ML100690431: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/25/2009
| issue date = 05/25/2009
| title = 2009 Palisades Proposed Admin JPMs
| title = 2009 Palisades Proposed Admin JPMs
| author name = Valos N A
| author name = Valos N
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO ADMIN 1a TITLE: DETERMINE FEEDWATER RESERVE INVENTORY CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


JPM:  RO/SRO ADMIN 1a TITLE:  DETERMINE FEEDWATER RESERVE INVENTORY 
JPM RO/SRO ADMIN 1a JOB PERFORMANCE MEASURE DATA PAGE Task:   Determine Feedwater Reserve Inventory Alternate Path: N/A Facility JPM #: Modified RO-A.1a 2008 AUDIT K/A: 2.1.25         Importance:       RO: 3.9           SRO: 4.2 K/A Statement: Ability to interpret reference materials such as graphs, curves, tables, etc.
 
Task Standard: Feedwater reserve inventory calculated to last 3.9 to 4.5 hours.
CANDIDATE: _____________________________________________
Preferred Evaluation Location: ANY               __X__
 
Preferred Evaluation Method:       Perform     __X__       Simulate   _____
EXAMINER: _____________________________________________
 
JPM RO/SRO ADMIN 1a JOB PERFORMANCE MEASURE DATA PAGE Task: Determine Feedwater Reserve Inventory  
 
Alternate Path: N/A  
 
Facility JPM #: Modified RO-A.1a 2008 AUDIT  
 
K/A: 2.1.25   Importance: RO: 3.9   SRO: 4.2  
 
K/A Statement: Ability to interpret reference materials such as graphs, curves, tables, etc.
Task Standard: Feedwater reserve inventory ca lculated to last 3.9 to 4.5 hours.  
 
Preferred Evaluation Location: ANY __X__
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
EOP Supplement 2, PCS Cooldown Strategy Validation Time: 10 minutes        Time Critical:    NO Candidate: ___________________________________________
Time Start: ________          Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______          UNSAT ______
Comments:
Examiner: _______________________________                    Date:  ______________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 9                          MAY 2009


EOP Supplement 2, "PCS Cooldown Strategy"
JPM RO/SRO ADMIN 1a EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
EOP Supplement 2, PCS Cooldown Strategy Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
With the plant at 100% power, a loss of offsite power occurs. The reactor was manually tripped and the operators transitioned to EOP-8.0. The following plant conditions exist:
* Offsite power is not expected to be restored for at least 12 hours.
* Bus 13 is out of service and not expected to be restored for at least 10 hours
* It is 30 minutes after shutdown
* T-81 gravity feed to T-2 is not aligned
* T-2 is at 86%, T-81 is at 85%, and T-939 is at 58%
* Cold leg temperatures are stable at 535°F INITIATING CUES:
The CRS has directed you to complete EOP Supplement 2, PCS Cooldown Strategy.
Calculation of minimum cooldown rate (section 5.0 step 6) is NOT required at this time.
PALISADES NUCLEAR PLANT                      Page 3 of 9                            MAY 2009


Validation Time: 10  minutes  Time Critical: NO
JPM RO/SRO ADMIN 1a Proc. Step            TASK ELEMENT 1                                        STANDARD                  Grade Locate EOP Supplement 2, PCS n/a                                                    EOP Supplement 2 LOCATED                    S U Cooldown Strategy Comment:
Evaluator: Provides a working copy of EOP Supplement 2.
Proc. Step            TASK ELEMENT 2                                        STANDARD                  Grade CONDENSATE STORAGE TANK T-2 T-2 inventory = 94,000 gallons RECORDED 1.1    DETERMINE AND RECORD Condensate                                                              S U Storage Tank T-2 level using the T-2          (93,000 to 95,000 allowed) inventory curve Comment:
CRITICAL STEP Proc. Step            TASK ELEMENT 3                                        STANDARD                  Grade DEMINERALIZED WATER TANK T-939 IF any of the following conditions exist:
2.1                                                    DETERMINES T-939 water is NOT available      S U THEN Demineralized Water Tank T-939 is available Comment:
NOTE: Loss of Bus 13 combined with loss of Bus 1E (due to loss of offsite power) results in inability to power P-936 to transfer T-936 water to T-2.
CRITICAL STEP PALISADES NUCLEAR PLANT                          Page 4 of 9                                  MAY 2009


Candidate: ___________________________________________
JPM RO/SRO ADMIN 1a Proc. Step              TASK ELEMENT 4                                      STANDARD                    Grade If any of the following conditions              Determines T-81 is NOT available 3.1    exist..THEN Primary System Makeup                                                              S U Tank T-81 is available.
Comment:
CRITICAL STEP Proc. Step              TASK ELEMENT 5                                      STANDARD                    Grade ADD the available tank inventories:
Total Inventory = 94,000 gallons RECORDED 4.1    (Step 1.1 T-2) + (Step 2.2 T-939) = (Total                                                      S U (93,000 to 95,000 allowed) inventory)
Comment:
CRITICAL STEP Proc. Step              TASK ELEMENT 6                                      STANDARD                    Grade DETERMINE AND RECORD present                    TC Initial = 535 °F RECORDED (given in initial 5.1                                                                                                    S U highest PCS Loop TC (TC Initial)                conditions)
Comment:
Proc. Step              TASK ELEMENT 7                                      STANDARD                    Grade DETERMINE AND RECORD inventory                  Required Sensible Heat Removal Inventory =
required to remove sensible heat using TC      42,000 gallons RECORDED 5.2                                                                                                    S U Initial temperature and the Sensible Heat Removal curve.                                (41,000 to 43,000 allowed)
Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                          Page 5 of 9                                  MAY 2009


Time Start: ________  Time Finish: ________
JPM RO/SRO ADMIN 1a Proc. Step              TASK ELEMENT 8                                        STANDARD                    Grade SUBTRACT Step 5.2 results from Step 4.1        Inventory Available to remove decay heat =
results:                                        52,000 gallons RECORDED 5.3                                                                                                      S U (Step 4.1 Total FW) - (Step 5.2 Sensible        (94,000 - 42,000 = 52,000)
Heat) = (Inventory for decay heat removal)      (50,000 to 54,000 allowed)
Comment:
CRITICAL STEP Proc. Step              TASK ELEMENT 9                                        STANDARD                    Grade DETERMINE AND RECORD the time interval available for heat removal using the following:
Applicable Decay Heat Removal curve        Time interval available for heat removal for the number of PCPs operating              = 4.2 hours RECORDED 5.4                                                                                                      S U Graph line for elapsed time after            (Interpolation may be used) shutdown (3.7 to 4.5 hours allowed)
Amount of inventory available to remove decay heat (graph)
Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                          Page 6 of 9                                      MAY 2009


Performance Time:  ________  minutes
JPM RO/SRO ADMIN 1a Proc. Step             TASK ELEMENT 10                                         STANDARD                     Grade If the time interval available for heat removal is less than eight hours, THEN PERFORM the following:                           Shift Manager Informed that time interval 5.5.a    a. Inform the Shift Manager of the               available for heat removal = 4.2 hours           S U available interval and that additional        (3.7 to 4.5 hours allowed) inventory sources are required.
 
Comment:
Performance Rating: SAT______  UNSAT ______
EVALUATOR: Notify candidate that the Shift Manager will have someone else identify potential inventory sources that can be made available in the next 4 hours per step 5.b of section 5.0.
 
Proc. Step             TASK ELEMENT 11                                         STANDARD                     Grade Notify the CRS EOP Supplement 2 is complete [reported time interval available       CRS NOTIFIED that EOP Supplement 2 task is n/a    for heat removal and available inventory          complete S U sources]
Comments:
Comment:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 9 MAY 2009 JPM RO/SRO ADMIN 1a EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
EOP Supplement 2, "PCS Cooldown Strategy"
 
Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE
 
DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assi gned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
 
INITIAL CONDITIONS:
 
With the plant at 100% power, a loss of offsit e power occurs. The reactor was manually tripped and the operators transiti oned to EOP-8.0. The following plant conditions exist:
Offsite power is not expected to be restored for at least 12 hours. Bus 13 is out of service and not expected to be restored for at least 10 hours It is 30 minutes after shutdown T-81 gravity feed to T-2 is not aligned T-2 is at 86%, T-81 is at 85%, and T-939 is at 58%
Cold leg temperatures are stable at 535 F INITIATING CUES:
 
The CRS has directed you to complete EOP Supplement 2, PCS Cooldown Strategy. 
 
Calculation of minimum cooldown rate (section 5.0 step 6) is NOT required at this time. 
 
PALISADES NUCLEAR PLANT Page 3 of 9 MAY 2009 JPM RO/SRO ADMIN 1a Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate EOP Supplement 2, PCS Cooldown Strategy EOP Supplement 2 LOCATED S  U Comment:
Evaluator: Provides a working copy of EOP Supplement 2.
 
Proc. Step TASK ELEMENT 2 STANDARD Grade 1.1 CONDENSATE STORAGE TANK T-2 DETERMINE AND RECORD Condensate Storage Tank T-2 level using the "T-2 inventory" curve T-2 inventory =
94,000 gallons RECORDED (93,000 to 95,000 allowed)
S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 3 STANDARD Grade 2.1 DEMINERALIZED WATER TANK T-939 IF any of the following conditions exist: -
THEN Demineralized Water Tank T-939 is available DETERMINES T-939 water is NOT available S  U Comment:  NOTE: Loss of Bus 13 combined with loss of Bus 1E (due to loss of offsite power) results in inability to power P-936 to transfer T-936 water to T-2.
CRITICAL STEP
 
PALISADES NUCLEAR PLANT Page 4 of 9 MAY 2009 JPM RO/SRO ADMIN 1a Proc. Step TASK ELEMENT 4 STANDARD Grade 3.1 If any of the following conditions exist-..THEN Primary System Makeup
 
Tank T-81 is available.
Determines T-81 is NOT available S  U Comment:
CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade 4.1 ADD the available tank inventories: (Step 1.1 T-2) + (Step 2.2 T-939) = (Total inventory)
Total Inventory
= 94,000 gallons RECORDED (93,000 to 95,000 allowed)
S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 6 STANDARD Grade 5.1 DETERMINE AND RECORD present highest PCS Loop T C (T C Initial)
T C Initial =
535 °F RECORDED (given in initial conditions)
S  U Comment: 
 
Proc. Step TASK ELEMENT 7 STANDARD Grade 5.2 DETERMINE AND RECORD inventory required to remove sensible heat using "T C Initial" temperature and the "Sensible Heat Removal" curve.
Required Sensible Heat Removal Inventory =
42,000 gallons RECORDED (41,000 to 43,000 allowed)
S  U Comment:
CRITICAL STEP
 
PALISADES NUCLEAR PLANT Page 5 of 9 MAY 2009 JPM RO/SRO ADMIN 1a Proc. Step TASK ELEMENT 8 STANDARD Grade 5.3 SUBTRACT Step 5.2 results from Step 4.1 results: (Step 4.1 Total FW) - (Step 5.2 Sensible Heat) = (Inventory for decay heat removal)
Inventory Available to remove decay heat =
52,000 gallons RECORDED (94,000 - 42,000 = 52,000)
(50,000 to 54,000 allowed)
S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 9 STANDARD Grade 5.4 DETERMINE AND RECORD the time interval available for heat removal using the following:  Applicable "Decay Heat Removal" curve for the number of PCPs operating  Graph line for elapsed time after shutdown  Amount of inventory available to remove decay heat (graph)
Time interval available for heat removal
= 4.2 hours RECORDED (Interpolation may be used)
(3.7 to 4.5 hours allowed)
S  U Comment:
CRITICAL STEP
 
PALISADES NUCLEAR PLANT Page 6 of 9 MAY 2009 JPM RO/SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 7 of 9 MAY 2009 Proc. Step TASK ELEMENT 10 STANDARD Grade 5.5.a If the time interval available for heat removal is less than eight hours, THEN  
 
PERFORM the following:  
: a. Inform the Shift Manager of the available interval and that additional inventory sources are required.
Shift Manager Informed that time interval available for heat removal =
4.2 hours (3.7 to 4.5 hours allowed)
S  U Comment:
EVALUATOR: Notify candidate that the Shift Manager will have someone else identify potential inventory sources that can be made available in the next 4 hours per step 5.b of section 5.0.  
 
Proc. Step TASK ELEMENT 11 STANDARD Grade n/a Notify the CRS EOP Supplement 2 is complete [reported time interval available  
 
for heat removal and available inventory
 
sources] CRS NOTIFIED that EOP Supplement 2 task is  
 
complete S U Comment:
Evaluator: If notified as CRS, Acknowledge.
Evaluator: If notified as CRS, Acknowledge.
END OF TASK  
END OF TASK PALISADES NUCLEAR PLANT                            Page 7 of 9                                      MAY 2009


JPM RO/SRO ADMIN 1a SIMULATOR OPERATOR INSTRUCTIONS NONE
JPM RO/SRO ADMIN 1a SIMULATOR OPERATOR INSTRUCTIONS NONE PALISADES NUCLEAR PLANT         Page 8 of 9                 MAY 2009
 
PALISADES NUCLEAR PLANT Page 8 of 9 MAY 2009 JPM RO/SRO ADMIN 1a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
 
With the plant at 100% power, a loss of offs ite power occurs. The reactor was manually tripped and the operators transiti oned to EOP-8.0. The following plant conditions exist:
Offsite power is not expected to be restored for at least 12 hours. Bus 13 is out of service and not expected to be restored for at least 10 hours It is 30 minutes after shutdown T-81 gravity feed to T-2 is not aligned T-2 is at 86%, T-81 is at 85%, and T-939 is at 58%
Cold leg temperatures are stable at 535 F INITIATING CUES:
 
The CRS has directed you to complete EOP Supplement 2, PCS Cooldown Strategy. 


