing C. NDINS room sump levels decreasing D. Reactor coolant pressure increasing Page 16 of 100 Question:
A.     ND NO Pump discharge pressure increasing B.     Pressurizer level increasing C.     NDINS NO/NS room sump levels decreasing D.
16 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Which one of the following indications is used in EP/1/A/5000/ECA-1.2 (LOCA Outside Containment) to verify that a leak outside containment has been successfully isolated?
O.     Reactor coolant pressure increasing Page 16 of 100
A. NO Pump discharge pressure increasing B. Pressurizer level increasing C. NO/NS room sump levels decreasing O. Reactor coolant pressure increasing Page 16 of 100 Question:
 
17 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100%. Given the following conditions and sequence of events: Initial Conditions
CATAWBA NUCLEAR STATION Question:        17 2009 SRO NRC Examination (1 point)
Unit 1 is operating at 100%. Given the following conditions and sequence of events:
Initial Conditions
* The crew tripped the reactor due to a loss of all feedwater
* The crew tripped the reactor due to a loss of all feedwater
* EP/1/A/SOOOIE-O (Reactor Trip or Safety Injection) was completed
* EP/1/A/5000/E-O EP/1/A/SOOOIE-O (Reactor Trip or Safety Injection) was completed
* The crew was depressurizing the S/Gs to feed from the condensate booster pumps per EP/1/A/SOOO/FR-H.1 (Response to Loss of Secondary Heat Sink) Current Conditions
* The crew was depressurizing the S/Gs to feed from the condensate booster EP/1/A/SOOO/FR-H.1 (Response to Loss of Secondary Heat Sink) pumps per EP/1/A/5000/FR-H.1 Current Conditions
* Bleed and feed criteria have been met and the crew is establishing bleed and feed per EP/1/A/SOOO/FR-H.1
* Bleed and feed criteria have been met and the crew is establishing bleed and feed per EP/1/A/SOOO/FR-H.1 EP/1/A/5000/FR-H.1
: 1. Which cold leg accumulators provide backup motive force to open the PZR PORVs? 2. What is the function of the NC PORVs when establishing bleed and feed in EP/1/A/SOOO/FR-H.1
: 1. Which cold leg accumulators provide backup motive force to open the PZR PORVs?
? A. 1. A and B 2. To provide for adequate NC system heat removal until secondary heat sink can be restored B. 1. A and B 2. To depressurize the NC system to protect the S/G tubes from creep failure C. 1. C and D 2. To provide for adequate NC system heat removal until secondary heat sink can be restored D. 1. C and D 2. To depressurize the NC system to protect the S/G tubes from creep failure Page 17 oflOO Question:
: 2. What is the function of the NC PORVs when establishing bleed and feed in EP/1 /A/5000/FR-H.1 ?
17 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100%. Given the following conditions and sequence of events: Initial Conditions
EP/1/A/SOOO/FR-H.1 A.       1. A and B
* The crew tripped the reactor due to a loss of all feedwater
: 2. To provide for adequate NC system heat removal until secondary heat sink can be restored B.       1. A and B
* EP/1/A/5000/E-O (Reactor Trip or Safety Injection) was completed
: 2. To depressurize the NC system to protect the S/G tubes from creep failure C.       1. C and D
* The crew was depressurizing the S/Gs to feed from the condensate booster pumps per EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) Current Conditions
: 2. To provide for adequate NC system heat removal until secondary heat sink can be restored D.       1. C and D
* Bleed and feed criteria have been met and the crew is establishing bleed and feed per EP/1/A/5000/FR-H.1
: 2. To depressurize the NC system to protect the S/G tubes from creep failure Page 17 oflOO of 100
: 1. Which cold leg accumulators provide backup motive force to open the PZR PORVs? 2. What is the function of the NC PORVs when establishing bleed and feed in EP/1 /A/5000/FR-H.1  
 
? A. 1. A and B 2. To provide for adequate NC system heat removal until secondary heat sink can be restored B. 1. A and B 2. To depressurize the NC system to protect the S/G tubes from creep failure C. 1. C and D 2. To provide for adequate NC system heat removal until secondary heat sink can be restored D. 1. C and D 2. To depressurize the NC system to protect the S/G tubes from creep failure Page 17 of 100 Question:
CATAWBA NUCLEAR STATION Question:      18 2009 SRO NRC Examination (1 point)
18 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Given the following sequence of events: 0300 Reactor trip occurred due to a general warning 0320 Safety injection actuated due to a large break LOCA 0322 1 B N I pump trips due to a faulty breaker 0350 Loss of emergency coolant recirculation occurred and the crew entered EP/1/A/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation) 0351 NV and NI pump status are determined as follows:
Unit 1 was operating at 100% power. Given the following sequence of events:
0300   Reactor trip occurred due to a general warning 0320   Safety injection actuated due to a large break LOCA 0322   1B NI N I pump trips due to a faulty breaker 0350   Loss of emergency coolant recirculation occurred and the crew entered EP/1/A/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation) 0351 NV and NI pump status are determined as follows:
* 1A NV pump flow is 180 gpm and stable
* 1A NV pump flow is 180 gpm and stable
* 1 B NV pump flow is 170 gpm and stable
* 1 B NV pump flow is 170 gpm and stable
* 1 A NI pump flow is 340 gpm and stable
* 1A NI pump flow is 340 gpm and stable
* 1 B NI pump is tagged out 0420 The crew is performing step 19b RNO of EP/1/A15000IECA-1.1 to establish the appropriate safety injection flow per Enclosure 5 When the actions required per Step 19b RNO are complete, which ECCS pump(s) are in service? Reference provided A. 1A NI pump B. 1A NV pump and 1B NV pump C. 1A NV pump and 1A NI pump D. 1 B NV pump and 1A NI pump Page 18 of 100 Question:
* 1 B NI pump is tagged out 0420 The crew is performing step 19b RNO of EP/1/A15000IECA-1.1 EP/11A15000IECA-1.1 to establish the appropriate safety injection flow per Enclosure 5 When the actions required per Step 19b RNO are complete, which ECCS pump(s) are seNice?
18 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Given the following sequence of events: 0300 Reactor trip occurred due to a general warning 0320 Safety injection actuated due to a large break LOCA 0322 1 B NI pump trips due to a faulty breaker 0350 Loss of emergency coolant recirculation occurred and the crew entered EP/1/A/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation) 0351 NV and NI pump status are determined as follows:
in service?
* 1A NV pump flow is 180 gpm and stable
Reference provided A.       1A NI pump B.       1A NV pump and 1B NV pump C.       1A NV pump and 1A NI pump D.       1B NV pump and 1A NI pump Page 18 of 100
* 1 B NV pump flow is 170 gpm and stable
 
* 1 A NI pump flow is 340 gpm and stable
CATAWBA NUCLEAR STATION Question:      19 2009 SRO NRC Examination (1 point)
* 1 B NI pump is tagged out 0420 The crew is performing step 19b RNO of EP/11A15000IECA-1.1 to establish the appropriate safety injection flow per Enclosure 5 When the actions required per Step 19b RNO are complete, which ECCS pump(s) are in seNice? Reference provided A. 1A NI pump B. 1A NV pump and 1B NV pump C. 1A NV pump and 1A NI pump D. 1 B NV pump and 1A NI pump Page 18 of 100 Question:
Unit 1 is operating at 100% power. Given the following:
19 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
* While performing the RCCA movement test, control rod H-8 slips into the core to 200 steps withdrawn
* While performing the RCCA movement test, control rod H-8 slips into the core to 200 steps withdrawn
* All other Bank D control rods are at 216 steps withdrawn as indicated on DRPI and step demand counters
* All other Bank D control rods are at 216 steps withdrawn as indicated on DRPI and step demand counters
* The crew is performing AP/11A155001014 (Control Rod Misalignment) and currently referring to OP/11A161501008 (Rod Control) 1. What is the maximum time allowed to restore rod H-8 to within limits per Technical Specification 3.1.4 (Rod Group Alignment Limits)? 2. Which control rod lift coil(s) will be disconnected per OP/11A161501008 (Rod Control), when initially attempting to recover control rod H-B? A. 1. 30 minutes 2. Rod H-B B. 1. 30 minutes 2. All rods in the affected bank except H-8 C. 1. 1 hour 2. Rod H-B D. 1. 1 hour 2. All rods in the affected bank except H-8 Page 19 of 100 Question:
* The crew is performing AP/1/A/55001014 AP/11A155001014 (Control Rod Misalignment) and currently referring to OP/11A161501008 OP/1/A/6150/o08 (Rod Control)
19 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
: 1. What is the maximum time allowed to restore rod H-8 to within limits per Technical Specification 3.1.4 (Rod Group Alignment Limits)?
* While performing the RCCA movement test, control rod H-8 slips into the core to 200 steps withdrawn
: 2. Which control rod lift coil(s) will be disconnected per OP/11A161501008 OP/1/A/61501008 (Rod Control), when initially attempting to recover control rod H-8?
* All other Bank D control rods are at 216 steps withdrawn as indicated on DRPI and step demand counters
H-B?
* The crew is performing AP/1/A/55001014 (Control Rod Misalignment) and currently referring to OP/1/A/6150/o08 (Rod Control) 1. What is the maximum time allowed to restore rod H-8 to within limits per Technical Specification 3.1.4 (Rod Group Alignment Limits)? 2. Which control rod lift coil(s) will be disconnected per OP/1/A/61501008 (Rod Control), when initially attempting to recover control rod H-8? A. 1. 30 minutes 2. Rod H-8 B. 1. 30 minutes 2. All rods in the affected bank except H-8 C. 1. 1 hour 2. Rod H-8 D. 1. 1 hour 2. All rods in the affected bank except H-8 Page 19 of 100 Question:
A.       1. 30 minutes
20 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is increasing power when the following OAC indications are noted: OAC reading N-35 -3 .12E-5 amps N-36 -2.7 5E-6 amps N-41-11.3%
: 2. Rod H-8 H-B B.       1. 30 minutes
N-42 -11.2% N-43 -0.0% N-44 -10.8% Point Color GREEN GREEN BLUE GREEN MAGENTA GREEN 1. Which intermediate range instrument is reading correctly?
: 2. All rods in the affected bank except H-8 C.       1. 1 hour
: 2. What does the BLUE color of the OAC pointfor N-41 indicate?
: 2. Rod H-8 H-B D.       1. 1 hour
A. 1. N-35 2. The OAC point quality is "suspect" B. 1. N-35 2. The OAC point quality is "bad" C. 1. N-36 2. The OAC point quality is "suspect" D. 1. N-36 2. The OAC point quality is "bad" Page 20 of 100 Question:
: 2. All rods in the affected bank except H-8 Page 19 of 100
20 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is increasing power \Nhen the following OAC indications are noted: OAC reading N-35 -3 .12E-5 amps N-36 -2.75E-6 amps N-41 -11.3% N-42 -11.2% N-43 -0.0% N-44 -10.8% Point Color GREEN GREEN BLUE GREEN MAGENTA GREEN 1. Which intermediate range instrument is reading correctly?
 
: 2. What does the BLUE color of the OAC point for N-41 indicate?
CATAWBA NUCLEAR STATION Question:      20 2009 SRO NRC Examination (1 point)
A. 1. N-35 2. The OAC point quality is "suspect" B. 1. N-35 2. The OAC point quality is "bad" C. 1. N-36 2. The OAC point quality is "suspect" D. 1. N-36 2. The OAC point quality is "bad" Page 20 of 100 Question:
Unit 1 is increasing power when
21 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 50% power. Given the following:
                                \Nhen the following OAC indications are noted:
* A steam generator tube leak occurred on 1 A S/G
OAC reading                 Point Color N 3 .12E-5 amps           GREEN N 2.75E-6 2.7 5E-6 amps           GREEN N-41 -11.3%
* The crew depressurized the NC system per AP/1 IAl550010 1 0 (Reactor Coolant Leak), Case I (Steam Generator Tube Leak)
N-41-11.3%                       BLUE N-42 -11.2%                     GREEN N-43 -0.0%                     MAGENTA N-44 -10.8%                     GREEN
: 1. Which intermediate range instrument is reading correctly?
point for N-41 indicate?
: 2. What does the BLUE color of the OAC pointfor A.       1. N-35
: 2. The OAC point quality is "suspect" B.       1. N-35
: 2. The OAC point quality is "bad" C.       1. N-36
: 2. The OAC point quality is "suspect" D.       1. N-36
: 2. The OAC point quality is "bad" Page 20 of 100
 
CATAWBA NUCLEAR STATION Question:      21 2009 SRO NRC Examination (1 point)
Unit 1 was operating at 50% power. Given the following:
* A steam generator tube leak occurred on 1A S/G AP/1/A/5500101
* The crew depressurized the NC system per AP/1 IAl550010 10 (Reactor Coolant Leak), Case I (Steam Generator Tube Leak)
* Both ICC monitors are unavailable
* Both ICC monitors are unavailable
* Current NC pressure is 665 psig
* Current NC pressure is 665 psig
* Core exit thermocouple temperatures are 488°F
* Core exit thermocouple temperatures are 488°F
* T-Colds are 487.7°F 1. Based on current conditions, what subcooling value would the ICC monitors be reading if they were available?
* T-Colds are 487.rF 487.7°F
: 1. Based on current conditions, what subcooling value would the ICC monitors be reading if they were available?
: 2. Based on current conditions, what is steam header pressure?
: 2. Based on current conditions, what is steam header pressure?
A. 1. -8°F 2. 608 psig B. 1. -8 OF 2. 593 psig C. 1. +12° F 2. 608 psig D. 1. +12°F 2. 593 psig Reference provided Page 21 of 100 Question:
Reference provided A.         -8 ° F
21 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 50% power. Given the following:
: 1. -8°F
* A steam generator tube leak occurred on 1 A S/G
: 2. 608 psig B.       1. -8 OF of
* The crew depressurized the NC system per AP/1/A/5500101 0 (Reactor Coolant Leak), Case I (Steam Generator Tube Leak)
: 2. 593 psig C.       1. +12° F
* Both ICC monitors are unavailable
: 2. 608 psig D.       1. +12°F
* Current NC pressure is 665 psig
                +12° F
* Core exit thermocouple temperatures are 488°F
: 2. 593 psig Page 21 of 100
* T-Colds are 487.rF 1. Based on current conditions, what subcooling value would the ICC monitors be reading if they were available?
 
: 2. Based on current conditions, what is steam header pressure?
CATAWBA NUCLEAR STATION Question:      22 2009 SRO NRC Examination (1 point)
A. 1. -8 ° F 2. 608 psig B. 1. -8 of 2. 593 psig C. 1. +12° F 2. 608 psig D. 1. +12° F 2. 593 psig Reference provided Page 21 of 100 Question:
The Spent Fuel Pool Ventilation (VF) system is operating in unfiltered mode when a recycle paper bin near the Spent Fuel Pool truck bay doors catches fire and smoke is drawn into the VF system supply ductwork.
22 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination The Spent Fuel Pool Ventilation (VF) system is operating in unfiltered mode when a recycle paper bin near the Spent Fuel Pool truck bay doors catches fire and smoke is drawn into the VF system supply ductwork.
: 1. What affect will this condition have on the operation of the VF system?
: 1. What affect will this condition have on the operation of the VF system? 2. How is this fire classified?
: 2. How is this fire classified?
A. 1. The VF Supply fan trips only 2. ClassA B. 1. The VF Supply fan trips only 2. Class B C. 1. The VF Supply fan trips and the VF Filtered Exhaust fans will swap to filter mode 2. Class A D. 1. The VF Supply fan trips and the VF Filtered Exhaust fans will swap to filter mode 2. Class B Page 22 of 100 Question:
A.       1. The VF Supply fan trips only
22 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination The Spent Fuel Pool Ventilation (VF) system is operating in unfiltered mode when a recycle paper bin near the Spent Fuel Pool truck bay doors catches fire and smoke is drawn into the VF system supply ductwork.
: 2. ClassA Class A B.       1. The VF Supply fan trips only
: 1. What affect will this condition have on the operation of the VF system? 2. How is this fire classified?
: 2. Class B C.       1. The VF Supply fan trips and the VF Filtered Exhaust fans will swap to filter mode
A. 1. The VF Supply fan trips only 2. Class A B. 1. The VF Supply fan trips only 2. Class B C. 1. The VF Supply fan trips and the VF Filtered Exhaust fans will swap to filter mode 2. Class A D. 1. The VF Supply fan trips and the VF Filtered Exhaust fans will swap to filter mode 2. Class B Page 22 of 100 Question:
: 2. Class A D.       1. The VF Supply fan trips and the VF Filtered Exhaust fans will swap to filter mode
23 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
: 2. Class B Page 22 of 100
 
CATAWBA NUCLEAR STATION Question:      23 2009 SRO NRC Examination (1 point)
Unit 1 is operating at 100% power. Given the following:
* A small break LOCA occurs
* A small break LOCA occurs
* The crew is performing EP/1/A15000/ES-1.2 (Post LOCA Cooldown and Dep ress urization)
* The crew is performing EP/1/A/SOOO/ES-1.2 EP/1/A15000/ES-1.2 (Post LOCA Cooldown and Dep ress urization)
* All NC pumps are secured 1. What is the NC cooldown rate specified in this procedure?
* All NC pumps are secured
: 1. What is the NC cooldown rate specified in this procedure?
: 2. Which method is the first choice for the NC system depressurization for the given conditions?
: 2. Which method is the first choice for the NC system depressurization for the given conditions?
A. 1. As close as possible without exceeding 100°F in an hour 2. NV auxiliary spray B. 1. At the maximum rate 2. NV auxiliary spray C. 1. As close as possible without exceeding 100°F in an hour 2. NC PORV D. 1. At the maximum rate 2. NC PORV Page 23 of 100 Question:
A.     1. As close as possible without exceeding 100°F in an hour
23 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
: 2. NV auxiliary spray B.     1. At the maximum rate
* A small break LOCA occurs
: 2. NV auxiliary spray C.     1. As close as possible without exceeding 100°F in an hour
* The crew is performing EP/1/A/SOOO/ES-1.2 (Post LOCA Cooldown and Dep ress urization)
: 2. NC PORV D.     1. At the maximum rate
* All NC pumps are secured 1. What is the NC cooldown rate specified in this procedure?
: 2. NC PORV Page 23 of 100
: 2. Which method is the first choice for the NC system depressurization for the given conditions?
 
A. 1. As close as possible without exceeding 100°F in an hour 2. NV auxiliary spray B. 1. At the maximum rate 2. NV auxiliary spray C. 1. As close as possible without exceeding 100°F in an hour 2. NC PORV D. 1. At the maximum rate 2. NC PORV Page 23 of 100 Question:
CATAWBA NUCLEAR STATION Question:      24 2009 SRO NRC Examination (1 point)
24 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Given the following:
Unit 1 was operating at 100% power. Given the following:
* A large steam line break occurred 20 minutes ago
* A large steam line break occurred 20 minutes ago
* All MSIVs fail to close by any means
* All MSIVs fail to close by any means
Line 272: Line 283:
* NC pressure is 520 psig and slowly increasing
* NC pressure is 520 psig and slowly increasing
* The crew has completed EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)
* The crew has completed EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)
: 1. Based on current conditions, which procedure will the crew transition to when EP/1/A/5000/E-0 is exited? 2. At what point during this steam line break accident is the reactor vessel most susceptible to failure and why? A. 1. EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock) 2. During the initial cooldown because total stress on the inner wall of the vessel is higher at this time B. 1. EP/1/A/5000/E-2 (Faulted Steam Generator Isolation)
: 1. Based on current conditions, which procedure will the crew transition to when EP/1/A/5000/E-0 is exited?
: 2. During the initial cooldown because total stress on the inner wall of the vessel is higher at this time C. 1. EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock) 2. During the subsequent heatup after the S/Gs depressurize because total stress on the outer wall of the vessel is higher at this time D. 1. EP/1/A/5000/E-2 (Faulted Steam Generator Isolation)
: 2. At what point during this steam line break accident is the reactor vessel most susceptible to failure and why?
: 2. During the subsequent heatup after the S/Gs depressurize because total stress on the outer wall of the vessel is higher at this time Page 24 of 100 Question:
A.     1. EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock)
24 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Given the following:
: 2. During the initial cooldown because total stress on the inner wall of the vessel is higher at this time B.         EP/1 IA/5000/E-2 (Faulted Steam Generator Isolation)
* A large steam line break occurred 20 minutes ago
: 1. EP/1/A/5000/E-2
* All MSIVs fail to close by any means
: 2. During the initial cooldown because total stress on the inner wall of the vessel is higher at this time C.     1. EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock)
* NC cold leg temperatures are 248°F and slowly decreasing
: 2. During the subsequent heatup after the S/Gs depressurize because total stress on the outer wall of the vessel is higher at this time D.     1. EP/1/A/5000/E-2 (Faulted Steam Generator Isolation)
* NC pressure is 520 psig and slowly increasing
: 2. During the subsequent heatup after the S/Gs depressurize because total stress on the outer wall of the vessel is higher at this time Page 24 of 100
* The crew has completed EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)
 
: 1. Based on current conditions, which procedure will the crew transition to when EP/1/A/5000/E-0 is exited? 2. At what point during this steam line break accident is the reactor vessel most susceptible to failure and why? A. 1. EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock) 2. During the initial cooldown because total stress on the inner wall of the vessel is higher at this time B. 1. EP/1 IA/5000/E-2 (Faulted Steam Generator Isolation)
CATAWBA NUCLEAR STATION Question:      25 2009 SRO NRC Examination (1 point)
: 2. During the initial cooldown because total stress on the inner wall of the vessel is higher at this time C. 1. EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock) 2. During the subsequent heatup after the S/Gs depressurize because total stress on the outer wall of the vessel is higher at this time D. 1. EP/1/A/5000/E-2 (Faulted Steam Generator Isolation)
Given the following:
: 2. During the subsequent heatup after the S/Gs depressurize because total stress on the outer wall of the vessel is higher at this time Page 24 of 100 Question:
25 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
* 1A S/G pressure is 1212 psig and increasing
* 1A S/G pressure is 1212 psig and increasing
* 1A S/G level is approximately 18% N/R level and stable
* 1A S/G level is approximately 18% N/R level and stable
* The crew is performing EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities)
* The crew is performing EP/1/A/5000/FR-HA EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities)
* Operators have been dispatched to manually operate the 1 A S/G PORV 1. Howwill1A S/G indicated level initially respond when the PORV is opened? 2. What is the reason for this response? . A. 1. Indicated level will initially decrease 2. Increased voiding in the S/G downcomer region B. 1. Indicated level will initially increase 2. Increased voiding in the S/G downcomer region C. 1. Indicated level will initially decrease 2. Increased voiding in the S/G tube bundle area D. 1. Indicated level will initially increase 2. Increased voiding in the S/G tube bundle area Page 25 of 100 Question:
* Operators have been dispatched to manually operate the 1A 1A S/G PORV How will1A S/G indicated level initially respond when the PORV is opened?
25 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
: 1. Howwill1A
* 1A S/G pressure is 1212 psig and increasing
: 2. What is the reason for this response?           .
* 1A S/G level is approximately 18% N/R level and stable
A.       1. Indicated level will initially decrease
* The crew is performing EP/1/A/5000/FR-HA (Response to Loss of Normal Steam Release Capabilities)
: 2. Increased voiding in the S/G downcomer region B.       1. Indicated level will initially increase
* Operators have been dispatched to manually operate the 1A S/G PORV 1. How will1A S/G indicated level initially respond when the PORV is opened? 2. What is the reason for this response?
: 2. Increased voiding in the S/G downcomer region C.       1. Indicated level will initially decrease
A. 1. Indicated level will initially decrease 2. Increased voiding in the S/G downcomer region B. 1. Indicated level will initially increase 2. Increased voiding in the S/G downcomer region C. 1. Indicated level will initially decrease 2. Increased voiding in the S/G tube bundle area D. 1. Indicated level will initially increase 2. Increased voiding in the S/G tube bundle area Page 25 of 100 Question:
: 2. Increased voiding in the S/G tube bundle area D.       1. Indicated level will initially increase
26 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
: 2. Increased voiding in the S/G tube bundle area Page 25 of 100
 
CATAWBA NUCLEAR STATION Question:      26 2009 SRO NRC Examination (1 point)
Unit 1 is operating at 100% power. Given the following:
* A main steam line ruptures in containment
* A main steam line ruptures in containment
* NC Tcold temperatures are 278°F and slowly decreasing
* NC Tcold temperatures are 278°F and slowly decreasing
Line 302: Line 314:
* All S/G NR levels are offscale low
* All S/G NR levels are offscale low
* CA flow is 640 gpm
* CA flow is 640 gpm
* The crew is preparing to exit EPI1/A/5000/E-0 (Reactor Trip or Safety Injection)
* The crew is preparing to exit EPI1/A/5000/E-0 EP/1/A/SOOO/E-0 (Reactor Trip or Safety Injection)
Which one of the following procedures is the crew required to enter next? A. EP/1/A15000/E-2 (Faulted Steam Generator Isolation)
Which one of the following procedures is the crew required to enter next?
B. EP/1/A15000/FR-H.1 (Response to Loss of Secondary Heat Sink) C. EP/1/A15000/FR-P.2 (Response to Anticipated Pressurized Thermal Shock Condition)
A.       EP/1/A15000/E-2 EP/11A1S000/E-2 (Faulted Steam Generator Isolation)
D. EP/1/A1S000/FR-Z.1 (Response to High Containment Pressure)
B.       EP/11A1S000/FR-H.1 (Response to Loss of Secondary Heat Sink)
Page 26 of 100 Question:
EP/1/A15000/FR-H.1 C.       EP/1/A15000/FR-P.2 (Response to Anticipated Pressurized EP/11A1S000/FR-P.2 Thermal Shock Condition)
26 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
D.       EP/11A1S000/FR-Z.1 (Response to High Containment Pressure)
* A main steam line ruptures in containment
EP/1/A1S000/FR-Z.1 Page 26 of 100
* NC Tcold temperatures are 278°F and slowly decreasing
 
* Containment pressure is 3.2 psig and increasing
CATAWBA NUCLEAR STATION Question:      27 2009 SRO NRC Examination (1 point)
* No NS pump flow is indicated
Unit 1 is operating at 100% power. Given the following:
* All S/G NR levels are offscale low
* CA flow is 640 gpm
* The crew is preparing to exit EP/1/A/SOOO/E-0 (Reactor Trip or Safety Injection)
Which one of the following procedures is the crew required to enter next? A. EP/11A1S000/E-2 (Faulted Steam Generator Isolation)
B. EP/11A1S000/FR-H.1 (Response to Loss of Secondary Heat Sink) C. EP/11A1S000/FR-P.2 (Response to Anticipated Pressurized Thermal Shock Condition)
D. EP/11A1S000/FR-Z.1 (Response to High Containment Pressure)
Page 26 of 100 Question:
27 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
* At 1100 a large break LOCA occurs
* At 1100 a large break LOCA occurs
* At 1215, when the crew is in EP/1/A/5000/E-1 (Loss of Reactor or Secondary Coolant), waiting for the time to swap to hot leg recirc, containment sump level is 13 feet and slowly increasing
* At 1215, when the crew is in EP/1/A/5000/E-1 (Loss of Reactor or Secondary Coolant), waiting for the time to swap to hot leg recirc, containment sump level is 13 feet and slowly increasing
: 1. If containment sump level is increasing at a constant rate of 0.25 feet per minute, at what time is entry into EP/1/A/5000/FR-Z.2 (Response to Containment Flooding) required?
: 1. If containment sump level is increasing at a constant rate of 0.25 feet per minute, at what time is entry into EP/1/A/5000/FR-Z.2 (Response to Containment Flooding) required?
: 2. What signal closes valves inside containment that are not qualified for submergence?
: 2. What signal closes valves inside containment that are not qualified for submergence?
A. 1. 1225 2. St B. 1. 1245 2. St C. 1. 1225 2. Sp D. 1. 1245 2. Sp Page 27 of 100 Question:
A.       1. 1225
27 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
: 2. St B.       1. 1245
* At 1100 a large break LOCA occurs
: 2. St C.       1. 1225
* At 1215, when the crew is in EP/1/A/5000/E-1 (Loss of Reactor or Secondary Coolant), waiting for the time to swap to hot leg recirc, containment sump level is 13 feet and slowly increasing
: 2. Sp D.       1. 1245
: 1. If containment sump level is increasing at a constant rate of 0.25 feet per minute, at what time is entry into EP/1/A/5000/FR-Z.2 (Response to Containment Flooding) required?
: 2. Sp Page 27 of 100
: 2. What signal closes valves inside containment that are not qualified for submergence?
 
A. 1. 1225 2. St B. 1. 1245 2. St C. 1. 1225 2. Sp D. 1. 1245 2. Sp Page 27 of 100 Question:
CATAWBA NUCLEAR STATION Question:   28 2009 SRO NRC Examination (1 point)
28 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Regarding the reactor coolant pump motor stator: 1. What system provides cooling water? 2. What signal will isolate that cooling water source? A. 1. KG 2. PhaseA B. 1. KG 2. Phase B G. 1. YV 2. PhaseA D. 1. YV 2. Phase B Page 28 of 100 Question:
Regarding the reactor coolant pump motor stator:
28 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Regarding the reactor coolant pump motor stator: 1. What system provides cooling water? 2. What signal will isolate that cooling water source? A. 1. KG 2. PhaseA B. 1. KG 2. Phase B G. 1. YV 2. PhaseA D. 1. YV 2. Phase B Pa.ge 28 of 100 Question:
: 1. What system provides cooling water?
29 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was decreasing power from 100%. Given the following:
: 2. What signal will isolate that cooling water source?
A. 1. KG
: 2. PhaseA B. 1. KG
: 2. Phase B G. 1. YV
: 2. PhaseA D. 1. YV
: 2. Phase B Pa.ge Page 28 of 100
 
CATAWBA NUCLEAR STATION Question:      29 2009 SRO NRC Examination (1 point)
Unit 1 was decreasing power from 100%. Given the following:
* Pressurizer level was 53%
* Pressurizer level was 53%
* Reactor power was 85%
* Reactor power was 85%
* The power decrease was halted when the crew noted that 1 NV-294 (NV Pumps A & B Disch Flow Ctrl) was not maintaining pressurizer level at program level
* The power decrease was halted when the crew noted that 1NV-294 (NV Pumps A & B Disch Flow Ctrl) was not maintaining pressurizer level at program level
* 1 NV-294 was placed in manual and adjusted to restore pressurizer level to program level 1. When the crew discovered 1 NV-294 was not maintaining program level, how did actual level compare to program level? 2. When 1 NV-294 is repaired, what operator action(s) will be required to restore automatic pressurizer level control? A. 1. Actual level was lower than program level 2. Place 1 NV-294 in automatic only B. 1. Actual level was lower than program level 2. Place 1 NV-294 in automatic and restore the Pressurizer Level Master to automatic using the DCS soft controls C. 1. Actual level was higher than program level 2. Place 1 NV-294 in automatic only D. 1. Actual level was higher than program level 2. Place 1 NV-294 in automatic and restore the Pressurizer Level Master to automatic using the DCS soft controls Page 29 of 100 Question:
* 1NV-294 was placed in manual and adjusted to restore pressurizer level to program prog ra m level
29 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was decreasing power from 100%. Given the following:
: 1. When the crew discovered 1NV-294 was not maintaining program level, how did actual level compare to program level?
* Pressurizer level was 53%
: 2. When 1 NV-294 is repaired, what operator action(s) will be required to restore automatic pressurizer level control?
* Reactor power was 85%
A.       1. Actual level was lower than program level
* The power decrease was halted when the crew noted that 1 NV-294 (NV Pumps A & B Disch Flow Ctrl) was not maintaining pressurizer level at program level
: 2. Place 1NV-294 in automatic only B.       1. Actual level was lower than program level
* 1 NV-294 was placed in manual and adjusted to restore pressurizer level to prog ra m level 1. When the crew discovered 1 NV-294 was not maintaining program level, how did actual level compare to program level? 2. When 1 NV-294 is repaired, what operator action(s) will be required to restore automatic pressurizer level control? A. 1. Actual level was lower than program level 2. Place 1 NV-294 in automatic only B. 1. Actual level was lower than program level 2. Place 1 NV-294 in automatic and restore the Pressurizer Level Master to automatic using the DCS soft controls C. 1. Actual level was higher than program level 2. Place 1 NV-294 in automatic only D. 1. Actual level was higher than program level 2. Place 1 NV-294 in automatic and restore the Pressurizer Level Master to automatic using the DCS soft controls Page 29 of 100 Question:
: 2. Place 1NV-294 in automatic and restore the Pressurizer Level Master to automatic using the DCS soft controls C.       1. Actual level was higher than program level
30 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. For current conditions, what is the normal position of 1ND-33 (NO Sys Rtn To FWST) and how is this position administratively controlled?
: 2. Place 1NV-294 in automatic only D.       1. Actual level was higher than program level
A. Closed; white tagged in position B. Closed; locked in position C. Open; white tagged in position D. Open; locked in position Page 30 of 100 Question:
: 2. Place 1NV-294 in automatic and restore the Pressurizer Level Master to automatic using the DCS soft controls Page 29 of 100
30 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. For current conditions, what is the normal position of 1NO-33 (NO Sys Rtn To FWST) and how is this position administratively controlled?
 
A. Closed; white tagged in position B. Closed; locked in position C. Open; white tagged in position O. Open; locked in position Page 30 of 100 Question:
CATAWBA NUCLEAR STATION Question:      30 2009 SRO NRC Examination (1 point)
31 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power when a large break LOCA occurs.
Unit 1 is operating at 100% power.
* The crew has just transitioned to EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) and no manual actions have been taken 1. Based on the above conditions, which ECCS pump(s) are currently taking suction from the containment sump? 2. If NO is required to be aligned for hot recirculation, to which NC hot legs will NO inject? A. 1. NO pumps only 2. Band C NC hot legs only B. 1. NO pumps only 2. All 4 hot legs C. 1. NV pumps, NI pumps, NO pumps 2. Band C NC hot legs only O. 1. NV pumps, NI pumps, NO pumps 2. All 4 hot legs Page 31 oflOO Question:
1NO-33 (NO Sys Rtn To FWST)
31 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power when a large break LOCA occurs.
For current conditions, what is the normal position of 1ND-33 and how is this position administratively controlled?
* The crew has just transitioned to EP/1 /A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) and no manual actions have been taken 1. Based on the above conditions, which ECCS pump(s) are currently taking suction from the containment sump? 2. If NO is required to be aligned for hot kill recirculation, to which NC hot legs will NO inject? A. 1. NO pumps only 2. Band C NC hot legs only B. 1. NO pumps only 2. All 4 hot legs C. 1. NV pumps, NI pumps, NO pumps 2. Band C NC hot legs only O. 1. NV pumps, NI pumps, NO pumps 2. All 4 hot legs Page 31 of 100 Question:
A.       Closed; white tagged in position B.       Closed; locked in position C.       Open; white tagged in position D.
32 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when it experienced a steam line break accident resulting in a safety injection and the crew has entered EP/1/A15000/E-O (Reactor Trip or Safety Injection).
O.       Open; locked in position Page 30 of 100
Which one of the following completes the statement below? Per Enclosure 1 of EP/1/A/5000/E-0, when NC pressure decreases to less than ___ the crew will close 1 NV-202B and 1 NV-203A (NV Pumps A&B Recirc lsol) and when NC pressure increases to greater than the crew will re-open these valves. Closed Re-opened A. 1500 psig 2000 psig B. 1500 psig 1955 psig C. 1620 psig 2000 psig D. 1620 psig 1955 psig Page 32 of 100 Question:
 
32 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when it experienced a steam line break accident resulting in a safety injection and the crew has entered EP/11A15000/E-O (Reactor Trip or Safety Injection).
CATAWBA NUCLEAR STATION Question:      31 2009 SRO NRC Examination (1 point)
Which one of the following completes the statement below? Per Enclosure 1 of EP/1/A/5000/E-0, when NC pressure decreases to less than ___ the crew will close 1 NV-202B and 1 NV-203A (NV Pumps A&B Recirc lsol) and when NC pressure increases to greater than the crew will re-open these valves. Closed Re-opened A. 1500 psig 2000 psig B. 1500 psig 1955 psig C. 1620 psig 2000 psig D. 1620 psig 1955 psig Page 32 of 100 Question:
Unit 1 is operating at 100% power when a large break LOCA occurs.
33 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a LOCA occurred at Time O. Given the NC System pressure trend shown below: 2500 2000 u ::r ... ... u 1500 A-E u t: 1000 u ;j!!: 500 o o 1 2 3 456 7 8 9 W tl Time (minutes)
* The crew has just transitioned to EP/1 /A/5000/ES-1.3 (Transfer to Cold Leg EP/1/A/5000/ES-1.3 Recirculation) and no manual actions have been taken
Which of the following describes when each of the ECCS pumps listed begins to inject flow into the NC system? NI Pumps NO Pumps A. Between 0 and 1 minute Between 8 and 9 minutes B. Between 1 and 2 minutes Between 8 and 9 minutes C. Between 0 and 1 minute Between 9 and 10 minutes O. Between 1 and 2 minutes Between 9 and 10 minutes Page 33 of 100 Question:
: 1. Based on the above conditions, which ECCS pump(s) are currently taking suction from the containment sump?
33 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a LOCA occurred at Time O. Given the NC System pressure trend shown below: 2500 CJ ... ::I ... ... 2000 1500 D. E CJ t: 1000 u z o 1 2 3 4 5 6 7 8 9 10 11 Time (minutes)
: 2. If NO is required to be aligned for hot kill
Which of the following describes when each of the ECCS pumps listed begins to inject flow into the NC system? NI Pumps ND Pumps A. Between 0 and 1 minute Between 8 and 9 minutes B. Between 1 and 2 minutes Between 8 and 9 minutes C. Between 0 and 1 minute Between 9 and 10 minutes D. Between 1 and 2 minutes Between 9 and 10 minutes Page 33 of 100 Question:
                                              ~ recirculation, to which NC hot legs will NO inject?
34 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 completed NC fill and vent activities following a forced outage. Given the following:
A.       1. NO pumps only
: 2. Band C NC hot legs only B.       1. NO pumps only
: 2. All 4 hot legs C.       1. NV pumps, NI pumps, NO pumps
: 2. Band C NC hot legs only O.       1. NV pumps, NI pumps, NO pumps
: 2. All 4 hot legs Page 31 of 100 oflOO
 
CATAWBA NUCLEAR STATION Question:      32 2009 SRO NRC Examination (1 point)
Unit 1 was operating at 100% power when it experienced a steam line break accident resulting in a safety injection and the crew has entered EP/1/A15000/E-O EP/11A15000/E-O (Reactor Trip or Safety Injection).
Which one of the following completes the statement below?
Per Enclosure 1 of EP/1/A/5000/E-0, when NC pressure decreases to less than
_ _ _ the crew will close 1NV-202B and 1 NV-203A (NV Pumps A&B Recirc lsol) and when NC pressure increases to greater than               the crew will re-open these valves.
Closed         Re-opened A.         1500 psig       2000 psig B.         1500 psig         1955 psig C.         1620 psig       2000 psig D.         1620 psig       1955 psig Page 32 of 100
 
CATAWBA NUCLEAR STATION Question:          33 2009 SRO NRC Examination (1 point)
Unit 1 was operating at 100% power when a LOCA occurred at Time O. Given the NC System pressure trend shown below:
2500 ~--
2000
          ...u CJ
          ...::r
          ~
          ...u
::I
          ~      1500
          ~
A-D.
E u
CJ t: 1000
        ~
u z
        ;j!!:
500 o
o   1   2   3   4 4  55 6  6      7   8   9 W 10  tl 11 Time (minutes)
Which of the following describes when each of the ECCS pumps listed begins to inject flow into the NC system?
NI Pumps                         NO ND Pumps A.           Between 0 and 1 minute         Between 8 and 9 minutes B.           Between 1 and 2 minutes         Between 8 and 9 minutes C.           Between 0 and 1 minute         Between 9 and 10 minutes O.
D.            Between 1 and 2 minutes         Between 9 and 10 minutes Page 33 of 100
 
CATAWBA NUCLEAR STATION Question:      34 2009 SRO NRC Examination (1 point)
Unit 1 completed NC fill and vent activities following a forced outage. Given the following:
* A nitrogen blanket was placed on the pressurizer during the outage
* A nitrogen blanket was placed on the pressurizer during the outage
* NC level is 85% and stable
* NC level is 85% and stable
* The crew is in the process of drawing a bubble in the pressurizer
* The crew is in the process of drawing a bubble in the pressurizer
: 1. Per Selected Licensee Commitment 16.5-4 (Pressurizer), what is the limit on pressurizer heat up rate? 2. Per OP/1/Al61 00/001 (Controlling Procedure for Unit Startup), when a pressurizer PORV is opened, what indication verifies nitrogen venting is complete?
: 1. Per Selected Licensee Commitment 16.5-4 (Pressurizer), what is the limit on pressurizer heat up rate?
A. 1. 100°F in anyone hour period 2. PRT temperature equalizes with Pzr steam space temperature B. 1. 100°F in anyone hour period 2. PRT level increases without a corresponding PRT pressure increase C. 1. 80°F in anyone hour period 2. PRT temperature equalizes with Pzr steam space temperature D. 1. 80°F in anyone hour period 2. PRT level increases without a corresponding PRT pressure increase Page 34 of 100 Question:
: 2. Per OP/1/Al61 OP/1/A/61 00/001 (Controlling Procedure for Unit Startup), when a pressurizer PORV is opened, what indication verifies nitrogen venting is complete?
34 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 completed NC fill and vent activities following a forced outage. Given the following:
A.       1.100°Finanyonehourperiod
* A nitrogen blanket was placed on the pressurizer during the outage
: 1. 100°F in anyone hour period
* NC level is 85% and stable
: 2. PRT temperature equalizes with Pzr steam space temperature B.       1. 100°F in anyone hour period
* The crew is in the process of drawing a bubble in the pressurizer
: 2. PRT level increases without a corresponding PRT pressure increase C.       1. 80°F in anyone hour period
: 1. Per Selected Licensee Commitment 16.5-4 (Pressurizer), what is the limit on pressurizer heat up rate? 2. Per OP/1/A/61 00/001 (Controlling Procedure for Unit Startup), when a pressurizer PORV is opened, what indication verifies nitrogen venting is complete?
: 2. PRT temperature equalizes with Pzr steam space temperature D.       1. 80°F in anyone hour period
A. 1.100°Finanyonehourperiod
: 2. PRT level increases without a corresponding PRT pressure increase Page 34 of 100
: 2. PRT temperature equalizes with Pzr steam space temperature B. 1. 100°F in anyone hour period 2. PRT level increases without a corresponding PRT pressure increase C. 1. 80°F in anyone hour period 2. PRT temperature equalizes with Pzr steam space temperature D. 1. 80°F in anyone hour period 2. PRT level increases without a corresponding PRT pressure increase Page 34 of 100 Question:
 