JPM RO/SRO ADMIN 1a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
With the plant at 100% power, a loss of offsite power occurs. The reactor was manually tripped and the operators transitioned to EOP-8.0. The following plant conditions exist:
* Offsite power is not expected to be restored for at least 12 hours.
* Bus 13 is out of service and not expected to be restored for at least 10 hours
* It is 30 minutes after shutdown
* T-81 gravity feed to T-2 is not aligned
* T-2 is at 86%, T-81 is at 85%, and T-939 is at 58%
* Cold leg temperatures are stable at 535°F INITIATING CUES:
The CRS has directed you to complete EOP Supplement 2, PCS Cooldown Strategy.
Calculation of minimum cooldown rate (section 5.0 step 6) is NOT required at this time.
Calculation of minimum cooldown rate (section 5.0 step 6) is NOT required at this time.
PALISADES NUCLEAR PLANT Page 9 of 9 MAY 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
PALISADES NUCLEAR PLANT                   Page 9 of 9                           MAY 2009


JPM: RO ADMIN 1b TITLE: PERFORM A PCS HEATUP DETERMINATION
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO ADMIN 1b TITLE: PERFORM A PCS HEATUP DETERMINATION CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


CANDIDATE: _____________________________________________
JPM RO ADMIN 1b JOB PERFORMANCE MEASURE DATA PAGE Task:   Perform PCS Heatup Determination Alternate Path: N/A Facility JPM #: RO-A.1b 2008AUDIT K/A: 2.1.25             Importance:       RO: 3.9       SRO: 4.2 K/A Statement: Ability to interpret reference materials such as graphs, curves, tables etc.
 
Task Standard: Allowable Shutdown Cooling outage time calculated to be 28 minutes (27 minutes to 29 minutes).
EXAMINER: _____________________________________________
Preferred Evaluation Location: ANY               __X__
 
Preferred Evaluation Method:       Perform     __X__   Simulate   _____
JPM RO ADMIN 1b JOB PERFORMANCE MEASURE DATA PAGE Task: Perform PCS Heatup Determination  
 
Alternate Path: N/A  
 
Facility JPM #: RO-A.1b 2008AUDIT  
 
K/A: 2.1.25   Importance: RO: 3.9   SRO: 4.2  
 
K/A Statement: Ability to interpret reference materials such as graphs, curves, tables etc.
Task Standard: Allowable Shutdown Cooling out age time calculated to be 28 minutes (27 minutes to 29 minutes).  
 
Preferred Evaluation Location: ANY __X__
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
SOP-3, Safety Injection and Shutdown Cooling System ONP-17, Loss of Shutdown Cooling Validation Time: 15 minutes        Time Critical:    NO Candidate: ________________________________________________
Time Start: ________          Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______          UNSAT ______
Comments:
Examiner: _______________________________                Date:  ______________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 8                          May 2009


SOP-3, "Safety Injection and Shutdown Cooling System"    ONP-17, "Loss of Shutdown Cooling"
JPM RO ADMIN 1b EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-3, Safety Injection and Shutdown Cooling System ONP-17, Loss of Shutdown Cooling Also see Simulator Operator Instructions (last page of this document).
Validation Time: 15 minutes  Time Critical: NO
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate: ________________________________________________
INITIAL CONDITIONS:
 
* Ten days after a plant shutdown, PCS temperature is 114ºF
Time Start: ________  Time Finish: ________
* The Reactor cavity is flooded to a level of 629'
 
* The Pressurizer manway is removed
Performance Time:  ________ minutes
* Shutdown Cooling is in operation, but must be shutdown for the maximum time allowable INITIATING CUES:
 
The CRS directs you to determine how long (in minutes) Shutdown Cooling may be secured in accordance with SOP-3, Section 7.3.7.
Performance Rating: SAT______  UNSAT ______
PALISADES NUCLEAR PLANT                     Page 3 of 8                             May 2009
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 8 May 2009 JPM RO ADMIN 1b EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
SOP-3, "Safety Injection and Shutdown Cooling System" ONP-17, "Loss of Shutdown Cooling"
 
Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assi gned task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
Ten days after a plant shutdown, PCS temperature is 114ºF The Reactor cavity is flooded to a level of 629' The Pressurizer manway is removed Shutdown Cooling is in operation, but must be shutdown for the maximum time allowable  
 
INITIATING CUES:  
 
The CRS directs you to determine how l ong (in minutes) Shutdown Cooling may be secured in accordance with SOP-3, Section 7.3.7.  
 
PALISADES NUCLEAR PLANT Page 3 of 8 May 2009 JPM RO ADMIN 1b Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locates SOP-3, Safety Injection And Shutdown Cooling System, Section 7.3.7, PCS Heatup Rate Determination Section 7.3.7 of SOP-3 LOCATED S  U Comment:
Evaluator: Provides a working c opy of SOP-3, section 7.3.7.
 
Proc. Step TASK ELEMENT 2 STANDARD Grade 7.3.7a DETERMINE "Approximate Time to 200°F time from appropriate curve in ONP-17, Loss of Shutdown Cooling, for
 
existing/anticipated PCS conditions and
 
convert to hours.  , Approximate Time to 200°F
 
Curves, of ONP-17 LOCATED S  U Comment:
Evaluator:  Provide a working copy of ONP-17, Attachment 1.
 
Proc. Step TASK ELEMENT 3 STANDARD Grade (ONP-17, Att.1) 1.
DETERMINE PCS level using all available indications.
PCS level 629 feet (given in initial conditions)
S  U Comment: 
 
Proc. Step TASK ELEMENT 4 STANDARD Grade (ONP-17, Att.1) 2.
DETERMINE PCS temperature using any of the following:
PCS temperature 114°F (given in initial conditions)
S  U Comment: 


PALISADES NUCLEAR PLANT Page 4 of 8 May 2009 JPM RO ADMIN 1b Proc. Step TASK ELEMENT 5 STANDARD Grade (ONP17, Att.1) 5.
JPM RO ADMIN 1b Proc. Step             TASK ELEMENT 1                                    STANDARD                       Grade Locates SOP-3, Safety Injection And n/a    Shutdown Cooling System, Section 7.3.7,      Section 7.3.7 of SOP-3 LOCATED                    S U PCS Heatup Rate Determination Comment:
REFER TO appropriate page in this attachment for PCS conditions Page #8 of Attachment 1 REFERED TO:
Evaluator: Provides a working copy of SOP-3, section 7.3.7.
Uses Refueling Cavity Flooded to 629' to determine time to 200ºF  USES "10 Days" (time after reactor shutdown) and 114ºF point (initial PCS temperature) and
Proc. Step              TASK ELEMENT 2                                    STANDARD                        Grade DETERMINE Approximate Time to 200°F time from appropriate curve in ONP-17, Attachment 1, Approximate Time to 200°F 7.3.7a    Loss of Shutdown Cooling, for                                                                   S U Curves, of ONP-17 LOCATED existing/anticipated PCS conditions and convert to hours.
Comment:
Evaluator: Provide a working copy of ONP-17, Attachment 1.
Proc. Step              TASK ELEMENT 3                                    STANDARD                        Grade (ONP-DETERMINE PCS level using all available 17,                                                  PCS level 629 feet (given in initial conditions)  S U indications.
Att.1) 1.
Comment:
Proc. Step              TASK ELEMENT 4                                    STANDARD                        Grade (ONP-DETERMINE PCS temperature using any          PCS temperature 114°F (given in initial 17,                                                                                                      S U of the following:                            conditions)
Att.1) 2.
Comment:
PALISADES NUCLEAR PLANT                        Page 4 of 8                                        May 2009


DETERMINES time to 200ºF is ~2 hours S  U Comment:
JPM RO ADMIN 1b Proc. Step              TASK ELEMENT 5                                    STANDARD                      Grade Page #8 of Attachment 1 REFERED TO:
CRITICAL STEP
Uses Refueling Cavity Flooded to 629' to determine time to 200ºF (ONP17,    REFER TO appropriate page in this USES "10 Days" (time after reactor shutdown)    S U Att.1) 5. attachment for PCS conditions and 114ºF point (initial PCS temperature) and DETERMINES time to 200ºF is ~2 hours Comment:
 
CRITICAL STEP Proc. Step             TASK ELEMENT 6                                     STANDARD                       Grade DETERMINE PCS heatup rate as follows:
Proc. Step TASK ELEMENT 6 STANDARD Grade 7.3.7b DETERMINE PCS heatup rate as follows:  
7.3.7b    (200°F - TINITIAL)_______________           Heatup rate CALCULATED to be ~43ºF / hour         S U Approximate Time to 200°F (Hours)
(200°F - TINITIAL)_______________
Comment:
Approximate Time to 200°F (Hours)
Heatup rate CALCULATED to be ~43ºF / hour S U Comment:
NOTE: Heatup rate is calculated by dividing 86ºF (200ºF - 114ºF) by 2 hours.
NOTE: Heatup rate is calculated by dividing 86ºF (200ºF - 114ºF) by 2 hours.
CRITICAL STEP
CRITICAL STEP Proc. Step             TASK ELEMENT 7                                     STANDARD                       Grade DETERMINE the allowable Shutdown CALCULATES allowable Shutdown Cooling 7.3.7c. Cooling outage time (heatup rate >                                                             S U outage time to be 28 minutes (27 - 29 minutes).
 
20°F/Hr)
Proc. Step TASK ELEMENT 7 STANDARD Grade 7.3.7c. DETERMINE the allowable Shutdown Cooling outage time (heatup rate >  
Comment:
 
NOTE: Allowable outage time calculated by dividing 20ºF (maximum allowed heatup) by 43ºF / hour (previously calculated heatup rate) and converting to minutes.
20°F/Hr) CALCULATES allowable Shutdown Cooling
CRITICAL STEP PALISADES NUCLEAR PLANT                       Page 5 of 8                                       May 2009
 
outage time to be 28 minutes (27 - 29 minutes).
S  U Comment: NOTE: Allowable outage time calculated by dividing 20ºF (maximum allowed heatup) by 43ºF / hour (previously calculated heatup rate) and converting to minutes.
CRITICAL STEP
 
PALISADES NUCLEAR PLANT Page 5 of 8 May 2009 JPM RO ADMIN 1b  PALISADES NUCLEAR PLANT Page 6 of 8 May 2009 Proc. Step TASK ELEMENT 8 STANDARD Grade n/a Notifies the CRS that securing Shutdown Cooling has been calculated at


JPM RO ADMIN 1b Proc. Step              TASK ELEMENT 8                                    STANDARD                      Grade Notifies the CRS that securing Shutdown CRS NOTIFIED Shutdown Cooling can be n/a    Cooling has been calculated at                                                                S U secured for approximately 28 minutes.
approximately 28 minutes.
approximately 28 minutes.
CRS NOTIFIED Shutdown Cooling can be
Comment:
Evaluator: If notified by Operator of time for securing Shutdown Cooling, Acknowledge.
END OF TASK PALISADES NUCLEAR PLANT                        Page 6 of 8                                    May 2009


secured for approximately 28 minutes.
JPM RO ADMIN 1b SIMULATOR OPERATOR INSTRUCTIONS NONE PALISADES NUCLEAR PLANT          Page 7 of 8                May 2009
S  U Comment:
Evaluator: If notified by Operator of ti me for securing Shutdown Cooling, Acknowledge.


END OF TASK  
JPM RO ADMIN 1b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* Ten days after a plant shutdown, PCS temperature is 114ºF
* The Reactor cavity is flooded to a level of 629'
* The Pressurizer manway is removed
* Shutdown Cooling is in operation, but must be shutdown for the maximum time allowable INITIATING CUES:
The CRS directs you to determine how long (in minutes) Shutdown Cooling may be secured in accordance with SOP-3, Section 7.3.7.
PALISADES NUCLEAR PLANT                  Page 8 of 8                        May 2009


JPM RO ADMIN 1b SIMULATOR OPERATOR INSTRUCTIONS NONE PALISADES NUCLEAR PLANT Page 7 of 8 May 2009 JPM RO ADMIN 1b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: SRO ADMIN 1b TITLE: MONITOR PCS HEATUP/COOLDOWN WITH THE PPC CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


INITIAL CONDITIONS:
JPM SRO ADMIN 1b JOB PERFORMANCE MEASURE DATA PAGE Task:   Operate the Palisades Plant Computer System Alternate Path: N/A Facility JPM #: PPC-JPM-02 K/A: 2.1.19         Importance:       RO: 3.9           SRO: 3.8 K/A Statement: Ability to use plant computers to evaluate system or component status.
 
Task Standard: Commence monitoring a PCS heatup/cooldown using Page 372 SDC 15 Minute Rate Trend, of the PPC.
Ten days after a plant shutdown, PCS temperature is 114ºF  The Reactor cavity is flooded to a level of 629' The Pressurizer manway is removed Shutdown Cooling is in operation, but must be shutdown for the maximum time allowable
Preferred Evaluation Location: Simulator       __X__       In Plant     _____
 
Preferred Evaluation Method:       Perform     __X__       Simulate     _____
INITIATING CUES:
 
The CRS directs you to determine how l ong (in minutes) Shutdown Cooling may be secured in accordance with SOP-3, Section 7.3.7.
 
PALISADES NUCLEAR PLANT Page 8 of 8 May 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
 
JPM:  SRO ADMIN 1b TITLE:  MONITOR PCS HEATUP/COOLDOWN WITH THE PPC 
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM SRO ADMIN 1b JOB PERFORMANCE MEASURE DATA PAGE Task: Operate the Palisades Plant Computer System  
 
Alternate Path: N/A  
 
Facility JPM #: PPC-JPM-02  
 
K/A: 2.1.19   Importance: RO: 3.9   SRO: 3.8  
 
K/A Statement: Ability to use plant computer s to evaluate system or component status.
Task Standard: Commence monitoring a PCS heatup/cooldown using Page 372 "SDC 15 Minute Rate Trend," of the PPC.  
 