35 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3. Given the following:
CATAWBA NUCLEAR STATION Question:            35 2009 SRO NRC Examination (1 point)
Unit 1 is in Mode 3. Given the following:
* 1AD-6, E/1 (NCP A Thermal Barrier KC Outlet HilLo Flow) actuates
* 1AD-6, E/1 (NCP A Thermal Barrier KC Outlet HilLo Flow) actuates
* The flow trend below: ..... -.!!! E t 0.. (1l Q.O co -100 .---.-----.----,,----,--......,--
* The flow trend below:
80 70 30 20 10 o + .. _ ..... + ............... . o 10 20 30 40 50 60 70 BO 90 100 110 120 130 140 150 Time (seconds)
100 .---.-----.----,,----,--......,--
: 1. At what time on the above graph should 1 KC-394A (NC Pump 1A Therm Bar Otlt) have automatically closed? 2. If the NCP 1 A thermal barrier can not be isolated from the KC System by any means, how is over pressurization of the KC surge tanks prevented?
                $          90+-~-+~--~~-
A. 1. 100 seconds 2. The KC surge tanks vent line is large enough to prevent over pressurization B. 1. 130 seconds 2. The KC surge tanks vent line is large enough to prevent over press urization C. 1. 100 seconds 2. The KC surge tanks relief valve to the KC drain sump is large enough to prevent over pressurization D. 1. 130 seconds 2. The KC surge tanks relief valve to the KC drain sump is large enough to prevent over pressurization Page 3S of 100 Question:
90
35 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3. Given the following:
            .2 LL
* 1AD-6, E/1 (NCP A Thermal Barrier KC Outlet HilLo Flow) actuates
              ....,       80 Q)
* The flow trend below: 100 $ 90 .2 80 LL ...., Q) 70 -:;:;; ::s 0 60 '--Q) ,.... 50 .-c t: 0-ro OJJ 40 m-ro 30 E '-20 ttJ ..c l-u 10 .:><: 0 o 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Time (seconds)
            -:;:;;       70
: 1. At what time on the above graph should 1 KC-394A (NC Pump 1A Therm Bar Otlt) have automatically closed? 2. If the NCP 1 A thermal barrier can not be isolated from the KC System by any means, how is over pressurization of the KC surge tanks prevented?
::s 0
A. 1. 100 seconds 2. The KC surge tanks vent line is large enough to prevent over pressurization B. 1. 130 seconds 2. The KC surge tanks vent line is large enough to prevent over pressurization C. 1. 100 seconds 2. The KC surge tanks relief valve to the KC drain sump is large enough to prevent over pressurization D. 1. 130 seconds 2. The KC surge tanks relief valve to the KC drain sump is large enough to prevent over pressurization Page 35 of 100 Question:
              .....
36 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100%. Given the following conditions and sequence of events:
            .!!!
* A slight cooldown of the NC system causes the "C" PZR heaters to be full "on"
            .-
                    --
                '- ,....
Q) cE t(1l 0..
t:   0-60 50 ro OJJQ.O 40 m
co - -
ro         30 E
              '-
ttJ        20
            ..c l-           10 u
            .:><:
o 0 +.. _
                                  . . .+. . . . . . . ..
o     10 20 30 40 50 60 70 BO        80 90 100 110 120 130 140 150 Time (seconds)
: 1. At what time on the above graph should 1 KC-394A (NC Pump 1A Therm Bar Otlt) have automatically closed?
: 2. If the NCP 1A thermal barrier can not be isolated from the KC System by any means, how is over pressurization of the KC surge tanks prevented?
A. 1. 100 seconds
: 2. The KC surge tanks vent line is large enough to prevent over pressurization B. 1. 130 seconds
: 2. The KC surge tanks vent line is large enough to prevent over pressurization press  urization C. 1. 100 seconds
: 2. The KC surge tanks relief valve to the KC drain sump is large enough to prevent over pressurization D. 1. 130 seconds
: 2. The KC surge tanks relief valve to the KC drain sump is large enough to prevent over pressurization Page 35 3S of 100
 
CATAWBA NUCLEAR STATION Question:      36 2009 SRO NRC Examination (1 point)
Unit 1 was operating at 100%. Given the following conditions and sequence of events:
* A slight cooldown of the NC system causes the "c""C" PZR heaters to be full "on"
* A single channel of pressurizer pressure failed offscale high
* A single channel of pressurizer pressure failed offscale high
* A second channel of pressurizer pressure failed offscale low Assuming no operator actions, what affect does this combination of channel failures have on the Pressurizer Pressure Control system? A. The Pressurizer Pressure Master swaps to manual and pressure will increase to the reactor trip setpoint B. The Pressurizer Pressure Master swaps to manual and pressure will increase until 1 NC-32B and 1 NC-36B open C. The Pressurizer Pressure Master remains in automatic and pressure is controlled based on the average of the 2 unaffected channels D. The Pressurizer Pressure Master remains in automatic and pressure is controlled based on the highest of the 2 unaffected channels Page 36 of 100 Question:
* A second channel of pressurizer pressure failed offscale low Assuming no operator actions, what affect does this combination of channel failures have on the Pressurizer Pressure Control system?
36 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100%. Given the following conditions and sequence of events:
A.     The Pressurizer Pressure Master swaps to manual and pressure will increase to the reactor trip setpoint B.     The Pressurizer Pressure Master swaps to manual and pressure will increase until 1 NC-32B and 1 NC-36B open C.     The Pressurizer Pressure Master remains in automatic and pressure is controlled based on the average of the 2 unaffected channels D.     The Pressurizer Pressure Master remains in automatic and pressure is controlled based on the highest of the 2 unaffected channels Page 36 of 100
* A slight cooldown of the NC system causes the "c" PZR heaters to be full "on"
 
* A single channel of pressurizer pressure failed offscale high
CATAWBA NUCLEAR STATION Question:      37 2009 SRO NRC Examination (1 point)
* A second channel of pressurizer pressure failed offscale low Assuming no operator actions, what affect does this combination of channel failures have on the Pressurizer Pressure Control system? A. The Pressurizer Pressure Master swaps to manual and pressure will increase to the reactor trip setpoint B. The Pressurizer Pressure Master swaps to manual and pressure will increase until 1 NC-32B and 1 NC-36B open C. The Pressurizer Pressure Master remains in automatic and pressure is controlled based on the average of the 2 unaffected channels D. The Pressurizer Pressure Master remains in automatic and pressure is controlled based on the highest of the 2 unaffected channels Page 36 of 100 Question:
Unit 1 is increasing power following a refueling outage. Given the following:
37 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is increasing power following a refueling outage. Given the following:
* At 45% reactor power, the P-8 permissive failed "as-is"
* At 45% reactor power, the P-8 permissive failed "as-is"
* Reactor power is currently at 50% Based on the current conditions:
* Reactor power is currently at 50%
: 1. What is the condition of the P-8 "Hi Pwr Lo Flo Rx Trip Block" status light on 181-18? 2. If one NC pump were to trip, would an automatic reactor trip occur? A. 1. Lit 2. Yes B. 1. Lit 2. No C. 1. Dark 2. Yes D. 1. Dark 2. No Page 37 of 100 Question:
Based on the current conditions:
37 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is increasing power following a refueling outage. Given the following:
: 1. What is the condition of the P-8 "Hi Pwr Lo Flo Rx Trip Block" status light 1SI-18?
* At 45% reactor power, the P-8 permissive failed "as-is"
on 181-18?
* Reactor power is currently at 50% Based on the current conditions:
: 2. If one NC pump were to trip, would an automatic reactor trip occur?
: 1. What is the condition of the P-8 "Hi Pwr Lo Flo Rx Trip Block" status light on 1SI-18? 2. If one NC pump were to trip, would an automatic reactor trip occur? A. 1. Lit 2. Yes B. 1. Lit 2. No C. 1. Dark 2. Yes D. 1. Dark 2. No Page 37 of 100 Question:
A.       1. Lit
38 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3 and reducing NC pressure and temperature for a refueling outage. Given the following:
: 2. Yes B.       1. Lit
* Pressurizer pressure channel 2 fails "as-is" at 1985 psig
: 2. No C.       1. Dark
* Other pressurizer pressure channels indicate as follows: o Channel 1 is 1972 psig and slowly decreasing o Channel 3 is 1965 psig and slowly decreasing o Channel 4 is 1951 psig and slowly decreasing
: 2. Yes D.       1. Dark
* No operator actions have been taken Of the remaining channels that input into the P-11 circuit, how many of these must be below the P-11 setpoint before "ECCS TRN AlB PZR PRESS" can be blocked? A. 1 of the other 2 B. 2 of the other 2 C. 1 of the other 3 D. 2 of the other 3 Page 38 oflOO Question:
: 2. No Page 37 of 100
38 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3 and reducing NC pressure and temperature for a refueling outage. Given the following:
 
CATAWBA NUCLEAR STATION Question:       38 2009 SRO NRC Examination (1 point)
Unit 1 is in Mode 3 and reducing NC pressure and temperature for a refueling outage.
Given the following:
* Pressurizer pressure channel 2 fails "as-is" at 1985 psig
* Pressurizer pressure channel 2 fails "as-is" at 1985 psig
* Other pressurizer pressure channels indicate as follovvs:
* follovvs:
Other pressurizer pressure channels indicate as follows:
o Channel 1 is 1972 psig and slowly decreasing o Channel 3 is 1965 psig and slowly decreasing o Channel 4 is 1951 psig and slowly decreasing
o Channel 1 is 1972 psig and slowly decreasing o Channel 3 is 1965 psig and slowly decreasing o Channel 4 is 1951 psig and slowly decreasing
* No operator actions have been taken Of the remaining channels that input into the P-11 circuit, how many of these must be below the P-11 setpoint before "ECCS TRN AlB PZR PRESS" can be blocked? A. 1 of the other 2 B. 2 of the other 2 C. 1 of the other 3 D. 2 of the other 3 Page 38 of 100 Question:
* No operator actions have been taken Of the remaining channels that input into the P-11 circuit, how many of these must be below the P-11 setpoint before "ECCS TRN AlB PZR PRESS" can be blocked?
39 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power with lower containment temperature stable at 107&deg;F. Given the following events:
A.       1 of the other 2 B.       2 of the other 2 C.       1 of the other 3 D.       2 of the other 3 of 100 Page 38 oflOO
* 1A,1 B, and 1 C Lower Containment Ventilation Units (LCVU's) are in service
 
* LCVU 1 B fan trips on over-current Based on the conditions above, what is the first action OP/11A164501001 (Containment Ventilation (VV) Systems) specifies to provide additional cooling to lower containment?
CATAWBA NUCLEAR STATION Question:      39 2009 SRO NRC Examination (1 point)
A. Start 1 D LCVU in LOW speed B. Place 1 A and 1 C LCVUs in "MAX" cooling only C. Place 1 A and 1 C LCVUs in "MAX" cooling and HIGH speed D. Start 1 D LCVU in HIGH speed and place 1A and 1 C LCVUs in HIGH speed Page 39 of 100 Question:
Unit 1 was operating at 100% power with lower containment temperature stable at 107&deg;F. Given the following events:
39 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power with lower containment temperature stable at 107&deg;F. Given the following events:
* 1A,1 B, and 1C Lower Containment Ventilation Units (LCVU's) are in service
* 1A,1 B, and 1 C Lower Containment Ventilation Units (LCVU's) are in service
* LCVU 1B fan trips on over-current Based on the conditions above, what is the first action OP/11A164501001 OP/1/A/6450/001 (Containment Ventilation (VV) Systems) specifies to provide additional cooling to lower containment?
* LCVU 1 B fan trips on over-current Based on the conditions above, what is the first action OP/1/A/6450/001 (Containment Ventilation (VV) Systems) specifies to provide additional cooling to lower containment?
A.       Start 1D LCVU in LOW speed B.       Place 1A and 1C LCVUs in "MAX" cooling only C.     Place 1A and 1C LCVUs in "MAX" cooling and HIGH speed D.     Start 1D LCVU in HIGH speed and place 1A and 1 C LCVUs in HIGH speed Page 39 of 100
A. Start 1 D LCVU in LOW speed B. Place 1 A and 1 C LCVUs in "MAX" cooling only C. Place 1 A and 1 C LCVUs in "MAX" cooling and HIGH speed D. Start 1 D LCVU in HIGH speed and place 1A and 1 C LCVUs in HIGH speed Page 39 of 100 Question:
 
40 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
CATAWBA NUCLEAR STATION Question:      40 2009 SRO NRC Examination (1 point)
Unit 1 is operating at 100% power. Given the following:
Initial Conditions
Initial Conditions
* Lower Containment Vent Unit (LCVU) status and outlet temperatures per the OAC are: LCVU Status Outlet Temperature readings 1A Running 1 -108.1&deg;F 2 -107.5&deg;F 1B Running 1 -109.9&deg;F 2 -108.9&deg;F 1C Running 1 -112.4&deg;F 2 -111.2&deg;F 1D Secured 1 -105.6&deg;F 2 -104.4&deg;F Current Conditions
* Lower Containment Vent Unit (LCVU) status and outlet temperatures per the OAC are:
* The crew notes that 1 B LCVU has just tripped
LCVU           Status             Outlet Temperature readings 1A           Running               - 108.1 of 1 -108.1&deg;F         -107.5&deg;F 2 -1 07.5&deg;F 1B          Running            1 -109.9&deg;F
* OAC temperature readings as stated above have not begun to change yet Based on current plant conditions, and per PTl11A146001002A (Mode 1 Periodic Surveillance Items): 1. What temperature would be recorded for "Primary Containment Lower Compartment Average Air Temp"? 2. What are the Technical Specification temperature range limits for lower containment temperature?
                                                      -1 09.9&deg;F     2 -1
A. 1. 108.5&deg;F 2. 60&deg;F -120&deg;F B. 1. 109.8&deg;F 2. 60&deg;F -120&deg;F C. 1. 108.5&deg;F 2. 100&deg;F -120&deg;F D. 1. 109.8&deg;F 2. 100&deg;F -120&deg;F Page 40 of 100 Question:
                                                                      -108.9&deg;F 08.9&deg;F 1C           Running             1 -112.4&deg;F       2 - 111.2&deg;F 1D 10           Secured             1 -105.6&deg;F
40 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
                                                      - 105.6&deg;F      -104.4&deg;F 2 -1 04.4&deg;F Current Conditions
Initial Conditions
* The crew notes that 1B LCVU has just tripped
* Lower Containment Vent Unit (LCVU) status and outlet temperatures per the OAC are: LCVU Status Outlet Temperature readings 1A Running 1 -108.1 of 2 -1 07.5&deg;F 1B Running 1 -1 09.9&deg;F 2 -1 08.9&deg;F 1C Running 1 -112.4&deg;F 2 -111.2&deg;F 10 Secured 1 -105.6&deg;F 2 -1 04.4&deg;F Current Conditions
* OAC temperature readings as stated above have not begun to change yet Based on current plant conditions, and per PTl11A146001002A PT/1/A/46001002A (Mode 1 Periodic Surveillance Items):
* The crew notes that 1 B LCVU has just tripped
: 1. What temperature would be recorded for "Primary Containment Lower Compartment Average Air Temp"?
* OAC temperature readings as stated above have not begun to change yet Based on current plant conditions, and per PT/1/A/46001002A (Mode 1 Periodic Surveillance Items): 1. What temperature would be recorded for "Primary Containment Lower Compartment Average Air Temp"? 2. What are the Technical Specification temperature range limits for lower containment temperature?
: 2. What are the Technical Specification temperature range limits for lower containment temperature?
A. 1. 108.5&deg;F 2. 60&deg;F -120&deg;F B. 1. 109.8&deg;F 2. 60&deg;F -120&deg;F C. 1. 108.5&deg;F 2. 100&deg;F -120&deg;F O. 1. 109.8&deg;F 2. 100&deg;F -120&deg;F Page 40 of 100 Question:
A.       1. 108.5&deg;F
41 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Which one of the following lists of conditions would all result in 1 NF-228A (NF Supply Containment Isolation Valve) closing? (Evaluate each condition separately)
: 2. 60&deg;F -120&deg;F B.       1. 109.8&deg;F
: 1. Manual Phase A 2. Manual Phase B 3. Loss of instrument air 4. Glycol Expansion Tank Lo Lo Level 5. Trip of all running Ice Condenser Glycol Pumps A. 1 and 5 B. 2 and 5 C. 1,3 and 4 D. 2,3 and 4 Page 41 of 100 Question:
: 2. 60&deg;F -120&deg;F C.       1. 108.5&deg;F
41 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Which one of the following lists of conditions would all result in 1 NF-228A (NF Supply Containment Isolation Valve) closing? (Evaluate each condition separately)
: 2. 100&deg;F -120&deg;F
: 1. Manual Phase A 2. Manual Phase B 3. Loss of instrument air 4. Glycol Expansion Tank Lo Lo Level 5. Trip of all running Ice Condenser Glycol Pumps A. 1 and 5 B. 2 and 5 C. 1,3 and 4 D. 2,3 and 4 Page 41 of 100 Question:
                      - 120&deg;F D.
42 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination One hour ago, Unit 1 was operating at 100% power when a LOCA occurred requiring a reactor trip and safety injection.
O.       1. 109.8&deg;F
Given the following:
: 2. 100&deg;F -120&deg;F
* The automatic and manual swap to cold leg recirculation failed and both NO pumps have been secured
                      - 120&deg;F Page 40 of 100
* The crew implemented EP/1/A15000/ECA-1.1 (Loss of Emergency Coolant Recirculation)
 
* Current conditions are: o Containment pressure is 11 .2 psig and slowly increasing o FWST level is 4.9% and decreasing For the current conditions, how many of each type of pump listed is reauired to be running? A. 1 1 B. 1 o C. o 1 O. o o Page 42 of 100 Question:
CATAWBA NUCLEAR STATION Question:      41 2009 SRO NRC Examination (1 point)
42 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination One hour ago, Unit 1 was operating at 100% power when a LOCA occurred requiring a reactor trip and safety injection.
Which one of the following lists of conditions would all result in 1NF-228A (NF Supply Containment Isolation Valve) closing? (Evaluate each condition separately)
: 1. Manual Phase A
: 2. Manual Phase B
: 3. Loss of instrument air
: 4. Glycol Expansion Tank Lo Lo Level
: 5. Trip of all running Ice Condenser Glycol Pumps A.       1 and 5 B.       2 and 5 C.       1,3 and 4 D.       2,3 and 4 Page 41 of 100
 
CATAWBA NUCLEAR STATION Question:      42 2009 SRO NRC Examination (1 point)
One hour ago, Unit 1 was operating at 100% power when a LOCA occurred requiring a reactor trip and safety injection. Given the following:
* The automatic and manual swap to cold leg recirculation failed and both ND NO pumps have been secured
* The crew implemented EP/1/A15000/ECA-1.1 EP/1/A/SOOO/ECA-1.1 (Loss of Emergency Coolant Recirculation)
* Current conditions are:
o Containment pressure is 11   11.2
                                            .2 psig and slowly increasing o FWST level is 4.9% and decreasing For the current conditions, how many of each type of pump listed is reauired reouired to be running?
NV    NS A.       1     1 B.       1     o C.       o     1 O.
D.      o     o Page 42 of 100
 
CATAWBA NUCLEAR STATION Question:      43 2009 SRO NRC Examination (1 point)
Unit 1 was operating at 100% power when a 6 gpm tube leak occurred in 1A S/G.
Given the following:
Given the following:
* The automatic and manual swap to cold leg recirculation failed and both ND pumps have been secured
* The crew is operating the turbine controls in manual to quickly reduce load per AP/1/A155001009 AP/1  /A/55 00/0 09 (Rapid Downpower)
* The crew implemented EP/1/A/SOOO/ECA-1.1 (Loss of Emergency Coolant Recirculation)
* Current conditions are: o Containment pressure is 11.2 psig and slowly increasing o FWST level is 4.9% and decreasing For the current conditions, how many of each type of pump listed is reouired to be running? NV NS A. 1 1 B. 1 o C. o 1 D. o o Page 42 of 100 Question:
43 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a 6 gpm tube leak occurred in 1A S/G. Given the following:
* The crew is operating the turbine controls in manual to quickly reduce load per AP/1/A155001009 (Rapid Downpower)
* Current power level is 30% and decreasing
* Current power level is 30% and decreasing
: 1. Assuming a stable tube leakage rate. how does 1EMF-71 (S/G A Leakage) count rate for current conditions compare to the 100% power readings?
: 1. Assuming a stable tube leakage rate, rate. how does 1 EMF-71 (S/G A Leakage) count 1EMF-71 rate for current conditions compare to the 100% power readings?
: 2. Per NSD 513 (Primary to Secondary Leak Monitoring Program).
: 2. Per NSD 513 (Primary to Secondary Leak Monitoring Program),
which method(s) islare used to monitor S/G leak rate based on the current power level? A. 1. Lower counts now than when power was at 100% 2. 1EMF-33 (Condenser Air Ejector Exhaust) only B. 1. The same counts now as when power was at 100% 2. 1EMF-33 (Condenser Air Ejector Exhaust) only C. 1. Lower counts now than when power was at 100% 2. 1EMF-33 (Condenser Air Ejector Exhaust) and 1 EMF-71 D. 1. The same counts now as when power was at 100% 2. 1 EMF-33 (Condenser Air Ejector Exhaust) and 1 EMF-71 Page 43 of 100 Question:
Program). which method(s) is/are islare used to monitor S/G leak rate based on the current power level?
43 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a 6 gpm tube leak occurred in 1A S/G. Given the following:
A.       1. Lower counts now than when power was at 100%
* The crew is operating the turbine controls in manual to quickly reduce load per AP/1 /A/55 00/0 09 (Rapid Downpower)
: 2. 1EMF-33 1EMF-33 (Condenser Air Ejector Exhaust) only B.       1. The same counts now as when power was at 100%
* Current power level is 30% and decreasing
1EMF-33 (Condenser Air Ejector Exhaust) only
: 1. Assuming a stable tube leakage rate, how does 1 EMF-71 (S/G A Leakage) count rate for current conditions compare to the 100% power readings?
: 2. 1EMF-33 C.       1. Lower counts now than when power was at 100%
: 2. Per NSD 513 (Primary to Secondary Leak Monitoring Program), which method(s) is/are used to monitor S/G leak rate based on the current power level? A. 1. Lower counts now than when power was at 100% 2. 1 EMF-33 (Condenser Air Ejector Exhaust) only B. 1. The same counts now as when power was at 100% 2. 1 EMF-33 (Condenser Air Ejector Exhaust) only C. 1. Lower counts now than when power was at 100% 2. 1 EMF-33 (Condenser Air Ejector Exhaust) and 1 EMF-71 D. 1. The same counts now as when power was at 100% 2. 1 EMF-33 (Condenser Air Ejector Exhaust) and 1 EMF-71 Page 43 of 100 Question:
: 2. 1 EMF-33 (Condenser Air Ejector Exhaust) and 1 EMF-71 1EMF-33 D.       1. The same counts now as when power was at 100%
44 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3 preparing for reactor startup. Given the following 1SV-19 (S/G 1A PORV) nitrogen boUle pressures:
: 2. 1EMF-33 (Condenser Air Ejector Exhaust) and 1 EMF-71 Page 43 of 100
* Bottle #1 -1970 psig
 
* BoUie #2 -2165 psig What action (if any) is required for 1SV-19 per Selected Licensee Commitment 16.10-1 (Steam Vent to Atmosphere)?
CATAWBA NUCLEAR STATION Question:      44 2009 SRO NRC Examination (1 point)
A. No action is required B. Immediately take action to restore the nitrogen supply to operable status only C. Immediately enter the applicable conditions of Technical Specification 3.7.4 (S/G PORVs) only D. Immediately take action to restore the nitrogen supply to operable status and immediately enter the applicable conditions of Technical Specification 3.7.4 (S/G PORVs) Page 44 of 100 Question:
Unit 1 is in Mode 3 preparing for reactor startup. Given the following 1SV-19 (S/G 1A PORV) nitrogen boUle bottle pressures:
44 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3 preparing for reactor startup. Given the following 1SV-19 (S/G 1A PORV) nitrogen bottle pressures:
* Bottle #1 - 1970 psig
* Bottle #1 -1970 psig
* Bottle #2 - 2165 psig BoUie What action (if any) is required for 1SV-19 per Selected Licensee Commitment Ventto 16.10-1 (Steam Vent     to Atmosphere)?
* Bottle #2 -2165 psig What action (if any) is required for 1SV-19 per Selected Licensee Commitment 16.10-1 (Steam Ventto Atmosphere)?
A.       No action is required B.       Immediately take action to restore the nitrogen supply to operable status only C.       Immediately enter the applicable conditions of Technical Specification 3.7.4 (S/G PORVs) only D.       Immediately take action to restore the nitrogen supply to operable status and immediately enter the applicable conditions of Technical Specification 3.7.4 (S/G PORVs)
A. No action is required B. Immediately take action to restore the nitrogen supply to operable status only C. Immediately enter the applicable conditions of Technical Specification 3.7.4 (S/G PORVs) only D. Immediately take action to restore the nitrogen supply to operable status and immediately enter the applicable conditions of Technical Specification 3.7.4 (S/G PORVs) Page 44 of 100 Question:
Page 44 of 100
45 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following conditions:
 
CATAWBA NUCLEAR STATION Question:      45 2009 SRO NRC Examination (1 point)
Unit 1 is operating at 100% power. Given the following conditions:
Initial Conditions
Initial Conditions
* 1CF-37 (S/G 1 B CF Ctrl) is in manual and throttled
* 1CF-37   (S/G 1 B CF Ctrl) is in manual and throttled 1CF-37 (8/G
* 1 CF-39 (S/G 1 B CF Byp Ctrl) is in manual and full open
* 1CF-39 (8/G (S/G 1 B CF Byp Ctrl) is in manual and full open 8/G 1B Level is 66% and stable
* S/G 1 B Level is 66% and stable Current Conditions
* S/G Current Conditions
* 1CF-37 has just been placed in automatic Based on current conditions:
* 1CF-37 1CF-37 has just been placed in automatic Based on current conditions:
: 1. Howwill 1CF-37 respond? 2. What is the status of 1 B S/G level control? A. 1. Throttle further open 2. Automatic B. 1. Throttle further open 2. Manual C. 1. Throttle further closed 2. Automatic D. 1. Throttle further closed 2. Manual Page 45 of 100 Question:
: 1. Howwill How will 1CF-37 1CF-37 respond?
45 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following conditions:
: 2. What is the status of 1B S/G 8/G level control?
Initial Conditions
A.       1. Throttle further open
* 1 CF-37 (8/G 1 B CF Ctrl) is in manual and throttled
: 2. Automatic B.       1. Throttle further open
* 1 CF-39 (8/G 1 B CF Byp Ctrl) is in manual and full open
: 2. Manual C.       1. Throttle further closed
* 8/G 1 B Level is 66% and stable Current Conditions
: 2. Automatic D.       1. Throttle further closed
* 1 CF-37 has just been placed in automatic Based on current conditions:
: 2. Manual Page 45 of 100
: 1. How will 1 CF-37 respond? 2. What is the status of 1 B 8/G level control? A. 1. Throttle further open 2. Automatic B. 1. Throttle further open 2. Manual C. 1. Throttle further closed 2. Automatic D. 1. Throttle further closed 2. Manual Page 45 of 100 Question:
 
46 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Initial conditions:
CATAWBA NUCLEAR STATION Question:        46 2009 SRO NRC Examination (1 point)
Initial conditions:
* Unit 1 was operating at 100% power
* Unit 1 was operating at 100% power
* A loss of offsite power occurred
* A loss of offsite power occurred
Line 484: Line 579:
* The CA common suction piping from condensate grade sources ruptures
* The CA common suction piping from condensate grade sources ruptures
* 1AD-5, E/1 "CA Pumps Train A Loss of Norm Suct" actuates
* 1AD-5, E/1 "CA Pumps Train A Loss of Norm Suct" actuates
* 1AD-5, E/2 "CA Pumps Train B Loss of Norm Suct" actuates One minute later, what is the status of the CA system assuming no operator action? A. 1 A CA pump is tripped CAPT #1 is tripped 1 B CA pump suction is shifted to the RN system B. 1 A CA pump suction is shifted to the RN system CAPT #1 suction is shifted to the RN system 1 B CA pump is tripped C. 1 A CA pump suction is shifted to the RN system CAPT #1 is tripped 1 B CA pump is tripped D. 1 A CA pump is tripped CAPT #1 suction is shifted to the RN system 1 B CA pump suction is shifted to the RN system Page 46 of 100 Question:
* 1AD-5, E/2 "CA Pumps Train B Loss of Norm Suct" actuates One minute later, what is the status of the CA system assuming no operator action?
46 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Initial conditions:
A.       1A CA pump is tripped CAPT #1 is tripped 1 B CA pump suction is shifted to the RN system B.       1A CA pump suction is shifted to the RN system CAPT #1 suction is shifted to the RN system 1 B CA pump is tripped C.       1A CA pump suction is shifted to the RN system 1A CAPT #1 is tripped 1 B CA pump is tripped D.       1A CA pump is tripped CAPT #1 suction is shifted to the RN system 1 B CA pump suction is shifted to the RN system Page 46 of 100
* Unit 1 was operating at 100% power
 
* A loss of offsite power occurred
CATAWBA NUCLEAR STATION Question:    47 2009 SRO NRC Examination (1 point)
* The reactor tripped 30 minutes later the following sequence of events occurred:
Given the following:
* All CA pumps are running
* The incoming breaker to 1ETB spuriously opened
* Train "A" CA is RESET
* 1B DIG automatically started and loaded
* Train "B" CA is not RESET
* While monitoring DIG operating parameters, the crew noted that DIG 1B "VOLTS" was 4000 V
* The CA common suction piping from condensate grade sources ruptures
* Voltage was adjusted to normal How did 1B DIG output "AMPS" and "P/F" indications respond to this adjustment?
* 1AD-5, E/1 "CA Pumps Train A Loss of Norm Suct" actuates
AMPS               PIF P/F A.       increase         more lagging B.       increase         stay the sam same e C.       decrease         more lagging D.       decrease         stay the same sam e Page 47 of 100
* 1AD-5, E/2 "CA Pumps Train B Loss of Norm Suct" actuates One minute later, what is the status of the CA system assuming no operator action? A. 1 A CA pump is tripped CAPT #1 is tripped 1 B CA pump suction is shifted to the RN system B. 1 A CA pump suction is shifted to the RN system CAPT #1 suction is shifted to the RN system 1 B CA pump is tripped C. 1A CA pump suction is shifted to the RN system CAPT #1 is tripped 1 B CA pump is tripped D. 1 A CA pump is tripped CAPT #1 suction is shifted to the RN system 1 B CA pump suction is shifted to the RN system Page 46 of 100 Question:
 
47 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
CATAWBA NUCLEAR STATION Question:      48 2009 SRO NRC Examination (1 point)
* The incoming breaker to 1 ETB spuriously opened
Unit 1 is operating at 100% power. Given the following:
* 1 B DIG automatically started and loaded
* While monitoring DIG operating parameters, the crew noted that DIG 1 B "VOLTS" was 4000 V
* Voltage was adjusted to normal How did 1 B DIG output "AMPS" and "P/F" indications respond to this adjustment?
AMPS P/F A. increase more lagging B. increase stay the sam e C. decrease more lagging D. decrease stay the same Page 47 of 100 Question:
47 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
* The incoming breaker to 1 ETB spuriously opened
* 1 B DIG automatically started and loaded
* While monitoring DIG operating parameters, the crew noted that DIG 1 B "VOLTS" was 4000 V
* Voltage was adjusted to normal How did 1 B DIG output "AMPS" and "P/F" indications respond to this adjustment?
AMPS PIF A. increase more lagging B. increase stay the same C. decrease more lagging D. decrease stay the sam e Page 47 of 100 Question:
48 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
* A complete loss of offsite power occurs
* A complete loss of offsite power occurs
* All DIG load sequencing is complete Which one of the following Fire Protection (RF/RY) system pumps does not have an available power supply? A. RYpump A B. RF Jockey Pump A C. RY Pump C D. RF Jockey Pump C Page 48 of 100 Question:
* All DIG load sequencing is complete Which one of the following Fire Protection (RF/RY) system pumps does not have an available power supply?
48 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
A.       RYpump A B.       RF Jockey Pump A C.       RY Pump C D.       RF Jockey Pum Pumpp C Page 48 of 100
* A complete loss of offsite power occurs
 
* All DIG load sequencing is complete Which one of the following Fire Protection (RF/RY) system pumps does not have an available power supply? A. RYpump A B. RF Jockey Pump A C. RY Pump C D. RF Jockey Pum p C Page 48 of 100 Question:
CATAWBA NUCLEAR STATION Question:    49 2009 SRO NRC Examination (1 point)
49 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Which one of the following sets of equipment receives power from the 250VDC Auxiliary Power System? A. CF Pump Control Power and Turbine Emergency Bearing Oil Pump B. Deadlight Panels and Turbine Emergency Bearing Oil Pump C. CF Pump Control Power and 6.9 KV Switchgear Control Power D. Deadlight Panels and 6.9 KV Switchgear Control Power Page 49 of 100 Question:
Which one of the following sets of equipment receives power from the 250VDC Auxiliary Power System?
49 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Which one of the following sets of equipment receives power from the 250VDC Auxiliary Power System? A. CF Pump Control Power and Turbine Emergency Bearing Oil Pump B. Deadlight Panels and Turbine Emergency Bearing Oil Pump C. CF Pump Control Power and 6.9 KV Switchgear Control Power D. Deadlight Panels and 6.9 KV Switchgear Control Power Page 49 of 100 Question:
A.     CF Pump Control Power and Turbine Emergency Bearing Oil Pump B.     Deadlight Panels and Turbine Emergency Bearing Oil Pump C.     CF Pump Control Power and 6.9 KV Switchgear Control Power D.     Deadlight Panels and 6.9 KV Switchgear Control Power Page 49 of 100
50 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following conditions and sequence of events: Initial Conditions
 
* A blackout occurs on 1 ETA
CATAWBA NUCLEAR STATION Question:        50 2009 SRO NRC Examination (1 point)
* All 1 A D/G sequencing is complete
Unit 1 is operating at 100% power. Given the following conditions and sequence of events:
* 1AD-11, A/B "125VDC Diesel Gen A Control Pwr Sys Trbl" actuates
Initial Conditions
* 1AD-11, B/7 "D/G 1 A Panel Trouble" actuates
* A blackout occurs on 1ETA
* 1A D/G Panel alarm E/5 "Loss of DC Control Power" actuates Final Conditions
* All 1A D/G DIG sequencing is complete
* 1AD-11, A/B A/8 "125VDC Diesel Gen A Control Pwr Sys Trbl" actuates
        *               "D/G 1A Panel Trouble" actuates 1AD-11, B/7 "DIG
* 1A D/G DIG Panel alarm E/5 "Loss of DC Control Power" actuates Final Conditions
* Normal power is restored to 1 ETA
* Normal power is restored to 1 ETA
* 1A D/G is secured
* 1A D/G DIG is secured
* The annunciators listed above are still lit Based on the final conditions:
* The annunciators listed above are still lit Based on the final conditions:
: 1. Which of the following methods could have been used to secure the 1A D/G locally? 2. Will 1 A D/G start on a subsequent 1 ETA blackout?
: 1. Which of the following methods could have been used to secure the 1A D/G DIG locally?
A. 1. The RUN/STOP knob only 2. Yes B. 1. The RUN/STOP knob only 2. No C. 1. The RUN/STOP knob or the STOP pushbutton
: 2. Will 1A D/G DIG start on a subsequent 1ETA blackout?
: 2. Yes D. 1. The RUN/STOP knob or the STOP pushbutton
A.       1. The RUN/STOP RUNISTOP knob only
: 2. No Page 50 of 100 Question:
: 2. Yes B.       1. The RUN/STOP RUNISTOP knob only
50 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following conditions and sequence of events: Initial Conditions
: 2. No C.       1. The RUN/STOP RUNISTOP knob or the STOP pushbutton
* A blackout occurs on 1 ETA
: 2. Yes D.               RUNISTOP knob or the STOP pushbutton
* All 1 A DIG sequencing is complete
: 1. The RUN/STOP
* 1AD-11, A/8 "125VDC Diesel Gen A Control Pwr Sys Trbl" actuates
: 2. No Page 50 of 100
* 1AD-11, B/7 "DIG 1 A Panel Trouble" actuates
 
* 1A DIG Panel alarm E/5 "Loss of DC Control Power" actuates Final Conditions
CATAWBA NUCLEAR STATION Question:      51 2009 SRO NRC Examination (1 point)
* Normal power is restored to 1 ETA
Unit 1 is in Mode 3 preparing for a reactor startup. Given the following:
* 1A DIG is secured
* 1ETA experiences a blackout
* The annunciators listed above are still lit Based on the final conditions:
: 1. Which of the following methods could have been used to secure the 1A DIG locally? 2. Will 1 A DIG start on a subsequent 1 ETA blackout?
A. 1. The RUNISTOP knob only 2. Yes B. 1. The RUNISTOP knob only 2. No C. 1. The RUNISTOP knob or the STOP pushbutton
: 2. Yes D. 1. The RUNISTOP knob or the STOP pushbutton
: 2. No Page 50 of 100 Question:
51 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3 preparing for a reactor startup. Given the following:
* 1 ETA experiences a blackout
* The 1A DIG starts and is sequencing on loads per the accelerated sequence
* The 1A DIG starts and is sequencing on loads per the accelerated sequence
* Half way through the accelerated sequence, the fuel racks stick in an open position causing DIG speed to rapidly increase 1. What is the setpoint for the DIG overspeed trip? 2. For the conditions stated above will the DIG trip on overspeed if the setpoint is exceeded?
* Half way through the accelerated sequence, the fuel racks stick in an open position causing DIG speed to rapidly increase
A. 1. 495 rpm 2. No B. 1. 495 rpm 2. Yes c. 1. 517.5 rpm 2. No D. 1. 517.5 rpm 2. Yes PageSl of 100 Question:
: 1. What is the setpoint for the DIG overspeed trip?
51 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3 preparing for a reactor startup. Given the following:
: 2. For the conditions stated above will the DIG trip on overspeed if the setpoint is exceeded?
* 1 ETA experiences a blackout
A.       1. 495 rpm
* The 1A DIG starts and is sequencing on loads per the accelerated sequence
: 2. No B.       1. 495 rpm
* Half way through the accelerated sequence, the fuel racks stick in an open position causing DIG speed to rapidly increase 1. What is the setpoint for the DIG overspeed trip? 2. For the conditions stated above will the DIG trip on overspeed if the setpoint is exceeded?
: 2. Yes
A. 1. 495 rpm 2. No B. 1. 495 rpm 2. Yes c. 1. 517.5 rpm 2. No D. 1. 517.5 rpm 2. Yes Page 51 of 100 Question:
: c.       1. 517.5 rpm
52 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 50% power when a power spike causes a 1 EMF-33 (CSAE EXHAUST) Trip 2 alarm. What manual actions (if any) does OP/1/B/61 00101 OX (Annunciator Response to Radiation Monitoring PaneI1RAD-1) direct the operator to take to place systems affected by this EMF alarm in their post alarm condition?
: 2. No D.       1. 517.5 rpm
A. Swap "Unit 1 CSAE EXH" discharge from "UNIT VENT" to "AUTO" B. Close 1 BB-48 (BB Pumps Disch to TB Sump) C. Close SIG Sample valves D. None Page 52 of 100 Question:
: 2. Yes PageSl Page 51 of 100
52 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 50% power when a power spike causes a 1 EMF-33 (CSAE EXHAUST) Trip 2 alarm. What manual actions (if any) does OP/1/B/6100/01 OX (Annunciator Response to Radiation Monitoring Panel 1 RAD-1) direct the operator to take to place systems affected by this EMF alarm in their post alarm condition?
 
A. Swap "Unit 1 CSAE EXH" discharge from "UNIT VENT" to "AUTO" B. Close 1 BB-48 (BB Pumps Disch to TB Sump) C. Close S/G Sample valves D. None Page 52 of 100 Question:
CATAWBA NUCLEAR STATION Question:    52 2009 SRO NRC Examination (1 point)
53 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Both units are operating at 100% power. Given the following:
Unit 1 was operating at 50% power when a power spike causes a 1EMF-33 (CSAE EXHAUST) Trip 2 alarm.
* Only 1 A RN pump in service
What manual actions (if any) does OP/1/B/61   00101 OX (Annunciator Response to OP/1/B/6100/01 Radiation Monitoring Panel 1RAD-1) direct the operator to take to place systems PaneI1RAD-1) affected by this EMF alarm in their post alarm condition?
* An 86N relay actuates on 1 ETB Based on the above conditions, which RN pumps are operating one minute later? A. 1A only B. 1A and 1B only c. 1 A and 2B only D. 1 A, 1 B, and 2B only Page 53 of 100 Question:
A.     Swap "Unit 1 CSAE EXH" discharge from "UNIT VENT" to "AUTO" B.     Close 1 BB-48 (BB Pumps Disch to TB Sump)
53 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Both units are operating at 100% power. Given the following:
C.     Close SIG S/G Sample valves D.     None Page 52 of 100
* Only 1 A RN pump in service
 
* An 86N relay actuates on 1 ETB Based on the above conditions, which RN pumps are operating one minute later? A. 1A only B. 1A and 1B only C. 1 A and 2B only D. 1 A, 1 B, and 2B only Page 53 of 100 Question:
CATAWBA NUCLEAR STATION Question:    53 2009 SRO NRC Examination (1 point)
54 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 automatically trips from 100% power and the crew entered EP/1/A/5000/E-0 (Reactor Trip or Safety Injection).
Both units are operating at 100% power. Given the following:
Given the following conditions and sequence of events:
* Only 1A RN pump in service
* An 86N relay actuates on 1ETB Based on the above conditions, which RN pumps are operating one minute later?
A. 1A only B. 1A and 1B only c.
C. 1A and 2B only D. 1A, 1B, and 2B only Page 53 of 100
 
CATAWBA NUCLEAR STATION Question:    54 2009 SRO NRC Examination (1 point)
Unit 1 automatically trips from 100% power and the crew entered EP/1/A/5000/E-0 (Reactor Trip or Safety Injection). Given the following conditions and sequence of events:
* Both trains of CA SYS VL V RESET are "RESET"
* Both trains of CA SYS VL V RESET are "RESET"
* CA flow is throttled to maintain proper S/G levels
* CA flow is throttled to maintain proper S/G levels
* A complete loss of VI pressure occurs How is manual control of the CA flow control valves and CA flow affected by the loss of VI pressure?
* A complete loss of VI pressure occurs How is manual control of the CA flow control valves and CA flow affected by the loss of VI pressure?
A. Control of the CA flow control valves is immediately lost and CA flow will immediately decrease B. Control of the CA flow control valves is immediately lost and CA flow will immediately increase C. Control of the CA flow control valves is maintained for at least 1 hour, and then CA flow will decrease D. Control of the CA flow control valves is maintained for at least 1 hour, and then CA flow will increase Page 54 of 100 Question:
A.     Control of the CA flow control valves is immediately lost and CA flow will immediately decrease B.     Control of the CA flow control valves is immediately lost and CA flow will immediately increase C.     Control of the CA flow control valves is maintained for at least 1 hour, and then CA flow will decrease D.     Control of the CA flow control valves is maintained for at least 1 hour, and then CA flow will increase Page 54 of 100
54 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 automatically trips from 100% power and the crew entered EP/1/A/5000/E-0 (Reactor Trip or Safety Injection).
 
Given the following conditions and sequence of events:
CATAWBA NUCLEAR STATION Question:    55 2009 SRO NRC Examination (1 point)
* Both trains of CA SYS VL V RESET are "RESET"
Unit 1 was operating at 100% power. At 1000, a secondary steam leak occurred in the Unit 1 containment. The crew has started a controlled shutdown using AP/1/A/55001009 (Rapid Downpower). Containment pressure and temperature trends AP/1/A/5500/009 indicate:
* CA flow is throttled to maintain proper S/G levels
Time       Temperatu T emperatu re     Pressure 1000           113&deg;F         0.15   psig 1005           11 rF 11rF          0.28   psig 1010           119&deg;F         0.42   psig 1015           122&deg;F         0.48   psig 1020           126&deg;F         0.65   psig 1025           129&deg;F         0.91   psig No manual operator actions have been taken related to LCVU operation.
* A complete loss of VI pressure occurs How is manual control of the CA flow control valves and CA flow affected by the loss of VI pressure?
During which time period did the Lower Containment Ventilation Units (LCVUs) cooling water bypass valves (full flow valves) automatically open?
A. Control of the CA flow control valves is immediately lost and CA flow will immediately decrease B. Control of the CA flow control valves is immediately lost and CA flow will immediately increase C. Control of the CA flow control valves is maintained for at least 1 hour, and then CA flow will decrease D. Control of the CA flow control valves is maintained for at least 1 hour, and then CA flow will increase Page 54 of 100 Question:
A.     Between 1005 and 1010 B.     Between 1010 and 1015 C.     Between 1015 and 1020 D.     Between 1020 and 1025 Page 55 of 100
55 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. At 1000, a secondary steam leak occurred in the Unit 1 containment.
 
The crew has started a controlled shutdown using AP/1/A/5500/009 (Rapid Downpower).
CATAWBA NUCLEAR STATION Question:    56 2009 SRO NRC Examination (1 point)
Containment pressure and temperature trends indicate:
Unit 1 was in Mode 3 at 55rF and 2235 psig with shutdown banks withdrawn in preparation for startup. Given the following conditions and sequence of events:
Time Temperatu re Pressure 1000 113&deg;F 0.15 psig 1005 11rF 0.28 psig 1010 119&deg;F 0.42 psig 1015 122&deg;F 0.48 psig 1020 126&deg;F 0.65 psig 1025 129&deg;F 0.91 psig No manual operator actions have been taken related to LCVU operation.
* 1TXS 1TXS is red tagged tagg ed
During which time period did the Lower Containment Ventilation Units (LCVUs) cooling water bypass valves (full flow valves) automatically open? A. Between 1005 and 1010 B. Between 1010 and 1015 C. Between 1015 and 1020 D. Between 1020 and 1025 Page 55 of 100 Question:
55 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. At 1000, a secondary steam leak occurred in the Unit 1 containment.
The crew has started a controlled shutdown using AP/1/A/55001009 (Rapid Downpower).
Containment pressure and temperature trends indicate:
Time T emperatu re Pressure 1000 113&deg;F 0.15 psig 1005 11 rF 0.28 psig 1010 119&deg;F 0.42 psig 1015 122&deg;F 0.48 psig 1020 126&deg;F 0.65 psig 1025 129&deg;F 0.91 psig No manual operator actions have been taken related to LCVU operation.
During which time period did the Lower Containment Ventilation Units (LCVUs) cooling water bypass valves (full flow valves) automatically open? A. Between 1005 and 1010 B. Between 1010 and 1015 C. Between 1015 and 1020 D. Between 1020 and 1025 Page 55 of 100 Question:
56 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was in Mode 3 at 55rF and 2235 psig with shutdown banks withdrawn in preparation for startup. Given the following conditions and sequence of events:
* 1TXS is red tagged
* A fault results in a loss of all loads on the short side of 1TC Which MG set(s) has/have a power supply available and what procedure is entered to address the above conditions?
* A fault results in a loss of all loads on the short side of 1TC Which MG set(s) has/have a power supply available and what procedure is entered to address the above conditions?
A. Only 1 B MG set; EP/1/AI5000/E-O (Reactor Trip or Safety Injection)
A.     Only 1B MG set; EP/1/AI5000/E-O (Reactor Trip or Safety Injection)
B. Only 1B MG set; AP/1/A/55001004 (Loss of Reactor Coolant Pump) C. 1A and 1B MG sets; EP/11A15000/E-O (Reactor Trip or Safety Injection)
B.                         AP/1/A/55001004 (Loss of Reactor Coolant Pump)
D. 1A and 1B MG sets; AP/11A155001004 (Loss of Reactor Coolant Pump) Page S6 of 100 Question:
Only 1B MG set; AP/1/A/5500/004 C.     1A 1A and 1 1B            EP/11A15000/E-O B MG sets; EP/1     /A/5000/E-O (Reactor Trip or Safety Injection)
56 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was in Mode 3 at 55rF and 2235 psig with shutdown banks withdrawn in preparation for startup. Given the following conditions and sequence of events:
D.     1A and 1B MG sets; AP/1/A/5500/004 AP/11A155001004 (Loss of Reactor Coolant Pump)
* 1 TXS is red tagg ed
Page S6 56 of 100
* A fault results in a loss of all loads on the short side of 1TC Which MG set(s) has/have a power supply available and what procedure is entered to address the above conditions?
 
A. Only 1 B MG set; EP/1/AI5000/E-O (Reactor Trip or Safety Injection)
CATAWBA NUCLEAR STATION Question:      57 2009 SRO NRC Examination (1 point)
B. Only 1B MG set; AP/1/A/5500/004 (Loss of Reactor Coolant Pump) C. 1 A and 1 B MG sets; EP/1 /A/5000/E-O (Reactor Trip or Safety Injection)
Unit 1 is in a mid loop condition conducting a vacuum refill of the NC system at the end of a refueling outage.
D. 1A and 1B MG sets; AP/1/A/5500/004 (Loss of Reactor Coolant Pump) Page 56 of 100 Question:
Which one of the following reactor vessel level instruments will provide the greatest accuracy for this condition?
57 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in a mid loop condition conducting a vacuum refill of the NC system at the end of a refueling outage. Which one of the following reactor vessel level instruments will provide the greatest accuracy for this condition?
A.       NC level loop indication B.       Sight glass loop indication C.       Ultrasonic level indication D.       RVLlS lower range indication Page 57 of 100
A. NC level loop indication B. Sight glass loop indication C. Ultrasonic level indication D. RVLlS lower range indication Page 57 of 100 Question:
 
57 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in a mid loop condition conducting a vacuum refill of the NC system at the end of a refueling outage. Which one of the following reactor vessel level instruments will provide the greatest accuracy for this condition?
CATAWBA NUCLEAR STATION Question:      58 2009 SRO NRC Examination (1 point)
A. NC level loop indication B. Sight glass loop indication C. Ultrasonic level indication D. RVLlS lower range indication Page 57 of 100 Question:
Unit 1 is operating at 100%. Given the following indications:
58 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100%. Given the following indications:
* Pressurizer level is 61 % and increasing
* Pressurizer level is 61 % and increasing
* Spray valves have throttled open and pressurizer pressure is slowly decreasing towards normal pressure
* Spray valves have throttled open and pressurizer pressure is slowly decreasing towards normal pressure
* Charging flow initially decreased and has stabilized at a lower flow rate
* Charging flow initially decreased and has stabilized at a lower flow rate
* Letdown flow is 0 gpm
* Letdown flow is 0 gpm
* All pressurizer heaters are off 1. Which one of the following failures would account for all these indications?
* All pressurizer heaters are off
: 2. What procedure will be used to address the results of this failure? A. 1. Selected Pressurizer Level (SPL-1) "PZR LVL LOW" output signal is present 2. AP/1/AI5500/012 (Loss of Charging or Letdown) B. 1. Channel 1 pressurizer level/pressure common reference leg is leaking 2. AP/1/A/5500/012 (Loss of Charging or Letdown) C. 1. Selected Pressurizer Level (SPL-2) "PZR LVL LOW" output signal is present 2. AP/1/A/5500/011 (Pressurizer Pressure Anomalies)
: 1. Which one of the following failures would account for all these indications?
D. 1. Channel 1 pressurizer level/pressure common reference leg is leaking 2. AP/1/AI5500/011 (Pressurizer Pressure Anomalies)
: 2. What procedure will be used to address the results of this failure?
Page 58 of 100 Question:
A.       1. Selected Pressurizer Level (SPL-1) "PZR LVL LOW" output signal is present
58 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100%. Given the following indications:
: 2. AP/1/AI5500/012 AP/1/A155001012 (Loss of Charging or Letdown)
* Pressurizer level is 61 % and increasing
B.       1. Channel 1 pressurizer level/pressure common reference leg is leaking
* Spray valves have throttled open and pressurizer pressure is slowly decreasing towards normal pressure
: 2. AP/1/A/5500/012 AP/1/A/55001012 (Loss of Charging or Letdown)
* Charging flow initially decreased and has stabilized at a lower flow rate
C.       1. Selected Pressurizer Level (SPL-2) "PZR LVL LOW" output signal is present
* Letdown flow is 0 gpm
: 2. AP/1/A/5500/011 AP/1/A/55001011 (Pressurizer Pressure Anomalies)
* All pressurizer heaters are off 1. Which one of the following failures would account for all these indications?
D.       1. Channel 1 pressurizer level/pressure common reference leg is leaking
: 2. What procedure will be used to address the results of this failure? A. 1. Selected Pressurizer Level (SPL-1) "PZR LVL LOW" output signal is present 2. AP/1/A155001012 (Loss of Charging or Letdown) B. 1. Channel 1 pressurizer level/pressure common reference leg is leaking 2. AP/1/A/55001012 (Loss of Charging or Letdown) C. 1. Selected Pressurizer Level (SPL-2) "PZR LVL LOW" output signal is present 2. AP/1/A/55001011 (Pressurizer Pressure Anomalies)
: 2. AP/1/AI5500/011 AP/1/A155001011 (Pressurizer Pressure Anomalies)
D. 1. Channel 1 pressurizer level/pressure common reference leg is leaking 2. AP/1/A155001011 (Pressurizer Pressure Anomalies)
Page S8 58 of 100
Page S8 of 100 Question:
 
59 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Assuming intermediate range N-35 channel compensation voltage is lost and a reactor trip occurs: 1. How will N-35 indication compare to N-36 when actual reactor power has decreased into the source range? 2. What is the minimum number of intermediate range instruments required to be below the P6 setpoint to automatically re-energize the source range instruments N-31 and N-32? A. 1. N-35 will read higher than N-36 2. One B. 1. N-35 will read higher than N-36 2. Two c. 1. N-35 will read lower than N-36 2. One D. 1. N-35 will read lower than N-36 2. Two Page 59 of 100 Question:
CATAWBA NUCLEAR STATION Question:      59 2009 SRO NRC Examination (1 point)
59 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Assuming intermediate range N-35 channel compensation voltage is lost and a reactor trip occurs: 1. How will N-35 indication compare to N-36 when actual reactor power has decreased into the source range? 2. What is the minimum number of intermediate range instruments required to be below the P6 setpoint to automatically re-energize the source range instruments N-31 and N-32? A. 1. N-35 will read higher than N-36 2. One B. 1. N-35 will read higher than N-36 2. Two c. 1. N-35 will read lower than N-36 2. One D. 1. N-35 will read lower than N-36 2. Two Page S9 of 100 Question:
Unit 1 is operating at 100% power. Assuming intermediate range N-35 channel compensation voltage is lost and a reactor trip occurs:
60 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
: 1. How will N-35 indication compare to N-36 when actual reactor power has decreased into the source range?
: 2. What is the minimum number of intermediate range instruments required to be below the P6 setpoint to automatically re-energize the source range instruments N-31 and N-32?
A.       1. N-35 will read higher than N-36
: 2. One B.       1. N-35 will read higher than N-36
: 2. Two
: c.       1. N-35 will read lower than N-36
: 2. One D.       1. N-35 will read lower than N-36
: 2. Two Page 59 S9 of 100
 
CATAWBA NUCLEAR STATION Question:      60 2009 SRO NRC Examination (1 point)
Unit 1 is operating at 100% power. Given the following:
* Containment Pressure Channel I failed high
* Containment Pressure Channel I failed high
* The failed channel is bypassed Which of the following lists the logic for a Containment Spray actuation based on the conditions above? A. 1/3 B. 2/3 C. 1/2 D. 2/2 Page 60 of 100 Question:
* The failed channel is bypassed Which of the following lists the logic for a Containment Spray actuation based on the conditions above?
60 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following:
A.       1/3 B.       2/3 C.       1/2 D.       2/2 Page 60 of 100
* Containment Pressure Channel I failed high
 
* The failed channel is bypassed Which of the following lists the logic for a Containment Spray actuation based on the conditions above? A. 1/3 B. 2/3 C. 1/2 D. 2/2 Page 60 of 100 Question:
CATAWBA NUCLEAR STATION Question:      61 2009 SRO NRC Examination (1 point)
61 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Regarding hydrogen production during a design basis large break LOCA: 1. Which one of the following is a larger contributor to post LOCA hydrogen buildup in containment?
Regarding hydrogen production during a design basis large break LOCA:
: 1. Which one of the following is a larger contributor to post LOCA hydrogen buildup in containment?
: 2. Per OP/11A16450101 0 (Containment Hydrogen Control Systems).
: 2. Per OP/11A16450101 0 (Containment Hydrogen Control Systems).
what minimum containment hydrogen concentration requires Technical Support Center (TSC) approval prior to placing the Hydrogen Recombiners in service? A. 1. Zirc-Water reaction in core region 2.4% B. 1. Zirc-Water reaction in core region 2. 6% C. 1. Dissolved hydrogen in the NC System 2.4% D. 1. Dissolved hydrogen in the NC System 2. 6% Page 61 of 100 Question:
Systems), what minimum containment hydrogen concentration requires Technical Support Center (TSC) approval prior to placing the Hydrogen Recombiners in service?
61 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Regarding hydrogen production during a design basis large break LOCA: 1. Which one of the following is a larger contributor to post LOCA hydrogen buildup in containment?
A.     1. Zirc-Water reaction in core region
: 2. Per OP/11A16450101 0 (Containment Hydrogen Control Systems), what minimum containment hydrogen concentration requires Technical Support Center (TSC) approval prior to placing the Hydrogen Recombiners in service? A. 1. Zirc-Water reaction in core region 2. 4% B. 1. Zirc-Water reaction in core region 2. 6% C. 1. Dissolved hydrogen in the NC System 2. 4% D. 1. Dissolved hydrogen in the NC System 2. 6% Page 61 of 100 Question:
: 2. 4%
62 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
2.4%
B.     1. Zirc-Water reaction in core region
: 2. 6%
C.     1. Dissolved hydrogen in the NC System 2.4%
: 2. 4%
D.     1. Dissolved hydrogen in the NC System
: 2. 6%
Page 61 of 100
 
CATAWBA NUCLEAR STATION Question:      62 2009 SRO NRC Examination (1 point)
Given the following:
* A transfer of control to the Standby Shutdown Facility (SSF) has been completed
* A transfer of control to the Standby Shutdown Facility (SSF) has been completed
* Natural circulation is being verified per OP/01B/61001013 (Standby Shutdown Facility Operations)
* Natural circulation is being verified per OP/01B/61001013 OP/O/B/61 001013 (Standby Shutdown Facility Operations)
* NC system pressure is 1700 psig
* NC system pressure is 1700 psig
* In-core thermocouple readings are: o 582&deg;F o 610&deg;F o 588&deg;F o 600&deg;F o 585&deg;F 1. Per OP/0/B/&#xa3;1 001013, what NC system pressure indication is used for the purpose of determining the status of natural circulation?
* In-core thermocouple readings are:
: 2. For the given conditions, does natural circulation currently exist? A. 1. Pressurizer pressure 2. Yes B. 1. Pressurizer pressure 2. No Reference provided C. 1. NC Loop B WR pressure 2. Yes D. 1. NC Loop B WR pressure 2. No Page 62 of 100 Question:
o 582&deg;F o 610&deg;F o 588&deg;F o 600&deg;F o 585&deg;F
62 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
: 1. Per OP/0/B/&#xa3;1 OP/O/B/61 001013, what NC system pressure indication is used for the purpose of determining the status of natural circulation?
* A transfer of control to the Standby Shutdown Facility (SSF) has been completed
: 2. For the given conditions, does natural circulation currently exist?
* Natural circulation is being verified per OP/O/B/61 001013 (Standby Shutdown Facility Operations)
Reference provided A.       1. Pressurizer pressure
* NC system pressure is 1700 psig
: 2. Yes B.       1. Pressurizer pressure
* In-core thermocouple readings are: o 582&deg;F o 610&deg;F o 588&deg;F o 600&deg;F o 585&deg;F 1. Per OP/O/B/61 001013, what NC system pressure indication is used for the purpose of determining the status of natural circulation?
: 2. No C.       1. NC Loop B WR pressure
: 2. For the given conditions, does natural circulation currently exist? A. 1. Pressurizer pressure 2. Yes B. 1. Pressurizer pressure 2. No Reference provided C. 1. NC Loop B WR pressure 2. Yes D. 1. NC Loop B WR pressure 2. No Page 62 of 100 Question:
: 2. Yes D.       1. NC Loop B WR pressure
63 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Initial Conditions
: 2. No Page 62 of 100
 
CATAWBA NUCLEAR STATION Question:      63 2009 SRO NRC Examination (1 point)
Unit 1 was operating at 100% power.
Initial Conditions
* Both CF pumps tripped
* Both CF pumps tripped
* No CA pumps could be started
* No CA pumps could be started
* WR level in all S/Gs is 0%
* WR level in all S/Gs is 0%
* The crew established bleed and feed per EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) Current Conditions
* EP/1 /A/5000/FR-H.1 (Response to The crew established bleed and feed per EP/1/A/5000/FR-H.1 Loss of Secondary Heat Sink)
Current Conditions
* CA is available
* CA is available
* Core exit thermocouple temperatures are decreasing Based on the current conditions, how does EP/1/A/5000/FR-H.1 initially direct CA flow to be established?
* Core exit thermocouple temperatures are decreasing Based on the current conditions, how does EP/1/A/5000/FR-H.1 initially direct CA flow to be established?
A. Feed 1 S/G at greater than 450 gpm B. Feed 4 S/Gs at a total flow of greater than 450 gpm C. Feed 1 S/G at less than or equal to 100 gpm D. Feed 4 S/Gs at less than or equal to 100 gpm each Page 63 of 100 Question:
A.       Feed 1 S/G at greater than 450 gpm B.       Feed 4 S/Gs at a total flow of greater than 450 gpm C.       Feed 1 S/G at less than or equal to 100 gpm D.       Feed 4 S/Gs at less than or equal to 100 gpm each Page 63 of 100
63 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Initial Conditions
 
* Both CF pumps tripped
CATAWBA NUCLEAR STATION Question:      64 2009 SRO NRC Examination (1 point)
* No CA pumps could be started
Unit 1 is at 14% power synchronizing the turbine to the grid.
* WR level in all S/Gs is 0%
: 1. What is the normal position of the "STEAM DUMP SELECT" switch for current conditions?
* The crew established bleed and feed per EP/1 /A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) Current Conditions
* CA is available
* Core exit thermocouple temperatures are decreasing Based on the current conditions, how does EP/1/A/5000/FR-H.1 initially direct CA flow to be established?
A. Feed 1 S/G at greater than 450 gpm B. Feed 4 S/Gs at a total flow of greater than 450 gpm C. Feed 1 S/G at less than or equal to 100 gpm D. Feed 4 S/Gs at less than or equal to 100 gpm each Page 63 of 100 Question:
64 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is at 14% power synchronizing the turbine to the grid. 1. What is the normal position of the "STEAM DUMP SELECT" switch for current conditions?
: 2. How will steam dump demand respond to a turbine trip under current conditions?
: 2. How will steam dump demand respond to a turbine trip under current conditions?
A. 1. "PRESS" 2. decrease B. 1. "PRESS" 2. increase C. 1. "T-AVG" 2. decrease D. 1. "T-AVG" 2. increase Page 64 of 100 Question:
A.       1. "PRESS"
64 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is at 14% power synchronizing the turbine to the grid. 1. What is the normal position of the "STEAM DUMP SELECT" switch for current conditions?
: 2. decrease B.       1. "PRESS"
: 2. How will steam dump demand respond to a turbine trip under current conditions?
: 2. increase C.       1. "T-AVG"
A. 1. "PRESS" 2. decrease B. 1. "PRESS" 2. increase C. 1. "T-AVG" 2. decrease D. 1. "T-AVG" 2. increase Page 64 of 100 Question:
: 2. decrease D.       1. "T-AVG"
65 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 80% power when the turbine tripped due to an inadvertent generator over frequency signal. Which of the following lists automatic actions that will all occur as a result of this turbine trip? 1. Steam dumps actuate in Plant Trip mode 2. Zone 1A and Zone 1 B Lockouts occur 3. C-Heater Drain Pumps trip 4. Feedwater heater extraction steam check valves close A. 1,2 and 3 B. 1,3 and 4 C. 2,3 and 4 D. 1,2 and 4 Page 65 of 100 Question:
: 2. increase Page 64 of 100
65 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 80% power when the turbine tripped due to an inadvertent generator over frequency signal. Which of the following lists automatic actions that will all occur as a result of this turbine trip? 1. Steam dumps actuate in Plant Trip mode 2. Zone 1A and Zone 1 B Lockouts occur 3. C-Heater Drain Pumps trip 4. Feedwater heater extraction steam check valves close A. 1,2 and 3 B. 1,3 and 4 C. 2,3 and 4 D. 1,2 and 4 Page 65 of 100 Question:
 
66 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Per NSD 512 (Maintenance of RO/SRO Licenses).
CATAWBA NUCLEAR STATION Question:      65 2009 SRO NRC Examination (1 point)
which of the following lists two requirements to maintain an Active RO License? A. 1. Serve in the RO or BOP position for 5 complete 12 hour shifts per quarter 2. Complete a plant tour in the areas listed in NSD 512 once per quarter B. 1. Serve in the RO or BOP position for 5 complete 12 hour shifts per quarter 2. Maintain respirator qualifications current C. 1. Serve in the RO or BOP position for 40 hours per quarter including shift turnovers
Unit 1 was operating at 80% power when the turbine tripped due to an inadvertent generator over frequency signal.
: 2. Complete a plant tour in the areas listed in NSD 512 once per quarter. D. 1. Serve in the RO or BOP position for 40 hours per quarter including shift turnovers
Which of the following lists automatic actions that will all occur as a result of this turbine trip?
: 2. Maintain respirator qualifications current Page 66 of 100 Question:
: 1. Steam dumps actuate in Plant Trip mode
66 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Per NSD 512 (Maintenance of RO/SRO Licenses).
: 2. Zone 1A and Zone 1 B Lockouts occur
which of the following lists two requirements to maintain an Active RO License? A. 1. Serve in the RO or BOP position for 5 complete 12 hour shifts per quarter 2. Complete a plant tour in the areas listed in NSD 512 once per quarter B. 1. Serve in the RO or BOP position for 5 complete 12 hour shifts per quarter 2. Maintain respirator qualifications current C. 1. Serve in the RO or BOP position for 40 hours per quarter including shift turnovers
: 3. C-Heater Drain Pumps trip
: 2. Complete a plant tour in the areas listed in NSD 512 once per quarter. D. 1. Serve in the RO or BOP position for 40 hours per quarter including shift turnovers
: 4. Feedwater heater extraction steam check valves close A.       1,2 and 3 B.       1,3 and 4 C.     2,3 and 4 D.       1,2 and 4 Page 65 of 100
: 2. Maintain respirator qualifications current Page 66 of 100 Question:
 
67 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Per OMP 2-31 (Control Room Instrumentation Status): 1. Where is a list of active Increased Surveillances required to be maintained?
CATAWBA NUCLEAR STATION Question:    66 2009 SRO NRC Examination (1 point)
Per NSD 512 (Maintenance of RO/SRO Licenses). which of the following lists two requirements to maintain an Active RO License?
A. 1. Serve in the RO or BOP position for 5 complete 12 hour shifts per quarter
: 2. Complete a plant tour in the areas listed in NSD 512 once per quarter B. 1. Serve in the RO or BOP position for 5 complete 12 hour shifts per quarter
: 2. Maintain respirator qualifications current C. 1. Serve in the RO or BOP position for 40 hours per quarter including shift turnovers
: 2. Complete a plant tour in the areas listed in NSD 512 once per quarter.
D. 1. Serve in the RO or BOP position for 40 hours per quarter including shift turnovers
: 2. Maintain respirator qualifications current Page 66 of 100
 
CATAWBA NUCLEAR STATION Question:    67 2009 SRO NRC Examination (1 point)
Per OMP 2-31 (Control Room Instrumentation Status):
: 1. Where is a list of active Increased Surveillances required to be maintained?
: 2. Who (by title) determines the monitoring frequency of an Increased Surveillance?
: 2. Who (by title) determines the monitoring frequency of an Increased Surveillance?
A. 1. OPS Shift Routine Logbook 2.0SM B. 1. OPS Shift Routine Logbook 2. Unit Supervisor C. 1. AUTOLOG 2.0SM D. 1. AUTOLOG 2. Unit Supervisor Page 67 of 100 Question:
A. 1. OPS Shift Routine Logbook 2.0SM B. 1. OPS Shift Routine Logbook
67 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Per OMP 2-31 (Control Room Instrumentation Status): 1. Where is a list of active Increased Surveillances required to be maintained?
: 2. Unit Supervisor C. 1. AUTOLOG 2.0SM D. 1. AUTOLOG
: 2. Who (by title) determines the monitoring frequency of an Increased Surveillance?
: 2. Unit Supervisor Page 67 of 100
A. 1. OPS Shift Routine Logbook 2.0SM B. 1. OPS Shift Routine Logbook 2. Unit Supervisor C. 1. AUTOLOG 2.0SM D. 1. AUTOLOG 2. Unit Supervisor Page 67 of 100 Question:
 
68 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination The crane operator has determined that a fuel handling interlock must be bypassed that is not addressed by a procedure.
CATAWBA NUCLEAR STATION Question:      68 2009 SRO NRC Examination (1 point)
The crane operator has determined that a fuel handling interlock must be bypassed that is not addressed by a procedure.
Assume approval has been obtained to bypass the interlock.
Assume approval has been obtained to bypass the interlock.
In accordance with OP/1/A/65501007 (Reactor Building Manipulator Crane Operation) which of the following, by title, must be notified when any "Interlock Bypass" is placed into and removed from bypass when handling new fuel assemblies?
In accordance with OP/1/A/65501007 OP/1/A/6550/007 (Reactor Building Manipulator Crane Operation) which of the following, by title, must be notified when any "Interlock Bypass" is placed into and removed from bypass when handling new fuel assemblies?
A. WCCSRO B. Control Room Supervisor C. Reactor Systems Engineer D. Fuel Handling Equipment Engineer Page 68 of 100 Question:
A.       WCCSRO B.       Control Room Supervisor C.       Reactor Systems Engineer D.       Fuel Handling Equipment Engineer Page 68 of 100
68 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination The crane operator has determined that a fuel handling interlock must be bypassed that is not addressed by a procedure.
 
Assume approval has been obtained to bypass the interlock.
CATAWBA NUCLEAR STATION Question:      69 2009 SRO NRC Examination (1 point)
In accordance with OP/1/A/6550/007 (Reactor Building Manipulator Crane Operation) which of the following, by title, must be notified when any "Interlock Bypass" is placed into and removed from bypass when handling new fuel assemblies?
Which one of the following completes the statement:
A. WCCSRO B. Control Room Supervisor C. Reactor Systems Engineer D. Fuel Handling Equipment Engineer Page 68 of 100 Question:
At         power and increasing, the flow restricting orifice on the _ _ _ S/Gs will begin forcing flow through the CA nozzle.
69 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Which one of the following completes the statement:
A.     15%; Unit 1 B.     40%; Unit 1 C.     15%; Unit 2 D.             Unit 2 40%; Unit2 Page 69 of 100
At power and increasing, the flow restricting orifice on the ___ S/Gs will begin forcing flow through the CA nozzle. A. 15%; Unit 1 B. 40%; Unit 1 C. 15%; Unit 2 D. 40%; Unit2 Page 69 of 100 Question:
 
69 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Which one of the following completes the statement:
CATAWBA NUCLEAR STATION Question:      70 2009 SRO NRC Examination (1 point)
At power and increasing, the flow restricting orifice on the ___ S/Gs will begin forcing flow through the CA nozzle. A. 15%; Unit 1 B. 40%; Unit 1 C. 15%; Unit 2 D. 40%; Unit 2 Page 69 of 100 Question:
Unit 1 NC system conditions are 248&deg;F and 600 psig.
70 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 NC system conditions are 248&deg;F and 600 psig. 1. For the stated plant conditions, is the FWST required to be operable per Technical Specification 3.5.4 (Refueling Water Storage Tank)? 2. When the FWST is required to be operable, and the FWST is below the borated water volume required by SR 3.5.4.2, what is the required action?
: 1. For the stated plant conditions, is the FWST required to be operable per Technical Specification 3.5.4 (Refueling Water Storage Tank)?
A. 1. No 2. Immediately take action to restore the FWST to operable status B. 1. No 2. Restore the FWST to operable status within 1 hour C. 1. Yes 2. Immediately take action to restore the FWST to operable status D. 1. Yes 2. Restore the FWST to operable status within 1 hour Page 70 of 100 Question:
: 2. When the FWST is required to be operable, and the FWST is below the borated water volume required by SR 3.5.4.2, what is the required action?
70 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 NC system conditions are 248&deg;F and 600 psig. 1. For the stated plant conditions, is the FWST required to be operable per Technical Specification 3.5.4 (Refueling Water Storage Tank)? 2. When the FWST is required to be operable, and the FWST is below the borated water volume required by SR 3.5.4.2, what is the required action? A. 1. No 2. Immediately take action to restore the FWST to operable status B. 1. No 2. Restore the FWST to operable status within 1 hour C. 1. Yes 2. Immediately take action to restore the FWST to operable status D. 1. Yes 2. Restore the FWST to operable status within 1 hour Page 70 of 100 Question:
A.     1. No
71 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination The NV system is being aligned for startup. The procedure being used calls for independent verification of a single valve located in a room with a general dose rate of 130mRlhr.
: 2. Immediately take action to restore the FWST to operable status B.     1. No
: 2. Restore the FWST to operable status within 1 hour C.     1. Yes
: 2. Immediately take action to restore the FWST to operable status D.     1. Yes
: 2. Restore the FWST to operable status within 1 hour Page 70 of 100
 
CATAWBA NUCLEAR STATION Question:    71 2009 SRO NRC Examination (1 point)
The NV system is being aligned for startup. The procedure being used calls for independent verification of a single valve located in a room with a general dose rate of 130mR/hr.
130mRlhr.
Given the following conditions:
Given the following conditions:
* Estimated time to independently verify the valve's position is 10 minutes
* Estimated time to independently verify the valve's position is 10 minutes
Line 701: Line 818:
* There is no airbome activity in this room
* There is no airbome activity in this room
* The room has no surface contamination areas
* The room has no surface contamination areas
* Assume any necessary approvals are obtained Per NSD 700 (Verification Techniques), can independent verification of the valve above be waived and why or why not? A. Yes, because the general area dose rate is greater than 100mRlhr B. No, because the general area dose rate is less than 1 Rlhr c. Yes, because the radiation exposure for a single verification would exceed the allowable limit D. No, because radiation exposure for a single verification is within the allowable limit Page 71 of 100 Question:
* Assume any necessary approvals are obtained Per NSD 700 (Verification Techniques), can independent verification of the valve above be waived and why or why not?
71 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination The NV system is being aligned for startup. The procedure being used calls for independent verification of a single valve located in a room with a general dose rate of 130mR/hr.
A. Yes, because the general area dose rate is greater than 100mRlhr B. No, because the general area dose rate is less than 1 Rlhr
Given the following conditions:
: c. Yes, because the radiation exposure for a single verification would exceed the allowable limit D. No, because radiation exposure for a single verification is within the allowable limit Page 71 of 100
* Estimated time to independently verify the valve's position is 10 minutes
 
* There are no known hot spots in the area
CATAWBA NUCLEAR STATION Question:      72 2009 SRO NRC Examination (1 point)
* There is no airbome activity in this room
Unit 1 is operating at 75% power. An engineer needs to enter the Reactor Building pipechase area to perform some scoping work for a future modification.
* The room has no surface contamination areas
* Assume any necessary approvals are obtained Per NSD 700 (Verification Techniques), can independent verification of the valve above be waived and why or why not? A. Yes, because the general area dose rate is greater than 100mRlhr B. No, because the general area dose rate is less than 1 Rlhr c. Yes, because the radiation exposure for a single verification would exceed the allowable limit D. No, because radiation exposure for a single verification is within the allowable limit Page 71 of 100 Question:
72 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 75% power. An engineer needs to enter the Reactor Building pipechase area to perform some scoping work for a future modification.
Per Site Directive 3.1.2 (Access to Reactor Building and Areas Having High Pressure Steam Relief Devices):
Per Site Directive 3.1.2 (Access to Reactor Building and Areas Having High Pressure Steam Relief Devices):
: 1. For current plant conditions, whose permission is required to allow entry into this area? 2. What operational modes require use of the "buddy system" for entry into the Reactor Building?
: 1. For current plant conditions, whose permission is required to allow entry into this area?
A. 1. Radiation Protection and the WCC SRO 2. Modes 1 and 2 only B. 1. Radiation Protection and the WCC SRO 2. Modes 1,2,3 and 4 C. 1. Radiation Protection only 2. Modes 1 and 2 only D. 1. Radiation Protection only 2. Modes 1,2,3 and 4 Page 72 of 100 Question:
: 2. What operational modes require use of the "buddy system" for entry into the Reactor Building?
72 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 75% power. An engineer needs to enter the Reactor Building pipechase area to perform some scoping work for a future modification.
A.       1. Radiation Protection and the WCC SRO
Per Site Directive 3.1.2 (Access to Reactor Building and Areas Having High Pressure Steam Relief Devices):
: 2. Modes 1 and 2 only B.       1. Radiation Protection and the WCC SRO
: 1. For current plant conditions, whose permission is required to allow entry into this area? 2. What operational modes require use of the "buddy system" for entry into the Reactor Building?
: 2. Modes 1,2,3 and 4 C.       1. Radiation Protection only
A. 1. Radiation Protection and the WCC SRO 2. Modes 1 and 2 only B. 1. Radiation Protection and the WCC SRO 2. Modes 1,2,3 and 4 C. 1. Radiation Protection only 2. Modes 1 and 2 only D. 1. Radiation Protection only 2. Modes 1,2,3 and 4 Page 72 of 100 Question:
: 2. Modes 1 and 2 only D.       1. Radiation Protection only
73 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination An RWP that you are preparing to work under states that the highest dose rate in a particular area (at 30 cm) is 325 mRlhr. When you arrive at the work site, a flashing yellow light is noted in the entry path to the area. 1. How would an area with the dose rate specified in the RWP be designated?
: 2. Modes 1,2,3 and 4 Page 72 of 100
: 2. What is the significance of the flashing yellow light? A. 1. Rad iation Area 2. Radiography is in progress B. 1. High Radiation Area 2. Radiography is in progress c. 1. Radiation Area 2. The area has been designated as a "Locked" High Radiation Area D. 1. High Radiation Area 2. The area has been designated as a "Locked" High Radiation Area Page 73 of 100 Question:
 
73 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination An RWP that you are preparing to work under states that the highest dose rate in a particular area (at 30 cm) is 325 mRlhr. When you arrive at the work site, a flashing yellow light is noted in the entry path to the area. 1. How would an area with the dose rate specified in the RWP be designated?
CATAWBA NUCLEAR STATION Question:      73 2009 SRO NRC Examination (1 point)
: 2. What is the significance of the flashing yellow light? A. 1. Radiation Area 2. Radiography is in progress B. 1. High Radiation Area 2. Radiography is in progress c. 1. Radiation Area 2. The area has been designated as a "Locked" High Radiation Area D. 1. High Radiation Area 2. The area has been designated as a "Locked" High Radiation Area Page 73 of 100 Question:
An RWP that you are preparing to work under states that the highest dose rate in a particular area (at 30 cm) is 325 mRlhr. When you arrive at the work site, a flashing yellow light is noted in the entry path to the area.
74 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a complete loss of offsite power occurred.
: 1. How would an area with the dose rate specified in the RWP be designated?
A LOCA occurred as a result of the transient.
: 2. What is the significance of the flashing yellow light?
Given the following conditions:
A.         Rad iation Area
: 1. Radiation
: 2. Radiography is in progress B.       1. High Radiation Area
: 2. Radiography is in progress
: c.       1. Radiation Area
: 2. The area has been designated as a "Locked" High Radiation Area D.       1. High Radiation Area
: 2. The area has been designated as a "Locked" High Radiation Area Page 73 of 100
 
CATAWBA NUCLEAR STATION Question:      74 2009 SRO NRC Examination (1 point)
Unit 1 was operating at 100% power when a complete loss of offsite power occurred.
A LOCA occurred as a result of the transient. Given the following conditions:
* 1A DIG did not start and manual start attempts have failed
* 1A DIG did not start and manual start attempts have failed
* Containment pressure is 3.4 psig
* Containment pressure is 3.4 psig
Line 734: Line 858:
* IIR SUR is 0 DPM
* IIR SUR is 0 DPM
* SIR SUR is 0.3 DPM Which one of the following is the highest priority Critical Safety Function for the given plant conditions?
* SIR SUR is 0.3 DPM Which one of the following is the highest priority Critical Safety Function for the given plant conditions?
A. SUBCRITICALITY B. CORE COOLING C. CONTAINMENT D. HEAT SINK Page 74 of 100 Question:
A.     SUBCRITICALITY B.     CORE COOLING C.     CONTAINMENT D.       HEAT SINK Page 74 of 100
74 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power when a complete loss of offsite power occurred.
 