Preferred Evaluation Location: Simulator __X__ In Plant _____  
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
GOP-2, MODE 5 To MODE 3  525°F PO-2, PCS Heatup/Cooldown Operations Validation Time: 10 minutes        Time Critical:    NO Candidate: __________________________________________________
Time Start: ________        Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______        UNSAT ______
Comments:
Examiner: _______________________________                  Date:    ______________
Signature PALISADES NUCLEAR PLANT                  Page 2 of 7                            May 2009


GOP-2, "MODE 5 To MODE 3  525°F"    PO-2, "PCS Heatup/Cooldown Operations"
JPM SRO ADMIN 1b EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
* PO-2, PCS Heatup/Cooldown Operations Also see Simulator Operator Instructions (last page of this document).
Validation Time: 10 minutes  Time Critical: NO
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate: __________________________________________________
INITIAL CONDITIONS:
 
* A Plant refueling has just been completed.
Time Start: ________  Time Finish: ________
* Shutdown Cooling is in service with a PCS temperature of 186°F.
 
* GCL-2, Mode 5 to Mode 3 525°F Checklist is in progress.
Performance Time:  ________  minutes
* Two PCPs are in service.
 
* Technical Specification Surveillance Procedure PO-2, PCS Heatup/Cooldown Operations, has just been authorized by the CRS.
Performance Rating: SAT______  UNSAT ______
* No equipment is out of service, all systems are OPERABLE.
 
INITIATING CUES:
Comments:
* The CRS directs you to setup for monitoring a PCS heatup via the PPC, utilizing Page 361 PCS 15 Minute Rate Trend per PO-2, step 5.1.1.
 
PALISADES NUCLEAR PLANT                     Page 3 of 7                             May 2009
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 7 May 2009 JPM SRO ADMIN 1b EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
PO-2, PCS Heatup/Cooldown Operations Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assi gned task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
A Plant refueling has just been completed. Shutdown Cooling is in service with a PCS temperature of 186°F. GCL-2, Mode 5 to Mode 3   525°F Checklist is in progress. Two PCPs are in service. Technical Specification Surveillanc e Procedure PO-2, PCS Heatup/Cooldown Operations, has just been authorized by the CRS. No equipment is out of serv ice, all systems are OPERABLE.  
 
INITIATING CUES:  
 
The CRS directs you to setup for monitoring a PCS heatup via the PPC, utilizing Page 361 "PCS 15 Minute Rate Tr end" per PO-2, step 5.1.1.  
 
PALISADES NUCLEAR PLANT Page 3 of 7 May 2009 JPM SRO ADMIN 1b Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate PO-2, PCS Heatup/Cooldown Operations, step 5.1.1 Step 5.1.1 of PO-2 LOCATED S  U Comment:
EVALUATOR: Provide Operator a working copy of PO-2, step 5.1.1.


Proc. Step TASK ELEMENT 2 STANDARD Grade 5.1.1b SELECT the "Operator Mode Support" screen from the main menu  Main menu screen SELECTED. "Operator Mode Support" screen SELECTED from main menu screen
JPM SRO ADMIN 1b Proc. Step             TASK ELEMENT 1                                      STANDARD                   Grade Locate PO-2, PCS Heatup/Cooldown n/a                                                    Step 5.1.1 of PO-2 LOCATED                    S U Operations, step 5.1.1 Comment:
. S  U Comment:
EVALUATOR: Provide Operator a working copy of PO-2, step 5.1.1.
EVALUATOR NOTE: Operator may go straight to PPC page 361 (task element 3).  
Proc. Step            TASK ELEMENT 2                                      STANDARD                    Grade Main menu screen SELECTED.
SELECT the Operator Mode Support 5.1.1b                                                    Operator Mode Support screen SELECTED     S U screen from the main menu from main menu screen.
Comment:
EVALUATOR NOTE: Operator may go straight to PPC page 361 (task element 3).
Proc. Step            TASK ELEMENT 3                                      STANDARD                    Grade SELECT any of the following, as applicable, to monitor PCS heatup/cooldown rate:          Page 361 PCS 15 Minute Trend page 5.1.1c                                                                                                  S U SELECTED Page 361 PCS 15 Minute Rate Trend Comment:
CRITICAL STEP Proc. Step            TASK ELEMENT 4                                      STANDARD                    Grade START 15 minute automatic reports as 5.1.1d    follows:                                      F7 key HCR Reports DEPRESSED                S U DEPRESS F7 key HCR Reports Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                        Page 4 of 7                                    May 2009


Proc. Step TASK ELEMENT 3 STANDARD Grade 5.1.1c SELECT any of the following, as applicable, to monitor PCS heatup/cooldown rate:  Page 361 "PCS 15 Minute Rate Trend" Page 361 "PCS 15 Minute Trend" page SELECTED S  U Comment:
JPM SRO ADMIN 1b Proc. Step             TASK ELEMENT 5                                       STANDARD                     Grade START 15 minute automatic reports as follows:
CRITICAL STEP
5.1.1d                                                 Cyclic Printout Enabled SELECTED              S U SELECT the Cyclic Printout Enabled response Comment:
 
CRITICAL STEP Proc. Step             TASK ELEMENT 6                                       STANDARD                     Grade START 15 minute automatic reports as follows:                                     One (1) or Y is TYPED AND Update Hardkey is 5.1.1d                                                                                                  S U TYPE a one (1) AND DEPRESS the             DEPRESSED.
Proc. Step TASK ELEMENT 4 STANDARD Grade 5.1.1d START 15 minute automatic reports as follows:  DEPRESS F7 key "HCR Reports" F7 key "HCR Reports" DEPRESSED S  U Comment:
UPDATE Hardkey to start the reports.
CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 May 2009 JPM SRO ADMIN 1b PALISADES NUCLEAR PLANT Page 5 of 7 May 2009 Proc. Step TASK ELEMENT 5 STANDARD Grade 5.1.1d START 15 minute automatic reports as follows:  SELECT the "Cyclic Printout Enabled" response "Cyclic Printout Enabled" SELECTED S  U Comment:
Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 6 STANDARD Grade 5.1.1d START 15 minute automatic reports as follows: TYPE a one (1)
AND DEPRESS the "UPDATE" Hardkey to start the reports.
One (1) or Y is TYPED AND "Update" Hardkey is DEPRESSED.
S  U Comment:
NOTE: The Heatup/Cooldown print out is on a 15 minute timer that is always running.
NOTE: The Heatup/Cooldown print out is on a 15 minute timer that is always running.
When the printout is enabled, the next pr int timeout could be anywhere from 1 second to 15 minutes later. Evaluator:   If Operator checks that the printout is printing and it is not, STATE that the hardcopy printout is not required and to continue.
When the printout is enabled, the next print timeout could be anywhere from 1 second to 15 minutes later.
CRITICAL STEP
Evaluator: If Operator checks that the printout is printing and it is not, STATE that the hardcopy printout is not required and to continue.
 
CRITICAL STEP Proc. Step             TASK ELEMENT 7                                       STANDARD                     Grade Notify the CRS that heatup/cooldown CRS notified that heatup/cooldown monitoring by 5.1.1d    monitoring of the SDC by PPC, Page 361 is                                                     S U PPC in progress in progress Comment:
Proc. Step TASK ELEMENT 7 STANDARD Grade 5.1.1d Notify the CRS that heatup/cooldown monitoring of the SDC by PPC, Page 361 is  
 
in progress CRS notified that heatup/cooldown monitoring by
 
PPC in progress S  U Comment:
EVALUATOR: If notified as CRS that PPC monitoring is in progress, Acknowledge.
EVALUATOR: If notified as CRS that PPC monitoring is in progress, Acknowledge.
END OF TASK  
END OF TASK PALISADES NUCLEAR PLANT                       Page 5 of 7                                     May 2009
 
JPM SRO ADMIN 1b SIMULATOR OPERATOR INSTRUCTIONS IC-3, Ready to come off S/D Cooling.
 
PALISADES NUCLEAR PLANT Page 6 of 7 May 2009 JPM SRO ADMIN 1b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
 
A Plant refueling has just been completed. Shutdown Cooling is in service with a PCS temperature of 186°F. GCL-2, Mode 5 to Mode 3  525°F Checklist is in progress. Two PCPs are in service. Technical Specification Surveillanc e Procedure PO-2, PCS Heatup/Cooldown Operations, has just been authorized by the CRS. No equipment is out of serv ice, all systems are OPERABLE.
 
INITIATING CUES:
 
The CRS directs you to setup for monitoring a PCS heatup via the PPC, utilizing Page 361
 
"PCS 15 Minute Rate Trend" per PO-2, step 5.1.1.
PALISADES NUCLEAR PLANT Page 7 of 7 May 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
 
JPM:  RO ADMIN 2 TITLE:  PERFORM SHO-1 SURVEILLANCE
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________


JPM RO ADMIN 2 JOB PERFORMANCE MEASURE DATA PAGE  Task: Complete the SHO-1 Surveillance
JPM SRO ADMIN 1b SIMULATOR OPERATOR INSTRUCTIONS IC-3, Ready to come off S/D Cooling.
PALISADES NUCLEAR PLANT              Page 6 of 7            May 2009


Alternate Path: N/A
JPM SRO ADMIN 1b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* A Plant refueling has just been completed.
* Shutdown Cooling is in service with a PCS temperature of 186°F.
* GCL-2, Mode 5 to Mode 3  525°F Checklist is in progress.
* Two PCPs are in service.
* Technical Specification Surveillance Procedure PO-2, PCS Heatup/Cooldown Operations, has just been authorized by the CRS.
* No equipment is out of service, all systems are OPERABLE.
INITIATING CUES:
The CRS directs you to setup for monitoring a PCS heatup via the PPC, utilizing Page 361 PCS 15 Minute Rate Trend per PO-2, step 5.1.1.
PALISADES NUCLEAR PLANT                  Page 7 of 7                            May 2009


Facility JPM #: RO-A.2 2008 AUDIT
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO ADMIN 2 TITLE: PERFORM SHO-1 SURVEILLANCE CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


K/A: 2.2.12   Importance: RO: 3.7   SRO: 4.1  
JPM RO ADMIN 2 JOB PERFORMANCE MEASURE DATA PAGE Task:    Complete the SHO-1 Surveillance Alternate Path: N/A Facility JPM #: RO-A.2 2008 AUDIT K/A: 2.2.12             Importance:         RO: 3.7           SRO: 4.1 K/A Statement: Knowledge of surveillance procedures Task Standard: Identification of two out-of-spec readings during the performance of SHO-1 for Wide Range Nuclear Instruments and B Steam Generator Pressure Preferred Evaluation Location: Simulator       __X__   In Plant     _____
 
Preferred Evaluation Method:       Perform     __X__   Simulate     _____
K/A Statement: Knowledge of surveillance procedures  
 
Task Standard: Identification of two out-of-spec readings during the performance of SHO-1 for Wide Range Nuclear Inst ruments and 'B' Steam Generator Pressure Preferred Evaluation Location: Simulator __X__ In Plant _____  
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
SHO-1, Operators Shift Items Modes 1, 2, 3, and 4 Validation Time: 20 minutes        Time Critical:    NO Candidate: __________________________________________
Time Start: ________          Time Finish:      ________
Performance Time: ________ minutes Performance Rating:    SAT______          UNSAT ______
Comments:
Examiner: _______________________________                Date:    ______________
Signature PALISADES NUCLEAR PLANT                  Page 2 of 11                        May 2009


SHO-1, "Operator's Shift Items Modes 1, 2, 3, and 4"
JPM RO ADMIN 2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
* SHO-1, Attachment 1, Shift Surveillance Data Sheet
Validation Time: 20 minutes  Time Critical: NO
* Red ink pen Also see Simulator Operator Instructions (last page of this document).
 
READ TO CANDIDATE DIRECTION TO CANDIDATE:
Candidate: __________________________________________
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
 
INITIAL CONDITIONS:
Time Start: ________  Time Finish: ________
* The plant is at 100% power.
 
* It is Monday, 0100 hours.
Performance Time: ________ minutes
INITIATING CUES:
 
You have been directed to take the readings of SHO-1, Items 5.1.1 through and including 5.1.14 on pages 1,2,3,4, and 5 for A Shift. ALL remaining readings have already been taken by another NCO.
Performance Rating: SAT______  UNSAT ______
PALISADES NUCLEAR PLANT                     Page 3 of 11                             May 2009
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 11 May 2009 JPM RO ADMIN 2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
SHO-1, Attachment 1, Shift Surveillance Data Sheet Red ink pen Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assi gned task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
The plant is at 100% power. It is Monday, 0100 hours.  
 
INITIATING CUES:  
 
You have been directed to take the readings of SHO-1, Items 5.1.1 through and  
 
including 5.1.14 on pages 1,2,3,4, and 5 for  
'A' Shift. ALL remaining readings have already been taken by another NCO.  
 
PALISADES NUCLEAR PLANT Page 3 of 11 May 2009 JPM RO ADMIN 2 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Partially completed copy of SHO-1 located LOCATES copy of partially completed SHO-1 S  U Comment:
Evaluator: Provides Operator with a pa rtially completed copy of SHO-1.


Proc. Step TASK ELEMENT 2 STANDARD Grade 5.1.1 Power Range Nuclear Instrumentation:
JPM RO ADMIN 2 Proc. Step             TASK ELEMENT 1                                  STANDARD                       Grade n/a    Partially completed copy of SHO-1 located    LOCATES copy of partially completed SHO-1      S U Comment:
Record data and check all channels agree within 1% CHECKS all channels agree within 1%  RECORDS readings in "Shift A Readings" column  INITIALS "RECRD BY" S  U Comment:
Evaluator: Provides Operator with a partially completed copy of SHO-1.
Proc. Step            TASK ELEMENT 2                                  STANDARD                      Grade CHECKS all channels agree within 1%
Power Range Nuclear Instrumentation:
RECORDS readings in Shift A Readings 5.1.1    Record data and check all channels agree                                                     S U column within 1%
INITIALS "RECRD BY" Comment:
NOTE: Surveillance steps may be performed in any order.
NOTE: Surveillance steps may be performed in any order.
Proc. Step            TASK ELEMENT 3                                  STANDARD                      Grade CHECKS all channels agree within 1%
Thermal Margin Monitor T Power:
RECORDS readings in Shift A Readings 5.1.2    Record data and check all channels agree                                                    S U column within 1%
INITIALS "RECRD BY" Comment:
PALISADES NUCLEAR PLANT                      Page 4 of 11                                    May 2009


Proc. Step TASK ELEMENT 3 STANDARD Grade 5.1.2 Thermal Margin Monitor T Power: Record data and check all channels agree within 1%  CHECKS all channels agree within 1%  RECORDS readings in "Shift A Readings" column  INITIALS "RECRD BY" S  U Comment: 
JPM RO ADMIN 2 Proc. Step           TASK ELEMENT 4                                     STANDARD                   Grade Thermal Margin Monitor Functions, NI/T Power Deviation Meter (C-27):         CHECKS NI/T and TMM Primary Screens updating Check NI/T Comparator varying as 5.1.3                                                                                              S U expected for changes between NI/T         RECORDS a  in Shift A Readings column Power INITIALS RECRD BY Check TMM Primary Screens updating Comment:
 
Proc. Step           TASK ELEMENT 5                                     STANDARD                   Grade CHECKS TMM System Status Screen Power Axial Shape Index:                            Density status OK 5.1.4    Check TMM System Status Screen                                                           S U RECORDS a  in Shift A Readings column Power Density status OK INITIALS RECRD BY Comment:
PALISADES NUCLEAR PLANT Page 4 of 11 May 2009 JPM RO ADMIN 2 Proc. Step TASK ELEMENT 4 STANDARD Grade 5.1.3 Thermal Margin Monitor Functions, NI/T Power Deviation Meter (C-27): Check NI/T Comparator varying as expected for changes between NI/T Power  Check TMM Primary Screens updating  CHECKS NI/T and TMM Primary Screens updating  RECORDS a  in "Shift A Readings" column   INITIALS RECRD BY S  U Comment:
Proc. Step           TASK ELEMENT 6                                     STANDARD                   Grade CHECKS TMM System Status Screen TC PCS Cold Leg Temperature:                     < 543.5&deg;F Check TMM System Status Screen TC        Check TMM System Status Screen Trip 5.1.5      <543.5&deg;F                                     Status Box indicates TC: OK               S U Check TMM System Status Screen Trip      RECORDS a  in Shift A Readings column Status Box indicates TC: OK INITIALS RECRD BY Comment:
 
PALISADES NUCLEAR PLANT                     Page 5 of 11                                   May 2009
Proc. Step TASK ELEMENT 5 STANDARD Grade 5.1.4 Axial Shape Index:
Check TMM "System Status" Screen Power Density status "OK"  CHECKS TMM "System Status" Screen Power Density status "OK"  RECORDS a  in "Shift A Readings" column   INITIALS RECRD BY S  U Comment:
 
Proc. Step TASK ELEMENT 6 STANDARD Grade 5.1.5 PCS Cold Leg Temperature:
Check TMM "System Status" Screen T C <543.5&deg;F Check TMM "System Status" Screen Trip Status Box indicates T C: "OK"  CHECKS TMM "System Status" Screen T C < 543.5&deg;F Check TMM "System Status" Screen Trip Status Box indicates T C: "OK"  RECORDS a  in "Shift A Readings" column  INITIALS RECRD BY S  U Comment: 
 
PALISADES NUCLEAR PLANT Page 5 of 11 May 2009 JPM RO ADMIN 2 Proc. Step TASK ELEMENT 7 STANDARD Grade 5.1.6 Wide Range Nuclear Instrumentation (NIs): Record data and check NIs agree within 11/2 decades  CHECKS data within 11/2 decades  RECORDS data in "Shift A Readings" column S  U Comment:
NOTE: Data for NI 1/3 is NOT within 11/2 decades
 
Proc. Step TASK ELEMENT 8 STANDARD Grade 5.1.6 Wide Range Nuclear Instrumentation (NIs):  Determine out of tolerance data for NI 1/3  Identifies out of tolerance reading  DETERMINES NI 1/3 not within 11/2 decades  CIRCLES in RED NI-1/3A reading  INITIALS RECRD BY
* May NOTIFY CRS of the out of spec reading S U Comment:
Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance should continue: RESPOND to continue with the surveillance.
*NOTE: 'INITIALS RECRD BY" is not part of the critical step CRITICAL STEP
 
Proc. Step TASK ELEMENT 9 STANDARD Grade 5.1.7 Quadrant Power Tilt:
Check NI Channels 5, 6, 7 and 8 Deviation lights not lit  No alarms  (EK-06C3)  CHECKS no Deviation lights lit for NI 5, 6, 7 and 8  VERIFIES no alarms (EK-06C3)  RECORDS a  in "Shift A Readings" column   INITIALS RECRD BY S  U Comment:
 
PALISADES NUCLEAR PLANT Page 6 of 11 May 2009 JPM RO ADMIN 2 Proc. Step TASK ELEMENT 10 STANDARD Grade 5.1.8 Steam Generator Pressure:
Record data and check all channels for each S/G agree within 40 psi  RECORDS S/G pressures in "Shift A Readings" column  CHECKS S/G pressures within 40 psi S  U Comment:
NOTE: Data for PIC-0752C indication for "B" S/G is > 40 psi out of agreement.
 
Proc. Step TASK ELEMENT 11 STANDARD Grade 5.1.8 Steam Generator Pressure:
Record data and check all channels for each S/G agree within 40 psi  DETERMINES PIC-0752C indication for "B" S/G is >40 psi out of agreement with the other
 
three for "B" S/G  CIRCLES in RED at least PIC-0752C reading (may circle all four)  *INITIALS RECRD BY  May NOTIFY CRS of the out of spec reading S  U Comment:
Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance should continue: RESPOND to continue with the surveillance.
*NOTE: 'INITIALS RECRD BY" is not part of the critical step CRITICAL STEP
 
Proc. Step TASK ELEMENT 12 STANDARD Grade 5.1.9 Steam Generator Level:
Record data and check all channels for each S/G agree within 4%  RECORDS S/G levels in "Shift A Readings" column  CHECKS S/G levels within 4%  INITIALS RECRD BY S  U Comment:
 
PALISADES NUCLEAR PLANT Page 7 of 11 May 2009 JPM RO ADMIN 2 Proc. Step TASK ELEMENT 13 STANDARD Grade 5.1.10 Primary Coolant Flow:
Record data and check all channels agree within 5%  RECORDS PCS flow in "Shift A Readings" column  CHECKS PCS flows within 5%  INITIALS RECRD BY S  U Comment: 
 
Proc. Step TASK ELEMENT 14 STANDARD Grade 5.1.11 PZR Code Safety Relief Valve Position Indication Temperature:
Record data and check temperatures are consistent with plant conditions  RECORDS PZR Safety Relief temperatures readings ranging from approx. 100 to 120 F in "Shift A Readings" column  INITIALS RECRD BY S  U Comment:  Note: These reading are ambient and consistent with plant conditions.
 
Proc. Step TASK ELEMENT 15 STANDARD Grade 5.1.12 PORV Position Indication Temperature:
Record data and check temperatures are consistent with plant conditions and other
 
PORV indications  RECORDS 'N/A' in this block (does not apply for plant conditions)
S  U Comment: 
 
PALISADES NUCLEAR PLANT Page 8 of 11 May 2009 JPM RO ADMIN 2  PALISADES NUCLEAR PLANT Page 9 of 11 May 2009 Proc. Step TASK ELEMENT 16 STANDARD Grade 5.1.13 PZR Pressure:
Record data and check all agree within 40 psi and Mode 1 pressure  2010 psia and  2100 psia  RECORDS PZR pressures in "Shift A Readings" column  CHECKS pressures within 40 psia  Checks PZR pressure between 2010 psia and 2100 psia  INITIALS RECRD BY S  U Comment: 


Proc. Step TASK ELEMENT 17 STANDARD Grade 5.1.14 Thermal Margin Low Pressure Trip Channels: Record data and:  Check Channels A and C agree within 85 psi  Check Channels B and D agree within 85 psi  RECORDS TMM low pressures in "Shift A Readings" column CHECKS Channels A and C agree within 85 psi  CHECKS Channels B and D agree within 85 psi INITIALS RECRD BY S  U Comment:
JPM RO ADMIN 2 Proc. Step               TASK ELEMENT 7                                    STANDARD                         Grade Wide Range Nuclear Instrumentation (NIs):                                          CHECKS data within 11/2 decades 5.1.6                                                                                                      S U Record data and check NIs agree within           RECORDS data in Shift A Readings column 11/2 decades Comment:
NOTE: Data for NI 1/3 is NOT within 11/2 decades Proc. Step              TASK ELEMENT 8                                    STANDARD                        Grade Wide Range Nuclear Instrumentation              DETERMINES NI 1/3 not within 11/2 decades (NIs):                                          CIRCLES in RED NI-1/3A reading 5.1.6                                                                                                      S U Determine out of tolerance data for NI 1/3    INITIALS RECRD BY
* Identifies out of tolerance reading            May NOTIFY CRS of the out of spec reading Comment:
Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance should continue: RESPOND to continue with the surveillance.
*NOTE: INITIALS RECRD BY is not part of the critical step CRITICAL STEP Proc. Step              TASK ELEMENT 9                                    STANDARD                        Grade CHECKS no Deviation lights lit for NI 5, 6, 7 Quadrant Power Tilt:                              and 8 Check NI Channels 5, 6, 7 and 8                VERIFIES no alarms (EK-06C3) 5.1.7                                                                                                      S U Deviation lights not lit RECORDS a in Shift A Readings column No alarms (EK-06C3)
INITIALS RECRD BY Comment:
PALISADES NUCLEAR PLANT                          Page 6 of 11                                      May 2009


Proc. Step TASK ELEMENT 18 STANDARD Grade n/a  Return completed SHO-1 to CRS  Inform CRS of out of spec readings (if not already done)  Completed SHO-1 RETURNED to the CRS CRS INFORMED of the out of spec readings (if not already done)
JPM RO ADMIN 2 Proc. Step           TASK ELEMENT 10                                      STANDARD                     Grade Steam Generator Pressure:                    RECORDS S/G pressures in Shift A 5.1.8                                                  Readings column                                S U Record data and check all channels for each S/G agree within 40 psi                CHECKS S/G pressures within 40 psi Comment:
S U Comment:
NOTE: Data for PIC-0752C indication for B S/G is > 40 psi out of agreement.
END OF TASK
Proc. Step            TASK ELEMENT 11                                      STANDARD                    Grade DETERMINES PIC-0752C indication for B S/G is >40 psi out of agreement with the other three for B S/G Steam Generator Pressure:
5.1.8                                                CIRCLES in RED at least PIC-0752C reading      S U Record data and check all channels for (may circle all four) each S/G agree within 40 psi
                                                        *INITIALS RECRD BY May NOTIFY CRS of the out of spec reading Comment:
Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance should continue: RESPOND to continue with the surveillance.
*NOTE: INITIALS RECRD BY is not part of the critical step CRITICAL STEP Proc. Step            TASK ELEMENT 12                                      STANDARD                    Grade RECORDS S/G levels in Shift A Readings Steam Generator Level:                        column 5.1.9    Record data and check all channels for                                                        S U CHECKS S/G levels within 4%
each S/G agree within 4%
INITIALS RECRD BY Comment:
PALISADES NUCLEAR PLANT                      Page 7 of 11                                      May 2009


JPM RO ADMIN 2 SIMULATOR OPERATOR INSTRUCTIONS Reset to any full power IC. Insert the following or use CAE file o OVERRIDE NI-1/3A Wide Range Log Mete r indication to failed low (NI PWR-1 @ 0.75) o OVERRIDE PIC-0752C to indicate ~860#  (Value = 0.71) o OVRD NI-4-PWR-1 @ 1.0. Ensure "A" Channel TMM VHPT setpoint is at normal value. Ensure NI @ 100.1%, i.e., accurate.
JPM RO ADMIN 2 Proc. Step            TASK ELEMENT 13                                        STANDARD                    Grade RECORDS PCS flow in Shift A Readings Primary Coolant Flow:                            column 5.1.10    Record data and check all channels agree                                                        S U CHECKS PCS flows within 5%
Ensure copies of SHO-1, Attachment 1, page 1, 2, 3, 4, and 5 are available with Section 5.1.14 grayed out. Ensure Simulator clipboard copy of SHO-1, Attachment 1 is the current revision.
within 5%
PALISADES NUCLEAR PLANT Page 10 of 11 May 2009 JPM RO ADMIN 2 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIALS RECRD BY Comment:
Proc. Step            TASK ELEMENT 14                                        STANDARD                    Grade PZR Code Safety Relief Valve Position          RECORDS PZR Safety Relief temperatures Indication Temperature:                          readings ranging from approx. 100&deg; to 120&deg;F in 5.1.11                                                      Shift A Readings column                      S U Record data and check temperatures are consistent with plant conditions                INITIALS RECRD BY Comment:
Note:      These reading are ambient and consistent with plant conditions.
Proc. Step            TASK ELEMENT 15                                        STANDARD                    Grade PORV Position Indication Temperature:
Record data and check temperatures are         RECORDS N/A in this block (does not apply 5.1.12                                                                                                      S U consistent with plant conditions and other      for plant conditions)
PORV indications Comment:
PALISADES NUCLEAR PLANT                         Page 8 of 11                                     May 2009