A LOCA occurred as a result of the transient.
CATAWBA NUCLEAR STATION Question:      75 2009 SRO NRC Examination (1 point)
Given the following conditions:
During an emergency event, which one of the following identifies:
* 1A DIG did not start and manual start attempts have failed
* Containment pressure is 3.4 psig
* NC subcooling is -8&deg;F
* Core exit thermocouples are 642&deg;F
* RVLlS level is 37%
* SIG NR levels are all 13%
* CA has not been reset
* CA flow is 470 gpm
* IIR SUR is 0 DPM
* SIR SUR is 0.3 DPM Which one of the following is the highest priority Critical Safety Function for the given plant conditions?
A. SUBCRITICALITY B. CORE COOLING C. CONTAINMENT D. HEAT SINK Page 74 of 100 Question:
75 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination During an emergency event, which one of the following identifies:
: 1. The on-site emergency facility that assumes responsibility for communications with offsite agencies including the NRC once it is activated?
: 1. The on-site emergency facility that assumes responsibility for communications with offsite agencies including the NRC once it is activated?
: 2. What minimum level of emergency classification always requires an evacuation of all non-essential personnel?
: 2. What minimum level of emergency classification always requires an evacuation of all non-essential personnel?
A. 1. Technical Support Center (TSC) 2. Site Area Emergency B. 1. Technical Support Center (TSC) 2. General Emergency C. 1. Operations Support Center (OSC) 2. Site Area Emergency D. 1. Operations Support Center (OSC) 2. General Emergency Page 75 of 100 Question:
A.       1. Technical Support Center (TSC)
75 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination During an emergency event, which one of the following identifies:
: 2. Site Area Emergency B.       1. Technical Support Center (TSC)
: 1. The on-site emergency facility that assumes responsibility for communications with offsite agencies including the NRC once it is activated?
: 2. General Emergency C.       1. Operations Support Center (OSC)
: 2. What minimum level of emergency classification always requires an evacuation of all non-essential personnel?
: 2. Site Area Emergency D.       1. Operations Support Center (OSC)
A. 1. Technical Support Center (TSC) 2. Site Area Emergency B. 1. Technical Support Center (TSC) 2. General Emergency C. 1. Operations Support Center (OSC) 2. Site Area Emergency D. 1. Operations Support Center (OSC) 2. General Emergency Page 75 of 100 Question:
: 2. General Emergency Page 75 of 100
76 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100%. Given the following conditions:
 
CATAWBA NUCLEAR STATION Question:      76 2009 SRO NRC Examination (1 point)
Unit 1 was operating at 100%. Given the following cond  itions:
conditions:
* A pressurizer safety valve opened and did not fully reclose
* A pressurizer safety valve opened and did not fully reclose
* Current Conditions per the OAC are shown to the right: 1. Based on the current conditions what is the temperature downstream of the partially open pressurizer safety valve? 2. Which NC overpressure transient establishes the required relief capacity of the pressurizer safety valves per the Technical Specification Bases? Reference provided A. 1. 550&deg;F 2. NCP locked rotor B. 1. 550&deg;F 2. Main turbine trip C. 1. 320&deg;F 2. NCP locked rotor D. 1. 320&deg;F 2. Main turbine trip Page 76 of 100 Question:
* Current Conditions per the OAC are shown to the right:
76 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100%. Given the following cond itions:
: 1. Based on the current conditions what is the temperature downstream of the partially open pressurizer safety valve?
* A pressurizer safety valve opened and did not fully reclose
: 2. Which NC overpressure transient establishes the required relief capacity of the pressurizer safety valves per the Technical Specification Bases?
* Current Conditions per the OAC are shown to the right: 1. Based on the current conditions what is the temperature downstream of the partially open pressurizer safety valve? 2. Which NC overpressure transient establishes the required relief capacity of the pressurizer safety valves per the Technical Specification Bases? Reference provided A. 1. 550&deg;F 2. NCP locked rotor B. 1. 550&deg;F 2. Main turbine trip C. 1. 320&deg;F 2. NCP locked rotor D. 1. 320&deg;F 2. Main turbine trip Page 76 of 100 Question:
Reference provided A.       1. 550&deg;F
77 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was heating up after a refueling outage. Given the following conditions and sequence of events:
: 2. NCP locked rotor B.       1. 550&deg;F
: 2. Main turbine trip C.       1. 320&deg;F
: 2. NCP locked rotor D.       1. 320&deg;F
: 2. Main turbine trip Page 76 of 100
 
CATAWBA NUCLEAR STATION Question:    77 2009 SRO NRC Examination (1 point)
Unit 1 was heating up after a refueling outage. Given the following conditions and sequence of events:
* NC temperature is 225&deg;F and stable
* NC temperature is 225&deg;F and stable
* 1A NV pump was in service
* 1A NV pump was in service
* An oil leak resulted in damage to the pump rotating element and work is currently in progress to replace the damaged rotating element 1. Which one of the following Selected Licensee Commitments (SLCs) applies based on current conditions?
* An oil leak resulted in damage to the pump rotating element and work is currently in progress to replace the damaged rotating element
: 2. What post maintenance requirement(s) must be completed prior to restoring 1A NV pump to OPERABLE status per the SLCs? A. 1. SLC 16.9-9 (Boration Systems Charging Pump-Shutdown)
: 1. Which one of the following Selected Licensee Commitments (SLCs) applies based on current conditions?
: 2. Post maintenance work order functional only B. 1. SLC 16.9-9 (Boration Systems Charging Pump-Shutdown)
: 2. What post maintenance requirement(s) must be completed prior to restoring 1A NV pump to OPERABLE status per the SLCs?
: 2. Post maintenance work order functional and in-service testing C. 1. SLC 16.9-10 (Boration Systems Charging Pump-Operating)
A.     1. SLC 16.9-9 (Boration Systems Charging Pump-Shutdown)
: 2. Post maintenance work order functional only D. 1. SLC 16.9-10 (Boration Systems Charging Pump-Operating)
: 2. Post maintenance work order functional only B.     1. SLC 16.9-9 (Boration Systems Charging Pump-Shutdown)
: 2. Post maintenance work order functional and in-service testing Page 77 of 100 Question:
: 2. Post maintenance work order functional and in-service testing C.     1. SLC 16.9-10 (Boration Systems Charging Pump-Operating)
77 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was heating up after a refueling outage. Given the following conditions and sequence of events:
: 2. Post maintenance work order functional only D.     1. SLC 16.9-10 (Boration Systems Charging Pump-Operating)
* NC temperature is 225&deg;F and stable
: 2. Post maintenance work order functional and in-service testing Page 77 of 100
* 1A NV pump was in service
 
* An oil leak resulted in damage to the pump rotating element and work is currently in progress to replace the damaged rotating element 1. Which one of the following Selected Licensee Commitments (SLCs) applies based on current conditions?
CATAWBA NUCLEAR STATION Question:      78 2009 SRO NRC Examination (1 point)
: 2. What post maintenance requirement(s) must be completed prior to restoring 1A NV pump to OPERABLE status per the SLCs? A. 1. SLC 16.9-9 (Boration Systems Charging Pump-Shutdown)
Unit 1 was operating at 100% power. Given the following conditions and sequence of events:
: 2. Post maintenance work order functional only B. 1. SLC 16.9-9 (Boration Systems Charging Pump-Shutdown)
: 2. Post maintenance work order functional and in-service testing C. 1. SLC 16.9-10 (Boration Systems Charging Pump-Operating)
: 2. Post maintenance work order functional only D. 1. SLC 16.9-10 (Boration Systems Charging Pump-Operating)
: 2. Post maintenance work order functional and in-service testing Page 77 of 100 Question:
78 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Given the following conditions and sequence of events:
* Manual reactor trip and safety injection occurred due to a tube rupture on 1A S/G
* Manual reactor trip and safety injection occurred due to a tube rupture on 1A S/G
* A complete loss of offsite power occurs
* A complete loss of offsite power occurs
* All S/G pressures have been maintained stable by automatic operation of the S/G PORVs
* All S/G pressures have been maintained stable by automatic operation of the S/G PORVs
* The crew is in EP/1/A/SOOO/E-3 (Steam Generator Tube Rupture) cooling down the NC system to the required core exit temperature based on 1A S/G pressure
* The crew is in EP/1/A/SOOO/E-3 (Steam Generator Tube Rupture) cooling down the NC system to the required core exit temperature based on 1A S/G pressure
* CUrrent NC loop Tcolds are as follows and decreasing: o A Loop -245&deg;F o BLoop -530&deg;F o C Loop -526&deg;F o D Loop -528&deg;F 1. What is the basis for the required core exit temperature selection?
* CUrrent NC loop Tcolds are as follows and decreasing:
o A Loop - 245&deg;F o BLoop - 530&deg;F o C Loop - 526&deg;F o D Loop - 528&deg;F
: 1. What is the basis for the required core exit temperature selection?
: 2. What is the correct procedure flowpath for this situation?
: 2. What is the correct procedure flowpath for this situation?
A. 1. To ensure intact S/G pressures will remain above the main steam isolation setpoint during the NC system cooldown and depressurization
A.     1. To ensure intact S/G pressures will remain above the main steam isolation setpoint during the NC system cooldown and depressurization
: 2. Transition to EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition)
: 2. Transition to EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition)
B. 1. To ensure intact S/G pressures will remain above the main steam isolation setpoint during the NC system cooldown and depressurization
B.     1. To ensure intact S/G pressures will remain above the main steam isolation setpoint during the NC system cooldown and depressurization
: 2. Continue in EP/1/A/5000/E-3 (Steam Generator Tube Rupture) C. 1. To establish and maintain subcooling for the NC system cooldown and depressurization
: 2. Continue in EP/1/A/5000/E-3 (Steam Generator Tube Rupture)
C.     1. To establish and maintain subcooling for the NC system cooldown and depressurization
: 2. Transition to EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition)
: 2. Transition to EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition)
D. 1. To establish and maintain subcooling for the NC system cooldown and depressurization
D.     1. To establish and maintain subcooling for the NC system cooldown and depressurization
: 2. Continue in EP/1/A/5000/E-3 (Steam Generator Tube Rupture) Page 78 of 100 Question:
: 2. Continue in EP/1/A/5000/E-3 (Steam Generator Tube Rupture)
78 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Given the following conditions and sequence of events:
Page 78 of 100
* Manual reactor trip and safety injection occurred due to a tube rupture on 1A S/G
 
* A complete loss of offsite power occurs
CATAWBA NUCLEAR STATION Question:      79 2009 SRO NRC Examination (1 point)
* All S/G pressures have been maintained stable by automatic operation of the S/G PORVs
Unit 1 was operating at 100% power and Unit 2 was in No Mode. Given the following events and conditions:
* The crew is in EP/1/A/SOOO/E-3 (Steam Generator Tube Rupture) cooling down the NC system to the required core exit temperature based on 1A S/G pressure
* CUrrent NC loop Tcolds are as follows and decreasing: o A Loop -245&deg;F o BLoop -530&deg;F o C Loop -526&deg;F o D Loop -528&deg;F 1. What is the basis for the required core exit temperature selection?
: 2. What is the correct procedure flowpath for this situation?
A. 1. To ensure intact S/G pressures will remain above the main steam isolation setpoint during the NC system cooldown and depressurization
: 2. Transition to EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition)
B. 1. To ensure intact S/G pressures will remain above the main steam isolation setpoint during the NC system cooldown and depressurization
: 2. Continue in EP/1/A/5000/E-3 (Steam Generator Tube Rupture) C. 1. To establish and maintain subcooling for the NC system cooldown and depressurization
: 2. Transition to EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition)
D. 1. To establish and maintain subcooling for the NC system cooldown and depressurization
: 2. Continue in EP/1/A/5000/E-3 (Steam Generator Tube Rupture) Page 78 of 100 Question:
79 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power and Unit 2 was in No Mode. Given the following events and conditions:
* Terrorist attack resulted in a total loss of switchyard
* Terrorist attack resulted in a total loss of switchyard
* 1A DIG failed to start
* 1A DIG failed to start
* The OSM orders an evacuation of the control room due to the ongoing security threat per AP/1/A/55001017 (Loss of Control Room) 1. Which Unit 1 CA pump(s) is/are currently available and can be controlled from the location to which the crew is evacuated?
* The OSM orders an evacuation of the control room due to the ongoing security threat per AP/1/A/55001017 (Loss of Control Room)
: 1. Which Unit 1 CA pump(s) is/are currently available and can be controlled from the location to which the crew is evacuated?
: 2. How is secondary side pressure control maintained automatically from the location to which the crew is evacuated?
: 2. How is secondary side pressure control maintained automatically from the location to which the crew is evacuated?
A. 1. CAPT #1 only 2. By the steam line code safety valves B. 1. CAPT #1 only 2. By the S/G PORVs C. 1. CAPT #1 and 1 B motor driven CA Pump 2. By the steam line code safety valves D. 1. CAPT #1 and 1 B motor driven CA Pump 2. By the S/G PORVs Page 79 of 100 Question:
A.       1. CAPT #1 only
79 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power and Unit 2 was in No Mode. Given the following events and conditions:
: 2. By the steam line code safety valves B.       1. CAPT #1 only
* Terrorist attack resulted in a total loss of switchyard
: 2. By the S/G PORVs C.       1. CAPT #1 and 1 B motor driven CA Pump
* 1A DIG failed to start
: 2. By the steam line code safety valves D.       1. CAPT #1 and 1 B motor driven CA Pump
* The OSM orders an evacuation of the control room due to the ongoing security threat per AP/1/A/55001017 (Loss of Control Room) 1. Which Unit 1 CA pump(s) is/are currently available and can be controlled from the location to which the crew is evacuated?
: 2. By the S/G PORVs Page 79 of 100
: 2. How is secondary side pressure control maintained automatically from the location to which the crew is evacuated?
 
A. 1. CAPT #1 only 2. By the steam line code safety valves B. 1. CAPT #1 only 2. By the S/G PORVs C. 1. CAPT #1 and 1 B motor driven CA Pump 2. By the steam line code safety valves D. 1. CAPT #1 and 1 B motor driven CA Pump 2. By the S/G PORVs Page 79 of 100 Question:
CATAWBA NUCLEAR STATION Question:    80 2009 SRO NRC Examination (1 point)
80 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power and Unit 2 was in No Mode. Given the following:
Unit 1 was operating at 100% power and Unit 2 was in No Mode. Given the following:
* 1100 The TCC reported that RTCA (Real Time Contingency Analysis) indicates CNS switchyard voltage would not be adequate if Unit 1 should trip
* 1100 The TCC reported that RTCA (Real Time Contingency Analysis) indicates CNS switchyard voltage would not be adequate if Unit 1 should trip
* 1102 The crew entered AP/1 /A/5500/037 (Generator Voltage and Electric Grid Disturbances), Case I (Abnormal Generator or Grid Voltage)
* 1102 The crew entered AP/1/Al5500/037 AP/1 /A/5500/037 (Generator Voltage and Electric Grid Disturbances), Case I (Abnormal Generator or Grid Voltage)
* 1300 The crew notified SPOC to install jumpers per AM/1/A/51 00/008 (4Kv Essential Power (EPC) System Degraded Voltage Logic) 1. Which one of the following describes the operability of the VCfYC system per Technical Specifications at 1100? 2. What is the basis for installing these jumpers under the current conditions?
* 1300 The crew notified SPOC to install jumpers per AM/1/Al51 AM/1/A/51 00/008 (4Kv Essential Power (EPC) System Degraded Voltage Logic)
A. 1. VC/YC is operable 2. To bypass the 8 second time delay for load shed/sequencer actuation on a blackout signal B. 1. VC/YC is operable 2. To prevent the D/G sequencer from double sequencing if a LOCA occurs C. 1. VC/YC is not operable 2. To bypass the 8 second time delay for load shed/sequencer actuation on a blackout signal D. 1. VC/YC is not operable 2. To prevent the D/G sequencer from double sequencing if a LOCA occurs Page 80 of 100 Question:
: 1. Which one of the following describes the operability of the VCNC VCfYC system per Technical Specifications at 1100?
80 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power and Unit 2 was in No Mode. Given the following:
: 2. What is the basis for installing these jumpers under the current conditions?
* 1100 The TCC reported that RTCA (Real Time Contingency Analysis) indicates CNS switchyard voltage would not be adequate if Unit 1 should trip
A.     1. VC/YC is operable
* 1102 The crew entered AP/1/Al5500/037 (Generator Voltage and Electric Grid Disturbances), Case I (Abnormal Generator or Grid Voltage)
: 2. To bypass the 8 second time delay for load shed/sequencer actuation on a blackout signal B.     1. VC/YC is operable
* 1300 The crew notified SPOC to install jumpers per AM/1/Al51 00/008 (4Kv Essential Power (EPC) System Degraded Voltage Logic) 1. Which one of the following describes the operability of the VCNC system per Technical Specifications at 1100? 2. What is the basis for installing these jumpers under the current conditions?
: 2. To prevent the D/G sequencer from double sequencing if a LOCA occurs C.     1. VC/YC is not operable
A. 1. VC/YC is operable 2. To bypass the 8 second time delay for load shed/sequencer actuation on a blackout signal B. 1. VC/YC is operable 2. To prevent the D/G sequencer from double sequencing if a LOCA occurs C. 1. VC/YC is not operable 2. To bypass the 8 second time delay for load shed/sequencer actuation on a blackout signal D. 1. VC/YC is not operable 2. To prevent the D/G sequencer from double sequencing if a LOCA occurs Page 80 of 100 Question:
: 2. To bypass the 8 second time delay for load shed/sequencer actuation on a blackout signal D.     1. VC/YC is not operable
81 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 50% power. Given the following:
: 2. To prevent the D/G sequencer from double sequencing if a LOCA occurs Page 80 of 100
 
CATAWBA NUCLEAR STATION Question:      81 2009 SRO NRC Examination (1 point)
Unit 1 was operating at 50% power. Given the following:
Initial Conditions
Initial Conditions
* 1 A CA pump red tagged for PMs
* 1A 1A CA pump red tagged for PMs
* UST level is 104%
* UST level is 104%
* During a board walkdown, 1CA-6 (CA Pmps Suct From CA CST) was noted to be closed Current Conditions
* During a board walkdown, 1CA-6 (CA Pmps Suct From CA CST) was noted to be closed Current Conditions
* The reactor was manually tripped due to a main steam equalization header break
* The reactor was manually tripped due to a main steam equalization header break
* All power is lost to 1 ETB
* All power is lost to 1ETB
* 1SM-5 (S/G 1B SM Isol) failed to close
* 1SM-5 (S/G 1B SM Isol) failed to close
* 1SM-3 (S/G 1C SM Isol) failed to close
* 1SM-3 (S/G 1C SM Isol) failed to close
* 1A S/G conditions  
* 1A S/G conditions - NR level is 10% ; pressure is 650 psig and stable
-NR level is 10% ; pressure is 650 psig and stable
* 1B S/G conditions - NR level is 0% ; pressure is 5 psig and stable
* 1 B S/G conditions  
* 1  C S/G conditions - NR level is 0% ; pressure is 7 psig and stable 1C
-NR level is 0% ; pressure is 5 psig and stable
* 1D S/G conditions - NR level is 8% ; pressure is 675 psig and stable
* 1C S/G conditions  
: 1. Based on the Initial Conditions, which CA pump(s) was/were required to be declared inoperable per Technical Specifications?
-NR level is 0% ; pressure is 7 psig and stable
: 2. Based on the Current Conditions, what procedure will the crew transition to upon EP/1/A/5000/E-0 exit of EP/1 /A/5000/E-0 (Reactor Trip or Safety Injection)?
* 1 D S/G conditions  
A.       1. 1A CA Pump only
-NR level is 8% ; pressure is 675 psig and stable 1. Based on the Initial Conditions, which CA pump(s) was/were required to be declared inoperable per Technical Specifications?
: 2. EP/1/A/5000/E-2 ( Faulted Steam Generator Isolation)
: 2. Based on the Current Conditions, what procedure will the crew transition to upon exit of EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)?
B.       1. All three CA pumps
A. 1. 1A CA Pump only 2. EP/1/A/5000/E-2 ( Faulted Steam Generator Isolation)
: 2. EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink)
B. 1. All three CA pumps 2. EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) C. 1. 1A CA Pump only 2. EP/1/AI5000/FR-H.1 (Response to Loss of Secondary Heat Sink) D. 1. All three CA pumps 2. EP/1/A/5000/E-2 ( Faulted Steam Generator Isolation)
C.       1. 1A CA Pump only
Page 81 of 100 Question:
: 2. EP/1/A/5000/FR-H.1 EP/1/AI5000/FR-H.1 (Response to Loss of Secondary Heat Sink)
81 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 50% power. Given the following:
D.       1. All three CA pumps
Initial Conditions
: 2. EP/1/A/5000/E-2 ( Faulted Steam Generator Isolation)
* 1A CA pump red tagged for PMs
Page 81 of 100
* UST level is 104%
 
* During a board walkdown, 1CA-6 (CA Pmps Suct From CA CST) was noted to be closed Current Conditions
CATAWBA NUCLEAR STATION Question:        82 2009 SRO NRC Examination (1 point)
* The reactor was manually tripped due to a main steam equalization header break
Unit 1 is operating at 98% power. A surveillance test per PT/1/A/46001001 (RCCA Movement Test) is in progress. As Control Bank D was being moved, one control rod in Control Bank D slipped to 120 steps withdrawn and stopped. This is an incore thermocouple map one minute later.
* All power is lost to 1 ETB
R   P     N   M   L   K     J   H   G   FED           C   B   A 576       572     576 605 546    599        611     603 2
* 1SM-5 (S/G 1B SM Isol) failed to close
3                  605                 624               BAD     569 I
* 1SM-3 (S/G 1C SM Isol) failed to close
4              597    602                609               617 5        602                625               616               614 6  563        611                 611              626     623     568 7        602        606                617               620 8  561                612        634     572               626 9        619                611               613               614 10  548      II 610              II 606             613               574 11                  627                BAD               610     614 12              612    599                608               622 13                  620      619               576       626     562 14              540    628        613     608     614 15                            BAD I     622     580
* 1A S/G conditions
: 1. Which single rod has slipped into the core to 120 steps withdrawn?
-NR level is 10% ; pressure is 650 psig and stable
: 2. In addition to reducing power to less than 75% and verifying SDM, what other surveillances (if any) are required per Technical Specification 3.1.4 (Rod Group Alignment Limits) to allow continued power operation in Mode 1?
* 1 B S/G conditions
A.         Rod D-12; no additional surveillances are required B.         Rod M-4; no additional surveillances are required C.         Rod D-12; FNt.H(X,Y) and Fo(X,Y,Z)
-NR level is 0% ; pressure is 5 psig and stable
D.         Rod M-4; ~t.H(X,Y) and Fo(X,Y,Z)
* 1 C S/G conditions
Page 82 of 100
-NR level is 0% ; pressure is 7 psig and stable
 
* 1 D S/G conditions
CATAWBA NUCLEAR STATION Question:    83 2009 SRO NRC Examination (1 point)
-NR level is 8% ; pressure is 675 psig and stable 1. Based on the Initial Conditions, which CA pump(s) was/were required to be declared inoperable per Technical Specifications?
Unit 1 was in Mode 6 performing core alterations. Given the following conditions and sequence of events:
: 2. Based on the Current Conditions, what procedure will the crew transition to upon exit of EP/1 /A/5000/E-0 (Reactor Trip or Safety Injection)?
* N-31 was removed from service 3 days ago 2
A. 1. 1A CA Pump only 2. EP/1/A/5000/E-2 ( Faulted Steam Generator Isolation)
* x1 02 cps N-32 indicates 1.1 x10
B. 1. All three CA pumps 2. EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) C. 1. 1A CA Pump only 2. EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) D. 1. All three CA pumps 2. EP/1/A/5000/E-2 ( Faulted Steam Generator Isolation)
* 1AD-2, E/2 (TRAIN A ~HUTDOWN MARGIN ALARM) actuates
Page 81 of 100 Question:
82 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 98% power. A surveillance test per PT/1/A/46001001 (RCCA Movement Test) is in progress.
As Control Bank D was being moved, one control rod in Control Bank D slipped to 120 steps withdrawn and stopped. This is an incore thermocouple map one minute later. R P N M L K J H G FED C B A 2 3 4 5 6 7 8 9 10 11 12 13 14 15 602 563 602 561 619 548 546 599 605 597 602 611 606 612 I 610 627 612 599 620 540 628 576 572 576 611 603 605 I 624 BAD 569 609 617 625 616 614 611 626 623 617 620 634 572 626 611 613 614 I 606 613 BAD 610 614 608 622 619 576 626 562 613 608 614 BAD I 622 580 1. Which single rod has slipped into the core to 120 steps withdrawn?
568 574 2. In addition to reducing power to less than 75% and verifying SDM, what other surveillances (if any) are required per Technical Specification 3.1.4 (Rod Group Alignment Limits) to allow continued power operation in Mode 1? A. Rod D-12; no additional surveillances are required B. Rod M-4; no additional surveillances are required C. Rod D-12; FNt.H(X,Y) and Fo(X,Y,Z)
D. Rod M-4; and Fo(X,Y,Z)
Page 82 of 100 Question:
82 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 98% power. A surveillance test per PT/1/A/46001001 (RCCA Movement Test) is in progress.
As Control Bank D was being moved, one control rod in Control Bank D slipped to 120 steps withdrawn and stopped. This is an incore thermocouple map one minute later. R P N M L K J H G FED C B A 2 3 4 5 6 7 8 9 10 11 12 13 14 15 602 563 602 561 619 548 546 599 605 597 602 611 606 612 I 610 627 612 599 620 540 628 576 572 576 611 603 605 I 624 BAD 569 609 617 625 616 614 611 626 623 617 620 634 572 626 611 613 614 I 606 613 BAD 610 614 608 622 619 576 626 562 613 608 614 BAD I 622 580 1. Which single rod has slipped into the core to 120 steps withdrawn?
568 574 2. In addition to reducing power to less than 75% and verifying SDM, what other surveillances (if any) are required per Technical Specification 3.1.4 (Rod Group Alignment Limits) to allow continued power operation in Mode 1? A. Rod D-12; no additional surveillances are required B. Rod M-4; no additional surveillances are required C. Rod D-12; FNt.H(X,Y) and Fo(X,Y,Z)
D. Rod M-4; and Fo(X,Y,Z)
Page 82 of 100 Question:
83 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was in Mode 6 performing core alterations.
Given the following conditions and sequence of events:
* N-31 was removed from service 3 days ago
* N-32 indicates 1.1 x10 2 cps
* 1AD-2, E/2 (TRAIN A MARGIN ALARM) actuates
* BDMS Train A indicates "E1"
* BDMS Train A indicates "E1"
* BDMS Train B indicates 1.4 x102 cps 1. What procedure is entered to address the stated conditions?
* BDMS Train B indicates 1.4 x102 cps
: 1. What procedure is entered to address the stated conditions?
: 2. Are core alterations required to be stopped based on the above conditions?
: 2. Are core alterations required to be stopped based on the above conditions?
A. 1. AP/1 IA/55001013 (Boron Dilution)
A.     1. AP/1 IA/55001013 (Boron Dilution)
: 2. No B. 1. AP/1/A/55001013 (Boron Dilution)
AP/1/A/55001013
: 2. Yes c. 1. AP/1 IA/55001016 (Malfunction of Nuclear Instrumentation System) 2. No D. 1. AP/1 IA/55001016 (Malfunction of Nuclear Instrumentation System) 2. Yes Page 83 of 100 Question:
: 2. No B.     1. AP/1/A/55001013 (Boron Dilution)
83 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was in Mode 6 performing core alterations.
: 2. Yes c.
Given the following conditions and sequence of events:
C.     1. AP/1 IA/55001016 (Malfunction of Nuclear Instrumentation System)
* N-31 was removed from service 3 days ago
AP/1/A/55001016
* N-32 indicates 1.1 x1 0 2 cps
: 2. No D.     1. AP/1 IA/55001016 (Malfunction of Nuclear Instrumentation System)
* 1AD-2, E/2 (TRAIN A MARGIN ALARM) actuates
AP/1/A/55001016
* BDMS Train A indicates "E1"
: 2. Yes Page 83 of 100
* BDMS Train B indicates 1.4 x102 cps 1. What procedure is entered to address the stated conditions?
 
: 2. Are core alterations required to be stopped based on the above conditions?
CATAWBA NUCLEAR STATION Question:        84 2009 SRO NRC Examination (1 point)
A. 1. AP/1/A/55001013 (Boron Dilution)
Unit 1 was at 3% power performing a startup. Given the following:
: 2. No B. 1. AP/1/A/55001013 (Boron Dilution)
: 2. Yes C. 1. AP/1/A/55001016 (Malfunction of Nuclear Instrumentation System) 2. No D. 1. AP/1/A/55001016 (Malfunction of Nuclear Instrumentation System) 2. Yes Page 83 of 100 Question:
84 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was at 3% power performing a startup. Given the following:
Initial conditions
Initial conditions
* Intermediate Range channel N-35 failed low
* Intermediate Range channel N-35 failed low
* The crew removed N-35 from service per the applicable abnormal procedure Current conditions
* The crew removed N-35 from service per the applicable abnormal procedure Current conditions
* IAE retumed the channel to service and reported that the SUR circuitry for N-35 had to be disabled as part of the channel repair
* IAE retumed the channel to service and reported that the SUR circuitry for N-35 had to be disabled as part of the channel repair
* Engineering has evaluated the repair and determined that all other functions will operate as designed with the SUR circuitry disabled 1. When the crew removed N-35 from service per the abnormal procedure, which fuses (if any) were removed? 2. For the conditions above, is N-35 operable?
* Engineering has evaluated the repair and determined that all other functions will operate as designed with the SUR circuitry disabled
A. 1. The control power fuses 2. No B. 1. The control power fuses 2. Yes C. 1. No fuses were removed 2. No D. 1. No fuses were removed 2. Yes Page 84 of 100 Question:
: 1. When the crew removed N-35 from service per the abnormal procedure, which fuses (if any) were removed?
84 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was at 3% power performing a startup. Given the following:
: 2. For the conditions above, is N-35 operable?
Initial conditions
A.       1. The control power fuses
* Intermediate Range channel N-35 failed low
: 2. No B.       1. The control power fuses
* The crew removed N-35 from service per the applicable abnormal procedure Current conditions
: 2. Yes C.       1. No fuses were removed
* IAE retumed the channel to service and reported that the SUR circuitry for N-35 had to be disabled as part of the channel repair
: 2. No D.       1. No fuses were removed
* Engineering has evaluated the repair and determined that all other functions will operate as designed with the SUR circuitry disabled 1. When the crew removed N-35 from service per the abnormal procedure, which fuses (if any) were removed? 2. For the conditions above, is N-35 operable?
: 2. Yes Page 84 of 100
A. 1. The control power fuses 2. No B. 1. The control power fuses 2. Yes C. 1. No fuses were removed 2. No D. 1. No fuses were removed 2. Yes Page 84 of 100 Question:
 
85 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was in Mode 3 and Unit 2 was operating at 100% power when a fire occurred on site. Given the following:
CATAWBA NUCLEAR STATION Question:      85 2009 SRO NRC Examination (1 point)
Unit 1 was in Mode 3 and Unit 2 was operating at 100% power when a fire occurred on site. Given the following:
* A large amount of smoke entered the Auxiliary Building Ventilation (VA) system ductwork
* A large amount of smoke entered the Auxiliary Building Ventilation (VA) system ductwork
* 1A main transformer was de-energized due to the fire Based on the above conditions:
* 1A main transformer was de-energized due to the fire Based on the above conditions:
: 1. How will the VA system respond? 2. What is the status of the "A" train VA system per Technical Specifications?
: 1. How will the VA system respond?
A. 1. VA Supply fans (ABSU) will trip and then the Unfiltered Exhaust Fans will trip 2. Only 1A train is not operable B. 1. VA Supply fans (ABSU) will trip and then the Unfiltered Exhaust Fans will trip 2. Both 1A and 2A trains are not operable c. 1. VA Supply fans (ABSU) will trip and then the ABSU inlet dampers will close 2. Only 1 A train is not operable D. 1. VA Supply fans (ABSU) will trip and then the ABSU inlet dampers will close 2. Both 1A and 2A trains are not operable Page 85 of 100 Question:
: 2. What is the status of the "A" train VA system per Technical Specifications?
85 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was in Mode 3 and Unit 2 was operating at 100% power when a fire occurred on site. Given the following:
A.     1. VA Supply fans (ABSU) will trip and then the Unfiltered Exhaust Fans will trip
* A large amount of smoke entered the Auxiliary Building Ventilation (VA) system ductwork
: 2. Only 1A train is not operable B.     1. VA Supply fans (ABSU) will trip and then the Unfiltered Exhaust Fans will trip 1A and 2A trains are not operable
* 1A main transformer was de-energized due to the fire Based on the above conditions:
: 2. Both 1A
: 1. How will the VA system respond? 2. What is the status of the "A" train VA system per Technical Specifications?
: c.     1. VA Supply fans (ABSU) will trip and then the ABSU inlet dampers will close
A. 1. VA Supply fans (ABSU) will trip and then the Unfiltered Exhaust Fans will trip 2. Only 1A train is not operable B. 1. VA Supply fans (ABSU) will trip and then the Unfiltered Exhaust Fans will trip 2. Both 1 A and 2A trains are not operable c. 1. VA Supply fans (ABSU) will trip and then the ABSU inlet dampers will close 2. Only 1A train is not operable D. 1. VA Supply fans (ABSU) will trip and then the ABSU inlet dampers will close 2. Both 1 A and 2A trains are not operable Page 85 of 100 Question:
: 2. Only 1A 1A train is not operable D.     1. VA Supply fans (ABSU) will trip and then the ABSU inlet dampers will close
86 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is at 3% power and increasing.
: 2. Both 1A 1A and 2A trains are not operable Page 85 of 100
Given the following has just occurred:
 
CATAWBA NUCLEAR STATION Question:      86 2009 SRO NRC Examination (1 point)
Unit 1 is at 3% power and increasing. Given the following has just occurred:
* 1AD-7 C/1 NCP #1 "SEAL LEAKOFF HI FLOW" actuates
* 1AD-7 C/1 NCP #1 "SEAL LEAKOFF HI FLOW" actuates
* 1 B NCP sealleakoff is 6.5 gpm and stable
* 1B NCP sealleakoff is 6.5 gpm and stable 1B
* 1 B NCP Seal Outlet temperature is 165&deg;F and stable
* 1B NCP Seal Outlet temperature is 165&deg;F and stable
* 1 B NCP Lower Bearing temperature is 140&deg;F and stable
* 1B NCP Lower Bearing temperature is 140&deg;F and stable
* The crew enters AP/1/A/55001008 (Malfunction of Reactor Coolant Pump) Per AP/1 IA/55001008, what is the maximum time 1 B NCP can remain in service and what procedure will the crew be directed to enter when the pump is tripped? A. 5 minutes; EP/1/A/5000/E-O (Reactor Trip or Safety Injection)
* AP/1/A/55001008 (Malfunction of Reactor Coolant Pump)
B. 5 minutes; AP/1/A/55001004 (Loss of Reactor Coolant Pump) C. 8 hours; OP/1/A/61001002 (Controlling Procedure For Unit Shutdown)
The crew enters AP/11A155001008 Per AP/1 IA/55001008, what is the maximum time 1 AP/1/A/55001008,                            B NCP can remain in service and 1B what procedure will the crew be directed to enter when the pump is tripped?
D. 8 hours; API1 IA/55001004 (Loss of Reactor Coolant Pump) Page 86 of 100 Question:
A.       5 minutes; EP/1/A/5000/E-O (Reactor Trip or Safety Injection)
86 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is at 3% power and increasing.
B.       5 minutes; AP/1/A/55001004 (Loss of Reactor Coolant Pump)
Given the following has just occurred:
C.       8 hours; OP/1/A/61001002 OP/11A161001002 (Controlling Procedure For Unit Shutdown)
* 1AD-7 C/1 NCP #1 "SEAL LEAKOFF HI FLOW" actuates
D.       8 hours; API1 IA/55001004 (Loss of Reactor Coolant Pump)
* 1B NCP sealleakoff is 6.5 gpm and stable
AP/1/A/55001004 Page 86 of 100
* 1 B NCP Seal Outlet temperature is 165&deg;F and stable
 
* 1 B NCP Lower Bearing temperature is 140&deg;F and stable
CATAWBA NUCLEAR STATION Question:      87 2009 SRO NRC Examination (1 point)
* The crew enters AP/11A155001008 (Malfunction of Reactor Coolant Pump) Per AP/1/A/55001008, what is the maximum time 1B NCP can remain in service and what procedure will the crew be directed to enter when the pump is tripped? A. 5 minutes; EP/1/A/5000/E-O (Reactor Trip or Safety Injection)
Unit 1 is at 450&deg;F and 1860 psig heating up with shutdown banks withdrawn following a refueling outage. Given the following conditions and sequence of events:
B. 5 minutes; AP/1/A/55001004 (Loss of Reactor Coolant Pump) C. 8 hours; OP/11A161001002 (Controlling Procedure For Unit Shutdown)
Initial Conditions
D. 8 hours; AP/1/A/55001004 (Loss of Reactor Coolant Pump) Page 86 of 100 Question:
* YO has been manually aligned to provide cooling to 1A NV pump per AP/1/A/55001021 (Loss of Component Cooling)
87 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is at 450&deg;F and 1860 psig heating up with shutdown banks withdrawn following a refueling outage. Given the following conditions and sequence of events: Initial Conditions
AP/1/A/5500/021 Current Conditions
* YO has been manually aligned to provide cooling to 1A NV pump per AP/1/A/55001021 (Loss of Component Cooling) Current Conditions
* KC has not been restored
* KC has not been restored
* The crew trips the reactor and all reactor coolant pumps
* The crew trips the reactor and all reactor coolant pumps
* A 100 gpm NC system leak occurs on an NC loop crossover pipe 1. If a safety injection becomes necessary, what guidance does AP/1 IA/55001021 provide for maintaining Unit 1 NC pump seal injection?
* A 100 gpm NC system leak occurs on an NC loop crossover pipe
: 2. What procedure will AP/1/A/55001021 direct the crew to implement next? A. 1. Maintain YO aligned to 1A NV pump and continuously monitor motor parameters
: 1. If a safety injection becomes necessary, what guidance does AP/1 IA/55001021
: 2. AP/1/A/55001005 (Reactor Trip or Inadvertent S/I Below P-11) B. 1. Maintain YO aligned to 1A NV pump and continuously monitor motor parameters
                                                                            /A/5500/021 provide for maintaining Unit 1 NC pump seal injection?
: 2. AP/1/A/55001027 (Shutdown LOCA) C. 1. Realign KC to the 1A NV pump and start the Standby Makeup Pump 2. AP/1/A/55001005 (Reactor Trip or Inadvertent S/I Below P-11 ) O. 1. Realign KC to the 1A NV pump and start the Standby Makeup Pump 2. AP/1/A/55001027 (Shutdown LOCA) Page 87 of 100 Question:
AP/1/A/55001021 direct the crew to implement next?
87 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is at 450&deg;F and 1860 psig heating up with shutdown banks withdrawn following a refueling outage. Given the following conditions and sequence of events: Initial Conditions
: 2. What procedure will AP/1/A/5500/021 A.       1. Maintain YO aligned to 1A NV pump and continuously monitor motor parameters AP/1/A/55001005 (Reactor Trip or Inadvertent S/I
* YO has been manually aligned to provide cooling to 1A NV pump per AP/1/A/5500/021 (Loss of Component Cooling) Current Conditions
: 2. AP/1/A/5500/005                                 SII Below P-11)
* KC has not been restored
B.       1. Maintain YO aligned to 1A NV pump and continuously monitor motor parameters
* The crew trips the reactor and all reactor coolant pumps
: 2. AP/1/A/5500/027 AP/1/A/55001027 (Shutdown LOCA)
* A 100 gpm NC system leak occurs on an NC loop crossover pipe 1. If a safety injection becomes necessary, what guidance does AP/1 /A/5500/021 provide for maintaining Unit 1 NC pump seal injection?
C.       1. Realign KC to the 1A NV pump and start the Standby Makeup Pump AP/1/A/55001005 (Reactor Trip or Inadvertent SII
: 2. What procedure will AP/1/A/5500/021 direct the crew to implement next? A. 1. Maintain YO aligned to 1A NV pump and continuously monitor motor parameters
: 2. AP/1/A/5500/005                                S/I Below P-11)
: 2. AP/1/A/5500/005 (Reactor Trip or Inadvertent SII Below P-11) B. 1. Maintain YO aligned to 1A NV pump and continuously monitor motor parameters
P-11 )
: 2. AP/1/A/5500/027 (Shutdown LOCA) C. 1. Realign KC to the 1A NV pump and start the Standby Makeup Pump 2. AP/1/A/5500/005 (Reactor Trip or Inadvertent SII Below P-11) O. 1. Realign KC to the 1A NV pump and start the Standby Makeup Pump 2. AP/1/A/5500/027 (Shutdown LOCA) Page 87 of 100 Question:
O.       1. Realign KC to the 1A NV pump and start the Standby Makeup Pump
88 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following conditions on Unit 1: Initial Conditions
: 2. AP/1/A/5500/027 AP/1/A/55001027 (Shutdown LOCA)
Page 87 of 100
 
CATAWBA NUCLEAR STATION Question:      88 2009 SRO NRC Examination (1 point)
Given the following conditions on Unit 1:
Initial Conditions
* Reactor power was 100% and stable
* Reactor power was 100% and stable
* Turbine impulse pressure was 693 psig and stable Final Conditions
* Turbine impulse pressure was 693 psig and stable Final Conditions
* Security has reported significant steam escaping from the interior doghouse
* Security has reported significant steam escaping from the interior doghouse
* The crew is performing actions in AP/1/A/55001028 (Secondary Steam Leak)
* The crew is performing actions in AP/1/A155001028 AP/1/A/55001028 (Secondary Steam Leak)
* Reactor power is 99.9% and stable
* Reactor power is 99.9% and stable
* Turbine impulse pressure is 657 psig and stable 1. What single steam relief valve passing full flow produced the conditions noted? 2. What actions will be directed by AP/1/A/55001028 based on the final conditions?
* Turbine impulse pressure is 657 psig and stable
A. 1. A steam line safety 2. Trip the reactor and go to EP/1/A/5000/E-0 (Reactor Trip or Safety Injection B. 1. A steam line safety 2. Initiate a unit shutdown per AP/1/A/55001009 (Rapid Downpower)
: 1. What single steam relief valve passing full flow produced the conditions noted?
C. 1. A S/G PORV 2. Trip the reactor and go to EP/1/A/5000/E-0 (Reactor Trip or Safety Injection D. 1. AS/G PORV 2. Initiate a unit shutdown per AP/1/A/55001009 (Rapid Downpower)
AP/1/A/55001028 based on the final conditions?
Page 88 of 100 Question:
: 2. What actions will be directed by AP/1/A155001028 A.       1. A steam line safety
88 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following conditions on Unit 1: Initial Conditions
: 2. Trip the reactor and go to EP/1/A15000/E-0 EP/1/A/5000/E-0 (Reactor Trip or Safety Injection B.       1. A steam line safety
* Reactor power was 100% and stable
: 2. Initiate a unit shutdown per AP/1/A155001009 AP/1/A/55001009 (Rapid Downpower)
* Turbine impulse pressure was 693 psig and stable Final Conditions
C.       1. A S/G PORV
* Security has reported significant steam escaping from the interior doghouse
: 2. Trip the reactor and go to EP/1/A150001E-0 EP/1/A/5000/E-0 (Reactor Trip or Safety Injection D.       1. A  S/G PORV AS/G
* The crew is performing actions in AP/1/A155001028 (Secondary Steam Leak)
: 2. Initiate a unit shutdown per AP/1/A/55001009 AP/1/A155001009 (Rapid Downpower)
* Reactor power is 99.9% and stable
Page 88 of 100
* Turbine impulse pressure is 657 psig and stable 1. What single steam relief valve passing full flow produced the conditions noted? 2. What actions will be directed by AP/1/A155001028 based on the final conditions?
 