INITIAL CONDITIONS:  
JPM RO ADMIN 2 Proc. Step            TASK ELEMENT 16                                      STANDARD                Grade RECORDS PZR pressures in Shift A Readings column PZR Pressure:
CHECKS pressures within 40 psia 5.1.13    Record data and check all agree within                                                    S U 40 psi and Mode 1 pressure  2010 psia        Checks PZR pressure between 2010 psia and and  2100 psia                                2100 psia INITIALS RECRD BY Comment:
Proc. Step            TASK ELEMENT 17                                      STANDARD                Grade Thermal Margin Low Pressure Trip              RECORDS TMM low pressures in Shift A Channels:                                      Readings column Record data and:                              CHECKS Channels A and C agree within 5.1.14                                                  85 psi                                      S U Check Channels A and C agree within 85 psi                                    CHECKS Channels B and D agree within 85 psi Check Channels B and D agree within 85 psi                                    INITIALS RECRD BY Comment:
Proc. Step            TASK ELEMENT 18                                      STANDARD                Grade Return completed SHO-1 to CRS              Completed SHO-1 RETURNED to the CRS n/a      Inform CRS of out of spec readings (if not  CRS INFORMED of the out of spec readings    S U already done)                                (if not already done)
Comment:
END OF TASK PALISADES NUCLEAR PLANT                      Page 9 of 11                                  May 2009


The plant is at 100% power  It is Monday, 0100 hours
JPM RO ADMIN 2 SIMULATOR OPERATOR INSTRUCTIONS
* Reset to any full power IC.
* Insert the following or use CAE file o OVERRIDE NI-1/3A Wide Range Log Meter indication to failed low (NI              PWR-1 @ 0.75) o OVERRIDE PIC-0752C to indicate ~860# (Value = 0.71) o OVRD NI-4-PWR-1 @ 1.0.
* Ensure "A" Channel TMM VHPT setpoint is at normal value.
* Ensure NI @ 100.1%, i.e., accurate.
* Ensure copies of SHO-1, Attachment 1, page 1, 2, 3, 4, and 5 are available with Section 5.1.14 grayed out.
* Ensure Simulator clipboard copy of SHO-1, Attachment 1 is the current revision.
PALISADES NUCLEAR PLANT              Page 10 of 11                          May 2009


INITIATING CUES:  
JPM RO ADMIN 2 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* The plant is at 100% power
* It is Monday, 0100 hours INITIATING CUES:
You have been directed to take the readings of SHO-1, Items 5.1.1 through and including 5.1.14 on pages 1,2,3,4, and 5 for A Shift. ALL remaining readings have already been taken by another NCO.
PALISADES NUCLEAR PLANT                Page 11 of 11                            May 2009


You have been directed to take the readings of SHO-1, Items 5.1.1 through and
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: SRO ADMIN 2 TITLE: REVIEW SHO-1 SURVEILLANCE CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


including 5.1.14 on pages 1,2,3,4, and 5 for 'A' Shift. ALL remaining readings have
JPM SRO ADMIN 2 JOB PERFORMANCE MEASURE DATA PAGE Task:   Conduct Surveillance Testing Alternate Path: N/A Facility JPM #: NEW K/A: 2.2.12             Importance:       RO: 3.7           SRO: 4.1 K/A Statement: Knowledge of surveillance procedures Task Standard: Identification of two out-of-spec readings during the performance of SHO-1 for Wide Range Nuclear Instrumentation and B Steam Generator Pressure AND the identification of the appropriate Technical Specification LCO action statement entries due to the out-of-spec readings.
 
Preferred Evaluation Location: ANY               __X__
already been taken by another NCO.
Preferred Evaluation Method:       Perform     __X__   Simulate   _____
 
PALISADES NUCLEAR PLANT Page 11 of 11 May 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
 
JPM:  SRO ADMIN 2 TITLE:  REVIEW SHO-1 SURVEILLANCE
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM SRO ADMIN 2 JOB PERFORMANCE MEASURE DATA PAGE Task: Conduct Surveillance Testing  
 
Alternate Path: N/A  
 
Facility JPM #: NEW  
 
K/A: 2.2.12   Importance: RO: 3.7   SRO: 4.1  
 
K/A Statement: Knowledge of surveillance procedures  
 
Task Standard: Identification of two out-of-spec readings during the performance of SHO-1 for Wide Range Nuclear In strumentation and 'B' Steam Generator Pressure AND the identification of t he appropriate Technical Specification LCO action statement entries due to the out-of-spec  
 
readings.  
 
Preferred Evaluation Location: ANY __X__  
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
SHO-1, Operators Shift Items Modes 1, 2, 3, and 4 Validation Time: 15 minutes        Time Critical:    NO Candidate: _________________________________________
Time Start: ________          Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______          UNSAT ______
Comments:
Examiner: _______________________________                Date:  ______________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 7                        MAY 2009


SHO-1, "Operator's Shift Items Modes 1, 2, 3, and 4"
JPM SRO ADMIN 2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
Completed SHO-1, Attachment 1, Shift Surveillance Data Sheet for Monday Technical Specifications Technical Specifications Bases Also see Simulator Operator Instructions (last page of this document).
Validation Time: 15  minutes  Time Critical: NO
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate: _________________________________________
INITIAL CONDITIONS:
 
* The plant is at 100% power.
Time Start: ________  Time Finish: ________
* It is Monday, 2200 hours.
 
* You are an on-shift SRO.
Performance Time:  ________ minutes
* SHO-1, Shift Surveillance Data Sheet, was completed at 2115 hours.
 
* The plant is in Mode 1.
Performance Rating: SAT______  UNSAT ______
INITIATING CUES:
 
* The Shift Manager directs you to complete a supervisory review of completed SHO-1 in accordance with step 5.3 of SHO-1.
Comments:
Evaluator Note: Provide candidate with completed SHO-1 for Monday with one data point for S/G Pressure and one for NI-1/3A are below the acceptance range. Do NOT circle the readings in red. Bad data should be for 'C' shift only.
 
PALISADES NUCLEAR PLANT                     Page 3 of 7                             MAY 2009
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 7 MAY 2009 JPM SRO ADMIN 2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
Completed SHO-1, Attachment 1, Sh ift Surveillance Data Sheet for Monday Technical Specifications Technical Specifications Bases Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assi gned task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
The plant is at 100% power. It is Monday, 2200 hours.
You are an on-shift SRO.
SHO-1, Shift Surveillance Data Sheet, was completed at 2115 hours.
The plant is in Mode 1.
INITIATING CUES:  
 
The Shift Manager directs you to comple te a supervisory review of completed SHO-1 in accordance with step 5.3 of SHO-1.
Evaluator Note: Provide candidate with co mpleted SHO-1 for Monday with one data point for S/G Pressure and one for NI-1/3A are below the acceptance range. Do NOT circle the readings in red. Bad data should be for 'C' shift only.  
 
PALISADES NUCLEAR PLANT Page 3 of 7 MAY 2009 JPM SRO ADMIN 2 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Partially completed copy of SHO-1 located LOCATES copy of partially completed SHO-1 S  U Comment:  Evaluator: Provides Operator with a copy of SHO-1 completed for Monday (all three shifts).
Proc. Step TASK ELEMENT 2 STANDARD Grade 5.3.1 REVIEW SHO-1 Monday entries to ensure all applicable components have been
 
inspected.
At the end of each day, an On Shift SRO shall
 
review the data sheets applicable to that day for
 
completion of applicable items and ensure
 
proper disposition of off-normal items. This is
 
documented by sign-off on Attachment 1, "Shift
 
Surveillance Data Sheet."  S  U Comment: 


Proc. Step TASK ELEMENT 3 STANDARD Grade 5.1.6 Wide Range Nuclear Instrumentation (NIs):  Determine out of tolerance data for NI 1/3 Identifies out of tolerance entry for A-shift  DETERMINES NI 1/3 not within 11/2 decades CIRCLES in RED NI-1/3A entry for C-shift May NOTIFY CRS of the out of spec reading S  U Comment:
JPM SRO ADMIN 2 Proc. Step               TASK ELEMENT 1                                        STANDARD                       Grade n/a    Partially completed copy of SHO-1 located        LOCATES copy of partially completed SHO-1          S U Comment:
Evaluator: Provides Operator with a copy of SHO-1 completed for Monday (all three shifts).
Proc. Step              TASK ELEMENT 2                                        STANDARD                        Grade At the end of each day, an On Shift SRO shall review the data sheets applicable to that day for REVIEW SHO-1 Monday entries to ensure            completion of applicable items and ensure 5.3.1    all applicable components have been              proper disposition of off-normal items. This is    S U inspected.                                        documented by sign-off on Attachment 1, "Shift Surveillance Data Sheet."
Comment:
Proc. Step              TASK ELEMENT 3                                        STANDARD                        Grade Wide Range Nuclear Instrumentation DETERMINES NI 1/3 not within 11/2 decades (NIs):
5.1.6                                                      CIRCLES in RED NI-1/3A entry for C-shift         S U Determine out of tolerance data for NI 1/3 May NOTIFY CRS of the out of spec reading Identifies out of tolerance entry for A-shift Comment:
Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance review should continue: RESPOND to continue with the surveillance review.
Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance review should continue: RESPOND to continue with the surveillance review.
CRITICAL STEP
CRITICAL STEP PALISADES NUCLEAR PLANT                            Page 4 of 7                                      MAY 2009


PALISADES NUCLEAR PLANT Page 4 of 7 MAY 2009 JPM SRO ADMIN 2 PALISADES NUCLEAR PLANT Page 5 of 7 MAY 2009 Proc. Step TASK ELEMENT 4 STANDARD Grade 5.1.8 Steam Generator Pressure:
JPM SRO ADMIN 2 Proc. Step             TASK ELEMENT 4                                         STANDARD                     Grade DETERMINES PIC-0752C indication for B S/G is >40 psi out of agreement with the other Steam Generator Pressure:                        three for B S/G for C-shift.
Reviews data and checks all channels for each S/G agree within 40 psi  DETERMINES PIC-0752C indication for "B" S/G is >40 psi out of agreement with the other  
5.1.8    Reviews data and checks all channels for                                                          S U CIRCLES in RED PIC-0752C reading (may each S/G agree within 40 psi                    circle others as well)
 
May NOTIFY CRS of the out of spec reading Comment:
three for "B" S/G for C-shift. CIRCLES in RED PIC-0752C reading (may circle others as well) May NOTIFY CRS of the out of spec reading S  U Comment:
Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance review should continue: RESPOND to continue with the surveillance review.
Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance review should continue: RESPOND to continue with the surveillance review.
CRITICAL STEP
CRITICAL STEP Proc. Step             TASK ELEMENT 5                                         STANDARD                     Grade Attachment 1 5.3 Reviewed: space signed.
 
The following TS Conditions are identified for the inoperable NI instrumentation:
Proc. Step TASK ELEMENT 5 STANDARD Grade 5.3   At the end of each day, an On Shift SRO shall review the data sheets applicable to that day for completion of applicable  
At the end of each day, an On Shift SRO
 
* LCO 3.3.7.A shall review the data sheets applicable to
items and ensure proper disposition of  
* LCO 3.3.1.B that day for completion of applicable 5.3      items and ensure proper disposition of         The following TS Conditions are identified for  S U off-normal items. This is documented by         the inoperable S/G pressure instrument:
 
sign-off on Attachment 1, "Shift
off-normal items. This is documented by  
* LCO 3.3.7.A Surveillance Data Sheet."
 
* LCO 3.3.1.A LCO 3.3.9.A MAY be identified for the inoperable NI instrumentation for LCO Annex entry (since it applies in MODES 3, 4 and 5):
sign-off on Attachment 1, "Shift  
Comment:
 
Surveillance Data Sheet."  Attachment 1 "5.3 Reviewed:" space signed. The following TS Conditions are identified for the inoperable NI instrumentation:  LCO 3.3.7.A LCO 3.3.1.B  The following TS Conditions are identified for the inoperable S/G pressure instrument:  LCO 3.3.7.A  LCO 3.3.1.A LCO 3.3.9.A MAY be identified for the inoperable NI instrumentation for LCO Annex  
 
entry (since it applies in MODES 3, 4 and 5):
S  U Comment:
Evaluator Cue: If asked as the CRS to disposition the out of spec readings:
Evaluator Cue: If asked as the CRS to disposition the out of spec readings:
Acknowledge and inform candidate th at they need to determine proper disposition of the off-normal items.
Acknowledge and inform candidate that they need to determine proper disposition of the off-normal items.
CRITICAL STEP END OF TASK  
CRITICAL STEP END OF TASK PALISADES NUCLEAR PLANT                         Page 5 of 7                                       MAY 2009
 
JPM SRO ADMIN 2 SIMULATOR OPERATOR INSTRUCTIONS IF Simulator is used for conducting this JPM, then perform the following:  Reset to any full power IC. Insert the following or use CAE file o OVERRIDE NI-1/3A Wide Range Log Meter indication to failed low (NI-3 PWR-1 @ 0.75) o OVERRIDE PIC-0752C to indicate ~860#  (Value = 0.71) o OVRD NI-4-PWR-1 @ 1.0. Ensure "A" Channel TMM VHPT setpoint is at normal value. Ensure NI @ 100.1%, i.e., accurate.
Ensure copies of SHO-1, Attachment 1, page 1, 2, 3, 4, and 5 are available with Section 5.1.14 grayed out. Ensure Simulator clipboard copy of SHO-1, Attachment 1 is the current revision.
PALISADES NUCLEAR PLANT Page 6 of 7 MAY 2009 JPM SRO ADMIN 2 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
 
The plant is at 100% power. It is Monday, 2200 hours.
You are an on-shift SRO.
SHO-1, Shift Surveillance Data Sheet, was completed at 2115 hours.
The plant is in Mode 1.