A. 1. A steam line safety 2. Trip the reactor and go to EP/1/A15000/E-0 (Reactor Trip or Safety Injection B. 1. A steam line safety 2. Initiate a unit shutdown per AP/1/A155001009 (Rapid Downpower)
CATAWBA NUCLEAR STATION Question:      89 2009 SRO NRC Examination (1 point)
C. 1. A S/G PORV 2. Trip the reactor and go to EP/1/A150001E-0 (Reactor Trip or Safety Injection D. 1. A S/G PORV 2. Initiate a unit shutdown per AP/1/A155001009 (Rapid Downpower)
Unit 1 is operating at 100% power. Given the following timeline:
Page 88 of 100 Question:
12/15/09 1500     During the review of completed procedures it was noted that 12/07109 at 0300 was the last time the 7 day surveillance was performed on the 1A DIG battery cells.
89 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following timeline:
12/15/09 1800       IAE completed the 1A      1A DIG battery cell surveillance and noted one bad battery cell.
12/15/09 1500 During the review of completed procedures it was noted that 12/07109 at 0300 was the last time the 7 day surveillance was performed on the 1A DIG battery cells. 12/15/09 1800 IAE completed the 1A DIG battery cell surveillance and noted one bad battery cell. Based on the above conditions and in accordance with Technical Specification 3.8.4 (DC Sources -Operating):
Based on the above conditions and in accordance with Technical Specification 3.8.4 (DC Sources - Operating):
BAf-&#xa3;:D oN A-r 1500: CLUc...t;.
BA?t."D oI-J ~D;z:."1'X"oNS BAf-&#xa3;:D oN   ~DJ:"I'X"oNS A-r 1500:
: 1. What is the latest time that this surveiliance.eaR ee-completed before the LCO for Technical Specification 3.8 .4..wifl .ru!! be met? I,,4JOU t.:D J:;!!!:(" IHtVe:.. BEEN
I 5: 00 :                          CLUc...t;.
: 2. When is the cascade to Technical Specification 3.8.1 (AC Sources -Operating) required to be made based on the bad battery cell? A. 1. 12/15/09 at 2100 2. Immediately B. 1. 12/15/09 at 2100 2. Within 1 hour C. 1. 12/22/09 at 1500 2. Immediately D. 1. 12/22/09 at 1500 2. Within 1 hour Page 89 of 100 Question:
CLU        ~,,~gE&#xa3;N t..t;. fhI!.."~  BE&#xa3;N
89 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is operating at 100% power. Given the following timeline:
: 1. What is the latest time that this surveiliance.eaR ee-completedee-.completed before the LCO for 3.8 .4..wifl .ru!! be met? I,,4JOU Technical Specification 3.8.4..wifl.rutl                            t.:D J:;!!!:(" IHtVe:..
12/15/09 1500 During the review of completed procedures it was noted that 12/07109 at 0300 was the last time the 7 day surveillance was performed on the 1A DIG battery cells. 12/15/09 1800 IAE completed the 1 A DIG battery cell surveillance and noted one bad battery cell. Based on the above conditions and in accordance with Technical Specification 3.8.4 (DC Sources -Operating):
                                                                            /,AJout.l>.J:;:!J!:("               ME-r~
BA?t."D oI-J A-r I 5: 00 : CLU t..t;.
IHWe:.. BEEN ~E..rr
BE&#xa3;N 1. What is the latest time that this surveiliance.eaR ee-.completed before the LCO for Technical Specification 3.8.4..wifl.rutl be met? /,AJout.l>.J:;:!J!:(" IHWe:.. BEEN
: 2. When is the cascade to Technical Specification 3.8.1 (AC Sources - Operating) required to be made based on the bad battery cell?
: 2. When is the cascade to Technical Specification 3.8.1 (AC Sources -Operating) required to be made based on the bad battery cell? A. 1. 12/15/09 at 2100 2. Immediately B. 1. 12/15/09 at 2100 2. Within 1 hour C. 1. 12/22/09 at 1500 2. Immediately D. 1. 12/22/09 at 1500 2. Within 1 hour Page 89 of 100 Question:
A.       1. 12/15/09 at 2100
90 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 and 2 are operating at 100% power with 2A RN pump in service. Given the following conditions and sequence of events:
: 2. Immediately B.       1. 12/15/09 at 2100
: 2. Within 1 hour C.       1. 12/22/09 at 1500
: 2. Immediately D.       1. 12/22/09 at 1500
: 2. Within 1 hour Page 89 of 100
 
CATAWBA NUCLEAR STATION Question:      90 2009 SRO NRC Examination (1 point)
Unit 1 and 2 are operating at 100% power with 2A RN pump in service. Given the following conditions and sequence of events:
* 1A DIG is tagged for PMs
* 1A DIG is tagged for PMs
* The following annunciators actuate: o 1AD-12, Al2 -"RN Essential Hdr A Pressure -Lo" o 2AD-12, Al2 -"RN Essential Hdr A Pressure -Lo" o 1AD-12, Al5 -"RN Essential Hdr B Pressure -Lo" o 2AD-12, Al5 -"RN Essential Hdr B Pressure -Lo"
* The following annunciators actuate:
o 1AD-12, A/2Al2 - "RN Essential Hdr A Pressure - Lo" o 2AD-12, A/2Al2 - "RN Essential Hdr A Pressure - Lo" o 1AD-12, A/5Al5 - "RN Essential Hdr B Pressure - Lo" o 2AD-12, A/5Al5 - "RN Essential Hdr B Pressure - Lo"
* The 2A RN pump trips
* The 2A RN pump trips
* The 1A RN pump is started and the alarms listed above clear 1. Is the 2A DIG operable per Technical Specifications for the conditions stated above? 2. What actions are required per OP/O/A/64001006C (Nuclear Service Water System)? A. 1. No 2. Ensure the RN essential header supply crossover valves are open B. 1. No 2. Rackout and tag the "A" VC Compressor breaker C. 1. Yes 2. Ensure the RN essential header supply crossover valves are open D. 1. Yes 2. Rackout and tag the "A" VC Compressor breaker Page 90 of 100 Question:
* The 1A RN pump is started and the alarms listed above clear
90 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 and 2 are operating at 100% power with 2A RN pump in service. Given the following conditions and sequence of events:
: 1. Is the 2A DIG operable per Technical Specifications for the conditions stated above?
* 1A DIG is tagged for PMs
: 2. What actions are required per OP/O/A/64001006C (Nuclear Service Water System)?
* The following annunciators actuate: o 1AD-12, A/2 -"RN Essential Hdr A Pressure -Lo" o 2AD-12, A/2 -"RN Essential Hdr A Pressure -Lo" o 1AD-12, A/5 -"RN Essential Hdr B Pressure -Lo" o 2AD-12, A/5 -"RN Essential Hdr B Pressure -Lo"
A.       1. No
* The 2A RN pump trips
: 2. Ensure the RN essential header supply crossover valves are open B.       1. No
* The 1A RN pump is started and the alarms listed above clear 1. Is the 2A DIG operable per Technical Specifications for the conditions stated above? 2. What actions are required per OP/O/A/64001006C (Nuclear Service Water System)? A. 1. No 2. Ensure the RN essential header supply crossover valves are open B. 1. No 2. Rackout and tag the "A" VC Compressor breaker C. 1. Yes 2. Ensure the RN essential header supply crossover valves are open D. 1. Yes 2. Rackout and tag the "A" VC Compressor breaker Page 90 of 100 Question:
: 2. Rackout and tag the "A" VC Compressor breaker C.       1. Yes
91 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
: 2. Ensure the RN essential header supply crossover valves are open D.       1. Yes
: 2. Rackout and tag the "A" VC Compressor breaker Page 90 of 100
 
CATAWBA NUCLEAR STATION Question:      91 2009 SRO NRC Examination (1 point)
Given the following:
* Unit 1 is performing a power decrease required by Technical Specifications
* Unit 1 is performing a power decrease required by Technical Specifications
* At 45% power, 1 SMPS5219 (Turbine Impulse Pressure 1 ATWSI AMSAC Related) stopped decreasing
* At 45% power, 1 SMPS5219 (Turbine Impulse Pressure 1 ATWSI AMSAC Related) stopped decreasing
* The power supply to 1SMPS5218 (Turbine Impulse Pressure 1 ATWSI AMSAC Related) has failed
* The power supply to 1SMPS5218 (Turbine Impulse Pressure 1 ATWSI AMSAC Related) has failed
* IAE has been notified to repair failed channels
* IAE has been notified to repair failed channels
* Current reactor power is 28.5% 1. What guidance does OP/1/A161 001003 (Controlling Procedure for Unit Operation) provide for the AMSAC system for this situation?
* Current reactor power is 28.5%
: 2. Per the Selected Licensee Commitment (SLC), the basis for AMSAC, is to provide independent means of initiating a turbine trip signal and a under ATWS conditions.
OP/11A161 001003 (Controlling Procedure for Unit Operation)
A. 1. Continue the power decrease 2. reactor trip signal B. 1. Continue the power decrease 2. CA autostart signal C. 1. Stop the power decrease 2. reactor trip signal D. 1. Stop the power decrease 2. CA autostart signal Page 91 of 100 Question:
: 1. What guidance does OP/1/A161 provide for the AMSAC system for this situation?
91 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
: 2. Per the Selected Licensee Commitment (SLC), the basis for AMSAC, is to provide independent means of initiating a turbine trip signal and a                 under ATWS conditions.
* Unit 1 is performing a power decrease required by Technical Specifications
A.       1. Continue the power decrease
* At 45% power, 1 SMPS5219 (Turbine Impulse Pressure 1 ATWSI AMSAC Related) stopped decreasing
: 2. reactor trip signal B.       1. Continue the power decrease
* The power supply to 1SMPS5218 (Turbine Impulse Pressure 1 ATWSI AMSAC Related) has failed
: 2. CA autostart signal C.       1. Stop the power decrease
* IAE has been notified to repair failed channels
: 2. reactor trip signal D.       1. Stop the power decrease
* Current reactor power is 28.5% 1. What guidance does OP/11A161 001003 (Controlling Procedure for Unit Operation) provide for the AMSAC system for this situation?
: 2. CA autostart signal Page 91 of 100
: 2. Per the Selected Licensee Commitment (SLC), the basis for AMSAC, is to provide independent means of initiating a turbine trip signal and a under ATWS conditions.
 
A. 1. Continue the power decrease 2. reactor trip signal B. 1. Continue the power decrease 2. CA autostart signal C. 1. Stop the power decrease 2. reactor trip signal D. 1. Stop the power decrease 2. CA autostart signal Page 91 of 100 Question:
CATAWBA NUCLEAR STATION Question:      92 2009 SRO NRC Examination (1 point)
92 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 entered Mode 6 three days ago. Given the following conditions and sequence of events:
Unit 1 entered Mode 6 three days ago. Given the following conditions and sequence of events:
* The head crew is currently lifting the reactor vessel upper internals
* The head crew is currently lifting the reactor vessel upper internals
* The B train Containment Purge Exhaust System (VP) duct heaters lose power
* The B train Containment Purge Exhaust System (VP) duct heaters lose power
* The B train VP system fan status/ system flow is unchanged
* The B train VP system fan status/ system flow is unchanged
: 1. For the conditions above, is the VP system required to be operable per Technical Specification 3.9.3 (Containment Penetrations)?
: 1. For the conditions above, is the VP system required to be operable per Technical Specification 3.9.3 (Containment Penetrations)?
: 2. Is proper functioning of the VP duct heaters required for operability of the VP system per the bases of Technical Specification 3.9.3? A. 1. Yes 2. Yes B. 1. No 2. Yes C. 1. Yes 2. No D. 1. No 2. No Page 92 of 100 Question:
: 2. Is proper functioning of the VP duct heaters required for operability of the VP system per the bases of Technical Specification 3.9.3?
92 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 entered Mode 6 three days ago. Given the following conditions and sequence of events:
A.       1. Yes
* The head crew is currently lifting the reactor vessel upper internals
: 2. Yes B.       1. No
* The B train Containment Purge Exhaust System (VP) duct heaters lose power
: 2. Yes C.       1. Yes
* The B train VP system fan status/ system flow is unchanged
: 2. No D.       1. No
: 1. For the conditions above, is the VP system required to be operable per Technical Specification 3.9.3 (Containment Penetrations)?
: 2. No Page 92 of 100
: 2. Is proper functioning of the VP duct heaters required for operability of the VP system per the bases of Technical Specification 3.9.3? A. 1. Yes 2. Yes B. 1. No 2. Yes C. 1. Yes 2. No D. 1. No 2. No Page 92 of 100 Question:
 
93 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 6 with core unload in progress.
CATAWBA NUCLEAR STATION Question:      93 2009 SRO NRC Examination (1 point)
Given the following:
Unit 1 is in Mode 6 with core unload in progress. Given the following:
* An RP technician in the Spent Fuel Pool (SFP) building calls the control room and reports that level in the SFP is decreasing
* An RP technician in the Spent Fuel Pool (SFP) building calls the control room and reports that level in the SFP is decreasing
* The fuel assembly most recently removed from the core is currently in the reactor building manipulator crane 1. Based on current conditions, what procedure will direct movement of the fuel assembly being handled to a safe location?
* The fuel assembly most recently removed from the core is currently in the reactor building manipulator crane
: 2. Where is the fuel assembly in the reactor building manipulator crane required to be placed? A. 1. AP/1/A155001026 (Loss of Refueling Canal Level) 2. Into the upender and lowered to the fully down position B. 1. AP/1/A/55001026 (Loss of Refueling Canal Level) 2. Fully down in the core or the deep end of the canal C. 1. AP/1/A155001041 (Loss of Spent Fuel Cooling or Level) 2. Into the upender and lowered to the fully down position D. 1. AP/1/A/55001041 (Loss of Spent Fuel Cooling or Level) 2. Fully down in the core or the deep end of the canal Page 93 of 100 Question:
: 1. Based on current conditions, what procedure will direct movement of the fuel assembly being handled to a safe location?
93 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 6 with core unload in progress.
: 2. Where is the fuel assembly in the reactor building manipulator crane required to be placed?
Given the following:
A.       1. AP/1/A155001026 AP/1/A/55001026 (Loss of Refueling Canal Level)
* An RP technician in the Spent Fuel Pool (SFP) building calls the control room and reports that level in the SFP is decreasing
: 2. Into the upender and lowered to the fully down position B.       1. AP/1/A/55001026 (Loss of Refueling Canal Level)
* The fuel assembly most recently removed from the core is currently in the reactor building manipulator crane 1. Based on current conditions, what procedure will direct movement of the fuel assembly being handled to a safe location?
: 2. Fully down in the core or the deep end of the canal C.       1. AP/1/A155001041 AP/1/A/55001041 (Loss of Spent Fuel Cooling or Level)
: 2. Where is the fuel assembly in the reactor building manipulator crane required to be placed? A. 1. AP/1/A/55001026 (Loss of Refueling Canal Level) 2. Into the upender and lowered to the fully down position B. 1. AP/1/A/55001026 (Loss of Refueling Canal Level) 2. Fully down in the core or the deep end of the canal C. 1. AP/1/A/55001041 (Loss of Spent Fuel Cooling or Level) 2. Into the upender and lowered to the fully down position D. 1. AP/1/A/55001041 (Loss of Spent Fuel Cooling or Level) 2. Fully down in the core or the deep end of the canal Page 93 of 100 Question:
: 2. Into the upender and lowered to the fully down position D.       1. AP/1/A/55001041 (Loss of Spent Fuel Cooling or Level)
94 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 entered a forced outage 3 days ago to replace an NC pump motor.
: 2. Fully down in the core or the deep end of the canal Page 93 of 100
 
CATAWBA NUCLEAR STATION Question:      94 2009 SRO NRC Examination (1 point)
Unit 1 entered a forced outage 3 days ago to replace an NC pump motor.
* 2 work crews are involved in replacing the NC pump motor, an NC pump crew and an IAE crew. The tagout boundary is being shared by both crews
* 2 work crews are involved in replacing the NC pump motor, an NC pump crew and an IAE crew. The tagout boundary is being shared by both crews
* The NC pump crew has the new motor in place and has outstanding Work Order Task Assignments (WOTAs) for wiring completion
* The NC pump crew has the new motor in place and has outstanding Work Order Task Assignments (WOTAs) for wiring completion
* The IAE crew has asked the Unit 1 SRO for clearance of their WOTA to allow electrical testing of the new motor which requires connecting an outside power source Per NSD 500 (Red Tags/Configuration Control Tags), in addition to ensuring the work can be performed safely, what other condition is required to be met by the Unit 1 SRO prior to granting clearance to the IAE crew WOTA? A. The Unit 1 SRO must obtain OSM concurrence B. The Unit 1 SRO must ensure the two crews have established constant communication C. The Unit 1 SRO must ensure all affected crews have been informed of the intent to apply an outside power source D. The Unit 1 SRO must ensure a Safety Group representative has walked down the area where the outside power source will be applied Page 94 of 100 Question:
* The IAE crew has asked the Unit 1 SRO for clearance of their WOTA to allow electrical testing of the new motor which requires connecting an outside power source Per NSD 500 (Red Tags/Configuration Control Tags), in addition to ensuring the work can be performed safely, what other condition is required to be met by the Unit 1 SRO prior to granting clearance to the IAE crew WOTA?
94 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 entered a forced outage 3 days ago to replace an NC pump motor.
A.       The Unit 1 SRO must obtain OSM concurrence B.       The Unit 1 SRO must ensure the two crews have established constant communication C.       The Unit 1 SRO must ensure all affected crews have been informed of the intent to apply an outside power source D.       The Unit 1 SRO must ensure a Safety Group representative has walked down the area where the outside power source will be applied Page 94 of 100
* 2 work crews are involved in replacing the NC pump motor, an NC pump crew and an IAE crew. The tagout boundary is being shared by both crews
 
* The NC pump crew has the new motor in place and has outstanding Work Order Task Assignments (WOTAs) for wiring completion
CATAWBA NUCLEAR STATION Question:    95 2009 SRO NRC Examination (1 point)
* The IAE crew has asked the Unit 1 SRO for clearance of their WOTA to allow electrical testing of the new motor which requires connecting an outside power source Per NSD 500 (Red Tags/Configuration Control Tags), in addition to ensuring the work can be performed safely, what other condition is required to be met by the Unit 1 SRO prior to granting clearance to the IAE crew WOTA? A. The Unit 1 SRO must obtain OSM concurrence B. The Unit 1 SRO must ensure the two crews have established constant communication C. The Unit 1 SRO must ensure all affected crews have been informed of the intent to apply an outside power source D. The Unit 1 SRO must ensure a Safety Group representative has walked down the area where the outside power source will be applied Page 94 of 100 Question:
Unit 1 was operating at 100% power. Given the following:
95 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Given the following:
* 1N0-64 (1 B NO Train Cold Leg Injection Return Safety Relief) lifted and did not reseat
* 1 N0-64 (1 B NO Train Cold Leg Injection Return Safety Relief) lifted and did not reseat
* The crew used the closest valves in the piping available to isolate the leak
* The crew used the closest valves in the piping available to isolate the leak
* Oue to parts availability it will be 4-5 days before repairs can be completed
* Due Oue to parts availability it will be 4-5 days before repairs can be completed
* The crew began a Technical Specification shutdown 1. Which trains of NO, if any, are operable?
* The crew began a Technical Specification shutdown
: 2. When shutting down, what is the next operational mode in which Technical Specification 3.5.2 (ECCS -Operating) will no longer apply? Reference provided A. 1. No trains of NO are operable 2. Mode 4 B. 1. No trains of NO are operable 2. Mode 5 C. 1. 1A Train of NO only 2. Mode 4 O. 1. 1A Train of NO only 2. Mode 5 Page 95 of 100 Question:
: 1. Which trains of NO, if any, are operable?
95 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was operating at 100% power. Given the following:
: 2. When shutting down, what is the next operational mode in which Technical Specification 3.5.2 (ECCS - Operating) will no longer apply?
* 1 N0-64 (1 B NO Train Cold Leg Injection Return Safety Relief) lifted and did not reseat
Reference provided A.     1. No trains of NO are operable
* The crew used the closest valves in the piping available to isolate the leak
: 2. Mode 4 B.     1. No trains of NO are operable
* Due to parts availability it will be 4-5 days before repairs can be completed
: 2. Mode 5 C.     1. 1A Train of NO only
* The crew began a Technical Specification shutdown 1. Which trains of NO, if any, are operable?
: 2. Mode 4 O.     1. 1A Train of NO only
: 2. When shutting down, what is the next operational mode in which Technical Specification 3.5.2 (ECCS -Operating) will no longer apply? Reference provided A. 1. No trains of NO are operable 2. Mode 4 B. 1. No trains of NO are operable 2. Mode 5 C. 1. 1A Train of NO only 2. Mode 4 O. 1. 1A Train of NO only 2. Mode 5 Page 95 of 100 Question:
: 2. Mode 5 Page 95 of 100
96 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3. Given the following:
 
* An operator is bleeding off nitrogen pressure from the 1 A NW surge tank
CATAWBA NUCLEAR STATION Question:      96 2009 SRO NRC Examination (1 point)
* At the completion of venting, the crew notes NW surge tank pressure is 21 psig Per Technical Specification 3.6.17 (Containment Valve Injection Water System): 1. What are the modes of applicability for this Technical Specification?
Unit 1 is in Mode 3. Given the following:
: 2. What is the current status of 1A Train of NW? A. 1. Modes 1, 2 and 3 only 2. Operable B. 1. Modes 1, 2 and 3 only 2. Not operable C. 1. Modes 1, 2, 3 and 4 2. Operable D. 1. Modes 1,2,3 and 4 2. Not operable Page 96 of 100 Question:
* An operator is bleeding off nitrogen pressure from the 1A NW surge tank
96 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 is in Mode 3. Given the following:
* At the completion of venting, the crew notes NW surge tank pressure is 21 psig Per Technical Specification 3.6.17 (Containment Valve Injection Water System):
* An operator is bleeding off nitrogen pressure from the 1 A NW surge tank
: 1. What are the modes of applicability for this Technical Specification?
* At the completion of venting, the crew notes NW surge tank pressure is 21 psig Per Technical Specification 3.6.17 (Containment Valve Injection Water System): 1. What are the modes of applicability for this Technical Specification?
: 2. What is the current status of 1A Train of NW?
: 2. What is the current status of 1A Train of NW? A. 1. Modes 1,2 and 3 only 2. Operable B. 1. Modes 1,2 and 3 only 2. Not operable C. 1. Modes 1,2,3 and 4 2. Operable D. 1. Modes 1,2,3 and 4 2. Not operable Page 96 of 100 Question:
A.       1. Modes 1,2 1, 2 and 3 only
97 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
: 2. Operable B.       1. Modes 1,2 1, 2 and 3 only
: 2. Not operable C.       1. Modes 1,2,3 1, 2, 3 and 4
: 2. Operable D.       1. Modes 1,2,3 and 4
: 2. Not operable Page 96 of 100
 
CATAWBA NUCLEAR STATION Question:      97 2009 SRO NRC Examination (1 point)
Given the following:
* A LOCA has occurred in Unit 1
* A LOCA has occurred in Unit 1
* The TSC has been fully staffed and activated
* The TSC has been fully staffed and activated
* An individual is needed for lifesaving activities during which 27 Rem of TEDE exposure is expected to be received 1. Is the individual required to be a volunteer?
* An individual is needed for lifesaving activities during which 27 Rem of TEDE exposure is expected to be received
: 1. Is the individual required to be a volunteer?
: 2. Who is required to approve the exposure for this lifesaving activity?
: 2. Who is required to approve the exposure for this lifesaving activity?
A. 1. Yes 2. The TSC Emergency Coordinator B. 1.Yes 2. The Operations Shift Manager C. 1. No 2. The TSC Emergency Coordinator D. 1. No 2. The Operations Shift Manager Page 97 of 100 Question:
A.     1. Yes 1.Yes
97 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following:
: 2. The TSC Emergency Coordinator B.     1. Yes 1.Yes
* A LOCA has occurred in Unit 1
: 2. The Operations Shift Manager C.     1. No 1.No
* The TSC has been fully staffed and activated
: 2. The TSC Emergency Coordinator D.     1. No
* An individual is needed for lifesaving activities during which 27 Rem of TEDE exposure is expected to be received 1. Is the individual required to be a volunteer?
: 2. The Operations Shift Manager Page 97 of 100
: 2. Who is required to approve the exposure for this lifesaving activity?
 
A. 1.Yes 2. The TSC Emergency Coordinator B. 1. Yes 2. The Operations Shift Manager C. 1.No 2. The TSC Emergency Coordinator D. 1. No 2. The Operations Shift Manager Page 97 of 100 Question:
CATAWBA NUCLEAR STATION Question:      98 2009 SRO NRC Examination (1 point)
98 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination An individual with a current year Total Effective Dose Equivalent (TEDE) of 1500 mR is preparing to perform a job in the RCA. The RWP states that the dose rate in the area is 200 mRlhr. Per NSD 507 (Radiation Protection):
An individual with a current year Total Effective Dose Equivalent (TEDE) of 1500 mR is preparing to perform a job in the RCA. The RWP states that the dose rate in the area is 200 mRlhr.
: 1. What is the maximum time he can work in this area until he accumulates enough dose to require an extension prior to the next entry into the RCA? 2. What is the minimum level RP position that could provide the approval of a dose extension if needed? A. 1. 0.5 hours 2. An RP Supervisor B. 1. 0.5 hours 2. The RP Manager C. 1. 1.5 hours 2. An RP Supervisor D. 1. 1.5 hours 2. The RP Manager Page 98 of 100 Question:
Per NSD 507 (Radiation Protection):
98 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination An individual with a current year Total Effective Dose Equivalent (TEDE) of 1500 mR is preparing to perform a job in the RCA. The RWP states that the dose rate in the area is 200 mRlhr. Per NSD 507 (Radiation Protection):
: 1. What is the maximum time he can work in this area until he accumulates enough dose to require an extension prior to the next entry into the RCA?
: 1. What is the maximum time he can work in this area until he accumulates enough dose to require an extension prior to the next entry into the RCA? 2. What is the minimum level RP position that could provide the approval of a dose extension if needed? A. 1. 0.5 hours 2. An RP Supervisor B. 1. 0.5 hours 2. The RP Manager C. 1. 1.5 hours 2. An RP Supervisor D. 1. 1.5 hours 2. The RP Manager Page 98 of 100 Question:
: 2. What is the minimum level RP position that could provide the approval of a dose extension if needed?
99 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was at 25% and increasing following a refueling outage. Given the following conditions and sequence of events:
A.       1. 0.5 hours
: 2. An RP Supervisor B.       1. 0.5 hours
: 2. The RP Manager C.       1. 1.5 hours
: 2. An RP Supervisor D.       1. 1.5 hours
: 2. The RP Manager Page 98 of 100
 
CATAWBA NUCLEAR STATION Question:      99 2009 SRO NRC Examination (1 point)
Unit 1 was at 25% and increasing following a refueling outage. Given the following conditions and sequence of events:
* Unit 1 experiences a large break LOCA
* Unit 1 experiences a large break LOCA
* Containment sump level is 5.2 ft and increasing
* Containment sump level is 5.2 ft and increasing
* During the swap to cold leg r-ecirculation, 1 NI-136B (NO Supply To NI Pump 1B) could not be opened
* During the swap to cold leg r-ecirculation, 1NI-136B (NO Supply To NI Pump 1B) 1B) could not be opened
* The crew verified S/I flow per EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation)
* EP/1/A/5000/ES-1.3 (Transfer to Cold Leg The crew verified S/I flow per EP/11A15000/ES-1.3 Recirculation)
* The crew is preparing to transition out of EP/1/A/5000/ES-1.3 when all running ECCS pumps begin showing signs of cavitation
* EP/1/A/5000/ES-1.3 when all running The crew is preparing to transition out of EP/11A15000/ES-1.3 ECCS pumps begin showing signs of cavitation EP/1/A/5000/ES-1.3 when 1N
: 1. What action, if any, was required per EP/1/A/5000/ES-1.3 when 1 N 1-136B would not open? 2. What procedure will EP/1/A/5000/ES-1.3 direct the crew to enter to address cavitation of the ECCS pumps? A. 1. 1B NI pump was secured 2. EP/1/A/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation)
: 1. What action, if any, was required per EP/11A15000/ES-1.3             1-136B would NI-136B not open?
B. 1. 1 B N I pump was secured 2. EP/1 IA/5000/ECA-1.3 (Containment Sump Blockage)
EP/1/A/5000/ES-1.3 direct the crew to enter to address
C. 1. No action required 2. EP/1 IA/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation)
: 2. What procedure will EP/11A15000/ES-1.3 cavitation of the ECCS pumps?
D. 1. No action required 2. EP/1 IA/5000/ECA-1.3 (Containment Sump Blockage)
A.       1. 11B B NI N I pump pu mp was secured
Page 99 of 100 Question:
: 2. EP/1/A/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation)
99 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Unit 1 was at 25% and increasing following a refueling outage. Given the following conditions and sequence of events:
B.       1. 1B N I pump was secured EP/1 IA/5000/ECA-1.3 (Containment Sump Blockage)
* Unit 1 experiences a large break LOCA
: 2. EP/1/A/5000/ECA-1.3 C.       1. No action required EP/1 IA/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation)
* Containment sump level is 5.2 ft and increasing
: 2. EP/1/A/5000/ECA-1.1 D.       1. No action required EP/1/A/5000/ECA-1.3
* During the swap to cold leg r-ecirculation, 1 NI-136B (NO Supply To NI Pump 1 B) could not be opened
: 2. EP/1  IA/5000/ECA-1.3 (Containment Sump Blockage)
* The crew verified S/I flow per EP/11A15000/ES-1.3 (Transfer to Cold Leg Recirculation)
Page 99 of 100
* The crew is preparing to transition out of EP/11A15000/ES-1.3 when all running ECCS pumps begin showing signs of cavitation
 
: 1. What action, if any, was required per EP/11A15000/ES-1.3 when 1 NI-136B would not open? 2. What procedure will EP/11A15000/ES-1.3 direct the crew to enter to address cavitation of the ECCS pumps? A. 1. 1 B N I pu mp was secured 2. EP/1/A/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation)
CATAWBA NUCLEAR STATION Question: 100 2009 SRO NRC Examination (1 point)
B. 1. 1 B N I pump was secured 2. EP/1/A/5000/ECA-1.3 (Containment Sump Blockage)
Given the following two events:
C. 1. No action required 2. EP/1/A/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation)
* Earthquake o Seismic instrumentation indicates .04 g vertical acceleration and .05 g horizontal acceleration o 1AD-4, B/8 "OBE Exceeded" is not actuated
D. 1. No action required 2. EP/1/A/5000/ECA-1.3 (Containment Sump Blockage)
* High Auxiliary Building radiation o 1RAD-1, B/3 "EMF41 Aux Bldg Vent Hi Rad" is actuated 6
Page 99 of 100 Question:
o EMF41 is reading 1.2 x 106 counts per minute and slowly increasing Which one of the above events requires activation of the site assembly alarm per RP/0/A/5 00 010 10 (Conducting a Site Assembly or Preparing the Site for an RP/O/A/50001010 Evacuation) and from what location(s) is this alarm activated?
100 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following two events:
A.     Earthquake Event; Control Room only B.     Earthquake Event; Control Room and Secondary Alarm Station (SAS)
* Earthquake o Seismic instrumentation indicates
C.     High Auxiliary Building radiation; Control Room only D.     High Auxiliary Building radiation; Control Room and Secondary Alarm Station (SAS)
.04 g vertical acceleration and .05 g horizontal acceleration o 1AD-4, B/8 "OBE Exceeded" is not actuated
Page 100 of oflOO 100
* High Auxiliary Building radiation o 1RAD-1, B/3 "EMF41 Aux Bldg Vent Hi Rad" is actuated o EMF41 is reading 1.2 x 10 6 counts per minute and slowly increasing Which one of the above events requires activation of the site assembly alarm per RP/0/A/5 00 010 1 0 (Conducting a Site Assembly or Preparing the Site for an Evacuation) and from what location(s) is this alarm activated?
 
A. Earthquake Event; Control Room only B. Earthquake Event; Control Room and Secondary Alarm Station (SAS) C. High Auxiliary Building radiation; Control Room only D. High Auxiliary Building radiation; Control Room and Secondary Alarm Station (SAS) Page 100 oflOO Question:
Listfor:
100 (1 point) CATAWBA NUCLEAR STATION 2009 SRO NRC Examination Given the following two events:
Reference List    for: 2009 SRO NRC Exam CN-1561-1.1 CN-1562-1.3 Databook Figure 148 Databook Figure 158 Databook Figure 57 EP/11A15000/ECA-1.1 Enclosure 5 EP/1/A/5000/ECA-1.1 Steam Tables
* Earthquake o Seismic instrumentation indicates
 
.04 g vertical acceleration and .05 g horizontal acceleration o 1AD-4, B/8 "OBE Exceeded" is not actuated
I"
* High Auxiliary Building radiation o 1RAD-1, B/3 "EMF41 Aux Bldg Vent Hi Rad" is actuated o EMF41 is reading 1.2 x 10 6 counts per minute and slowly increasing Which one of the above events requires activation of the site assembly alarm per RP/O/A/50001010 (Conducting a Site Assembly or Preparing the Site for an Evacuation) and from what location(s) is this alarm activated?
                            .
A. Earthquake Event; Control Room only B. Earthquake Event; Control Room and Secondary Alarm Station (SAS) C. High Auxiliary Building radiation; Control Room only D. High Auxiliary Building radiation; Control Room and Secondary Alarm Station (SAS) Page 100 of 100 Reference Listfor: 2009 SRO NRC Exam CN-1561-1.1 CN-1562-1.3 Databook Figure 148 Databook Figure 158 Databook Figure 57 EP/11A15000/ECA-1.1 Enclosure 5 Steam Tables Reference List for: 2009 SRO NRC Exam CN-1561-1.1  
i!
                      ,"    ~  =
                      ~  s  R
                        ", i
            ~~ ".,,""
* P1 ~    I  ~ '0 ** 0.0.
iltJJ ~, ~Immii
        ~ ~ i~~i~?~i
  ~    ~ I ~ !"'!;!l
              ~I i~~~~~~
  <r.        il*iI;1Ulre:;.
 
                                                                                          - - - - - - - - - - - - - - - - - - - - - - - - - - _.._--_...__.._..... _.... _-----
a
    .,.
(
            '--'\
                                                                                                                    "-.
                                                                                                                    "-"
Unit 1 Data Book                                                                                                                                                                                      DPC-1552.08-00-0014, Rev. 8 Source: DPC*1552.08-00*0014, Figure 16-2 95  ,.-------,.....--I------r----.,.----.---.----r-~---~--***-l
                                              'r                                                                                                        '--1                                                                 . -----I
                                                                                                                                                                                                                                      ~
90 +--------j                    InitiaJ NO Initial  NC                                                                --t-----t-------+----+--:""'....----~_______.j f--...-.----+--.-.----+-----+--------+--.-----+---:::iO""~O!:::-_+__~-----~                                                                    ~
                                                                                                                                                                                  -
85 +-------1                       System 80 .. -__ .___-.__        -- I--T_e_m_p_er_a_tu_re-..J,f--------+-----I------I-----+----=*"~......
                                              . Temperature
                                                                                                                                                                                    ~_+............-
__~__
                                                                                                                                                                                        ...--'            -----+__.~ .._ ......_ ..-..,~
                                                                                                                                                                                                                                      .. ~i
_I
                                                                                                                            --.---.--..~~
                                                                                                                                                                                                                  ~ ........
75 .f---.............j -      -7      00 &deg;F                                                                -_.-                                ~
75
                                                -
70 - - - - . - ~ -~ -.. 100 7
                                                        ~ 90
                                                        ~ 90&deg;F of 1--_ _ _ 1____- !I of of 100 of                                          I ::::::1 ..........-    r-~
                                                                                                                                                                            ..-
1 - - * -......
                                                                                                                                                                                        ~ .... "-
I---"'
                                                                                                                                                                            *--::;--1---
_--
                                                                                                                                                                                                      . ..
                                                                                                                                                                                                      . .- :::--
                                                                                                                                                                                                                    ..
                                                                                                                                                                                                            .. .. *.. ..
                                                                                                                                                                                                                        ..  .
                                                                                                                                                                                                                            * .. ..
i
                                                -      "'-120  of o          f  ,  '                                    ~                                          ..-"
                                                                                                                                                                  ...-"          ..-    .
                                                                                                                                                                                          ...... " .
65 .    -  -
65 ._---:-.--    - - - -  --    --120
                                                                                                      ~    ~                            .,., ........ .........      .  ..  . ..-
2B en
::s
:::l
        .S:C
                      ,
                      ~
60 +----~-----1600F
                                                ~140&deg;F
                                                -)I(-140&deg;F - - -
                                                -----160 OF
                                                                                    ~~
                                                                                            ~.      -'                  .  ~
                                                                                                                              .-J..............
                                                                                                                            ..-                  ..  .  .
:~-..-.or~-~---_+__------_-b~~~~
                                                                                                                  ...- .. .... ....i--
                                                                                                              .... ..-                      .
                                                                                                                                      .... - ..----......;,-------:;-...                        - -  ....
                                                                                                                                                                                      -+-"....'-------"-..
                                                                                                                                                                                                                              -"
                                                                                                                                                                                                                          ....-"
55 +---------j ---1-180 55                            ---+-180 OF    of                                                                                              I
                                                                                                                                                                                                -------
        ~
L              ...................
                                                                                                        '        ...... ....                                ..\-    ..........
                                                                                                                                                                      ....
                                                                                                                                                                                                            --I------------l
::iE
                                                                            /'"                    ..                                                          I            .-
                                                                                                                                                                                                                                        -
                                                                                                                              -
                                                --200&deg;F
                                                -200&deg;F                                      .......                                                              ~
        .5
        .S OJ Oi  50 ~---~.                                        ~
                                                                  ,/"          ","~r-~.~
                                                                                            ".
                                                                                                      .. ~.-~~----~-,,-
                                                                                                  ~ .-                                  .. .-  ~~~------+--
                                                                                                                                              .......                                            ______
                                                                                                                                                                                                    ----+~-~~--~~
:. ~--,,'          _~. -\---.            .- . -+-----=~-~~~--t---_I__---_1
        ~ 45                                                              ....
        '0
                                                                                                              -'"
                                                                                  ;--.!:,
CD
        .s.8            _____._+-------_/-7_+            /" . --:      ",
                                                                        ..              ...      .-,,'                      ..                      ~    .--' ~
                                                                                                                                                                                                                  -
                                                                                                                                                                --
40                                                                                                                                                                                                                      ;;;:;
          <Il Ql
                                                  . / . "'~....
                                                  ./~            " ;;;;t ..........
                                                                                .  ~
                                                                                                                  ~~*-~
                                                                                                                    ~~
                                                                                                                                    ~
                                                                                                                                                                                                          --~ -
i=
f=
E 35                                          r.. ! ..........
                                          /'.... .. "".- ..        ..                ~-*"""
                                                                                      ~~t""                                                                        ~
E-#f" .'
                    +.--~~~~:~~                    .. ~.~..~~I~..~.. -.::~-~~~~~-_.j____~--~~!~~~~~~~~__--~-----~_--~
                                                            "
30 30 t                    . . . . . . ..        .~~~...                            _-.--.~
                                                                                                      -        ~
                ~t~ ... ~< ~~~~~=j~~=t=~t~~1===t~~j 25 .1:.---. . ~..                    /
                                                                                    ...---
L~~ ~~                                                  ~
20 20,
                    ~~ ~
                                +'-.. -.t~~.:=;~;::::.:~~:::........::..-1r---===:;=:;::t-=+:::::::=::~!
                          ~/#~ .... :.r~~
15 15                          4' ---""                          --
                    ~~
10..
10      *I'" I',.;..~.          ~I-"I_t-1 5
0 f:"::                                                        1.                        I                                                  !
I .
o                        5                  10              15                      20                    25                          30                      35                        40                          45 Days After Shutdown Rev, 0,11/19/2003 Rev.                                                          Figure 148*
14B
* Loss of Decay Heat Removal,  Re~oval, 18% NC Level, High Decay Heat                                                                                          Page 15 ~
 
  ..                                                                \
                                                                ~~                                                                                                                                                                                                      "\
Unit 1 Data Book                                                                                                                                                                                                                                                                                                Source: DPC*1552,OS-OO-0014, DPC*1552.0e*00-0014, Rev. 8 Figure 16-S 16-8 140                  l                                        1--                                                                                                                                                !
130            ,~-,--,,--- Initial                              l~i~:;e%C          NC                                                                                                                                                                                                                        ~
                                                                                                                                                                                                                                                                                                                                                                                                    ~
                                                                                                                                                                                                                                                                                                                                                                    ,... ~
System 120 iI Temperature                                                                                                                                                                                                        ......
l~                                                                                                                                                                                                                                                                                          .....
                                                                                                                                                                                                                                                                                                                                                                                                              . .. ..
                                                                                                                                                                                                                                                                                                                                                                                                              ........
                                                                                                                                                -70&deg;F
                                                                                                                                                -70&deg;F
                                                                                                                                                                                                                                                                                                                                ....-  ~                                                  .    .
                                                                                                                                                                                                                                                                                                                                                                            .. ... .. ~ ...... ... ...i
                                                                                                                                                                                                                                                                                                                                                                                                    ~
                                                                                                                                                                                                                                                                                                                                ~                                                              ...
110                                                      - ~- *- 90 of
                                                                                                                                                ~
v----
                                                                                                                                                                                                                                    -  __A
                                                                                                                                                                                                                                                                                          ,....... ~                                                        ..      ..
                                                                                                                                                                                                                                                                                                                                                                    ...                            ~.,..,.
                                                                                                                                                -            -100 of
                                                                                                                                                                                                                                                                                          ...........                                            .... ... '"                      ..............
100                                                                                                                                                                                                                                        ..
V- . . '.." ..... .. '". ..................
1--'
                                                                                                            ~--
                                                                                                                                                -        --120 of                                                                                                                                                                ...                            .......
                                                                                                                                                                                                                                                                    'V                                                                    ....... .......
                                                                                                                                                                                                                                                                                                                                                                              -- -                            "-"
_._--                              -*"-140 of                                                                                                                                                                                                                                                      ...........
                                                                          ..-
CI)
V) 90 ..                                                                                                                                                                  .//
                                                                                                                                                                                                                                                                                      . .  ..                            ......
i.
                                                                                                                                                                                                                                                                                                                                                                                                              -'"  '.-
                                                                                                                                                                                                                                                                              -.-. . -- - -
                                                                                                                                                                                                                                                                                  .                                                                                                        ..
                                                                                                                                                                                                                                                                                                                                                                                            .
Cl)
C)
                                                                                                                                                                                                                                  . . V .... I ............ ...................
                                                                                                                                                                                                                                                                                                                          .",.
                                                                                                                                                -+--160
                                                                                                                                                ---.-160 of                                                                                                                                                                                                                  __      II t                                                                                                                                                                    .                          ...........
                                                                                                                                                                                                                                                                                                        .............
                                                                                                                                                                                                                                                                                                                                                            ... ..                    .
::l
::l                                                                                                                                                                                                  II c:
                                                                          ~              80                                                    --+--180
                                                                                                                                                --+-180 of
                                                                                                                                                                                                      /                          L
                                                                                                                                                                                                                                                                                                                                        ..
                                                                                                                                                                                                                                                                                                                                        .. .... ..
                                                                                                                                                                                                      /                                                                                                                                                                                      -      ~
                                                                                                      .                                                                                                                                                .,.'" ,..,.... .,..,.
                                                                                                                                                                                                                                                '.-" ...........                                                          .. .                                                                      ~
                                                                                                                                                                                                                                                                      -
                                                                                                                                                --200&deg;F                                                                                                                                                                  ........
                                                                                                                                                                                                                                        '."                                                              .
cii Ci r-*- . - . ~.......-----
                                                                                                                                                                                                                                                            ......
II L                                                              . . ..
                                                                          ~
c:                                                                                                                                                                                                                                  ........
                                                                                                                                                                                                                                                                      -
                                                                                                                                                                                                                                                            .."..
70                                                                                                                              ..        ""
                                                                                                                                                                                                                                        ~-
iiii"'*--'
                                                                                                                                                                                                                                                                              ..    ..
                                                                                                                                                                                                                                                                                                          ..
                                                                                                                                                                                                              ..... ....... ...... ~                                                                                                                                        ~
                                                                                                                                                                                                                                                                                                                                -      ~~
_ _ _ _i
                                                                          '0 co 0
I
                                                                                                          .                                          ,
                                                                                                                                                                            /                        ........
                                                                                                                                                                                                                                        ...
                                                                                                                                                                                                                                                                  ..
                                                                          ....
                                                                          &#xa3;0            60 fI                                        V;-;
V*"                                            ""  ........
                                                                                                                                                                                                                        .. ......                                    ~
                                                                                                                                                                                                                                                                                                        ~
                                                                                                                                                                                                                                                                                                                                                                                                    ~
                                                                                                                                                                                                                                                                                                      ~-
Q)
Ql
                                                                                                                                                                              "    ..............                                      I                                                                                                                          ~~ ~~~
___r-.-.-
E                                                                                                                                      ....                                                                                                                                                        ,-;.--
1=
i=            50 I
I
                                                                                                                                                            . ....-                                  *                                ~
40 t-~~_~_~~~I~
                                                                                                                  ;:;/
                                                                                                                                .L                  [.;
                                                                                                                                                        " I"'"
                                                                                                                                                                      .........        ......
                                                                                                                                                                                                              ~~                                                        .~
                                                                                                                                                                                                                                                                                                                                        ~
                                                                                                        ~d~""~                                    .~ ~                                                      ~~                        .~
e-"'"
                                                                                                                              /'
                                                                                                      ~~                                                                                              ~e----
                                                                                                                                            ./
30
                                                                                                          ,/;~,,:xx: ~                                                                                ~
                                                                                                                                                                                                                                      ~-
20                                                                                                                                                                                                          ,I 10            ~                      ~~-                    ~--
                                                                                                                                                  '--
I
                                                                                                                                                                                                                                    -I--                                                      .      ..
0 o
E-.=: ~
5
                                                                                                                                                                    ..L _ _ ** _        .... _ *.
10
                                                                                                                                                                                                  ~  ,        ,
                                                                                                                                                                                                                ,      ,    ~  .....I*'
no lS 15 1-_**_[_*_1_
                                                                                                                                                                                                                                            , I . . . ' ..... _.L-+---'--'_...,. ___., ___
20
                                                                                                                                                                                                                                                                                    ...'._... '--
25 2S
                                                                                                                                                                                                                                                                                                        .    ' - - ' , - L - ._ _      --,.
30 I
II 35 I
40
                                                                                                                                                                                                                                                                                                                                                                                                        ,
45 Days After Shutdown Rev. 0, 11/19/2003                                                                                                          Figure 1158          S8 ... Loss of Decay Heal                          Heat Removal, 18% NC Level,                        level, Low Decay Heat                                                                                        Page21 Page 21 I
1_ ... ___________ **.* , .* _ ** ,_'.. _'" _. _,. _ .............. _... .*..
I_"'M'_"'_'_'_'
                                                                                ,.... __ .......... ,. __ ...... _,_ *.. ,, __ ........ __
* ______    ~_ .* _, ... _. ___ .....  *                                                                                                                                                                            -_
                                                                                                                                                                                                                                                                                                                                                .- ._..._........ ... _--
 
                            )/\                                                                                        ........          ')
Unit 1 Data Data Book                                                                                                                                              Source: OAC Reactor Coolant Saturation Calculations 2500~------~-------~------~------~~------r-------~------~------~------~V~----~
2500
                        .-----t----L 2300 ---.----+------+-,--
2400                                                          -  IL-~_ _---J 2200 +-----..,---------r---..
2300                          -.-              --- ,--,----j------1-----.---I------i--..-----+-----t---~/_l---.,--.-                                    - --                                          V-'
2200+-----+---------f,---------i--------l-----4-------+-------r-----+_-----~/~-------.-
2100 1---__ ... __._ _ __                                -----                                                                --                                                  _, _ _-7f 2000    ___
2100 -t-.-------.                      _ . - - - - -...----.:----.----...
                                            -,-,----+-----.-,,-------,,--,-----,--.---------!----,--1--------j--,-,'---1-----1                              _.---.-                                  -7l'/
1900 1--_.
2000
                                                    . _____    . __          .._..-.._ - -
                                ---+-----+-----1--'".-".----.--.---+__----+----'--------+--/-/1.---1------1
                                                                                                                                                            -                        _  _j_,L_-+-          __
                                                                                                                                                                                                      -j--T--.---I------
  ~ IJ) 1900 1600
                                                ~='~I----,
1800 .1---.----+----.------'-.--;---.-..
_ .......... ___... __                                                  -.- .---------1--------+--------+------+---,..--
I_ ._. _. .____ . .__. .__=-='
                                                                                      ._._._  .*__
                                                                                                            . . .'_. . . .__=______ __-.----
                  =_. _. . ,-.._'---'-',-- ---_,_-_-=;=-,.-------..-,--.. . -"",-.-, . . . ,., . ."-..-.. . .-..,_. . . . . . . .". --.. --.".---. __
118 00 '1---"'--'--
1700 700 1--___
                  . ..___                            -._. -:r-
_____________
                                                            --1------+--.--'''".----...-"...--.-, ........-- -.. -.------j---, --
                                                                                                                                                                          -.- --
                                                                                                                                                                          -+-_ _ _. .__  I77Z---+-  ._ . -. _------.-
                                                                                                                                                                                                              --r-._---
                                                                                                                                                                                                                            -I ilil ~ :~~ ~~~~_::_~~-... . -.-~-----~-                          ~I- Sub ,"--d-**-*---..*1*-.. -*_* ....._-._-- . -- -,,,                                                    ~--
                                                          --1-_
r!~L=~----_-_~-=.                                    -=-:.- ----J subcoo;~~~:-i~_=~:==~-                                                                      ~-- /-1 '-_-_-._ -~_=_-_-t, 0.
                                                    . --->---...--
                                                                                                . ____. __*=--..-* . --*-*-*--~-*7'"--t------!----
                                      .-- --"'--'- ___I' coo e Region .......-'---.... -.-...--.----.                                                                                - *41-----+----
  ~
C1)  1300 i---.                                                                                                                                          - - ' - ' - ' - .....                                _ _ _ _I 1200 _ _ _                          -'---'..
22 1300 1100 -
                  "r----'
                                                  .
                                                            -f-----                .-                                                    ---.".---      -_._.--_._1        , /
    *
    ~ 1100 ------+------j----.-----'t--."--'-,,....--.- ..
0:IJ) 1200 - - - - - - - - _ _ , _ - - - - - - - - - - - - -
E 1000 ____
g 1000  900 +.
                                                                      .---.l--------.---
                                                                            .---.
                                                                                            "-. ,---    --  --        -
                                                                                                                  --.---
                                                                                                          . . .-_.---
                                                                                                                            .
                                                                                                  --.-----r*-----+-----L~"-t-.
                                                                                                                                -  - -    -  - -  -  -    1  -  - -  . - -  /~------+-- , - , - - - - l - - - - - - j L ---,-----+-----+---------1
___-j _ _ _ '_ _yLL._. _ _ _...!-_
7                            ----+------j
    ~
    ~
                  -----,---1-------1------1----,---- --.,,-,_.--
f-,.-.-----+-----___t---,--1----~-----,-,--.-.-'----j-~-----,
                                                                                                                                  -----t----~'---.- ------,1------I-----~1 t
7 - - " , - - - --. -Il- . - - - - l.            I- - -1 I              ______-'. I 900                                                                                          - -....-4...                                -..,    J        _..                                            ---I
            ~~~
800 1 - - - - ; -
700 1------- (--'--"-r--'      =-~=_=~.---_--~=:,-.-.-_------.I--_..      '--..---.........---.-----...- - . / .
                                                                                                                                ,
                                                                                                                                                  /        ~
                                                                                                                                                                                            ---0*
j Region I 3                            I 600 It--.--'--r-------~
                    - - . - . - - I - . - - - - - - r - - - ...- - - - - - - ..                    __.. _--.....- ~.-.
                                                                                                .._-_._-.                --*-l*-"-- ----,----.
                                                                                                                                            --_. _-- ---          .
                                                                                                                                                                    .                          --.          -+-------
500 /_
400
                    -.._      _-  -- -f t--.
                                                .
                                            - - - - '-.- -
                                                              ------..
                                                                                                ----~
                                                                                                ------::;;ii" ---.-----,
                                                                                                ~              ~
                                                                                                                                  - - - . - . -...- .    --1
                                                                                                                                                          ,----1 Superheated
                                                                                                                                                  ..-1---..... -
                                                                                                                                                  "-1---'_.                  I          .
                                                                                                                                                                                              .        I
                                                                                                ~
                                                                    --
300                                                              _____                                                              - ' ........,.----+-----+--.
                                                                                                                                                            .                                    ..- ..
200 200+-----+-------~--_----=                                  __    ~
                                                                          ~-~=------+--------t-------lr                                                        -----t---------t----,---------~-I                .--j--.----'-l 100+-------~~--~~~~--~"------~-------+---------l--------+--------+-------+---------
100                                                                                                                                                                                                          .-
                      ~          ~--.,..---
o0+-~-~--~--4---------~------_+--------+_------__t--------~--------+_------___t--------_r---------l                                                            I          .                        I 200                      250                300          350                400                            450                      500                  550            600                    650        700 NC System Temperature (Oeg                          (Deg F)
Rev. 2, 4/5r" 4/5/("'')                                                Figure 57 *- Reactor Coolant Satuf            Satur'              ,' Curve                                                                        Pagf
 
CNS                                LOSS OF EMERGENCY COOLANT RECIRCULATION                                                                                PAGE NO.
EP/1/A15000/ECA-1.1 EP/1/A/SOOO/ECA-1.1                                                                                                                                                  74 of 83 Enclosure 5    S - Page 1 of 1 Rev 31 DCS Minimum 511 Flowrate Versus Time After Trip sir FLOW REQUIRED TO MATCH DECAY HEAT FLOW RATE (GPM) 600 ~----~~~-r~~~--~--~~~~~~--~--~~~~_n I\,
                  \. ,
                -\----+--+--+--.                    ~I~H-+---l-**-t-- *--*-I-I-I-I-+i----!---I--- ~ ..-                                        j---
                      \.
                      \.
                        \.
                          \.
                            \.
500
                ~----f\-      I\.
                                  ,, - I - \ - --                .--- -
                                                                          *--i---+*~+-t-+--I-tTt---i---t----~r-
                                                                                    .                      ..- t--.
                                                                                                            --          . --. r--\- -.. \.- - --
                                                                                                                                                        ..-. -. -
                  .                \-...:i='=""--
                                      ,                          -----j---+ *-t---j---j-+-t-j-~--- - c----r-
                                                                                                                    ~
r-- r-    -++ -
I\,
                                            ,
                                            \.
400~---4--+-~~++H---_+--+-~~~+---_+--~~44~
4DO
                - - - - ---- f--              L\. .. -+-+-1-++----1---1---+- +-1--++-++----1---+--- *---j~+-+-H I\,
                ----                          l_'\~ ~t__t-+-t---+_-I-- -I---f-l-+++-.---j---- ---- r--I- ... -
300 300~---4--+-+-~++~--_+--+-~~~+---_+--~~44~
f~-- --/-- - -I-+-I-i--t-----t---t-***-*r-- -.--
                ._._._-          .. _._...._._- --_.._-j---...
                                                                  "'                                                                              j-- .
                                                                    ""
                                                                          ""
                                                                              " '-
1-----l--+--I-+...j*...jI--H*+_ - - - -~ ~ ~ ---t-I--HH--- ----+--1---1---.
200 200~--~--+-+-rr~H----+--+-~-rHH+----r--r-r+~+H                            "                                                      --j---t-t---j--l-t
                                                                                              ~
                                                                                                        ~
I---t--+--+--+~+-H...j-l----*- -.-- --- '-I--l---l'+i-+---~                                                  ... --"--'~+-+--l-H-
                - - - _. -                      ---I--I-t-H--I---.-.-- -
                                                                -    ...-
f----.
                                                                              - - I - - -.- f - ...-
                                                                                                          "" ..... _
                                                                                                                      .........
                                                                                                                      ,          I"": .
                                                                                                                                      . ,.- -      -.-
                                                                                                                                  ........
100
:'-----l----1--f----l--f---l-                    -----t-----i--l-f--t--I--H-I----+--j--. r--                                      --t~        -
a                          3456789                                    .)
                                                                                  "3 44  5566778  89 9            -            3 4:
3              .
4 : : . 66778899 10                                              100                                    1000                                                  10000 TIME (MINUTES)
 
CLEAN COpy OF STEAM TABLES
 
-.
Examination KEY for: 2009 SRO NRC Examination Question            Answer Number 1                    B 2                    0D 3                  A 4                A 5                A 6                A 7                    D 0
8                  C 9                A 10                  C 11                  B 12                  0D 13                  D 0
14                A 15                  0D 16                  0D 17                A 18              A 19                0D 20              A 21                B 22              A 23                C 24              A 25                0D Printed 12117120095:18:37 PM              Page  0/4 Pagel10/4
 
Examination KEY for: 2009 SRO NRC Examination Question            Answer Number 26                D 0
27                A 28                D 0
29                D 0
30                B 31                A 32                A 33                D 0
34                B 35                B 36                A 37                B 38                B 39              A 40                D 0
41                C 42                D 0
43              A 44                B 45                C 46                D 0
47                D 0
48              A 49                B 50                B Printed 12117120095:18:42 PM              Page2of4 Page 2 0/4


CN-1562-1.3 Databook Figure 148 Databook Figure 158 Databook Figure 57 EP/1/A/5000/ECA-1.1 Enclosure 5 Steam Tables 
Examination KEY for: 2009 SRO NRC Examination Question            Answer Number 51                    0D 52                A 53                A 54                  0D 55                  C 56                  B 57                 C 58                A 59                  B 60                B 61                B 62                  0D 63                C 64                B 65                B 66                B 67                B 68                B 69                0D 70                0D 71                C 72                B 73                0D 74                B 75                B 1211712009 5:18:42 PM Printed 12117120095:18:42                Page 3 0/4
".,,"" I '0 ** 0.0. I !"'!;!l il*iI;1Ulre:;. . I" i! , " = s R ", i
* P1 iltJJ ".,,"" <r. 


'--'\ ( . . , Unit 1 Data Book 95 'r 90 Initial NO 85 System 80 . Temperature . ----75 -70&deg;F -90 of 70 ---100 of 65 ._---:-.-
Examination KEY for: 2009 SRO NRC Examination Question           Answer Number 76               C 77               D D
-"'-120 of en 2 60 ::s -----160 OF .S: 55 ::iE ---1-180 OF OJ 50 .5 -200&deg;F 45 CD .s 40 <Il E 35 i= 30 25 20 15 10 5 0 /" ./ .. "'" /' .. ".-.. " .... " E-#f" .' .1:.---. .. / ..
78               D 79               A 80               D D
.. .
81               C 82               D D
* I',.;.. . f:":: --------------------------_
83               A 84               D D
.. _--_ ... __ .. _ ..... _ .... _-----"-. '--1 --_.-I ..-..-" -' .,., ........ .. .. .. .. . ..-. .. Source: DPC*1552.08-00*0014, Rev. 8 Figure 16-2 . -----I -----...--' _I ........ .. "-.. .. . .. .. " .. .. .. .. ..-.. -" .... -.. ..-.. .. .. .. I .. -.. .. /'" .. ' I .-....... ...... .... -,/" "," ". .--.. .--------;--.!:, .. -'" ", .. .. .-,,' .. .--' .. ... .. ;;;:; .. -..........
85               D D
..
86               D D
---...---1 1 . I ! I . o 5 10 15 20 25 30 35 40 45 Days After Shutdown Rev. 0,11/19/2003 Figure 148* Loss of Decay Heat 18% NC Level, High Decay Heat Page 15 a "-" Unit 1 Data Book Source: DPC-1552.08-00-0014, Rev. 8 Figure 16-2 en B :::l C 95 90 +--------j InitiaJ NC --t-----t-------+----+--:""'
87               C 88               A 89               A 90               A 91               B 92               D D
....
93               B 94               C 95               A 96               D D
85 +-------1 System 80 . __ . ___ . __
97               A 98               D D
......
99               D D
__ __ -+ __ .. _ ...... _ ..
100               C Printed 12117120095:18:42 PM             Page4of4 Page 4 0/4}}
.. 75 .f---.............j
-70 of 1--___ 1____ !I --.---.--.. _---90&deg;F ..........-
I---"' ..
* 70 ----.--1 .. 100 of ::::::1 1--*-...... *--::;--1---
.. -.. :::--.. *.. .. i 65 .-----------120 of,' ...-" ..-...... -)I(-140&deg;F
---.-J..............
........ ..-" ..
+---------j
---+-180 of .. ...-.... i--.. -.. ----......;,-------:;-
... -+-" .. '-------"-
.. --I------------l 60 , 55 --200&deg;F L ...................
.... ..\-..........
..
.......
______
Oi 50 .S _____ ._+-------_/-7_+
--: :. .. -\---.. -...... ..
.......... -r.. ! ;;;;t '0 45 CD .8 40 Ql 30
.. ..
.. .. .j ____
__
t ...... .. ..
E 35 f= 20, +'-..
15 .. 4' ---"" --10. I'"
o 5 10 15 20 25 35 40 45 Days After Shutdown Rev, 0,11/19/2003 Figure 14B
* Loss of Decay Heat Removal, 18% NC Level, High Decay Heat Page 15 
.. I I_"'M'_"'_'_'_'
\ "\ Unit 1 Data Book Source: DPC*1552,OS-OO-0014, Rev. 8 Figure 16-S 140 130 120 110 100 CI) 90 C) .. ::l c: 80 Ci 70 '0 co 0 60 .... Q) E i= 50 40 30 20 10 0 l 1--! i Temperature
,... -70&deg;F ........ ...
* 90 of -__ A .. ... ... .. ..
i --100 of ... ,....... .. '" .............. 1--' ... ---120 of V ... ..................
.. '" -*"-140 of /' '" ... i. ...........
.. _._--V .",. .. -"'.--+--160 of .. .. I .... II .............
__ II --+--180 of L ...... ... ... .. . / .. -.. ... .. t --200&deg;F '" ...........
.,..,. ........ '" ..".. ........ -"" iiii"'*--'
.. I L .... ..... -. , .. ....... -f V;-; r-* --..-.. ,-;.--
___ , I -I--.. .. ..L __ ** _ .... _ *. , , , no I*' ,I. .. ' ..... _.L-+---'--'_
... ,. ___ ., ___ '--',-L-.
__ --,. I o 5 10 lS 20 2S 30 35 40 45 Days After Shutdown Rev. 0, 11/19/2003 Figure 1 S8 .. Loss of Decay Heal Removal, 18% NC Level, Low Decay Heat Page 21 .-._ ... _ ........ -_ ... _--I Unit 1 Data Book 140 130 Initial NC System 120 I Temperature l -70&deg;F 110 ---90 of --100 of 100 ---120 of V) 90 Cl) -::l c: 80 cii c: 70 0 co &#xa3; 60 Ql E 1= 50 40 30 20 10 0 -*"-140 of ./ ---.-160 of .... V --+-180 of / .. --200&deg;F .-.,.'" ,..,.... .. ...... I / .. .... ...... I ........ .. .. I V*" "" ........ .. ... " ..............
...... I I .... .. I .L .. ....-* " I"'" ...... [.; .........
;:;/ e-"'" /' ./ . E-.=: '--, ..... 1-_**_[_*_1_
....-...........
v----V-.. .. .. .. .. .. . ...... .. .. ...........
.. ..........
.. ...... -.. -.. -.. .. -.. --r-.-.-I ... '._ ... '--. .. .. .. ....... ....... .. .. .. Source: DPC*1552.0e*00-0014, Rev. 8 Figure 16-8 ...... .. .. .. .. .. .. ... ... .. .. ...... .. ..............
....... -'" -" --.. .. -.. -____ i -I I I , o 5 10 15 20 25 30 35 40 45 Days After Shutdown Rev. 0, 11/19/2003 Figure 158 . Loss of Decay Heat Removal, 18% NC level, Low Decay Heat Page21 1_ ... ___________
**.* , .* _ ** ,_' .. _'" _. _,. _ ..............
_... .*.. , .... __ ..........
,. __ ...... _,_ *.. ,, __ ........ __
* ______ .* _, ... _. ___ ..... * 
) ........ ) Unit 1 Data Book Source: OAC Reactor Coolant Saturation Calculations 2500 2400 .-----t----
L 2300 -
__ ---J -.----2200 ---V-' 2100 1---__ ... __ ._ _ __ -------_, __ -7f 2000 ____.-----
... ----.:----.----...
_.---.--7l' 1900 1--_. .._ .. -.. _----j--T--.---
.. _____ .. __ _ _j_,L_-+-__ I------1800 . _ ..........
___ ... __ ._._._ .* __ -.----I 1700 '1---"'--'--
_____________
=-='=______
__ Z ---IJ) 1600 1--___ .. ___ ._. -:r-I ._ .. _ ... ____ ... __ ... __ ..... '_ ....... __ -.----7 --r-._-0. --1-_ _ 7 ---+-i
....
.. --->---... --Sub ,"--d -**-*---.. *1*-.... -*_* ..... _-._--. ---,,, lil -.. -.. ----"'--'-___I' coo e Region ....... -'---.... -.-... --.----. -*41-----+----
C1) 1300 i---. --'-'-' -..... 1200 ___ -'---' .. -=-.. ____ ... __ *=--.. -** ..
2 1100 -. .----.".----_._.--_._1 IJ) -------.---1000 ____ .---.l--------.---
___ -j ___ ' __ yLL._. ___ ...!-_ g 900 +. .---. .. ... -_.---7 ----+------j
--.... -4... -.., 7 t -I I J _.. -l .1 800 1----;-, I -I j 700 (--'--"-r--'
'--.. ---.........
---.-----... --./. ---0* 600 I--.-.--I-.------r---.
.. __ .. _--..... -
--_ .. _-----. --. . . I 500 /-._--t-----'
-. --------::;;ii" ---.-.-... -. --1 Superheated Region I 3 I 400 .. "-1---'_.
-I . 300 -'. ..-.. 200 --.--j--.----'-l 100 .-I . I o 200 250 300 350 400 450 500 550 600 650 700 NC System Temperature (Oeg F) Rev. 2, 4/5r" Figure 57
* Reactor Coolant Satuf ' Curve Pagf \ / ........ ') Unit 1 Data Book Source: OAC Reactor Coolant Saturation Calculations 2400 ---.----+------+-,--
2300 +-----..,---------r---
.. ,--,----j------1-----.---I------i--
..
/ 2100 -t-.-------.
-,-,----+-----.-,,-------,,--,-----,--.---------!----,--1--------j--,-,'---1-----1 2000 ---+-----+-----1--'".-".----.--.---+__----+----'--------+--/-/1.---1------1 1900 1---.----+----.------'-.--;---.-
.. -.-.---------1--------+--------+------+---,..--
118 7 0 0 0 0 =_ .. _ .... ,-... _'---'-',--
---_,_-_-=;=-,.
-------.. -,--..... -"",-.-, ..... , ., ... "-.. -...... -.. ,_ ............... " .. --... --.".---. __ -+-___ ... __ I ._ ..... _------.-. ---1------+--.--'''".----
... -" ... --.-, ........ ---.. -.------j---, --
:.------J /-1 '-_-_-. __
____ I 2 1300 "r----' -f-----, / 0: 1200 -------1---__,_------------".,-----.--------1---.--
,-,----l------j E L
* 1100 ------+------j----.-----'t--."--'-,, .... --.-..
---,-----+-----+---------1 1000 -----,---1-------1------1----,----
--.,,-,_.--900
--" ,----.--.----l------I 1-------
/ ______ ' .. 600
.. -------.. _-_._-. --*-l*-"--
----,----. . -+-------500 _._--f-.
---.-----, ,----1 Superheated Region 400 ------.. --..... -300 _____ ........,.----+-----+--.
__
200 250 300 350 400 450 500 550 600 650 700 NC System Temperature (Deg F) Rev. 2, 4/5/("'')
Figure 57 -Reactor Coolant Satur' , Curve Pagf CNS LOSS OF EMERGENCY COOLANT RECIRCULATION PAGE NO. EP/1/A15000/ECA-1.1  -Page 1 of 1 74 of 83 Minimum 511 Flowrate Versus Time After Trip Rev 31 DCS sir FLOW REQUIRED TO MATCH DECAY HEAT FLOW RATE (GPM) 600 I\, \. , \. \. \. \. 500 \. I\. , --t--. , + , I\, \. , 4DO I\, "' j--. " 300 " " " " '-" 200 "" ..... .........
........ 100 a 3456789 " .) 456789 -. 34:::.6789 10 100 1000 10000 TIME (MINUTES)
CNS LOSS OF EMERGENCY COOLANT RECIRCULATION EP/1/A/SOOO/ECA-1.1 Enclosure S -Page 1 of 1 Minimum 511 Flowrate Versus Time After Trip sir FLOW REQUIRED TO MATCH DECAY HEAT FLOW RATE (GPM) 600
-\----+--+--+--. *--*-I-I-I-I-+i----!---I---.. -j---\. \. \. -I-\---
.. -. -. -.. \-...:i='=""--
.----. ..-.. --. r--\--... \.---------j---+
-c----r-r--r--+ -I\, \.
--------f--L\. .. -+-+-1-++----1---1---+-
+-1--++-++----1---+---
-----I---f-l-+++-.---j----
----r--I-... ---/----I-+-I-i--t-----t---t-***-*r--
-.--._._._-.. _._ .... _._---_ .. _-j---... 1-----l--+--I-+...j*...jI--H*+_
------t-I--HH---
----+--1---1---.
--j---t-t---j--l-t
-.-----
_ ...
---_. ----I--I-t-H--I---.-.--
-f----. . ,.---.--... ---I---.-f-... -, I"": . :'-----l----1--f----l--f---l-
-----t-----i--l-f--t--I--H-I----+--j--.
r--
-3456789 3456789 3 4 6 7 8 9 10 100 1000 10000 TIME (MINUTES)
PAGE NO. 74 of 83 Rev 31 DCS CLEAN COpy OF STEAM TABLES CLEAN COpy OF STEAM TABLES 
-. Examination KEY for: 2009 SRO NRC Examination Question Answer Number 1 B 2 D 3 A 4 A 5 A 6 A 7 D 8 C 9 A 10 C 11 B 12 D 13 D 14 A 15 D 16 D 17 A 18 A 19 D 20 A 21 B 22 A 23 C 24 A 25 D Printed 12117120095:18:37 PM Pagel 0/4 Examination KEY for: 2009 SRO NRC Examination Question Answer Number 1 B 2 0 3 A 4 A 5 A 6 A 7 0 8 C 9 A 10 C 11 B 12 0 13 0 14 A 15 0 16 0 17 A 18 A 19 0 20 A 21 B 22 A 23 C 24 A 25 0 Printed 12117120095:18:37 PM Page 10/4 Examination KEY for: 2009 SRO NRC Examination Question Answer Number 26 D 27 A 28 D 29 D 30 B 31 A 32 A 33 D 34 B 35 B 36 A 37 B 38 B 39 A 40 D 41 C 42 D 43 A 44 B 45 C 46 D 47 D 48 A 49 B 50 B Printed 12117120095:18:42 PM Page2of4 Examination KEY for: 2009 SRO NRC Examination Question Answer Number 26 0 27 A 28 0 29 0 30 B 31 A 32 A 33 0 34 B 35 B 36 A 37 B 38 B 39 A 40 0 41 C 42 0 43 A 44 B 45 C 46 0 47 0 48 A 49 B 50 B Printed 12117120095:18:42 PM Page 2 0/4 Examination KEY for: 2009 SRO NRC Examination Question Answer Number 51 D 52 A 53 A 54 D 55 C 56 B 57 C 58 A 59 B 60 B 61 B 62 D 63 C 64 B 65 B 66 B 67 B 68 B 69 D 70 D 71 C 72 B 73 D 74 B 75 B Printed 12117120095:18:42 PM Page 3 0/4 Examination KEY for: 2009 SRO NRC Examination Question Answer Number 51 0 52 A 53 A 54 0 55 C 56 B 57 C 58 A 59 B 60 B 61 B 62 0 63 C 64 B 65 B 66 B 67 B 68 B 69 0 70 0 71 C 72 B 73 0 74 B 75 B Printed 1211712009 5:18:42 PM Page 3 0/4 Examination KEY for: 2009 SRO NRC Examination Question Answer Number 76 C 77 D 78 D 79 A 80 D 81 C 82 D 83 A 84 D 85 D 86 D 87 C 88 A 89 A 90 A 91 B 92 D 93 B 94 C 95 A 96 D 97 A 98 D 99 D 100 C Printed 12117120095:18:42 PM Page4of4 Examination KEY for: 2009 SRO NRC Examination Question Answer Number 76 C 77 D 78 D 79 A 80 D 81 C 82 D 83 A 84 D 85 D 86 D 87 C 88 A 89 A 90 A 91 B 92 D 93 B 94 C 95 A 96 D 97 A 98 D 99 D 100 C Printed 12117120095:18:42 PM Page 4 0/4}}

Revision as of 00:01, 14 November 2019

Initial Exam 2009-301 Final SRO 2009 Written Exam
ML100070535
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/07/2010
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
50-413/09-301, 50-414/09-301
Download: ML100070535 (113)


Text

FACILITY NAME: _ _ __ __ -----,;C-.;a-.;;t.;:;:.;aw:.;;.;b~a::__-----

..;;:;C.;;;at=a;.;.;w;..;;:b~a____- - - - -

_____~2~0~0~9-~3~01~------

REPORTNUMBER: ________

FINAL SRO 2009 WRITTEN EXAM CONTENTS:

o Final SRO Written Exam (100 'as given' questions with changes made D

during administration annotated) o Reference Handouts Provided To Applicants D

o Answer Key D

Location of Electronic Files:

Not applicable.

CATAWBA NUCLEAR STATION Question: 1 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 75% power and increasing power following a refueling outage.

The following occurs at 1015:

  • 1AD-1, Et8 E/8 "TURB GEN HI VIBRATION" actuates
  • Turbine bearing vibration readings on the OAC indicate:

o Bearing #9 at 11 mils and stable o Bearing #10 at 13 mils and stable What response is required for these conditions per OP/1/B/61001010B OPt1tBt6100t010B (Alarm Response for PaneI1AD-1)?

A. Immediately trip the turbine only B. Immediately trip the reactor and verify the turbine trips automatically C. Monitor bearing vibrations and if vibration is unchanged at 1017, trip the turbine only D. Monitor bearing vibrations and if vibration is unchanged at 1017, trip the reactor and verify the turbine automatically trips Page 1 of 100

CATAWBA NUCLEAR STATION Question: 2 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following conditions and sequence of events:

Initial Conditions

  • 1NV-294 (NV Pmps A&B Disch Flow Ctrl) is in manual
  • PRT pressure is 6 psig and increasing
  • PRT level is 67% and increasing
  • The PRT has a small external leak (0.05 gpm)
  • Pressurizer pressure is 2235 psig Final Conditions 10 minutes later
  • The crew notes pressurizer pressure is 2197 psig and slowly decreasing
  • PRT pressure is 15 psig and increasing
  • PRT level is 68% and increasing Based on the conditions stated above, and assuming no operator action:
1. How (if at all) is charging flow affected?
2. How (if at all) is the external leakage rate from the PRT affected?

A. Charging flow is stable PRT external leakage rate will increase B. Charging flow is stable PRT external leakage rate is stable C. Charging flow is increasing PRT external leakage rate is stable D. Charging flow is increasing PRT external leakage rate will increase Page 2 of 100

CATAWBA NUCLEAR STATION Question: 3 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power when a LOCA occurred. Given the following conditions:

  • The crew is in EP/1/A/5000/E-1 (Loss of Reactor or Secondary Coolant)
  • NC pressure is 1200 psig and stable
  • Containment pressure peaked at 2.8 psig and is slowly decreasing
  • NC subcooling is 2°F and stable
  • Pressurizer level is 18% and slowly increasing
  • Total CA flow is 400 gpm and stable
  • All S/G NR levels are approximately 21% and slowly increasing Can safety injection be terminated at this time and why or why not?

A. Yes, safety injection termination criteria are met B. No, CA flow is too low C. No, NC subcooling is insufficient D. No, pressurizer level is too low Page 3 of 100

CATAWBA NUCLEAR STATION Question: 4 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power when a LOGA LOCA occurred. Given the following conditions and sequence of events:

  • EP/1/A15000/E-1 (Loss of Reactor or Secondary Coolant)

The crew is performing EP/1/A/5000/E-1

  • 1A train and 18 train ECCS EGGS are RESET
  • 1A DIG load sequencer is RESET
  • The crew can not reset 18 DIG load sequencer
  • An NLO completes the local action(s) required due to the inability to reset 18 DIG load sequencer from the control room
  • A complete loss of offsite power occurs
  • FWST level is 57% and decreasing Assuming no further operator action, which ECCS EGGS pumps are running 1 minute after the loss of offsite power?

A. 1A NVonly B. 1A NV and 18 NVonly C.

G. 1A NV, 1A NI and 1A NOND only D. 1A NV, 18 NV, 18 NI and 18 NDNO Page 4 of 100

CATAWBA NUCLEAR STATION Question: 5 2009 SRO NRC Examination (1 point)

Unit 1 is operating in Mode 3. Given the following temperatures on the 1A NCP at 0200 hrs:

  • Motor bearing temperature is 187.2°F
  • Lower pump bearing temperature is 211.2°F
  • #1 seal outlet temperature is 223.2°F
  • Motor stator winding temperature is 301.2°F 301 .2°F
  • All temperatures are increasing at 1 of per minute 1°F What is the earliest time that the 1A NCP must be secured per OP/1 IA/61501002A (Reactor Coolant Pump Operation)?

A. 0208 B. 0210 C. 0212 D. 0214 Page 5 of 100

CATAWBA NUCLEAR STATION Question: 6 2009 SRO NRC Examination (1 point)

Unit 1 is in Mode 5 preparing to enter Mode 6 after being shutdown 10 days ago. Given the following conditions and sequence of events:

  • NC wide range level is 18% and stable
  • 1A ND NO loop is in service
  • ND NO Pump A Discharge Temperature is 120°F and stable
  • ND NO Hx A Outlet Temperature is 100°F and stable
  • The 1A ND NO pump trips
  • The 1B ND NO pump can not be started Based on current conditions, what is the minimum time before core boiling occurs?

Reference provided A. 31-32 minutes B. 36-37 minutes C. 47 -48 minutes D. 55-56 minutes Page 6 oflOO of 100

CATAWBA NUCLEAR STATION Question: 7 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100%. Given the following conditions and sequence of events:

  • A S/G PORV opened momentarily and caused NC pressure to decrease to 2205 psig
  • With NC pressure at 2207 psig, 1AD-2, FIg "DeS Alternate Altemate Action" actuates
  • NC pressure is at 2250 psig and slowly increasing when the crew enters AP/1/A/55001011 (Pressurizer Pressure Anomalies), Case 2, Pressurizer Pressure Increasing Why will manual action be required to control Pzr pressure?

A. All Pzr heaters are on B. To prevent lifting a Pzr PORV C. Automatic Pzr spray actuation only is blocked D. Automatic Pzr spray and automatic PORV actuation are blocked Page 7 of 100

CATAWBA NUCLEAR STATION Question: 8 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. The basis for manually inserting control rods during an A TWS event is to reduce reactor power to:

A. prevent exceeding rated thermal power limits defined in Technical S pecificatio pecifi catio ns B. prevent rapid heatup of the NC system and potential overfill of the pressurizer C. ensure the only heat being added to the NC system is from core decay heat and NC pump heat D. ensure there is sufficient steam dump capacity to prevent opening the steam line code cod e safeties Page 8 of 100 oflOO

CATAWBA NUCLEAR STATION Question: 9 2009 SRO NRC Examination (1 point)

Given the following:

  • 1A CF pump is out of service for maintenance
  • The crew enters AP/11A155001006 AP/1/A/5500/006 (Loss of S/G Feedwater),

Feedwater). Case I (Loss of CF Supply To S/Gs).

What is the minimum power level which requires a manual reactor trip and what is the basis for manually tripping the reactor above that power level?

A. 5%; to ensure CA can maintain adequate S/G levels B. 10%; to ensure CA can maintain adequate S/G levels C. 5%; to ensure an inadvertent mode change does not occur D. 10%; to ensure an inadvertent mode change does not occur Page 9 of 100 oflOO

CATAWBA NUCLEAR STATION Question: 10 2009 SRO NRC Examination (1 point)

Regarding the actions of EP/1/A/5000/ECA 0.0 (Loss of All AC Power):

1. What is the basis for rapidly depressurizing intact S/Gs to 165 psig?
2. What is the basis for stopping the depressurization at 165 psig?

A. 1. To enhance natural circulation until forced cooling can be restored

2. To prevent injecting N2 from the CLAs B. 1. To enhance natural circulation until forced cooling can be restored
2. To prevent voiding in the reactor vessel upper head C. 1. To reduce NC temperature and pressure to minimize NC system inventory loss
2. To prevent injecting N2 from the CLAs D. 1. To reduce NC temperature and pressure to minimize NC system inventory loss
2. To prevent voiding in the reactor vessel upper head Page 10 of 100

CATAWBA NUCLEAR STATION Question: 11 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 75% power and Unit 2 is operating at 100% power when the following switchyard PCBs open:

  • PCB 17
  • PCB 18
  • PCB 19 Which one of the following statements correctly describes the effect on Units 1 and 2?

A. Unit 1 remains at 75% power and Unit 2 runs back to 48% power at 18% Imin B. Unit 1 runs back to 48% power at 18% Imin and Unit 2 remains at 100% power C. Unit 1 remains at 75% power and Unit 2 runs back to 23% power at 25% Imin D. Unit 1 runs back to 23% power at 25% Imin and Unit 2 remains at 100% power Page 11 of 100

CATAWBA NUCLEAR STATION Question: 12 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 30% power when 1ERPA de-energizes.

Based on the above conditions, which one of the following lists contains operations which would mlall require manual action? (Evaluate each condition separately)

1. 1A DIG start on a 1ETA blackout
2. 1A DIG FD Day Tank makeup on low level
3. Swap RN to the pond on a Train A Emergency Lo Pit Level
4. Rod withdrawal on a -1.5°F combined error signal
5. Makeup to VCT A. 1 and 2 B.
8. 3 and 4 C. 1,3, and 5 D. 2,4, and 5 Page 12 of 100

CATAWBA NUCLEAR STATION Question: 13 2009 SRO NRC Examination (1 point)

Unit 1 NC system temperature is at 335°F and decreasing for a refueling outage.

Given the following:

  • Vital charger 1 ECC fails
  • 1EMXA is unavailable to power spare charger 1ECS 1EMXA
1. What other MCC can provide an alternate supply to 1ECS?
2. Does OP/11A163501008 OP/1/Al6350/008 (125VDC/120VAC Vital Instrument and Control Power System) allow alignment of the alternate supply to 1 ECS"based ECSAbased on current Unit 1 conditions?

,",0 ~uf'PLy "10 ~1..t'PPt-'1 fl>vJE.e.

~w£f'. TO IE-be..

IEbe.

A. 1. 1EMXC

2. Yes B. 1. 1EMXC
2. No C. 1. 1EMXJ
2. Yes D. 1. 1EMXJ
2. No Page 13 of oflOO 100

CATAWBA NUCLEAR STATION Question: 14 2009 SRO NRC Examination (1 point)

Units 1 and 2 are operating at 100% power with RN pump 2A running. Given the following conditions and indications:

  • An Emergency Lo Pit Level actuation occurs
  • The crew is performing A P/O/A/55 00102 0 (Loss of Nuclear Service Water),

Case 2 (Loss of RN Pit Level)

  • During a board walkdown, the following are noted:

o 1RN-53B (Station RN Disch Hdr X-Over) is open o 1RN-54A (Station RN Disch Hdr X-Over) is closed

1. Where is RN discharge flow from the DIGs directed based on current conditions?
2. Which of the above RN valves must be realigned per AP/O/A/55001020?

A. 1. Standby Nuclear Service Water Pond 1RN~53B

2. 1RN-53B B. 1. RL discharge piping to Lake Wylie
2. 1RN-53B C. 1. Standby Nuclear Service Water Pond
2. 1RN-54A D. 1. RL discharge piping to Lake Wylie
2. 1RN-54A Page 14 of 100

CATAWBA NUCLEAR STATION Question: 15 2009 SRO NRC Examination (1 point)

Unit 1 is in Mode 3. Given the following initial valves and positions/functions:

positionslfunctions:

VALVE POSITION/FUNCTION POSITIONIFUNCTION 1NV-1A (NC Letdn to Regen Hx Isol) Open 1 CA-149 (S/G 1A CF Byp 8yp To CA Nozzle) Open 1 NV-153A (Letdn Hx OUt 3-Way Vlv) "DEMIN" 1 RN-291 (1A KC HX Outlet Throttle) "MINIFLOW" The Instrument Air (VI) system completely depressurizes.

When the VI system is re-pressurized, which one of the following valves will return to its initial position/function with no operator action?

A. 1NV-1A B. 1CA-149 1CA-149 C. 1NV-153A D. 1 RN-291 Page 15 of 100

CATAWBA NUCLEAR STATION Question: 16 2009 SRO NRC Examination (1 point)

Which one of the following indications is used in EP/1/A/5000/ECA-1.2 EPI1/A/5000/ECA-1.2 (LOCA Outside Containment) to verify that a leak outside containment has been successfully isolated?

A. ND NO Pump discharge pressure increasing B. Pressurizer level increasing C. NDINS NO/NS room sump levels decreasing D.

O. Reactor coolant pressure increasing Page 16 of 100

CATAWBA NUCLEAR STATION Question: 17 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100%. Given the following conditions and sequence of events:

Initial Conditions

  • The crew tripped the reactor due to a loss of all feedwater
  • EP/1/A/5000/E-O EP/1/A/SOOOIE-O (Reactor Trip or Safety Injection) was completed
  • The crew was depressurizing the S/Gs to feed from the condensate booster EP/1/A/SOOO/FR-H.1 (Response to Loss of Secondary Heat Sink) pumps per EP/1/A/5000/FR-H.1 Current Conditions
  • Bleed and feed criteria have been met and the crew is establishing bleed and feed per EP/1/A/SOOO/FR-H.1 EP/1/A/5000/FR-H.1
1. Which cold leg accumulators provide backup motive force to open the PZR PORVs?
2. What is the function of the NC PORVs when establishing bleed and feed in EP/1 /A/5000/FR-H.1 ?

EP/1/A/SOOO/FR-H.1 A. 1. A and B

2. To provide for adequate NC system heat removal until secondary heat sink can be restored B. 1. A and B
2. To depressurize the NC system to protect the S/G tubes from creep failure C. 1. C and D
2. To provide for adequate NC system heat removal until secondary heat sink can be restored D. 1. C and D
2. To depressurize the NC system to protect the S/G tubes from creep failure Page 17 oflOO of 100

CATAWBA NUCLEAR STATION Question: 18 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power. Given the following sequence of events:

0300 Reactor trip occurred due to a general warning 0320 Safety injection actuated due to a large break LOCA 0322 1B NI N I pump trips due to a faulty breaker 0350 Loss of emergency coolant recirculation occurred and the crew entered EP/1/A/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation) 0351 NV and NI pump status are determined as follows:

  • 1A NV pump flow is 180 gpm and stable
  • 1 B NV pump flow is 170 gpm and stable
  • 1A NI pump flow is 340 gpm and stable
  • 1 B NI pump is tagged out 0420 The crew is performing step 19b RNO of EP/1/A15000IECA-1.1 EP/11A15000IECA-1.1 to establish the appropriate safety injection flow per Enclosure 5 When the actions required per Step 19b RNO are complete, which ECCS pump(s) are seNice?

in service?