INITIATING CUES:  
JPM SRO ADMIN 2 SIMULATOR OPERATOR INSTRUCTIONS IF Simulator is used for conducting this JPM, then perform the following:
* Reset to any full power IC.
* Insert the following or use CAE file o OVERRIDE NI-1/3A Wide Range Log Meter indication to failed low (NI-3 PWR-1 @ 0.75) o OVERRIDE PIC-0752C to indicate ~860# (Value = 0.71) o OVRD NI-4-PWR-1 @ 1.0.
* Ensure "A" Channel TMM VHPT setpoint is at normal value.
* Ensure NI @ 100.1%, i.e., accurate.
* Ensure copies of SHO-1, Attachment 1, page 1, 2, 3, 4, and 5 are available with Section 5.1.14 grayed out.
* Ensure Simulator clipboard copy of SHO-1, Attachment 1 is the current revision.
PALISADES NUCLEAR PLANT                Page 6 of 7                          MAY 2009


JPM SRO ADMIN 2 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* The plant is at 100% power.
* It is Monday, 2200 hours.
* You are an on-shift SRO.
* SHO-1, Shift Surveillance Data Sheet, was completed at 2115 hours.
* The plant is in Mode 1.
INITIATING CUES:
The Shift Manager directs you to complete a supervisory review of completed SHO-1 in accordance with step 5.3 of SHO-1.
The Shift Manager directs you to complete a supervisory review of completed SHO-1 in accordance with step 5.3 of SHO-1.
PALISADES NUCLEAR PLANT Page 7 of 7 MAY 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
PALISADES NUCLEAR PLANT               Page 7 of 7                           MAY 2009
 
JPM:  SRO ADMIN 3 TITLE:  CALCULATE MAXIMUM PERMISSIBLE STAY TIME 
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM SRO ADMIN 3 JOB PERFORMANCE MEASURE DATA PAGE  Task: Determine maximum permissible stay time
 
Alternate Path: N/A


Facility JPM #: NEW
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: SRO ADMIN 3 TITLE: CALCULATE MAXIMUM PERMISSIBLE STAY TIME CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
K/A: 2.3.4    Importance: RO: 3.2    SRO: 3.7
 
K/A Statement: Knowledge of radiation ex posure limits under normal or emergency conditions.


JPM SRO ADMIN 3 JOB PERFORMANCE MEASURE DATA PAGE Task:    Determine maximum permissible stay time Alternate Path: N/A Facility JPM #: NEW K/A: 2.3.4              Importance:        RO: 3.2          SRO: 3.7 K/A Statement: Knowledge of radiation exposure limits under normal or emergency conditions.
Task Standard: Maximum time to perform Task #3 is calculated to be 51.4 to 51.9 minutes.
Task Standard: Maximum time to perform Task #3 is calculated to be 51.4 to 51.9 minutes.
Preferred Evaluation Location: ANY __X__  
Preferred Evaluation Location: ANY               __X__
 
Preferred Evaluation Method:         Perform     __X__   Simulate   _____
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
EI-2.1, Site Emergency Director EN-RP-201, Dosimetry Administration Validation Time: 20 minutes          Time Critical:    NO Candidate: _____________________________________________
Time Start: ________          Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______          UNSAT ______
Comments:
Examiner: _______________________________                  Date:  ______________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 7                      MAY 2009


EI-2.1, "Site Emergency Director"    EN-RP-201, "Dosimetry Administration"
JPM SRO ADMIN 3 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
EI-2.1, Site Emergency Director READ TO CANDIDATE DIRECTION TO CANDIDATE:
Validation Time: 20 minutes  Time Critical: NO
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
 
INITIAL CONDITIONS:
Candidate: _____________________________________________
The plant was at 100% power when a Steam Generator Tube Rupture occurred. A General Emergency was declared due to the plant conditions (fuel failure is also evident). Worker #1 has received 1.85 R TEDE this year prior to this event. Worker #1 has performed the following task for this event:
 
TIME            DOSE
Time Start: ________  Time Finish: ________
#       TASK REQUIRED         RATE 1       Closed A S/G ASDV air supply isolation valves         4 min           17.75 R/hr The Shift Manager then determined that the B S/G should have been isolated instead of A S/G. The following outside the Control Room tasks are now required:
 
TIME             DOSE
Performance Time:  ________ minutes
#       TASK REQUIRED         RATE 2       Open A S/G ASDV air supply isolation valves           3 min           17.75 R/hr 3       Manually open MO-0510, A S/G MSIV Bypass Valve         unknown         25.5 R/hr 4       Close B S/G ASDV air supply isolation valves           3 min           17.75 R/hr NOTE: Assume no dose is received while traveling between tasks.
 
INITIATING CUES:
Performance Rating: SAT______  UNSAT ______
Worker #1 is the only worker available to perform Tasks 2, 3 and 4. Your task is to determine the maximum time for Worker #1 to perform Task #3 without exceeding any established emergency dose limits. Report your results to the Shift Manager.
 
PALISADES NUCLEAR PLANT                     Page 3 of 7                             MAY 2009
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 7 MAY 2009 JPM SRO ADMIN 3 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
EI-2.1, "Site Emergency Director"
 
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assi gned task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
The plant was at 100% power when a Steam Generator Tube Rupture occurred. A General Emergency was declared due to the pl ant conditions (fuel failure is also evident). Worker #1 has received 1.85 R TEDE this year prior to this event. Worker #1  
 
has performed the following task for this event:  
# TASK TIME REQUIRED DOSE RATE 1 Closed 'A' S/G ASDV air supply isolation valves 4 min 17.75 R/hr The Shift Manager then determined that t he 'B' S/G should have been isolated instead of 'A' S/G. The following outside the Control Room tasks are now required:  
# TASK TIME REQUIRED DOSE RATE 2 Open 'A' S/G ASDV air supply isolation valves 3 min 17.75 R/hr 3 Manually open MO-0510, 'A' S/G MSIV Bypass Valve unknown 25.5 R/hr 4 Close 'B' S/G ASDV air supply isolation valves 3 min 17.75 R/hr NOTE: Assume no dose is received while traveling between tasks.
INITIATING CUES:
 
Worker #1 is the only worker available to perform Tasks 2, 3 and 4. Your task is to
 
determine the maximum time for Worker
#1 to perform Task #3 without exceeding any established emergency dose limits. Report your results to the Shift Manager.
PALISADES NUCLEAR PLANT Page 3 of 7 MAY 2009 JPM SRO ADMIN 3 Proc.Step TASK ELEMENT 1 STANDARD Grade--- Determine dose received while performing Task #1. Calculates dose received at 1.18 R.
S  U Comment: 
(17.75 R/hr) (1hr/60 min) (4 min) = 1.183 R CRITICAL STEP
 
Proc.Step TASK ELEMENT 2 STANDARD Grade--- Determine dose to be received while performing Task #2.
Calculates dose received at 0.878 R.
S  U Comment: 
(17.75 R/hr) (1hr/60 min) (3 min) = 0.8875 R CRITICAL STEP
 
Proc.Step TASK ELEMENT 3 STANDARD Grade--- Determine dose to be received while performing Task #4.
Calculates dose received at 0.878 R.
S  U Comment: 
(17.75 R/hr) (1hr/60 min) (3 min) = 0.8875 R CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 MAY 2009 JPM SRO ADMIN 3 PALISADES NUCLEAR PLANT Page 5 of 7 MAY 2009  Proc.Step TASK ELEMENT 4 STANDARD Grade--- Determine dose remaining from emergency dose limits.
Dose remaining determined to be 22.064 R. 
 
Candidate may use EI-2.1, "Site Emergency
 
Director" to determine 25R emergency dose
 
limit. S  U Comment: 
(25R) - (1.183R) - (2)
(0.8875R) = 22.042 R EVALUATOR: If candidate asks which emergency dose limit is being considered for Task #3, inform them that this would be "for protection of large populations."  Also if asked, inform candidate that they do not desire to volunteer dose limit above 25R.
CRITICAL STEP
 
Proc.Step TASK ELEMENT 5 STANDARD Grade--- Determine time available for Worker #1 to complete Task #3 without exceeding
 
emergency dose level.
Time available calculated to be 51.9 min.
S  U Comment:  (Available Dose)/(Dose Rate) = (22.042 R)/(25.5 R/hr) = 0.8644 hr (60 min/Hr) = 51.86 minutes (accept 51.9 to 51.4 minutes)
CRITICAL STEP
 
Proc. Step TASK ELEMENT 6 STANDARD Grade n/a Inform the Shift Manager of calculation results. Inform the Shift Manager that Worker #1 will
 
exceed 25 R emergency dose limit if Task #3
 
takes more than 51.9 minutes.
S  U Comment:
END OF TASK
 
JPM SRO ADMIN 3 SIMULATOR OPERATOR INSTRUCTIONS No Simulator setup required.
PALISADES NUCLEAR PLANT Page 6 of 7 MAY 2009 JPM SRO ADMIN 3 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
 
The plant was at 100% power when a Steam Generator Tube Rupture occurs. A General Emergency was declared due to the pl ant conditions (fuel failure is also evident). Worker #1 has received 1.85 R TEDE this year. The following task has been
 
performed by Worker #1:
# TASK TIME REQUIRED DOSE RATE 1 Closed 'A' S/G ASDV air supply isolation valves 4 min 17.75 R/hr The Shift Manager has determined that the wrong S/G has been isolated. The following outside the Control Room tasks are now required:
# TASK TIME REQUIRED DOSE RATE 2 Open 'A' S/G ASDV air supply isolation valves 3 min 17.75 R/hr 3 Manually open MO-0510, 'A' S/G MSIV Bypass Valve unknown 25.5 R/hr 4 Close 'B' S/G ASDV air supply isolation valves 3 min 17.75 R/hr NOTE: Assume no dose is received while traveling between tasks.  
 
INITIATING CUES:  
 
Worker #1 is the only worker available to perform Tasks 2, 3 and 4. Your task is to  
 
determine the maximum time for Worker  
#1 to perform Task #3 without exceeding any established emergency dose limits. Repor t your results to the Shift Manager.
PALISADES NUCLEAR PLANT Page 7 of 7 MAY 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
 
JPM:  RO ADMIN 4 TITLE: OBTAIN METEOROLOGICAL DATA FOR EMERGENCY NOTIFICATION FORM
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________


JPM RO ADMIN 4 JOB PERFORMANCE MEASURE DATA PAGE  Task: Obtain Meteorological Data for Emergency Notification Form
JPM SRO ADMIN 3 Proc.Step              TASK ELEMENT 1                                    STANDARD                    Grade Determine dose received while performing
  ---                                                  Calculates dose received at 1.18 R.            S U Task #1.
Comment:
(17.75 R/hr) (1hr/60 min) (4 min) = 1.183 R CRITICAL STEP Proc.Step              TASK ELEMENT 2                                    STANDARD                    Grade Determine dose to be received while
  ---                                                  Calculates dose received at 0.878 R.          S U performing Task #2.
Comment:
(17.75 R/hr) (1hr/60 min) (3 min) = 0.8875 R CRITICAL STEP Proc.Step              TASK ELEMENT 3                                    STANDARD                    Grade Determine dose to be received while
  ---                                                  Calculates dose received at 0.878 R.          S U performing Task #4.
Comment:
(17.75 R/hr) (1hr/60 min) (3 min) = 0.8875 R CRITICAL STEP PALISADES NUCLEAR PLANT                      Page 4 of 7                                    MAY 2009


Alternate Path: N/A
JPM SRO ADMIN 3 Proc.Step              TASK ELEMENT 4                                        STANDARD                    Grade Dose remaining determined to be 22.064 R.
Determine dose remaining from emergency          Candidate may use EI-2.1, Site Emergency
  ---                                                                                                      S U dose limits.                                    Director to determine 25R emergency dose limit.
Comment:
(25R) - (1.183R) - (2) (0.8875R) = 22.042 R EVALUATOR: If candidate asks which emergency dose limit is being considered for Task #3, inform them that this would be for protection of large populations. Also if asked, inform candidate that they do not desire to volunteer dose limit above 25R.
CRITICAL STEP Proc.Step              TASK ELEMENT 5                                        STANDARD                    Grade Determine time available for Worker #1 to
  ---    complete Task #3 without exceeding              Time available calculated to be 51.9 min.      S U emergency dose level.
Comment:
(Available Dose)/(Dose Rate) = (22.042 R)/(25.5 R/hr) = 0.8644 hr (60 min/Hr) = 51.86 minutes (accept 51.9 to 51.4 minutes)
CRITICAL STEP Proc. Step              TASK ELEMENT 6                                        STANDARD                    Grade Inform the Shift Manager that Worker #1 will Inform the Shift Manager of calculation exceed 25 R emergency dose limit if Task #3 n/a      results.                                                                                        S U takes more than 51.9 minutes.
Comment:
END OF TASK PALISADES NUCLEAR PLANT                          Page 5 of 7                                      MAY 2009


Facility JPM #: RO-A.4 2008 NRC
JPM SRO ADMIN 3 SIMULATOR OPERATOR INSTRUCTIONS
* No Simulator setup required.
PALISADES NUCLEAR PLANT            Page 6 of 7              MAY 2009


K/A: 2.4.39        Importance: RO: 3.
JPM SRO ADMIN 3 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
The plant was at 100% power when a Steam Generator Tube Rupture occurs. A General Emergency was declared due to the plant conditions (fuel failure is also evident). Worker #1 has received 1.85 R TEDE this year. The following task has been performed by Worker #1:
TIME              DOSE
#    TASK REQUIRED          RATE 1    Closed A S/G ASDV air supply isolation valves      4 min            17.75 R/hr The Shift Manager has determined that the wrong S/G has been isolated. The following outside the Control Room tasks are now required:
TIME              DOSE
#    TASK REQUIRED          RATE 2     Open A S/G ASDV air supply isolation valves        3 min            17.75 R/hr 3    Manually open MO-0510, A S/G MSIV Bypass Valve    unknown          25.5 R/hr 4     Close B S/G ASDV air supply isolation valves      3 min            17.75 R/hr NOTE: Assume no dose is received while traveling between tasks.
INITIATING CUES:
Worker #1 is the only worker available to perform Tasks 2, 3 and 4. Your task is to determine the maximum time for Worker #1 to perform Task #3 without exceeding any established emergency dose limits. Report your results to the Shift Manager.
PALISADES NUCLEAR PLANT                    Page 7 of 7                          MAY 2009


K/A Statement: Knowledge of RO responsib ilities in emergency plan implementation
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO ADMIN 4 TITLE:        OBTAIN METEOROLOGICAL DATA FOR EMERGENCY NOTIFICATION FORM CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


Task Standard: EI-6.7, Attachment 1, completed with correct data obtained  
JPM RO ADMIN 4 JOB PERFORMANCE MEASURE DATA PAGE Task:    Obtain Meteorological Data for Emergency Notification Form Alternate Path: N/A Facility JPM #: RO-A.4 2008 NRC K/A: 2.4.39      Importance:        RO: 3.9 K/A Statement: Knowledge of RO responsibilities in emergency plan implementation Task Standard: EI-6.7, Attachment 1, completed with correct data obtained Preferred Evaluation Location: Simulator         __X__   In Plant   _____
 
Preferred Evaluation Method:       Perform     __X__   Simulate   _____
Preferred Evaluation Location: Simulator __X__ In Plant _____  
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
EI-3.0, Communications and Notifications EI-6.0, Offsite Dose Calculation and Recommendations for Protective Actions EI-6.7, Plant Site Meteorological System Validation Time: 10 minutes        Time Critical:    NO Candidate: __________________________________________________
Time Start: ________          Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______          UNSAT ______
Comments:
Examiner: _______________________________                Date:    ______________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 8                        May 2009


EI-3.0, "Communications and Notifications" EI-6.0, "Offsite Dose Calculation and Recommendations for Protective
JPM RO ADMIN 4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
Actions" EI-6.7, "Plant Site Meteorological System"
 
Validation Time: 10 minutes  Time Critical: NO
 
Candidate: __________________________________________________
 
Time Start: ________  Time Finish: ________
 
Performance Time:  ________  minutes
 
Performance Rating: SAT______  UNSAT ______
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 8 May 2009 JPM RO ADMIN 4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
EI-6.7, Attachment 1 Also see Simulator Operator Instructions (last page of this document).
EI-6.7, Attachment 1 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
DIRECTION TO CANDIDATE:  
INITIAL CONDITIONS:
 
The Shift Manager, acting as the Site Emergency Director, has declared an Alert condition. A thunderstorm is in progress.
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
INITIATING CUES:
 
The Shift Manager has directed you to obtain Meteorological Data by completing of EI-6.7, utilizing the Meteorological Data display in the Control Room.
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assi gned task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
PALISADES NUCLEAR PLANT                      Page 3 of 8                              May 2009
 
INITIAL CONDITIONS:  
 
The Shift Manager, acting as the Site Emergency Director, has declared an Alert  
 
condition. A thunderstorm is in progress.  
 
INITIATING CUES:  
 
The Shift Manager has directed you to obtain Meteorological Data by completing of EI-6.7, utilizing the Meteor ological Data display in the Control Room.  


PALISADES NUCLEAR PLANT Page 3 of 8 May 2009 JPM RO ADMIN 4 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Correct Procedure located EI-6.7, Attachment 1 located S U Comment:
JPM RO ADMIN 4 Proc. Step           TASK ELEMENT 1                                       STANDARD                     Grade n/a     Correct Procedure located                     EI-6.7, Attachment 1 located                     S U Comment:
Evaluator: Provide candidate with a Working Copy.
Evaluator: Provide candidate with a Working Copy.
EVALUATOR NOTE: EI-6.7 Attachment 1 is completed by referencing steps 5.1.3 and 5.1.4. Due to wind speed and wind direction at 10 meters unavailable, 60 meter data is used.
EVALUATOR NOTE: EI-6.7 Attachment 1 is completed by referencing steps 5.1.3 and 5.1.4. Due to wind speed and wind direction at 10 meters unavailable, 60 meter data is used.
Proc. Step TASK ELEMENT 2 STANDARD Grade 5.1.3 Obtain meteorological data from the PPC, page 351 WS, Wind Speed (WS60)
Proc. Step           TASK ELEMENT 2                                       STANDARD                     Grade On EI-6.7 Att. 1 data recorded as follows:
_9_MPH  On EI-6.7 Att. 1 data recorded as follows:
Obtain meteorological data from the PPC, page 351                                      WS, Wind Speed = 6.93 mph 5.1.3                                                                                                    S U WS, Wind Speed (WS60) _9_MPH                  9 mph X .77 = 6.93 MPH
WS, Wind Speed =
( X ) 60 meters, *corrected Comment:
6.93 mph 9 mph X .77 = 6.93 MPH  
NOTE: WS60 must be used. WS60 multiplied by 0.77 to obtain corrected wind speed.
( X ) 60 meters, *corrected S  U Comment:
CRITICAL STEP Proc. Step           TASK ELEMENT 3                                       STANDARD                     Grade Obtain meteorological data from the PPC,     On EI-6.7 Att. 1 data recorded as follows:
NOTE: WS60 must be used. WS60 multiplied by 0.77 to obtain corrected wind speed.
page 351 5.1.3                                                  WD, Wind Direction = 73&deg; from                     S U WD, Wind Direction (WD60) ____&deg;
CRITICAL STEP
( X ) 60 meters Comment:
 
NOTE: WD60 must be used.
Proc. Step TASK ELEMENT 3 STANDARD Grade 5.1.3 Obtain meteorological data from the PPC, page 351 WD, Wind Direction (WD60)
CRITICAL STEP PALISADES NUCLEAR PLANT                       Page 4 of 8                                       May 2009
____&deg;  On EI-6.7 Att. 1 data recorded as follows:
WD, Wind Direction =
73&deg;   from ( X ) 60 meters S  U Comment:
NOTE: WD60 must be used.
CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 8 May 2009 JPM RO ADMIN 4 PALISADES NUCLEAR PLANT Page 5 of 8 May 2009 Proc. Step TASK ELEMENT 4 STANDARD Grade 5.1.4 Obtain meteorological data from the PPC, page 351 Stability Class (STAB)
____  On EI-6.7 Att. 1 data recorded as follows: Stability Class =
C    S  U Comment:
CRITICAL STEP


Proc. Step TASK ELEMENT 5 STANDARD Grade n/a EI-6.7, Attachment 1 completed: Date:,  Time:,  Completed By:
JPM RO ADMIN 4 Proc. Step             TASK ELEMENT 4                                    STANDARD                       Grade Obtain meteorological data from the PPC, page 351                                      On EI-6.7 Att. 1 data recorded as follows:
On EI-6.7 Att. 1 data recorded as follows:  
5.1.4    Stability Class (STAB) ____                                                                    S U Stability Class = C Comment:
 
CRITICAL STEP Proc. Step              TASK ELEMENT 5                                    STANDARD                      Grade On EI-6.7 Att. 1 data recorded as follows:
Date: Today's date Time: Current time Completed By:
EI-6.7, Attachment 1 completed:              Date: Todays date n/a                                                                                                    S U Date:, Time:, Completed By:                  Time: Current time Completed By: Operators name Comment:
Operator's name S  U Comment:
Proc. Step             TASK ELEMENT 6                                     STANDARD                       Grade Notify the CRS that EI-6.7 Attachment 1       Operator notifies CRS of completion of EI-6.7, n/a    completed.                                    Attachment 1.                                     S U Comment:
 
END OF TASK PALISADES NUCLEAR PLANT                        Page 5 of 8                                      May 2009
Proc. Step TASK ELEMENT 6 STANDARD Grade n/a Notify the CRS that EI-6.7 Attachment 1 completed.
Operator notifies CRS of completion of EI-6.7, Attachment 1.
S U Comment:
 
END OF TASK  


JPM RO ADMIN 4 SIMULATOR OPERATOR INSTRUCTIONS
JPM RO ADMIN 4 SIMULATOR OPERATOR INSTRUCTIONS
: 1. Reset to IC 17  
: 1. Reset to IC 17
: 2. Remove the following two PPC points from service by using MFs PC20 and PC 21 on PID PC02. These MFs will cause a "V" or invalid display from the Met Tower  
: 2. Remove the following two PPC points from service by using MFs PC20 and PC 21 on PID PC02. These MFs will cause a V or invalid display from the Met Tower 10 meter height. Candidate will have to use the 60 meter readings and use a conversion factor of 0.77 to obtain appropriate data. (ENSURE these MFs are changed back after JPM is completed)
 
* MWD10
10 meter height. Candidate will have to use the 60 meter readings and use a conversion factor of 0.77 to obtain appropriate data. (ENSURE these MFs are changed back after JPM is completed)
* MWS10
MWD10 MWS10  
: 3. Provide a Working Copy of EI-6.7, Att. 1 to evaluator.
: 3. Provide a Working Copy of EI-6.7, Att. 1 to evaluator.  
: 4. Use Remote Functions (RF) on PID PC02 to modify the following (after all RFs are changed, then use UPDATE NOW and respond YES):
: 4. Use Remote Functions (RF) on PID PC02 to modify the following (after all RFs are changed, then use UPDATE NOW and respond 'YES"): WS60 = 9 (change RF to this value) WD60 = 73 degrees FROM (change RF to this value)
* WS60 = 9 (change RF to this value)
Stability = C (no change needed since RF should already say "3")  
* WD60 = 73 degrees FROM (change RF to this value)
: 5. Candidate may use PPC monitor in Simula tor Computer Room for this JPM: ensure it is up and running.  
* Stability = C (no change needed since RF should already say 3)
 
: 5. Candidate may use PPC monitor in Simulator Computer Room for this JPM: ensure it is up and running.
PALISADES NUCLEAR PLANT Page 6 of 8 May 2009 Proc No EI-6.7 Attachment 1 Revision 7 Page 1 of 1 PLANT SITE METEOROLOGICAL SYSTEM WORKSHEET ANSWER KEY        ANSWER KEY        ANSWER KEY      ANSWER KEY      ANSWER KEY
PALISADES NUCLEAR PLANT                 Page 6 of 8                         May 2009
: 1. WS, Wind Speed =
6.93 mph (  ) 10 meters    (X) 60 meters, *corrected    (See Step 5.1.3 or 5.2.6)  *Multiply by 0.77        ( 9 MPH X 0.77 = 6.93 MPH)
: 2. WD, Wind Direction =
73 &deg; from (  ) 10 meters    (X) 60 meters (See Step 5.1.3 or 5.2.6)
    (see Step 5.1.4 or 5.2.7)
: 3. Stability Class
= C     
 
Date: __TODAY_____  Time: __
NOW___  Completed By:  __
JOE OPERATOR
_______ 
 
ANSWER KEY        ANSWER KEY        ANSWER KEY      ANSWER KEY      ANSWER KEY PALISADES NUCLEAR PLANT Page 7 of 8 May 2009 JPM RO ADMIN 4 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
 
The Shift Manager, acting as the Site Emergency Director, has declared an Alert condition. A thunderstorm is in progress.
 
INITIATING CUES:
 
The Shift Manager has directed you to obtain Met eorological Data by completing Attachment 1 of EI-6.7, utilizing Meteorological Da ta display in the Control Room.
PALISADES NUCLEAR PLANT Page 8 of 8 May 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
 
JPM:  SRO ADMIN 4 TITLE: CLASSIFY EVENT AND DETERMINE PAR
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM SRO ADMIN 4 JOB PERFORMANCE MEASURE DATA PAGE  Task: Classify an Event and Determine PARs - Protective Action Recommendations


Alternate Path: N/A
Proc No EI-6.7 Attachment 1 Revision 7 Page 1 of 1 PLANT SITE METEOROLOGICAL SYSTEM WORKSHEET ANSWER KEY            ANSWER KEY        ANSWER KEY          ANSWER KEY          ANSWER KEY
: 1. WS, Wind Speed = 6.93 mph                      ( ) 10 meters (X) 60 meters, *corrected (See Step 5.1.3 or 5.2.6)
        *Multiply by 0.77  ( 9 MPH X 0.77 = 6.93 MPH)
: 2. WD, Wind Direction = 73 &deg; from                ( ) 10 meters (X) 60 meters (See Step 5.1.3 or 5.2.6)
(see Step 5.1.4 or 5.2.7)
: 3. Stability Class = C Date: __TODAY_____ Time: __NOW___ Completed By: __JOE OPERATOR_______
ANSWER KEY            ANSWER KEY        ANSWER KEY          ANSWER KEY          ANSWER KEY PALISADES NUCLEAR PLANT                Page 7 of 8                                May 2009


Facility JPM #: SRO-A.4 2003 NRC
JPM RO ADMIN 4 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
The Shift Manager, acting as the Site Emergency Director, has declared an Alert condition. A thunderstorm is in progress.
INITIATING CUES:
The Shift Manager has directed you to obtain Meteorological Data by completing Attachment 1 of EI-6.7, utilizing Meteorological Data display in the Control Room.
PALISADES NUCLEAR PLANT                  Page 8 of 8                        May 2009


K/A: 2.4.41, 2.4.44  Importance: RO: 4.1, 4.0  SRO: 4.1, 4.4  
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: SRO ADMIN 4 TITLE:       CLASSIFY EVENT AND DETERMINE PAR CANDIDATE: _____________________________________________
EXAMINER_____________________________________________


K/A Statement: (2.4.41) Knowledge of t he emergency action level threshholds and classifications.     (2.4.44) Knowledge of emergency plan protective action recommendations.  
JPM SRO ADMIN 4 JOB PERFORMANCE MEASURE DATA PAGE Task:    Classify an Event and Determine PARs - Protective Action Recommendations Alternate Path:      N/A Facility JPM #:      SRO-A.4 2003 NRC K/A:    2.4.41, 2.4.44        Importance:      RO:4.1, 4.0    SRO:    4.1, 4.4 K/A Statement: (2.4.41) Knowledge of the emergency action level threshholds and classifications.
 