Reference provided A. 1A NI pump B. 1A NV pump and 1B NV pump C. 1A NV pump and 1A NI pump D. 1B NV pump and 1A NI pump Page 18 of 100

CATAWBA NUCLEAR STATION Question: 19 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following:

  • While performing the RCCA movement test, control rod H-8 slips into the core to 200 steps withdrawn
  • All other Bank D control rods are at 216 steps withdrawn as indicated on DRPI and step demand counters
  • The crew is performing AP/1/A/55001014 AP/11A155001014 (Control Rod Misalignment) and currently referring to OP/11A161501008 OP/1/A/6150/o08 (Rod Control)
1. What is the maximum time allowed to restore rod H-8 to within limits per Technical Specification 3.1.4 (Rod Group Alignment Limits)?
2. Which control rod lift coil(s) will be disconnected per OP/11A161501008 OP/1/A/61501008 (Rod Control), when initially attempting to recover control rod H-8?

H-B?

A. 1. 30 minutes

2. Rod H-8 H-B B. 1. 30 minutes
2. All rods in the affected bank except H-8 C. 1. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
2. Rod H-8 H-B D. 1. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
2. All rods in the affected bank except H-8 Page 19 of 100

CATAWBA NUCLEAR STATION Question: 20 2009 SRO NRC Examination (1 point)

Unit 1 is increasing power when

\Nhen the following OAC indications are noted:

OAC reading Point Color N 3 .12E-5 amps GREEN N 2.75E-6 2.7 5E-6 amps GREEN N-41 -11.3%

N-41-11.3% BLUE N-42 -11.2% GREEN N-43 -0.0% MAGENTA N-44 -10.8% GREEN

1. Which intermediate range instrument is reading correctly?

point for N-41 indicate?

2. What does the BLUE color of the OAC pointfor A. 1. N-35
2. The OAC point quality is "suspect" B. 1. N-35
2. The OAC point quality is "bad" C. 1. N-36
2. The OAC point quality is "suspect" D. 1. N-36
2. The OAC point quality is "bad" Page 20 of 100

CATAWBA NUCLEAR STATION Question: 21 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 50% power. Given the following:

  • Both ICC monitors are unavailable
  • Current NC pressure is 665 psig
  • Core exit thermocouple temperatures are 488°F
  • T-Colds are 487.rF 487.7°F
1. Based on current conditions, what subcooling value would the ICC monitors be reading if they were available?
2. Based on current conditions, what is steam header pressure?

Reference provided A. -8 ° F

1. -8°F
2. 608 psig B. 1. -8 OF of
2. 593 psig C. 1. +12° F
2. 608 psig D. 1. +12°F

+12° F

2. 593 psig Page 21 of 100

CATAWBA NUCLEAR STATION Question: 22 2009 SRO NRC Examination (1 point)

The Spent Fuel Pool Ventilation (VF) system is operating in unfiltered mode when a recycle paper bin near the Spent Fuel Pool truck bay doors catches fire and smoke is drawn into the VF system supply ductwork.

1. What affect will this condition have on the operation of the VF system?
2. How is this fire classified?

A. 1. The VF Supply fan trips only

2. ClassA Class A B. 1. The VF Supply fan trips only
2. Class B C. 1. The VF Supply fan trips and the VF Filtered Exhaust fans will swap to filter mode
2. Class A D. 1. The VF Supply fan trips and the VF Filtered Exhaust fans will swap to filter mode
2. Class B Page 22 of 100

CATAWBA NUCLEAR STATION Question: 23 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following:

  • A small break LOCA occurs
  • The crew is performing EP/1/A/SOOO/ES-1.2 EP/1/A15000/ES-1.2 (Post LOCA Cooldown and Dep ress urization)
  • All NC pumps are secured
1. What is the NC cooldown rate specified in this procedure?
2. Which method is the first choice for the NC system depressurization for the given conditions?

A. 1. As close as possible without exceeding 100°F in an hour

2. NV auxiliary spray B. 1. At the maximum rate
2. NV auxiliary spray C. 1. As close as possible without exceeding 100°F in an hour
2. NC PORV D. 1. At the maximum rate
2. NC PORV Page 23 of 100

CATAWBA NUCLEAR STATION Question: 24 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power. Given the following:

  • A large steam line break occurred 20 minutes ago
  • All MSIVs fail to close by any means
  • NC cold leg temperatures are 248°F and slowly decreasing
  • NC pressure is 520 psig and slowly increasing
  • The crew has completed EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)
1. Based on current conditions, which procedure will the crew transition to when EP/1/A/5000/E-0 is exited?
2. At what point during this steam line break accident is the reactor vessel most susceptible to failure and why?

A. 1. EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock)

2. During the initial cooldown because total stress on the inner wall of the vessel is higher at this time B. EP/1 IA/5000/E-2 (Faulted Steam Generator Isolation)
1. EP/1/A/5000/E-2
2. During the initial cooldown because total stress on the inner wall of the vessel is higher at this time C. 1. EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock)
2. During the subsequent heatup after the S/Gs depressurize because total stress on the outer wall of the vessel is higher at this time D. 1. EP/1/A/5000/E-2 (Faulted Steam Generator Isolation)
2. During the subsequent heatup after the S/Gs depressurize because total stress on the outer wall of the vessel is higher at this time Page 24 of 100

CATAWBA NUCLEAR STATION Question: 25 2009 SRO NRC Examination (1 point)

Given the following:

  • 1A S/G pressure is 1212 psig and increasing
  • 1A S/G level is approximately 18% N/R level and stable
  • The crew is performing EP/1/A/5000/FR-HA EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities)
  • Operators have been dispatched to manually operate the 1A 1A S/G PORV How will1A S/G indicated level initially respond when the PORV is opened?
1. Howwill1A
2. What is the reason for this response? .

A. 1. Indicated level will initially decrease

2. Increased voiding in the S/G downcomer region B. 1. Indicated level will initially increase
2. Increased voiding in the S/G downcomer region C. 1. Indicated level will initially decrease
2. Increased voiding in the S/G tube bundle area D. 1. Indicated level will initially increase
2. Increased voiding in the S/G tube bundle area Page 25 of 100

CATAWBA NUCLEAR STATION Question: 26 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following:

  • NC Tcold temperatures are 278°F and slowly decreasing
  • Containment pressure is 3.2 psig and increasing
  • No NS pump flow is indicated
  • All S/G NR levels are offscale low
  • CA flow is 640 gpm
  • The crew is preparing to exit EPI1/A/5000/E-0 EP/1/A/SOOO/E-0 (Reactor Trip or Safety Injection)

Which one of the following procedures is the crew required to enter next?

A. EP/1/A15000/E-2 EP/11A1S000/E-2 (Faulted Steam Generator Isolation)

B. EP/11A1S000/FR-H.1 (Response to Loss of Secondary Heat Sink)

EP/1/A15000/FR-H.1 C. EP/1/A15000/FR-P.2 (Response to Anticipated Pressurized EP/11A1S000/FR-P.2 Thermal Shock Condition)

D. EP/11A1S000/FR-Z.1 (Response to High Containment Pressure)

EP/1/A1S000/FR-Z.1 Page 26 of 100

CATAWBA NUCLEAR STATION Question: 27 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following:

  • At 1100 a large break LOCA occurs
  • At 1215, when the crew is in EP/1/A/5000/E-1 (Loss of Reactor or Secondary Coolant), waiting for the time to swap to hot leg recirc, containment sump level is 13 feet and slowly increasing
1. If containment sump level is increasing at a constant rate of 0.25 feet per minute, at what time is entry into EP/1/A/5000/FR-Z.2 (Response to Containment Flooding) required?
2. What signal closes valves inside containment that are not qualified for submergence?

A. 1. 1225

2. St B. 1. 1245
2. St C. 1. 1225
2. Sp D. 1. 1245
2. Sp Page 27 of 100

CATAWBA NUCLEAR STATION Question: 28 2009 SRO NRC Examination (1 point)

Regarding the reactor coolant pump motor stator:

1. What system provides cooling water?
2. What signal will isolate that cooling water source?

A. 1. KG

2. PhaseA B. 1. KG
2. Phase B G. 1. YV
2. PhaseA D. 1. YV
2. Phase B Pa.ge Page 28 of 100

CATAWBA NUCLEAR STATION Question: 29 2009 SRO NRC Examination (1 point)

Unit 1 was decreasing power from 100%. Given the following:

  • Pressurizer level was 53%
  • Reactor power was 85%
  • The power decrease was halted when the crew noted that 1NV-294 (NV Pumps A & & B Disch Flow Ctrl) was not maintaining pressurizer level at program level
  • 1NV-294 was placed in manual and adjusted to restore pressurizer level to program prog ra m level
1. When the crew discovered 1NV-294 was not maintaining program level, how did actual level compare to program level?
2. When 1 NV-294 is repaired, what operator action(s) will be required to restore automatic pressurizer level control?

A. 1. Actual level was lower than program level

2. Place 1NV-294 in automatic only B. 1. Actual level was lower than program level
2. Place 1NV-294 in automatic and restore the Pressurizer Level Master to automatic using the DCS soft controls C. 1. Actual level was higher than program level
2. Place 1NV-294 in automatic only D. 1. Actual level was higher than program level
2. Place 1NV-294 in automatic and restore the Pressurizer Level Master to automatic using the DCS soft controls Page 29 of 100

CATAWBA NUCLEAR STATION Question: 30 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power.

1NO-33 (NO Sys Rtn To FWST)

For current conditions, what is the normal position of 1ND-33 and how is this position administratively controlled?

A. Closed; white tagged in position B. Closed; locked in position C. Open; white tagged in position D.

O. Open; locked in position Page 30 of 100

CATAWBA NUCLEAR STATION Question: 31 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power when a large break LOCA occurs.

  • The crew has just transitioned to EP/1 /A/5000/ES-1.3 (Transfer to Cold Leg EP/1/A/5000/ES-1.3 Recirculation) and no manual actions have been taken
1. Based on the above conditions, which ECCS pump(s) are currently taking suction from the containment sump?
2. If NO is required to be aligned for hot kill

~ recirculation, to which NC hot legs will NO inject?

A. 1. NO pumps only

2. Band C NC hot legs only B. 1. NO pumps only
2. All 4 hot legs C. 1. NV pumps, NI pumps, NO pumps
2. Band C NC hot legs only O. 1. NV pumps, NI pumps, NO pumps
2. All 4 hot legs Page 31 of 100 oflOO

CATAWBA NUCLEAR STATION Question: 32 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power when it experienced a steam line break accident resulting in a safety injection and the crew has entered EP/1/A15000/E-O EP/11A15000/E-O (Reactor Trip or Safety Injection).

Which one of the following completes the statement below?

Per Enclosure 1 of EP/1/A/5000/E-0, when NC pressure decreases to less than

_ _ _ the crew will close 1NV-202B and 1 NV-203A (NV Pumps A&B Recirc lsol) and when NC pressure increases to greater than the crew will re-open these valves.

Closed Re-opened A. 1500 psig 2000 psig B. 1500 psig 1955 psig C. 1620 psig 2000 psig D. 1620 psig 1955 psig Page 32 of 100

CATAWBA NUCLEAR STATION Question: 33 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power when a LOCA occurred at Time O. Given the NC System pressure trend shown below:

2500 ~--

2000

...u CJ

...::r

~

...u

I

~ 1500

~

A-D.

E u

CJ t: 1000

~

u z

j!!

500 o

o 1 2 3 4 4 55 6 6 7 8 9 W 10 tl 11 Time (minutes)

Which of the following describes when each of the ECCS pumps listed begins to inject flow into the NC system?

NI Pumps NO ND Pumps A. Between 0 and 1 minute Between 8 and 9 minutes B. Between 1 and 2 minutes Between 8 and 9 minutes C. Between 0 and 1 minute Between 9 and 10 minutes O.

D. Between 1 and 2 minutes Between 9 and 10 minutes Page 33 of 100

CATAWBA NUCLEAR STATION Question: 34 2009 SRO NRC Examination (1 point)

Unit 1 completed NC fill and vent activities following a forced outage. Given the following:

  • A nitrogen blanket was placed on the pressurizer during the outage
  • NC level is 85% and stable
  • The crew is in the process of drawing a bubble in the pressurizer
1. Per Selected Licensee Commitment 16.5-4 (Pressurizer), what is the limit on pressurizer heat up rate?
2. Per OP/1/Al61 OP/1/A/61 00/001 (Controlling Procedure for Unit Startup), when a pressurizer PORV is opened, what indication verifies nitrogen venting is complete?

A. 1.100°Finanyonehourperiod

1. 100°F in anyone hour period
2. PRT temperature equalizes with Pzr steam space temperature B. 1. 100°F in anyone hour period
2. PRT level increases without a corresponding PRT pressure increase C. 1. 80°F in anyone hour period
2. PRT temperature equalizes with Pzr steam space temperature D. 1. 80°F in anyone hour period
2. PRT level increases without a corresponding PRT pressure increase Page 34 of 100

CATAWBA NUCLEAR STATION Question: 35 2009 SRO NRC Examination (1 point)

Unit 1 is in Mode 3. Given the following:

  • 1AD-6, E/1 (NCP A Thermal Barrier KC Outlet HilLo Flow) actuates
  • The flow trend below:

100 .---.-----.----,,----,--......,--

$ 90+-~-+~--~~-

90

.2 LL

...., 80 Q)

-:;:;; 70

s 0

.....

.!!!

.-

--

'- ,....

Q) cE t(1l 0..

t: 0-60 50 ro OJJQ.O 40 m

co - -

ro 30 E

'-

ttJ 20

..c l- 10 u

.:><:

o 0 +.. _

. . .+. . . . . . . ..

o 10 20 30 40 50 60 70 BO 80 90 100 110 120 130 140 150 Time (seconds)

1. At what time on the above graph should 1 KC-394A (NC Pump 1A Therm Bar Otlt) have automatically closed?
2. If the NCP 1A thermal barrier can not be isolated from the KC System by any means, how is over pressurization of the KC surge tanks prevented?

A. 1. 100 seconds

2. The KC surge tanks vent line is large enough to prevent over pressurization B. 1. 130 seconds
2. The KC surge tanks vent line is large enough to prevent over pressurization press urization C. 1. 100 seconds
2. The KC surge tanks relief valve to the KC drain sump is large enough to prevent over pressurization D. 1. 130 seconds
2. The KC surge tanks relief valve to the KC drain sump is large enough to prevent over pressurization Page 35 3S of 100

CATAWBA NUCLEAR STATION Question: 36 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100%. Given the following conditions and sequence of events:

  • A slight cooldown of the NC system causes the "c""C" PZR heaters to be full "on"
  • A single channel of pressurizer pressure failed offscale high
  • A second channel of pressurizer pressure failed offscale low Assuming no operator actions, what affect does this combination of channel failures have on the Pressurizer Pressure Control system?

A. The Pressurizer Pressure Master swaps to manual and pressure will increase to the reactor trip setpoint B. The Pressurizer Pressure Master swaps to manual and pressure will increase until 1 NC-32B and 1 NC-36B open C. The Pressurizer Pressure Master remains in automatic and pressure is controlled based on the average of the 2 unaffected channels D. The Pressurizer Pressure Master remains in automatic and pressure is controlled based on the highest of the 2 unaffected channels Page 36 of 100

CATAWBA NUCLEAR STATION Question: 37 2009 SRO NRC Examination (1 point)

Unit 1 is increasing power following a refueling outage. Given the following:

  • At 45% reactor power, the P-8 permissive failed "as-is"
  • Reactor power is currently at 50%

Based on the current conditions:

1. What is the condition of the P-8 "Hi Pwr Lo Flo Rx Trip Block" status light 1SI-18?

on 181-18?

2. If one NC pump were to trip, would an automatic reactor trip occur?

A. 1. Lit

2. Yes B. 1. Lit
2. No C. 1. Dark
2. Yes D. 1. Dark
2. No Page 37 of 100

CATAWBA NUCLEAR STATION Question: 38 2009 SRO NRC Examination (1 point)

Unit 1 is in Mode 3 and reducing NC pressure and temperature for a refueling outage.

Given the following:

  • Pressurizer pressure channel 2 fails "as-is" at 1985 psig
  • follovvs:

Other pressurizer pressure channels indicate as follows:

o Channel 1 is 1972 psig and slowly decreasing o Channel 3 is 1965 psig and slowly decreasing o Channel 4 is 1951 psig and slowly decreasing

  • No operator actions have been taken Of the remaining channels that input into the P-11 circuit, how many of these must be below the P-11 setpoint before "ECCS TRN AlB PZR PRESS" can be blocked?

A. 1 of the other 2 B. 2 of the other 2 C. 1 of the other 3 D. 2 of the other 3 of 100 Page 38 oflOO

CATAWBA NUCLEAR STATION Question: 39 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power with lower containment temperature stable at 107°F. Given the following events:

  • 1A,1 B, and 1C Lower Containment Ventilation Units (LCVU's) are in service
  • LCVU 1B fan trips on over-current Based on the conditions above, what is the first action OP/11A164501001 OP/1/A/6450/001 (Containment Ventilation (VV) Systems) specifies to provide additional cooling to lower containment?

A. Start 1D LCVU in LOW speed B. Place 1A and 1C LCVUs in "MAX" cooling only C. Place 1A and 1C LCVUs in "MAX" cooling and HIGH speed D. Start 1D LCVU in HIGH speed and place 1A and 1 C LCVUs in HIGH speed Page 39 of 100

CATAWBA NUCLEAR STATION Question: 40 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following:

Initial Conditions

  • Lower Containment Vent Unit (LCVU) status and outlet temperatures per the OAC are:

LCVU Status Outlet Temperature readings 1A Running - 108.1 of 1 -108.1°F -107.5°F 2 -1 07.5°F 1B Running 1 -109.9°F

-1 09.9°F 2 -1

-108.9°F 08.9°F 1C Running 1 -112.4°F 2 - 111.2°F 1D 10 Secured 1 -105.6°F

- 105.6°F -104.4°F 2 -1 04.4°F Current Conditions

  • The crew notes that 1B LCVU has just tripped
  • OAC temperature readings as stated above have not begun to change yet Based on current plant conditions, and per PTl11A146001002A PT/1/A/46001002A (Mode 1 Periodic Surveillance Items):
1. What temperature would be recorded for "Primary Containment Lower Compartment Average Air Temp"?
2. What are the Technical Specification temperature range limits for lower containment temperature?

A. 1. 108.5°F

2. 60°F -120°F B. 1. 109.8°F
2. 60°F -120°F C. 1. 108.5°F
2. 100°F -120°F

- 120°F D.

O. 1. 109.8°F

2. 100°F -120°F

- 120°F Page 40 of 100

CATAWBA NUCLEAR STATION Question: 41 2009 SRO NRC Examination (1 point)

Which one of the following lists of conditions would all result in 1NF-228A (NF Supply Containment Isolation Valve) closing? (Evaluate each condition separately)

1. Manual Phase A
2. Manual Phase B
3. Loss of instrument air
4. Glycol Expansion Tank Lo Lo Level
5. Trip of all running Ice Condenser Glycol Pumps A. 1 and 5 B. 2 and 5 C. 1,3 and 4 D. 2,3 and 4 Page 41 of 100

CATAWBA NUCLEAR STATION Question: 42 2009 SRO NRC Examination (1 point)

One hour ago, Unit 1 was operating at 100% power when a LOCA occurred requiring a reactor trip and safety injection. Given the following:

  • The automatic and manual swap to cold leg recirculation failed and both ND NO pumps have been secured
  • The crew implemented EP/1/A15000/ECA-1.1 EP/1/A/SOOO/ECA-1.1 (Loss of Emergency Coolant Recirculation)
  • Current conditions are:

o Containment pressure is 11 11.2

.2 psig and slowly increasing o FWST level is 4.9% and decreasing For the current conditions, how many of each type of pump listed is reauired reouired to be running?

NV NS A. 1 1 B. 1 o C. o 1 O.

D. o o Page 42 of 100

CATAWBA NUCLEAR STATION Question: 43 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power when a 6 gpm tube leak occurred in 1A S/G.

Given the following:

  • The crew is operating the turbine controls in manual to quickly reduce load per AP/1/A155001009 AP/1 /A/55 00/0 09 (Rapid Downpower)
  • Current power level is 30% and decreasing
1. Assuming a stable tube leakage rate, rate. how does 1 EMF-71 (S/G A Leakage) count 1EMF-71 rate for current conditions compare to the 100% power readings?
2. Per NSD 513 (Primary to Secondary Leak Monitoring Program),

Program). which method(s) is/are islare used to monitor S/G leak rate based on the current power level?

A. 1. Lower counts now than when power was at 100%

2. 1EMF-33 1EMF-33 (Condenser Air Ejector Exhaust) only B. 1. The same counts now as when power was at 100%

1EMF-33 (Condenser Air Ejector Exhaust) only

2. 1EMF-33 C. 1. Lower counts now than when power was at 100%
2. 1 EMF-33 (Condenser Air Ejector Exhaust) and 1 EMF-71 1EMF-33 D. 1. The same counts now as when power was at 100%
2. 1EMF-33 (Condenser Air Ejector Exhaust) and 1 EMF-71 Page 43 of 100

CATAWBA NUCLEAR STATION Question: 44 2009 SRO NRC Examination (1 point)

Unit 1 is in Mode 3 preparing for reactor startup. Given the following 1SV-19 (S/G 1A PORV) nitrogen boUle bottle pressures:

  • Bottle #1 - 1970 psig
  • Bottle #2 - 2165 psig BoUie What action (if any) is required for 1SV-19 per Selected Licensee Commitment Ventto 16.10-1 (Steam Vent to Atmosphere)?

A. No action is required B. Immediately take action to restore the nitrogen supply to operable status only C. Immediately enter the applicable conditions of Technical Specification 3.7.4 (S/G PORVs) only D. Immediately take action to restore the nitrogen supply to operable status and immediately enter the applicable conditions of Technical Specification 3.7.4 (S/G PORVs)

Page 44 of 100

CATAWBA NUCLEAR STATION Question: 45 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following conditions:

Initial Conditions

  • 1CF-39 (8/G (S/G 1 B CF Byp Ctrl) is in manual and full open 8/G 1B Level is 66% and stable
  • S/G Current Conditions
  • 1CF-37 1CF-37 has just been placed in automatic Based on current conditions:
1. Howwill How will 1CF-37 1CF-37 respond?
2. What is the status of 1B S/G 8/G level control?

A. 1. Throttle further open

2. Automatic B. 1. Throttle further open
2. Manual C. 1. Throttle further closed
2. Automatic D. 1. Throttle further closed
2. Manual Page 45 of 100

CATAWBA NUCLEAR STATION Question: 46 2009 SRO NRC Examination (1 point)

Initial conditions:

  • Unit 1 was operating at 100% power
  • A loss of offsite power occurred
  • The reactor tripped 30 minutes later the following sequence of events occurred:
  • All CA pumps are running
  • Train "A" CA is RESET
  • Train "B" CA is not RESET
  • The CA common suction piping from condensate grade sources ruptures
  • 1AD-5, E/1 "CA Pumps Train A Loss of Norm Suct" actuates
  • 1AD-5, E/2 "CA Pumps Train B Loss of Norm Suct" actuates One minute later, what is the status of the CA system assuming no operator action?

A. 1A CA pump is tripped CAPT #1 is tripped 1 B CA pump suction is shifted to the RN system B. 1A CA pump suction is shifted to the RN system CAPT #1 suction is shifted to the RN system 1 B CA pump is tripped C. 1A CA pump suction is shifted to the RN system 1A CAPT #1 is tripped 1 B CA pump is tripped D. 1A CA pump is tripped CAPT #1 suction is shifted to the RN system 1 B CA pump suction is shifted to the RN system Page 46 of 100

CATAWBA NUCLEAR STATION Question: 47 2009 SRO NRC Examination (1 point)

Given the following:

  • The incoming breaker to 1ETB spuriously opened
  • 1B DIG automatically started and loaded
  • While monitoring DIG operating parameters, the crew noted that DIG 1B "VOLTS" was 4000 V
  • Voltage was adjusted to normal How did 1B DIG output "AMPS" and "P/F" indications respond to this adjustment?

AMPS PIF P/F A. increase more lagging B. increase stay the sam same e C. decrease more lagging D. decrease stay the same sam e Page 47 of 100

CATAWBA NUCLEAR STATION Question: 48 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following:

  • A complete loss of offsite power occurs
  • All DIG load sequencing is complete Which one of the following Fire Protection (RF/RY) system pumps does not have an available power supply?

A. RYpump A B. RF Jockey Pump A C. RY Pump C D. RF Jockey Pum Pumpp C Page 48 of 100

CATAWBA NUCLEAR STATION Question: 49 2009 SRO NRC Examination (1 point)

Which one of the following sets of equipment receives power from the 250VDC Auxiliary Power System?

A. CF Pump Control Power and Turbine Emergency Bearing Oil Pump B. Deadlight Panels and Turbine Emergency Bearing Oil Pump C. CF Pump Control Power and 6.9 KV Switchgear Control Power D. Deadlight Panels and 6.9 KV Switchgear Control Power Page 49 of 100

CATAWBA NUCLEAR STATION Question: 50 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following conditions and sequence of events:

Initial Conditions

  • A blackout occurs on 1ETA
  • All 1A D/G DIG sequencing is complete
  • 1AD-11, A/B A/8 "125VDC Diesel Gen A Control Pwr Sys Trbl" actuates
  • "D/G 1A Panel Trouble" actuates 1AD-11, B/7 "DIG
  • 1A D/G DIG Panel alarm E/5 "Loss of DC Control Power" actuates Final Conditions
  • Normal power is restored to 1 ETA
  • 1A D/G DIG is secured
  • The annunciators listed above are still lit Based on the final conditions:
1. Which of the following methods could have been used to secure the 1A D/G DIG locally?
2. Will 1A D/G DIG start on a subsequent 1ETA blackout?

A. 1. The RUN/STOP RUNISTOP knob only

2. Yes B. 1. The RUN/STOP RUNISTOP knob only
2. No C. 1. The RUN/STOP RUNISTOP knob or the STOP pushbutton
2. Yes D. RUNISTOP knob or the STOP pushbutton
1. The RUN/STOP
2. No Page 50 of 100

CATAWBA NUCLEAR STATION Question: 51 2009 SRO NRC Examination (1 point)

Unit 1 is in Mode 3 preparing for a reactor startup. Given the following:

  • 1ETA experiences a blackout
  • The 1A DIG starts and is sequencing on loads per the accelerated sequence
  • Half way through the accelerated sequence, the fuel racks stick in an open position causing DIG speed to rapidly increase
1. What is the setpoint for the DIG overspeed trip?
2. For the conditions stated above will the DIG trip on overspeed if the setpoint is exceeded?

A. 1. 495 rpm

2. No B. 1. 495 rpm
2. Yes
c. 1. 517.5 rpm
2. No D. 1. 517.5 rpm
2. Yes PageSl Page 51 of 100

CATAWBA NUCLEAR STATION Question: 52 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 50% power when a power spike causes a 1EMF-33 (CSAE EXHAUST) Trip 2 alarm.

What manual actions (if any) does OP/1/B/61 00101 OX (Annunciator Response to OP/1/B/6100/01 Radiation Monitoring Panel 1RAD-1) direct the operator to take to place systems PaneI1RAD-1) affected by this EMF alarm in their post alarm condition?

A. Swap "Unit 1 CSAE EXH" discharge from "UNIT VENT" to "AUTO" B. Close 1 BB-48 (BB Pumps Disch to TB Sump)

C. Close SIG S/G Sample valves D. None Page 52 of 100

CATAWBA NUCLEAR STATION Question: 53 2009 SRO NRC Examination (1 point)

Both units are operating at 100% power. Given the following:

  • Only 1A RN pump in service
  • An 86N relay actuates on 1ETB Based on the above conditions, which RN pumps are operating one minute later?

A. 1A only B. 1A and 1B only c.

C. 1A and 2B only D. 1A, 1B, and 2B only Page 53 of 100

CATAWBA NUCLEAR STATION Question: 54 2009 SRO NRC Examination (1 point)

Unit 1 automatically trips from 100% power and the crew entered EP/1/A/5000/E-0 (Reactor Trip or Safety Injection). Given the following conditions and sequence of events:

  • Both trains of CA SYS VL V RESET are "RESET"
  • CA flow is throttled to maintain proper S/G levels
  • A complete loss of VI pressure occurs How is manual control of the CA flow control valves and CA flow affected by the loss of VI pressure?

A. Control of the CA flow control valves is immediately lost and CA flow will immediately decrease B. Control of the CA flow control valves is immediately lost and CA flow will immediately increase C. Control of the CA flow control valves is maintained for at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and then CA flow will decrease D. Control of the CA flow control valves is maintained for at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and then CA flow will increase Page 54 of 100

CATAWBA NUCLEAR STATION Question: 55 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power. At 1000, a secondary steam leak occurred in the Unit 1 containment. The crew has started a controlled shutdown using AP/1/A/55001009 (Rapid Downpower). Containment pressure and temperature trends AP/1/A/5500/009 indicate:

Time Temperatu T emperatu re Pressure 1000 113°F 0.15 psig 1005 11 rF 11rF 0.28 psig 1010 119°F 0.42 psig 1015 122°F 0.48 psig 1020 126°F 0.65 psig 1025 129°F 0.91 psig No manual operator actions have been taken related to LCVU operation.

During which time period did the Lower Containment Ventilation Units (LCVUs) cooling water bypass valves (full flow valves) automatically open?

A. Between 1005 and 1010 B. Between 1010 and 1015 C. Between 1015 and 1020 D. Between 1020 and 1025 Page 55 of 100

CATAWBA NUCLEAR STATION Question: 56 2009 SRO NRC Examination (1 point)

Unit 1 was in Mode 3 at 55rF and 2235 psig with shutdown banks withdrawn in preparation for startup. Given the following conditions and sequence of events:

  • 1TXS 1TXS is red tagged tagg ed
  • A fault results in a loss of all loads on the short side of 1TC Which MG set(s) has/have a power supply available and what procedure is entered to address the above conditions?

A. Only 1B MG set; EP/1/AI5000/E-O (Reactor Trip or Safety Injection)

B. AP/1/A/55001004 (Loss of Reactor Coolant Pump)

Only 1B MG set; AP/1/A/5500/004 C. 1A 1A and 1 1B EP/11A15000/E-O B MG sets; EP/1 /A/5000/E-O (Reactor Trip or Safety Injection)

D. 1A and 1B MG sets; AP/1/A/5500/004 AP/11A155001004 (Loss of Reactor Coolant Pump)

Page S6 56 of 100

CATAWBA NUCLEAR STATION Question: 57 2009 SRO NRC Examination (1 point)

Unit 1 is in a mid loop condition conducting a vacuum refill of the NC system at the end of a refueling outage.

Which one of the following reactor vessel level instruments will provide the greatest accuracy for this condition?

A. NC level loop indication B. Sight glass loop indication C. Ultrasonic level indication D. RVLlS lower range indication Page 57 of 100

CATAWBA NUCLEAR STATION Question: 58 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100%. Given the following indications:

  • Pressurizer level is 61 % and increasing
  • Spray valves have throttled open and pressurizer pressure is slowly decreasing towards normal pressure
  • Charging flow initially decreased and has stabilized at a lower flow rate
  • Letdown flow is 0 gpm
  • All pressurizer heaters are off
1. Which one of the following failures would account for all these indications?
2. What procedure will be used to address the results of this failure?

A. 1. Selected Pressurizer Level (SPL-1) "PZR LVL LOW" output signal is present

2. AP/1/AI5500/012 AP/1/A155001012 (Loss of Charging or Letdown)

B. 1. Channel 1 pressurizer level/pressure common reference leg is leaking

2. AP/1/A/5500/012 AP/1/A/55001012 (Loss of Charging or Letdown)

C. 1. Selected Pressurizer Level (SPL-2) "PZR LVL LOW" output signal is present

2. AP/1/A/5500/011 AP/1/A/55001011 (Pressurizer Pressure Anomalies)

D. 1. Channel 1 pressurizer level/pressure common reference leg is leaking

2. AP/1/AI5500/011 AP/1/A155001011 (Pressurizer Pressure Anomalies)

Page S8 58 of 100

CATAWBA NUCLEAR STATION Question: 59 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Assuming intermediate range N-35 channel compensation voltage is lost and a reactor trip occurs:

1. How will N-35 indication compare to N-36 when actual reactor power has decreased into the source range?
2. What is the minimum number of intermediate range instruments required to be below the P6 setpoint to automatically re-energize the source range instruments N-31 and N-32?

A. 1. N-35 will read higher than N-36

2. One B. 1. N-35 will read higher than N-36
2. Two
c. 1. N-35 will read lower than N-36
2. One D. 1. N-35 will read lower than N-36
2. Two Page 59 S9 of 100

CATAWBA NUCLEAR STATION Question: 60 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following:

  • Containment Pressure Channel I failed high
  • The failed channel is bypassed Which of the following lists the logic for a Containment Spray actuation based on the conditions above?

A. 1/3 B. 2/3 C. 1/2 D. 2/2 Page 60 of 100

CATAWBA NUCLEAR STATION Question: 61 2009 SRO NRC Examination (1 point)

Regarding hydrogen production during a design basis large break LOCA:

1. Which one of the following is a larger contributor to post LOCA hydrogen buildup in containment?
2. Per OP/11A16450101 0 (Containment Hydrogen Control Systems).

Systems), what minimum containment hydrogen concentration requires Technical Support Center (TSC) approval prior to placing the Hydrogen Recombiners in service?

A. 1. Zirc-Water reaction in core region

2. 4%

2.4%

B. 1. Zirc-Water reaction in core region

2. 6%

C. 1. Dissolved hydrogen in the NC System 2.4%

2. 4%

D. 1. Dissolved hydrogen in the NC System

2. 6%

Page 61 of 100

CATAWBA NUCLEAR STATION Question: 62 2009 SRO NRC Examination (1 point)

Given the following:

  • A transfer of control to the Standby Shutdown Facility (SSF) has been completed
  • Natural circulation is being verified per OP/01B/61001013 OP/O/B/61 001013 (Standby Shutdown Facility Operations)
  • NC system pressure is 1700 psig
  • In-core thermocouple readings are:

o 582°F o 610°F o 588°F o 600°F o 585°F

1. Per OP/0/B/£1 OP/O/B/61 001013, what NC system pressure indication is used for the purpose of determining the status of natural circulation?
2. For the given conditions, does natural circulation currently exist?

Reference provided A. 1. Pressurizer pressure

2. Yes B. 1. Pressurizer pressure
2. No C. 1. NC Loop B WR pressure
2. Yes D. 1. NC Loop B WR pressure
2. No Page 62 of 100

CATAWBA NUCLEAR STATION Question: 63 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power.

Initial Conditions

  • Both CF pumps tripped
  • No CA pumps could be started
  • WR level in all S/Gs is 0%
  • EP/1 /A/5000/FR-H.1 (Response to The crew established bleed and feed per EP/1/A/5000/FR-H.1 Loss of Secondary Heat Sink)

Current Conditions

  • CA is available
  • Core exit thermocouple temperatures are decreasing Based on the current conditions, how does EP/1/A/5000/FR-H.1 initially direct CA flow to be established?

A. Feed 1 S/G at greater than 450 gpm B. Feed 4 S/Gs at a total flow of greater than 450 gpm C. Feed 1 S/G at less than or equal to 100 gpm D. Feed 4 S/Gs at less than or equal to 100 gpm each Page 63 of 100

CATAWBA NUCLEAR STATION Question: 64 2009 SRO NRC Examination (1 point)

Unit 1 is at 14% power synchronizing the turbine to the grid.

1. What is the normal position of the "STEAM DUMP SELECT" switch for current conditions?
2. How will steam dump demand respond to a turbine trip under current conditions?

A. 1. "PRESS"

2. decrease B. 1. "PRESS"
2. increase C. 1. "T-AVG"
2. decrease D. 1. "T-AVG"
2. increase Page 64 of 100

CATAWBA NUCLEAR STATION Question: 65 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 80% power when the turbine tripped due to an inadvertent generator over frequency signal.

Which of the following lists automatic actions that will all occur as a result of this turbine trip?

1. Steam dumps actuate in Plant Trip mode
2. Zone 1A and Zone 1 B Lockouts occur
3. C-Heater Drain Pumps trip
4. Feedwater heater extraction steam check valves close A. 1,2 and 3 B. 1,3 and 4 C. 2,3 and 4 D. 1,2 and 4 Page 65 of 100

CATAWBA NUCLEAR STATION Question: 66 2009 SRO NRC Examination (1 point)

Per NSD 512 (Maintenance of RO/SRO Licenses). which of the following lists two requirements to maintain an Active RO License?

A. 1. Serve in the RO or BOP position for 5 complete 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts per quarter

2. Complete a plant tour in the areas listed in NSD 512 once per quarter B. 1. Serve in the RO or BOP position for 5 complete 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts per quarter
2. Maintain respirator qualifications current C. 1. Serve in the RO or BOP position for 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per quarter including shift turnovers
2. Complete a plant tour in the areas listed in NSD 512 once per quarter.

D. 1. Serve in the RO or BOP position for 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per quarter including shift turnovers

2. Maintain respirator qualifications current Page 66 of 100

CATAWBA NUCLEAR STATION Question: 67 2009 SRO NRC Examination (1 point)

Per OMP 2-31 (Control Room Instrumentation Status):

1. Where is a list of active Increased Surveillances required to be maintained?
2. Who (by title) determines the monitoring frequency of an Increased Surveillance?

A. 1. OPS Shift Routine Logbook 2.0SM B. 1. OPS Shift Routine Logbook

2. Unit Supervisor C. 1. AUTOLOG 2.0SM D. 1. AUTOLOG
2. Unit Supervisor Page 67 of 100

CATAWBA NUCLEAR STATION Question: 68 2009 SRO NRC Examination (1 point)

The crane operator has determined that a fuel handling interlock must be bypassed that is not addressed by a procedure.

Assume approval has been obtained to bypass the interlock.

In accordance with OP/1/A/65501007 OP/1/A/6550/007 (Reactor Building Manipulator Crane Operation) which of the following, by title, must be notified when any "Interlock Bypass" is placed into and removed from bypass when handling new fuel assemblies?

A. WCCSRO B. Control Room Supervisor C. Reactor Systems Engineer D. Fuel Handling Equipment Engineer Page 68 of 100

CATAWBA NUCLEAR STATION Question: 69 2009 SRO NRC Examination (1 point)

Which one of the following completes the statement:

At power and increasing, the flow restricting orifice on the _ _ _ S/Gs will begin forcing flow through the CA nozzle.

A. 15%; Unit 1 B. 40%; Unit 1 C. 15%; Unit 2 D. Unit 2 40%; Unit2 Page 69 of 100

CATAWBA NUCLEAR STATION Question: 70 2009 SRO NRC Examination (1 point)

Unit 1 NC system conditions are 248°F and 600 psig.

1. For the stated plant conditions, is the FWST required to be operable per Technical Specification 3.5.4 (Refueling Water Storage Tank)?
2. When the FWST is required to be operable, and the FWST is below the borated water volume required by SR 3.5.4.2, what is the required action?

A. 1. No

2. Immediately take action to restore the FWST to operable status B. 1. No
2. Restore the FWST to operable status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> C. 1. Yes
2. Immediately take action to restore the FWST to operable status D. 1. Yes
2. Restore the FWST to operable status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Page 70 of 100

CATAWBA NUCLEAR STATION Question: 71 2009 SRO NRC Examination (1 point)

The NV system is being aligned for startup. The procedure being used calls for independent verification of a single valve located in a room with a general dose rate of 130mR/hr.

130mRlhr.

Given the following conditions:

  • Estimated time to independently verify the valve's position is 10 minutes
  • There are no known hot spots in the area
  • There is no airbome activity in this room
  • The room has no surface contamination areas
  • Assume any necessary approvals are obtained Per NSD 700 (Verification Techniques), can independent verification of the valve above be waived and why or why not?

A. Yes, because the general area dose rate is greater than 100mRlhr B. No, because the general area dose rate is less than 1 Rlhr

c. Yes, because the radiation exposure for a single verification would exceed the allowable limit D. No, because radiation exposure for a single verification is within the allowable limit Page 71 of 100

CATAWBA NUCLEAR STATION Question: 72 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 75% power. An engineer needs to enter the Reactor Building pipechase area to perform some scoping work for a future modification.

Per Site Directive 3.1.2 (Access to Reactor Building and Areas Having High Pressure Steam Relief Devices):

1. For current plant conditions, whose permission is required to allow entry into this area?
2. What operational modes require use of the "buddy system" for entry into the Reactor Building?

A. 1. Radiation Protection and the WCC SRO

2. Modes 1 and 2 only B. 1. Radiation Protection and the WCC SRO
2. Modes 1,2,3 and 4 C. 1. Radiation Protection only
2. Modes 1 and 2 only D. 1. Radiation Protection only
2. Modes 1,2,3 and 4 Page 72 of 100

CATAWBA NUCLEAR STATION Question: 73 2009 SRO NRC Examination (1 point)

An RWP that you are preparing to work under states that the highest dose rate in a particular area (at 30 cm) is 325 mRlhr. When you arrive at the work site, a flashing yellow light is noted in the entry path to the area.

1. How would an area with the dose rate specified in the RWP be designated?
2. What is the significance of the flashing yellow light?

A. Rad iation Area

1. Radiation
2. Radiography is in progress B. 1. High Radiation Area
2. Radiography is in progress
c. 1. Radiation Area
2. The area has been designated as a "Locked" High Radiation Area D. 1. High Radiation Area
2. The area has been designated as a "Locked" High Radiation Area Page 73 of 100

CATAWBA NUCLEAR STATION Question: 74 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power when a complete loss of offsite power occurred.

A LOCA occurred as a result of the transient. Given the following conditions:

  • 1A DIG did not start and manual start attempts have failed
  • Containment pressure is 3.4 psig
  • NC subcooling is -8°F
  • Core exit thermocouples are 642°F
  • RVLlS level is 37%
  • SIG NR levels are all 13%
  • CA has not been reset
  • CA flow is 470 gpm
  • IIR SUR is 0 DPM
  • SIR SUR is 0.3 DPM Which one of the following is the highest priority Critical Safety Function for the given plant conditions?

A. SUBCRITICALITY B. CORE COOLING C. CONTAINMENT D. HEAT SINK Page 74 of 100

CATAWBA NUCLEAR STATION Question: 75 2009 SRO NRC Examination (1 point)

During an emergency event, which one of the following identifies:

1. The on-site emergency facility that assumes responsibility for communications with offsite agencies including the NRC once it is activated?
2. What minimum level of emergency classification always requires an evacuation of all non-essential personnel?

A. 1. Technical Support Center (TSC)

2. Site Area Emergency B. 1. Technical Support Center (TSC)
2. General Emergency C. 1. Operations Support Center (OSC)
2. Site Area Emergency D. 1. Operations Support Center (OSC)
2. General Emergency Page 75 of 100

CATAWBA NUCLEAR STATION Question: 76 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100%. Given the following cond itions:

conditions:

  • A pressurizer safety valve opened and did not fully reclose
  • Current Conditions per the OAC are shown to the right:
1. Based on the current conditions what is the temperature downstream of the partially open pressurizer safety valve?
2. Which NC overpressure transient establishes the required relief capacity of the pressurizer safety valves per the Technical Specification Bases?

Reference provided A. 1. 550°F

2. NCP locked rotor B. 1. 550°F
2. Main turbine trip C. 1. 320°F
2. NCP locked rotor D. 1. 320°F
2. Main turbine trip Page 76 of 100

CATAWBA NUCLEAR STATION Question: 77 2009 SRO NRC Examination (1 point)

Unit 1 was heating up after a refueling outage. Given the following conditions and sequence of events:

  • NC temperature is 225°F and stable
  • 1A NV pump was in service
  • An oil leak resulted in damage to the pump rotating element and work is currently in progress to replace the damaged rotating element
1. Which one of the following Selected Licensee Commitments (SLCs) applies based on current conditions?
2. What post maintenance requirement(s) must be completed prior to restoring 1A NV pump to OPERABLE status per the SLCs?

A. 1. SLC 16.9-9 (Boration Systems Charging Pump-Shutdown)

2. Post maintenance work order functional only B. 1. SLC 16.9-9 (Boration Systems Charging Pump-Shutdown)
2. Post maintenance work order functional and in-service testing C. 1. SLC 16.9-10 (Boration Systems Charging Pump-Operating)
2. Post maintenance work order functional only D. 1. SLC 16.9-10 (Boration Systems Charging Pump-Operating)
2. Post maintenance work order functional and in-service testing Page 77 of 100

CATAWBA NUCLEAR STATION Question: 78 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power. Given the following conditions and sequence of events:

  • A complete loss of offsite power occurs
  • All S/G pressures have been maintained stable by automatic operation of the S/G PORVs
  • The crew is in EP/1/A/SOOO/E-3 (Steam Generator Tube Rupture) cooling down the NC system to the required core exit temperature based on 1A S/G pressure
  • CUrrent NC loop Tcolds are as follows and decreasing:

o A Loop - 245°F o BLoop - 530°F o C Loop - 526°F o D Loop - 528°F

1. What is the basis for the required core exit temperature selection?
2. What is the correct procedure flowpath for this situation?

A. 1. To ensure intact S/G pressures will remain above the main steam isolation setpoint during the NC system cooldown and depressurization

2. Transition to EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition)

B. 1. To ensure intact S/G pressures will remain above the main steam isolation setpoint during the NC system cooldown and depressurization

2. Continue in EP/1/A/5000/E-3 (Steam Generator Tube Rupture)

C. 1. To establish and maintain subcooling for the NC system cooldown and depressurization

2. Transition to EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition)

D. 1. To establish and maintain subcooling for the NC system cooldown and depressurization

2. Continue in EP/1/A/5000/E-3 (Steam Generator Tube Rupture)

Page 78 of 100

CATAWBA NUCLEAR STATION Question: 79 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power and Unit 2 was in No Mode. Given the following events and conditions:

  • Terrorist attack resulted in a total loss of switchyard
  • 1A DIG failed to start
  • The OSM orders an evacuation of the control room due to the ongoing security threat per AP/1/A/55001017 (Loss of Control Room)
1. Which Unit 1 CA pump(s) is/are currently available and can be controlled from the location to which the crew is evacuated?
2. How is secondary side pressure control maintained automatically from the location to which the crew is evacuated?

A. 1. CAPT #1 only

2. By the steam line code safety valves B. 1. CAPT #1 only
2. By the S/G PORVs C. 1. CAPT #1 and 1 B motor driven CA Pump
2. By the steam line code safety valves D. 1. CAPT #1 and 1 B motor driven CA Pump
2. By the S/G PORVs Page 79 of 100

CATAWBA NUCLEAR STATION Question: 80 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power and Unit 2 was in No Mode. Given the following:

  • 1100 The TCC reported that RTCA (Real Time Contingency Analysis) indicates CNS switchyard voltage would not be adequate if Unit 1 should trip
  • 1102 The crew entered AP/1/Al5500/037 AP/1 /A/5500/037 (Generator Voltage and Electric Grid Disturbances), Case I (Abnormal Generator or Grid Voltage)
  • 1300 The crew notified SPOC to install jumpers per AM/1/Al51 AM/1/A/51 00/008 (4Kv Essential Power (EPC) System Degraded Voltage Logic)
1. Which one of the following describes the operability of the VCNC VCfYC system per Technical Specifications at 1100?
2. What is the basis for installing these jumpers under the current conditions?

A. 1. VC/YC is operable

2. To bypass the 8 second time delay for load shed/sequencer actuation on a blackout signal B. 1. VC/YC is operable
2. To prevent the D/G sequencer from double sequencing if a LOCA occurs C. 1. VC/YC is not operable
2. To bypass the 8 second time delay for load shed/sequencer actuation on a blackout signal D. 1. VC/YC is not operable
2. To prevent the D/G sequencer from double sequencing if a LOCA occurs Page 80 of 100

CATAWBA NUCLEAR STATION Question: 81 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 50% power. Given the following:

Initial Conditions

  • 1A 1A CA pump red tagged for PMs
  • UST level is 104%
  • During a board walkdown, 1CA-6 (CA Pmps Suct From CA CST) was noted to be closed Current Conditions
  • All power is lost to 1ETB
  • 1SM-5 (S/G 1B SM Isol) failed to close
  • 1SM-3 (S/G 1C SM Isol) failed to close
  • 1A S/G conditions - NR level is 10% ; pressure is 650 psig and stable
  • 1B S/G conditions - NR level is 0% ; pressure is 5 psig and stable
  • 1 C S/G conditions - NR level is 0% ; pressure is 7 psig and stable 1C
  • 1D S/G conditions - NR level is 8% ; pressure is 675 psig and stable
1. Based on the Initial Conditions, which CA pump(s) was/were required to be declared inoperable per Technical Specifications?
2. Based on the Current Conditions, what procedure will the crew transition to upon EP/1/A/5000/E-0 exit of EP/1 /A/5000/E-0 (Reactor Trip or Safety Injection)?

A. 1. 1A CA Pump only

2. EP/1/A/5000/E-2 ( Faulted Steam Generator Isolation)

B. 1. All three CA pumps

2. EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink)

C. 1. 1A CA Pump only

2. EP/1/A/5000/FR-H.1 EP/1/AI5000/FR-H.1 (Response to Loss of Secondary Heat Sink)

D. 1. All three CA pumps

2. EP/1/A/5000/E-2 ( Faulted Steam Generator Isolation)

Page 81 of 100

CATAWBA NUCLEAR STATION Question: 82 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 98% power. A surveillance test per PT/1/A/46001001 (RCCA Movement Test) is in progress. As Control Bank D was being moved, one control rod in Control Bank D slipped to 120 steps withdrawn and stopped. This is an incore thermocouple map one minute later.

R P N M L K J H G FED C B A 576 572 576 605 546 599 611 603 2

3 605 624 BAD 569 I

4 597 602 609 617 5 602 625 616 614 6 563 611 611 626 623 568 7 602 606 617 620 8 561 612 634 572 626 9 619 611 613 614 10 548 II 610 II 606 613 574 11 627 BAD 610 614 12 612 599 608 622 13 620 619 576 626 562 14 540 628 613 608 614 15 BAD I 622 580

1. Which single rod has slipped into the core to 120 steps withdrawn?
2. In addition to reducing power to less than 75% and verifying SDM, what other surveillances (if any) are required per Technical Specification 3.1.4 (Rod Group Alignment Limits) to allow continued power operation in Mode 1?

A. Rod D-12; no additional surveillances are required B. Rod M-4; no additional surveillances are required C. Rod D-12; FNt.H(X,Y) and Fo(X,Y,Z)

D. Rod M-4; ~t.H(X,Y) and Fo(X,Y,Z)

Page 82 of 100

CATAWBA NUCLEAR STATION Question: 83 2009 SRO NRC Examination (1 point)

Unit 1 was in Mode 6 performing core alterations. Given the following conditions and sequence of events:

  • N-31 was removed from service 3 days ago 2
  • x1 02 cps N-32 indicates 1.1 x10
  • 1AD-2, E/2 (TRAIN A ~HUTDOWN MARGIN ALARM) actuates
  • BDMS Train A indicates "E1"
  • BDMS Train B indicates 1.4 x102 cps
1. What procedure is entered to address the stated conditions?
2. Are core alterations required to be stopped based on the above conditions?

A. 1. AP/1 IA/55001013 (Boron Dilution)

AP/1/A/55001013

2. No B. 1. AP/1/A/55001013 (Boron Dilution)
2. Yes c.

C. 1. AP/1 IA/55001016 (Malfunction of Nuclear Instrumentation System)

AP/1/A/55001016

2. No D. 1. AP/1 IA/55001016 (Malfunction of Nuclear Instrumentation System)

AP/1/A/55001016

2. Yes Page 83 of 100

CATAWBA NUCLEAR STATION Question: 84 2009 SRO NRC Examination (1 point)

Unit 1 was at 3% power performing a startup. Given the following:

Initial conditions

  • Intermediate Range channel N-35 failed low
  • The crew removed N-35 from service per the applicable abnormal procedure Current conditions
  • IAE retumed the channel to service and reported that the SUR circuitry for N-35 had to be disabled as part of the channel repair
  • Engineering has evaluated the repair and determined that all other functions will operate as designed with the SUR circuitry disabled
1. When the crew removed N-35 from service per the abnormal procedure, which fuses (if any) were removed?
2. For the conditions above, is N-35 operable?

A. 1. The control power fuses

2. No B. 1. The control power fuses
2. Yes C. 1. No fuses were removed
2. No D. 1. No fuses were removed
2. Yes Page 84 of 100

CATAWBA NUCLEAR STATION Question: 85 2009 SRO NRC Examination (1 point)

Unit 1 was in Mode 3 and Unit 2 was operating at 100% power when a fire occurred on site. Given the following:

  • A large amount of smoke entered the Auxiliary Building Ventilation (VA) system ductwork
  • 1A main transformer was de-energized due to the fire Based on the above conditions:
1. How will the VA system respond?
2. What is the status of the "A" train VA system per Technical Specifications?

A. 1. VA Supply fans (ABSU) will trip and then the Unfiltered Exhaust Fans will trip

2. Only 1A train is not operable B. 1. VA Supply fans (ABSU) will trip and then the Unfiltered Exhaust Fans will trip 1A and 2A trains are not operable
2. Both 1A
c. 1. VA Supply fans (ABSU) will trip and then the ABSU inlet dampers will close
2. Only 1A 1A train is not operable D. 1. VA Supply fans (ABSU) will trip and then the ABSU inlet dampers will close
2. Both 1A 1A and 2A trains are not operable Page 85 of 100

CATAWBA NUCLEAR STATION Question: 86 2009 SRO NRC Examination (1 point)

Unit 1 is at 3% power and increasing. Given the following has just occurred:

  • 1AD-7 C/1 NCP #1 "SEAL LEAKOFF HI FLOW" actuates
  • 1B NCP sealleakoff is 6.5 gpm and stable 1B
  • 1B NCP Seal Outlet temperature is 165°F and stable
  • 1B NCP Lower Bearing temperature is 140°F and stable

The crew enters AP/11A155001008 Per AP/1 IA/55001008, what is the maximum time 1 AP/1/A/55001008, B NCP can remain in service and 1B what procedure will the crew be directed to enter when the pump is tripped?

A. 5 minutes; EP/1/A/5000/E-O (Reactor Trip or Safety Injection)

B. 5 minutes; AP/1/A/55001004 (Loss of Reactor Coolant Pump)

C. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; OP/1/A/61001002 OP/11A161001002 (Controlling Procedure For Unit Shutdown)

D. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; API1 IA/55001004 (Loss of Reactor Coolant Pump)

AP/1/A/55001004 Page 86 of 100

CATAWBA NUCLEAR STATION Question: 87 2009 SRO NRC Examination (1 point)

Unit 1 is at 450°F and 1860 psig heating up with shutdown banks withdrawn following a refueling outage. Given the following conditions and sequence of events:

Initial Conditions

  • YO has been manually aligned to provide cooling to 1A NV pump per AP/1/A/55001021 (Loss of Component Cooling)

AP/1/A/5500/021 Current Conditions

  • KC has not been restored
  • A 100 gpm NC system leak occurs on an NC loop crossover pipe
1. If a safety injection becomes necessary, what guidance does AP/1 IA/55001021

/A/5500/021 provide for maintaining Unit 1 NC pump seal injection?

AP/1/A/55001021 direct the crew to implement next?

2. What procedure will AP/1/A/5500/021 A. 1. Maintain YO aligned to 1A NV pump and continuously monitor motor parameters AP/1/A/55001005 (Reactor Trip or Inadvertent S/I
2. AP/1/A/5500/005 SII Below P-11)

B. 1. Maintain YO aligned to 1A NV pump and continuously monitor motor parameters

2. AP/1/A/5500/027 AP/1/A/55001027 (Shutdown LOCA)

C. 1. Realign KC to the 1A NV pump and start the Standby Makeup Pump AP/1/A/55001005 (Reactor Trip or Inadvertent SII

2. AP/1/A/5500/005 S/I Below P-11)

P-11 )

O. 1. Realign KC to the 1A NV pump and start the Standby Makeup Pump

2. AP/1/A/5500/027 AP/1/A/55001027 (Shutdown LOCA)

Page 87 of 100

CATAWBA NUCLEAR STATION Question: 88 2009 SRO NRC Examination (1 point)

Given the following conditions on Unit 1:

Initial Conditions

  • Reactor power was 100% and stable
  • Turbine impulse pressure was 693 psig and stable Final Conditions
  • Security has reported significant steam escaping from the interior doghouse
  • The crew is performing actions in AP/1/A155001028 AP/1/A/55001028 (Secondary Steam Leak)
  • Reactor power is 99.9% and stable
  • Turbine impulse pressure is 657 psig and stable
1. What single steam relief valve passing full flow produced the conditions noted?

AP/1/A/55001028 based on the final conditions?

2. What actions will be directed by AP/1/A155001028 A. 1. A steam line safety
2. Trip the reactor and go to EP/1/A15000/E-0 EP/1/A/5000/E-0 (Reactor Trip or Safety Injection B. 1. A steam line safety
2. Initiate a unit shutdown per AP/1/A155001009 AP/1/A/55001009 (Rapid Downpower)

C. 1. A S/G PORV

2. Trip the reactor and go to EP/1/A150001E-0 EP/1/A/5000/E-0 (Reactor Trip or Safety Injection D. 1. A S/G PORV AS/G
2. Initiate a unit shutdown per AP/1/A/55001009 AP/1/A155001009 (Rapid Downpower)

Page 88 of 100

CATAWBA NUCLEAR STATION Question: 89 2009 SRO NRC Examination (1 point)

Unit 1 is operating at 100% power. Given the following timeline:

12/15/09 1500 During the review of completed procedures it was noted that 12/07109 at 0300 was the last time the 7 day surveillance was performed on the 1A DIG battery cells.

12/15/09 1800 IAE completed the 1A 1A DIG battery cell surveillance and noted one bad battery cell.

Based on the above conditions and in accordance with Technical Specification 3.8.4 (DC Sources - Operating):

BA?t."D oI-J ~D;z:."1'X"oNS BAf-£:D oN ~DJ:"I'X"oNS A-r 1500:

I 5: 00 : CLUc...t;.

CLU ~,,~gE£N t..t;. fhI!.."~ BE£N

1. What is the latest time that this surveiliance.eaR ee-completedee-.completed before the LCO for 3.8 .4..wifl .ru!! be met? I,,4JOU Technical Specification 3.8.4..wifl.rutl t.:D J:;!!!:(" IHtVe:..

/,AJout.l>.J:;:!J!:(" ME-r~

IHWe:.. BEEN ~E..rr

2. When is the cascade to Technical Specification 3.8.1 (AC Sources - Operating) required to be made based on the bad battery cell?

A. 1. 12/15/09 at 2100

2. Immediately B. 1. 12/15/09 at 2100
2. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> C. 1. 12/22/09 at 1500
2. Immediately D. 1. 12/22/09 at 1500
2. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Page 89 of 100

CATAWBA NUCLEAR STATION Question: 90 2009 SRO NRC Examination (1 point)

Unit 1 and 2 are operating at 100% power with 2A RN pump in service. Given the following conditions and sequence of events:

  • 1A DIG is tagged for PMs

o 1AD-12, A/2Al2 - "RN Essential Hdr A Pressure - Lo" o 2AD-12, A/2Al2 - "RN Essential Hdr A Pressure - Lo" o 1AD-12, A/5Al5 - "RN Essential Hdr B Pressure - Lo" o 2AD-12, A/5Al5 - "RN Essential Hdr B Pressure - Lo"

  • The 2A RN pump trips
  • The 1A RN pump is started and the alarms listed above clear
1. Is the 2A DIG operable per Technical Specifications for the conditions stated above?
2. What actions are required per OP/O/A/64001006C (Nuclear Service Water System)?

A. 1. No

2. Ensure the RN essential header supply crossover valves are open B. 1. No
2. Rackout and tag the "A" VC Compressor breaker C. 1. Yes
2. Ensure the RN essential header supply crossover valves are open D. 1. Yes
2. Rackout and tag the "A" VC Compressor breaker Page 90 of 100

CATAWBA NUCLEAR STATION Question: 91 2009 SRO NRC Examination (1 point)

Given the following:

  • Unit 1 is performing a power decrease required by Technical Specifications
  • At 45% power, 1 SMPS5219 (Turbine Impulse Pressure 1 ATWSI AMSAC Related) stopped decreasing
  • The power supply to 1SMPS5218 (Turbine Impulse Pressure 1 ATWSI AMSAC Related) has failed
  • IAE has been notified to repair failed channels
  • Current reactor power is 28.5%

OP/11A161 001003 (Controlling Procedure for Unit Operation)

1. What guidance does OP/1/A161 provide for the AMSAC system for this situation?
2. Per the Selected Licensee Commitment (SLC), the basis for AMSAC, is to provide independent means of initiating a turbine trip signal and a under ATWS conditions.

A. 1. Continue the power decrease

2. reactor trip signal B. 1. Continue the power decrease
2. CA autostart signal C. 1. Stop the power decrease
2. reactor trip signal D. 1. Stop the power decrease
2. CA autostart signal Page 91 of 100

CATAWBA NUCLEAR STATION Question: 92 2009 SRO NRC Examination (1 point)

Unit 1 entered Mode 6 three days ago. Given the following conditions and sequence of events:

  • The head crew is currently lifting the reactor vessel upper internals
  • The B train Containment Purge Exhaust System (VP) duct heaters lose power
  • The B train VP system fan status/ system flow is unchanged
1. For the conditions above, is the VP system required to be operable per Technical Specification 3.9.3 (Containment Penetrations)?
2. Is proper functioning of the VP duct heaters required for operability of the VP system per the bases of Technical Specification 3.9.3?

A. 1. Yes

2. Yes B. 1. No
2. Yes C. 1. Yes
2. No D. 1. No
2. No Page 92 of 100

CATAWBA NUCLEAR STATION Question: 93 2009 SRO NRC Examination (1 point)

Unit 1 is in Mode 6 with core unload in progress. Given the following:

  • An RP technician in the Spent Fuel Pool (SFP) building calls the control room and reports that level in the SFP is decreasing
  • The fuel assembly most recently removed from the core is currently in the reactor building manipulator crane
1. Based on current conditions, what procedure will direct movement of the fuel assembly being handled to a safe location?
2. Where is the fuel assembly in the reactor building manipulator crane required to be placed?

A. 1. AP/1/A155001026 AP/1/A/55001026 (Loss of Refueling Canal Level)

2. Into the upender and lowered to the fully down position B. 1. AP/1/A/55001026 (Loss of Refueling Canal Level)
2. Fully down in the core or the deep end of the canal C. 1. AP/1/A155001041 AP/1/A/55001041 (Loss of Spent Fuel Cooling or Level)
2. Into the upender and lowered to the fully down position D. 1. AP/1/A/55001041 (Loss of Spent Fuel Cooling or Level)
2. Fully down in the core or the deep end of the canal Page 93 of 100

CATAWBA NUCLEAR STATION Question: 94 2009 SRO NRC Examination (1 point)

Unit 1 entered a forced outage 3 days ago to replace an NC pump motor.

  • 2 work crews are involved in replacing the NC pump motor, an NC pump crew and an IAE crew. The tagout boundary is being shared by both crews
  • The NC pump crew has the new motor in place and has outstanding Work Order Task Assignments (WOTAs) for wiring completion
  • The IAE crew has asked the Unit 1 SRO for clearance of their WOTA to allow electrical testing of the new motor which requires connecting an outside power source Per NSD 500 (Red Tags/Configuration Control Tags), in addition to ensuring the work can be performed safely, what other condition is required to be met by the Unit 1 SRO prior to granting clearance to the IAE crew WOTA?

A. The Unit 1 SRO must obtain OSM concurrence B. The Unit 1 SRO must ensure the two crews have established constant communication C. The Unit 1 SRO must ensure all affected crews have been informed of the intent to apply an outside power source D. The Unit 1 SRO must ensure a Safety Group representative has walked down the area where the outside power source will be applied Page 94 of 100

CATAWBA NUCLEAR STATION Question: 95 2009 SRO NRC Examination (1 point)

Unit 1 was operating at 100% power. Given the following:

  • 1N0-64 (1 B NO Train Cold Leg Injection Return Safety Relief) lifted and did not reseat
  • The crew used the closest valves in the piping available to isolate the leak
  • Due Oue to parts availability it will be 4-5 days before repairs can be completed
  • The crew began a Technical Specification shutdown
1. Which trains of NO, if any, are operable?
2. When shutting down, what is the next operational mode in which Technical Specification 3.5.2 (ECCS - Operating) will no longer apply?

Reference provided A. 1. No trains of NO are operable

2. Mode 4 B. 1. No trains of NO are operable
2. Mode 5 C. 1. 1A Train of NO only
2. Mode 4 O. 1. 1A Train of NO only
2. Mode 5 Page 95 of 100

CATAWBA NUCLEAR STATION Question: 96 2009 SRO NRC Examination (1 point)

Unit 1 is in Mode 3. Given the following:

  • An operator is bleeding off nitrogen pressure from the 1A NW surge tank
  • At the completion of venting, the crew notes NW surge tank pressure is 21 psig Per Technical Specification 3.6.17 (Containment Valve Injection Water System):
1. What are the modes of applicability for this Technical Specification?
2. What is the current status of 1A Train of NW?

A. 1. Modes 1,2 1, 2 and 3 only

2. Operable B. 1. Modes 1,2 1, 2 and 3 only
2. Not operable C. 1. Modes 1,2,3 1, 2, 3 and 4
2. Operable D. 1. Modes 1,2,3 and 4
2. Not operable Page 96 of 100

CATAWBA NUCLEAR STATION Question: 97 2009 SRO NRC Examination (1 point)

Given the following:

  • A LOCA has occurred in Unit 1
  • The TSC has been fully staffed and activated
  • An individual is needed for lifesaving activities during which 27 Rem of TEDE exposure is expected to be received
1. Is the individual required to be a volunteer?
2. Who is required to approve the exposure for this lifesaving activity?

A. 1. Yes 1.Yes

2. The TSC Emergency Coordinator B. 1. Yes 1.Yes
2. The Operations Shift Manager C. 1. No 1.No
2. The TSC Emergency Coordinator D. 1. No
2. The Operations Shift Manager Page 97 of 100

CATAWBA NUCLEAR STATION Question: 98 2009 SRO NRC Examination (1 point)

An individual with a current year Total Effective Dose Equivalent (TEDE) of 1500 mR is preparing to perform a job in the RCA. The RWP states that the dose rate in the area is 200 mRlhr.

Per NSD 507 (Radiation Protection):

1. What is the maximum time he can work in this area until he accumulates enough dose to require an extension prior to the next entry into the RCA?
2. What is the minimum level RP position that could provide the approval of a dose extension if needed?

A. 1. 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

2. An RP Supervisor B. 1. 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
2. The RP Manager C. 1. 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
2. An RP Supervisor D. 1. 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
2. The RP Manager Page 98 of 100

CATAWBA NUCLEAR STATION Question: 99 2009 SRO NRC Examination (1 point)

Unit 1 was at 25% and increasing following a refueling outage. Given the following conditions and sequence of events:

  • Unit 1 experiences a large break LOCA
  • Containment sump level is 5.2 ft and increasing
  • During the swap to cold leg r-ecirculation, 1NI-136B (NO Supply To NI Pump 1B) 1B) could not be opened
  • EP/1/A/5000/ES-1.3 (Transfer to Cold Leg The crew verified S/I flow per EP/11A15000/ES-1.3 Recirculation)
  • EP/1/A/5000/ES-1.3 when all running The crew is preparing to transition out of EP/11A15000/ES-1.3 ECCS pumps begin showing signs of cavitation EP/1/A/5000/ES-1.3 when 1N
1. What action, if any, was required per EP/11A15000/ES-1.3 1-136B would NI-136B not open?

EP/1/A/5000/ES-1.3 direct the crew to enter to address

2. What procedure will EP/11A15000/ES-1.3 cavitation of the ECCS pumps?

A. 1. 11B B NI N I pump pu mp was secured

2. EP/1/A/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation)

B. 1. 1B N I pump was secured EP/1 IA/5000/ECA-1.3 (Containment Sump Blockage)

2. EP/1/A/5000/ECA-1.3 C. 1. No action required EP/1 IA/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation)
2. EP/1/A/5000/ECA-1.1 D. 1. No action required EP/1/A/5000/ECA-1.3
2. EP/1 IA/5000/ECA-1.3 (Containment Sump Blockage)

Page 99 of 100

CATAWBA NUCLEAR STATION Question: 100 2009 SRO NRC Examination (1 point)

Given the following two events:

  • Earthquake o Seismic instrumentation indicates .04 g vertical acceleration and .05 g horizontal acceleration o 1AD-4, B/8 "OBE Exceeded" is not actuated
  • High Auxiliary Building radiation o 1RAD-1, B/3 "EMF41 Aux Bldg Vent Hi Rad" is actuated 6

o EMF41 is reading 1.2 x 106 counts per minute and slowly increasing Which one of the above events requires activation of the site assembly alarm per RP/0/A/5 00 010 10 (Conducting a Site Assembly or Preparing the Site for an RP/O/A/50001010 Evacuation) and from what location(s) is this alarm activated?

A. Earthquake Event; Control Room only B. Earthquake Event; Control Room and Secondary Alarm Station (SAS)

C. High Auxiliary Building radiation; Control Room only D. High Auxiliary Building radiation; Control Room and Secondary Alarm Station (SAS)

Page 100 of oflOO 100

Listfor:

Reference List for: 2009 SRO NRC Exam CN-1561-1.1 CN-1562-1.3 Databook Figure 148 Databook Figure 158 Databook Figure 57 EP/11A15000/ECA-1.1 Enclosure 5 EP/1/A/5000/ECA-1.1 Steam Tables

I"

.

i!

," ~ =

~ s R

", i

~~ ".,,""

  • P1 ~ I ~ '0 ** 0.0.

iltJJ ~, ~Immii

~ ~ i~~i~?~i

~ ~ I ~ !"'!;!l

~I i~~~~~~

<r. il*iI;1Ulre:;.

- - - - - - - - - - - - - - - - - - - - - - - - - - _.._--_...__.._..... _.... _-----

a

.,.

(

'--'\

"-.

"-"

Unit 1 Data Book DPC-1552.08-00-0014, Rev. 8 Source: DPC*1552.08-00*0014, Figure 16-2 95 ,.-------,.....--I------r----.,.----.---.----r-~---~--***-l

'r '--1 . -----I

~

90 +--------j InitiaJ NO Initial NC --t-----t-------+----+--:""'....----~_______.j f--...-.----+--.-.----+-----+--------+--.-----+---:::iO""~O!:::-_+__~-----~ ~

-

85 +-------1 System 80 .. -__ .___-.__ -- I--T_e_m_p_er_a_tu_re-..J,f--------+-----I------I-----+----=*"~......

. Temperature

~_+............-

__~__

...--' -----+__.~ .._ ......_ ..-..,~

.. ~i

_I

--.---.--..~~

~ ........

75 .f---.............j - -7 00 °F -_.- ~

75

-

70 - - - - . - ~ -~ -.. 100 7

~ 90

~ 90°F of 1--_ _ _ 1____- !I of of 100 of I ::::::1 ..........- r-~

..-

1 - - * -......

~ .... "-

I---"'

  • --::;--1---

_--

. ..

. .- :::--

..

.. .. *.. ..

.. .

  • .. ..

i

- "'-120 of o f , ' ~ ..-"

...-" ..- .

...... " .

65 . - -

65 ._---:-.-- - - - - -- --120

~ ~ .,., ........ ......... . .. . ..-

2B en

s
l

.S:C

,

~

60 +----~-----1600F

~140°F

-)I(-140°F - - -


160 OF

~~

~. -' . ~

.-J..............

..- .. . .

~-..-.or~-~---_+__------_-b~~~~

...- .. .... ....i--

.... ..- .

.... - ..----......;,-------:;-... - - ....

-+-"....'-------"-..

-"

....-"

55 +---------j ---1-180 55 ---+-180 OF of I


~

L ...................

' ...... .... ..\- ..........

....

--I------------l

iE

/'" .. I .-

-

-

--200°F

-200°F ....... ~

.5

.S OJ Oi 50 ~---~. ~

,/" ","~r-~.~

".

.. ~.-~~----~-,,-

~ .- .. .- ~~~------+--

....... ______


+~-~~--~~

. ~--,,' _~. -\---. .- . -+-----=~-~~~--t---_I__---_1

~ 45 ....

'0

-'"

--.!
,

CD

.s.8 _____._+-------_/-7_+ /" . --: ",

.. ... .-,,' .. ~ .--' ~

-

--

40  ;;;:;

<Il Ql

. / . "'~....

./~ " ;;;;t ..........

. ~

~~*-~

~~

~

--~ -

i=

f=

E 35 r.. ! ..........

/'.... .. "".- .. .. ~-*"""

~~t"" ~

E-#f" .'

+.--~~~~:~~ .. ~.~..~~I~..~.. -.::~-~~~~~-_.j____~--~~!~~~~~~~~__--~-----~_--~

"

30 30 t . . . . . . .. .~~~... _-.--.~

- ~

~t~ ... ~< ~~~~~=j~~=t=~t~~1===t~~j 25 .1:.---. . ~.. /

...---

L~~ ~~ ~

20 20,

~~ ~

+'-.. -.t~~.:=;~;::::.:~~:::........::..-1r---===:;=:;::t-=+:::::::=::~!

~/#~ .... :.r~~

15 15 4' ---"" --

~~

10..

10 *I'" I',.;..~. ~I-"I_t-1 5

0 f:":: 1. I  !

I .

o 5 10 15 20 25 30 35 40 45 Days After Shutdown Rev, 0,11/19/2003 Rev. Figure 148*

14B

.. \

~~ "\

Unit 1 Data Book Source: DPC*1552,OS-OO-0014, DPC*1552.0e*00-0014, Rev. 8 Figure 16-S 16-8 140 l 1--  !

130 ,~-,--,,--- Initial l~i~:;e%C NC ~

~

,... ~

System 120 iI Temperature ......

l~ .....

. .. ..

........

-70°F

-70°F

....- ~ . .

.. ... .. ~ ...... ... ...i

~

~ ...

110 - ~- *- 90 of

~

v----

- __A

,....... ~ .. ..

... ~.,..,.

- -100 of

........... .... ... '" ..............

100 ..

V- . . '.." ..... .. '". ..................

1--'

~--

- --120 of ... .......

'V ....... .......

-- - "-"

_._-- -*"-140 of ...........

..-

CI)

V) 90 .. .//

. . .. ......

i.

-'" '.-

-.-. . -- - -

. ..

.

Cl)

C)

. . V .... I ............ ...................

.",.

-+--160

---.-160 of __ II t . ...........

.............

... .. .

l
l II c:

~ 80 --+--180

--+-180 of

/ L

..

.. .... ..

/ - ~

. .,.'" ,..,.... .,..,.

'.-" ........... .. . ~

-

--200°F ........

'." .

cii Ci r-*- . - . ~.......-----

......

II L . . ..

~

c: ........

-

.."..

70 .. ""

~-

iiii"'*--'

.. ..

..

..... ....... ...... ~ ~

- ~~

_ _ _ _i

'0 co 0

I

. ,

/ ........

...

..

....

£0 60 fI V;-;

V*" "" ........

.. ...... ~

~

~

~-

Q)

Ql

" .............. I ~~ ~~~

___r-.-.-

E .... ,-;.--

1=

i= 50 I

I

. ....- * ~

40 t-~~_~_~~~I~

/

.L [.;

" I"'"

......... ......

~~ .~

~

~d~""~ .~ ~ ~~ .~

e-"'"

/'

~~ ~e----

./

30

,/;~,,:xx: ~ ~

~-

20 ,I 10 ~ ~~- ~--

'--

I

-I-- . ..

0 o

E-.=: ~

5

..L _ _ ** _ .... _ *.

10

~ , ,

, , ~ .....I*'

no lS 15 1-_**_[_*_1_

, I . . . ' ..... _.L-+---'--'_...,. ___., ___

20

...'._... '--

25 2S

. ' - - ' , - L - ._ _ --,.

30 I

II 35 I

40

,

45 Days After Shutdown Rev. 0, 11/19/2003 Figure 1158 S8 ... Loss of Decay Heal Heat Removal, 18% NC Level, level, Low Decay Heat Page21 Page 21 I

1_ ... ___________ **.* , .* _ ** ,_'.. _'" _. _,. _ .............. _... .*..

I_"'M'_"'_'_'_'

,.... __ .......... ,. __ ...... _,_ *.. ,, __ ........ __

  • ______ ~_ .* _, ... _. ___ ..... * -_

.- ._..._........ ... _--

)/\ ........ ')

Unit 1 Data Data Book Source: OAC Reactor Coolant Saturation Calculations 2500~------~-------~------~------~~------r-------~------~------~------~V~----~

2500

.-----t----L 2300 ---.----+------+-,--

2400 - IL-~_ _---J 2200 +-----..,---------r---..

2300 -.- --- ,--,----j------1-----.---I------i--..-----+-----t---~/_l---.,--.- - -- V-'

2200+-----+---------f,---------i--------l-----4-------+-------r-----+_-----~/~-------.-

2100 1---__ ... __._ _ __ ----- -- _, _ _-7f 2000 ___

2100 -t-.-------. _ . - - - - -...----.:----.----...

-,-,----+-----.-,,-------,,--,-----,--.---------!----,--1--------j--,-,'---1-----1 _.---.- -7l'/

1900 1--_.

2000

. _____ . __ .._..-.._ - -

---+-----+-----1--'".-".----.--.---+__----+----'--------+--/-/1.---1------1

- _ _j_,L_-+- __

-j--T--.---I------

~ IJ) 1900 1600

~='~I----,

1800 .1---.----+----.------'-.--;---.-..

_ .......... ___... __ -.- .---------1--------+--------+------+---,..--

I_ ._. _. .____ . .__. .__=-='

._._._ .*__

. . .'_. . . .__=______ __-.----

=_. _. . ,-.._'---'-',-- ---_,_-_-=;=-,.-------..-,--.. . -"",-.-, . . . ,., . ."-..-.. . .-..,_. . . . . . . .". --.. --.".---. __

118 00 '1---"'--'--

1700 700 1--___

. ..___ -._. -:r-

_____________

--1------+--.--".----...-"...--.-, ........-- -.. -.------j---, --

-.- --

-+-_ _ _. .__ I77Z---+- ._ . -. _------.-

--r-._---

-I ilil ~ :~~ ~~~~_::_~~-... . -.-~-----~- ~I- Sub ,"--d-**-*---..*1*-.. -*_* ....._-._-- . -- -,,, ~--

--1-_

r!~L=~----_-_~-=. -=-:.- ----J subcoo;~~~:-i~_=~:==~- ~-- /-1 '-_-_-._ -~_=_-_-t, 0.

. --->---...--

. ____. __*=--..-* . --*-*-*--~-*7'"--t------!----

.-- --"'--'- ___I' coo e Region .......-'---.... -.-...--.----. - *41-----+----

~

C1) 1300 i---. - - ' - ' - ' - ..... _ _ _ _I 1200 _ _ _ -'---'..

22 1300 1100 -

"r----'

.

-f----- .- ---.".--- -_._.--_._1 , /

~ 1100 ------+------j----.-----'t--."--'-,,....--.- ..

0:IJ) 1200 - - - - - - - - _ _ , _ - - - - - - - - - - - - -

E 1000 ____

g 1000 900 +.

.---.l--------.---

.---.

"-. ,--- -- -- -

--.---

. . .-_.---

.

--.-----r*-----+-----L~"-t-.

- - - - - - - - 1 - - - . - - /~------+-- , - , - - - - l - - - - - - j L ---,-----+-----+---------1

___-j _ _ _ '_ _yLL._. _ _ _...!-_

7 ----+------j

~

~


,---1-------1------1----,---- --.,,-,_.--

f-,.-.-----+-----___t---,--1----~-----,-,--.-.-'----j-~-----,


t----~'---.- ------,1------I-----~1 t

7 - - " , - - - --. -Il- . - - - - l. I- - -1 I ______-'. I 900 - -....-4... -.., J _.. ---I

~~~

800 1 - - - - ; -

700 1------- (--'--"-r--' =-~=_=~.---_--~=:,-.-.-_------.I--_.. '--..---.........---.-----...- - . / .

,

/ ~

---0*

j Region I 3 I 600 It--.--'--r-------~

- - . - . - - I - . - - - - - - r - - - ...- - - - - - - .. __.. _--.....- ~.-.

.._-_._-. --*-l*-"-- ----,----.

--_. _-- --- .

. --. -+-------

500 /_

400

-.._ _- -- -f t--.

.

- - - - '-.- -


..


~


::;;ii" ---.-----,

~ ~

- - - . - . -...- . --1

,----1 Superheated

..-1---..... -

"-1---'_. I .

. I

~

--

300 _____ - ' ........,.----+-----+--.

. ..- ..

200 200+-----+-------~--_----= __ ~

~-~=------+--------t-------lr -----t---------t----,---------~-I .--j--.----'-l 100+-------~~--~~~~--~"------~-------+---------l--------+--------+-------+---------

100 .-

~ ~--.,..---

o0+-~-~--~--4---------~------_+--------+_------__t--------~--------+_------___t--------_r---------l I . I 200 250 300 350 400 450 500 550 600 650 700 NC System Temperature (Oeg (Deg F)

Rev. 2, 4/5r" 4/5/(") Figure 57 *- Reactor Coolant Satuf Satur' ,' Curve Pagf

CNS LOSS OF EMERGENCY COOLANT RECIRCULATION PAGE NO.

EP/1/A15000/ECA-1.1 EP/1/A/SOOO/ECA-1.1 74 of 83 Enclosure 5 S - Page 1 of 1 Rev 31 DCS Minimum 511 Flowrate Versus Time After Trip sir FLOW REQUIRED TO MATCH DECAY HEAT FLOW RATE (GPM) 600 ~----~~~-r~~~--~--~~~~~~--~--~~~~_n I\,

\. ,

-\----+--+--+--. ~I~H-+---l-**-t-- *--*-I-I-I-I-+i----!---I--- ~ ..- j---

\.

\.

\.

\.

\.

500

~----f\- I\.

,, - I - \ - -- .--- -

  • --i---+*~+-t-+--I-tTt---i---t----~r-

. ..- t--.

-- . --. r--\- -.. \.- - --

..-. -. -

. \-...:i='=""--

, -----j---+ *-t---j---j-+-t-j-~--- - c----r-

~

r-- r- -++ -

I\,

,

\.

400~---4--+-~~++H---_+--+-~~~+---_+--~~44~

4DO

- - - - ---- f-- L\. .. -+-+-1-++----1---1---+- +-1--++-++----1---+--- *---j~+-+-H I\,


l_'\~ ~t__t-+-t---+_-I-- -I---f-l-+++-.---j---- ---- r--I- ... -

300 300~---4--+-+-~++~--_+--+-~~~+---_+--~~44~

f~-- --/-- - -I-+-I-i--t-----t---t-***-*r-- -.--

._._._- .. _._...._._- --_.._-j---...

"' j-- .

""

""

" '-

1-----l--+--I-+...j*...jI--H*+_ - - - -~ ~ ~ ---t-I--HH--- ----+--1---1---.

200 200~--~--+-+-rr~H----+--+-~-rHH+----r--r-r+~+H " --j---t-t---j--l-t

~

~

I---t--+--+--+~+-H...j-l----*- -.-- --- '-I--l---l'+i-+---~ ... --"--'~+-+--l-H-

- - - _. - ---I--I-t-H--I---.-.-- -

- ...-

f----.

- - I - - -.- f - ...-

"" ..... _

.........

, I"": .

. ,.- - -.-

........

100

'-----l----1--f----l--f---l- -----t-----i--l-f--t--I--H-I----+--j--. r-- --t~ -

a 3456789 .)

"3 44 5566778 89 9 - 3 4:

3 .

4 : : . 66778899 10 100 1000 10000 TIME (MINUTES)

CLEAN COpy OF STEAM TABLES

-.

Examination KEY for: 2009 SRO NRC Examination Question Answer Number 1 B 2 0D 3 A 4 A 5 A 6 A 7 D 0

8 C 9 A 10 C 11 B 12 0D 13 D 0

14 A 15 0D 16 0D 17 A 18 A 19 0D 20 A 21 B 22 A 23 C 24 A 25 0D Printed 12117120095:18:37 PM Page 0/4 Pagel10/4

Examination KEY for: 2009 SRO NRC Examination Question Answer Number 26 D 0

27 A 28 D 0

29 D 0

30 B 31 A 32 A 33 D 0

34 B 35 B 36 A 37 B 38 B 39 A 40 D 0

41 C 42 D 0

43 A 44 B 45 C 46 D 0

47 D 0

48 A 49 B 50 B Printed 12117120095:18:42 PM Page2of4 Page 2 0/4

Examination KEY for: 2009 SRO NRC Examination Question Answer Number 51 0D 52 A 53 A 54 0D 55 C 56 B 57 C 58 A 59 B 60 B 61 B 62 0D 63 C 64 B 65 B 66 B 67 B 68 B 69 0D 70 0D 71 C 72 B 73 0D 74 B 75 B 1211712009 5:18:42 PM Printed 12117120095:18:42 Page 3 0/4

Examination KEY for: 2009 SRO NRC Examination Question Answer Number 76 C 77 D D

78 D 79 A 80 D D

81 C 82 D D

83 A 84 D D

85 D D

86 D D

87 C 88 A 89 A 90 A 91 B 92 D D

93 B 94 C 95 A 96 D D

97 A 98 D D

99 D D

100 C Printed 12117120095:18:42 PM Page4of4 Page 4 0/4