(2.4.44) Knowledge of emergency plan protective action recommendations.
Task Standard: Event classified as a Gener al Emergency and PAR is evacuation of 2 mile radius and 5 miles in Areas 1 and 2, within 30 minutes.  
Task Standard: Event classified as a General Emergency and PAR is evacuation of 2 mile radius and 5 miles in Areas 1 and 2, within 30 minutes.
 
Preferred Evaluation Location: Simulator       __X__       In Plant     ______
Preferred Evaluation Location: Simulator __X__ In Plant ______  
Preferred Evaluation Method:       Perform     __X__       Simulate     ______
 
Preferred Evaluation Method: Perform __X__ Simulate ______  


==References:==
==References:==
EI-1, Emergency Classifications and Actions EI-3, Communications and Notifications EI-6.13, Protective Action Recommendations for Offsite Populations Validation Time: __30__ minutes            Time Critical:  YES Candidate: __________________________________________________
Time Start: ________          Time Finish:    ________
Performance Time:        ________ minutes Performance Rating:      SAT______        UNSAT ______
Comments:
Examiner: _______________________________                  Date:    ______________
Signature PALISADES NUCLEAR PLANT                  Page 2 of 9                            May 2009


EI-1, Emergency Classifications and Actions    EI-3, Communications and Notifications EI-6.13, Protective Action Recommendations for Offsite Populations
JPM SRO ADMIN 4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
Validation Time: __30__  minutes  Time Critical: YES
 
Candidate: __________________________________________________
 
Time Start: ________  Time Finish: ________
 
Performance Time:  ________  minutes
 
Performance Rating: SAT______  UNSAT ______
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 9 May 2009 JPM SRO ADMIN 4 PALISADES NUCLEAR PLANT Page 3 of 9 May 2009 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
EI-1 Attachment 1 EI-3 EI-6.13 Attachment 1 READ TO CANDIDATE DIRECTION TO CANDIDATE:
EI-1 Attachment 1 EI-3 EI-6.13 Attachment 1 READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
 
INITIAL CONDITIONS:
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have  
: 1. The Reactor has tripped.
 
: 2. A LOCA is in progress.
completed your assigned task return the handout sheet I provided you.
: 3. Pressurizer level is offscale LOW.
INITIAL CONDITIONS:  
: 4. PCS pressure is 100 psia.
: 1. The Reactor has tripped.  
: 5. CETs indicate 600&#xba;F.
: 2. A LOCA is in progress.  
: 6. Total LPSI/HPSI flow is NOT adequate per EOP Supplement 4.
: 3. Pressurizer level is offscale LOW.  
: 7. SIRW tank level is 38% and lowering slowly.
: 4. PCS pressure is 100 psia.  
: 8. Containment isolation has occurred as designed and EOP Supplement 6 for Containment Isolation is in progress.
: 5. CETs indicate 600&#xba;F.  
: 9. A release is NOT occurring through the plant stack or steam dumps.
: 6. Total LPSI/HPSI flow is NOT adequate per EOP Supplement 4. 7. SIRW tank level is 38% and lowering slowly.  
: 10. Containment Gamma Monitors (RIA-2321 and 2322) are indicating 5E4R/hr.
: 8. Containment isolation has occurr ed as designed and EOP Supplement 6 for Containment Isolation is in progress. 9. A release is NOT occurring through the plant stack or steam dumps. 10. Containment Gamma Monitors (RIA
: 11. Reactor Vessel Level Monitoring System (RVLMS) indicates ALL red lights
-2321 and 2322) are indicating 5E4R/hr. 11. Reactor Vessel Level Monitoring Syst em (RVLMS) indicates ALL red lights 12. Failed fuel analysis is in progress with no results to report yet.  
: 12. Failed fuel analysis is in progress with no results to report yet.
: 13. Obtained Meteorological Data is as follows:  
: 13. Obtained Meteorological Data is as follows:
 
QN = 0.0 QI = 0.0 Wind Speed = 1.1 Stability Class = G Wind Direction = 235 (from)
QN = 0.0 QI = 0.0 Wind Speed = 1.1 Stability Class = G Wind Direction = 235 (from)
Weather is clear with no precipitation  
Weather is clear with no precipitation INITIATING CUES:
 
During activation of the Site Emergency Plan, you are the Shift Manager (acting as the Site Emergency Director). You are to classify the event given the above information and determine any required Protective Action Recommendations, and complete an Event Notification Form. No previous event declaration has been made.
INITIATING CUES:  
 
During activation of the Site Emergency Plan, you are the Shift Manager (acting as the Site Emergency Director). You are to classify the event given the above information  
 
and determine any required Protective Action Recommendations, and complete an  
 
Event Notification Form. No previous event declaration has been made.
This JPM is Time Critical.
This JPM is Time Critical.
PALISADES NUCLEAR PLANT                      Page 3 of 9                              May 2009


JPM SRO ADMIN 4 Proc.Step TASK ELEMENT 1 STANDARD Grade EI-1 Locates procedure to determine Emergency Classification.
JPM SRO ADMIN 4 Proc.Step               TASK ELEMENT 1                                       STANDARD                     Grade Locates procedure to determine Emergency         Locates EI-1 and refers to Attachment 1, Hot EI-1                                                                                                      S U Classification.                                  Conditions (PCS > 200 degrees F).
Locates EI-1 and refers to Attachment 1, "Hot  
Comment:
 
EVALUATOR: Candidate may use placard of site emergency plan classifications or use paper copy from EI-1, attachment 1.
Conditions (PCS > 200 degrees F)".
Proc.Step             TASK ELEMENT 2                                       STANDARD                       Grade EI-1                                                   Refers to lower right-hand corner of EI-1, Refers to "Fission Product Barriers" section Attachment 1, Hot Conditions                    S U Att 1  (lower right-hand corner)
S  U Comment: EVALUATOR: Candidate may use placard of site emergency plan classifications or use paper copy from EI-1, attachment 1.
(PCS > 200 degrees F).
 
Comment:
Proc.Step TASK ELEMENT 2 STANDARD Grade EI-1 Att 1 Refers to "Fission Product Barriers" section (lower right-hand corner)
Proc.Step             TASK ELEMENT 3                                       STANDARD                     Grade
Refers to lower right-hand corner of EI-1,  , "Hot Conditions (PCS > 200 degrees F)".
___ Refers to Table F1
S  U Comment:
___ Determines a LOSS of Fuel Cladding (based on Containment Gamma monitors readings (item 5)
 
___ Determines a LOSS of PCS Barrier (based EI-1    Determines status of fission product                on leak rate and PCS subcooling)(item 2)     S U Att 1  barriers.                                            OR based on Containment Gamma Monitor readings.
Proc.Step TASK ELEMENT 3 STANDARD Grade EI-1 Att 1 Determines status of fission product barriers.
___ Determines a POTENTIAL LOSS of Containment Barrier (based on Containment Gamma monitors readings).(item 6)
___ Refers to Table F1 ___ Determines a LOSS of Fuel Cladding (based on Containment Gamma monitors  
Comment:
 
EVALUATOR: If candidate refers to EI-11, inform them "That procedure will be performed by the TSC."
readings (item 5) ___ Determines a LOSS of PCS Barrier (based on leak rate and PCS subcooling)(item 2)  
Proc.Step             TASK ELEMENT 4                                       STANDARD                     Grade PALISADES NUCLEAR PLANT                         Page 4 of 9                                       May 2009
 
OR based on Containment Gamma  
 
Monitor readings. ___ Determines a POTENTIAL LOSS of Containment Barrier (based on  
 
Containment Gamma monitors  
 
readings).(item 6)
S  U Comment: EVALUATOR: If candidate refers to EI-11, inform them "That procedure will be performed by the TSC."  
 
Proc.Step TASK ELEMENT 4 STANDARD GradePALISADES NUCLEAR PLANT Page 4 of 9 May 2009 JPM SRO ADMIN 4 EI-1 Att 1 Declares Emergency Classification.
Declares a GENERAL EMERGENCY per FG1 based on status of fission product barriers (loss
 
of TWO and potential loss of THIRD).
S  U Comment:
CRITICAL STEP
 
Proc.Step TASK ELEMENT 5 STANDARD Grade EI-1 Att 2 Prepares Emergency Actions/Notifications form. Obtains EI-1, Attachment 2 and fills out per
 
attached KEY.
S  U Comment:  NOTE:  This Task Element may be performed at any time during the JPM. Filling out this form is NOT required for this JPM; however a key is attached in case candidate fills out the form.
NOTE:  It is NOT the intent of this JPM to have candidate actually make the notifications.
 
Proc.Step TASK ELEMENT 6 STANDARD Grade EI-3 Att 1 Prepares Event Notification Form.
Obtains EI-3, Attachment 1 and fills out per attached KEY.
S  U Comment:
NOTE:  KEY is attached to this JPM. NOTE:  EI-3, Attachment 2, "Palisades Event Technical Data Sheet" is NOT required during this JPM. NOTE:  Candidate may use computer on Cont rol Room island area to prepare this form.
 
PALISADES NUCLEAR PLANT Page 5 of 9 May 2009 JPM SRO ADMIN 4 PALISADES NUCLEAR PLANT Page 6 of 9 May 2009 Proc.Step TASK ELEMENT 7 STANDARD Grade EI-6.13 Att 1 Determines Protective Action Recommendations (PARs).
Obtains EI-6.13 and corresponding Attachment
 
1 and determines: ___ Evacuate 5 mile in Areas 1 and 2 (minimum GE recommendation on bottom of Pg 1 of Attachment 1)
S  U Comment:
CRITICAL STEP
 
Proc.Step TASK ELEMENT 8 STANDARD Grade EI-3 Att 1 Completes filling out Palisades Event Notification Form.
Palisades Event Notification Form completely
 
filled per attached KEY AND form is approved (Candidate initials, date, and time entered  at
 
bottom of form)
S  U Comment:  NOTE:  Candidate may use computer on back-bar of Control Room island area to complete and print this form.
CRITICAL STEP END OF TASK


JPM SRO ADMIN 4 ANSWER KEY PALISADES NUCLEAR PLANT Page 7 of 9 May 2009 JPM SRO ADMIN 4 PALISADES NUCLEAR PLANT Page 8 of 9 May 2009 SIMULATOR OPERATOR INSTRUCTIONS No Simulator setup required.
JPM SRO ADMIN 4 EI-1                                                  Declares a GENERAL EMERGENCY per FG1 Declares Emergency Classification.            based on status of fission product barriers (loss  S U Att 1                                                of TWO and potential loss of THIRD).
Comment:
CRITICAL STEP Proc.Step            TASK ELEMENT 5                                      STANDARD                        Grade EI-1    Prepares Emergency Actions/Notifications      Obtains EI-1, Attachment 2 and fills out per S U Att 2  form.                                        attached KEY.
Comment:
NOTE: This Task Element may be performed at any time during the JPM. Filling out this form is NOT required for this JPM; however a key is attached in case candidate fills out the form.
NOTE: It is NOT the intent of this JPM to have candidate actually make the notifications.
Proc.Step            TASK ELEMENT 6                                      STANDARD                        Grade EI-3                                                  Obtains EI-3, Attachment 1 and fills out per Prepares Event Notification Form.                                                                S U Att 1                                                attached KEY.
Comment:
NOTE: KEY is attached to this JPM.
NOTE: EI-3, Attachment 2, "Palisades Event Technical Data Sheet" is NOT required during this JPM.
NOTE: Candidate may use computer on Control Room island area to prepare this form.
PALISADES NUCLEAR PLANT                     Page 5 of 9                                       May 2009


It is preferred that this JPM be done separat ely from the simulator. If, by chance, candidate IS in the simulator while doing th is JPM, THEN ensure the IC does NOT have a release in progress.
JPM SRO ADMIN 4 Proc.Step              TASK ELEMENT 7                                        STANDARD                    Grade Obtains EI-6.13 and corresponding Attachment 1 and determines:
ENSURE ALL DATA IS CLEARED FROM EP NOTIFICATION COMPUTER ON BACK-BAR OF CRS ISLAND PRIOR TO NEXT USE OF THIS JPM.
EI-6.13  Determines Protective Action
___ Evacuate 5 mile in Areas 1 and 2              S U Att 1  Recommendations (PARs).
(minimum GE recommendation on bottom of Pg 1 of Attachment 1)
Comment:
CRITICAL STEP Proc.Step              TASK ELEMENT 8                                        STANDARD                    Grade Palisades Event Notification Form completely EI-3    Completes filling out Palisades Event          filled per attached KEY AND form is approved S U Att 1  Notification Form.                              (Candidate initials, date, and time entered at bottom of form)
Comment:
NOTE: Candidate may use computer on back-bar of Control Room island area to complete and print this form.
CRITICAL STEP END OF TASK PALISADES NUCLEAR PLANT                        Page 6 of 9                                        May 2009


JPM SRO ADMIN 4 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
JPM SRO ADMIN 4 ANSWER KEY PALISADES NUCLEAR PLANT  Page 7 of 9          May 2009


INITIAL CONDITIONS:
JPM SRO ADMIN 4 SIMULATOR OPERATOR INSTRUCTIONS No Simulator setup required.
: 1. The Reactor has tripped.  
It is preferred that this JPM be done separately from the simulator. If, by chance, candidate IS in the simulator while doing this JPM, THEN ensure the IC does NOT have a release in progress.
: 2. A LOCA is in progress.
ENSURE ALL DATA IS CLEARED FROM EP NOTIFICATION COMPUTER ON BACK-BAR OF CRS ISLAND PRIOR TO NEXT USE OF THIS JPM.
: 3. Pressurizer level is offscale LOW.
PALISADES NUCLEAR PLANT                  Page 8 of 9                              May 2009
: 4. PCS pressure is 100 psia.
: 5. CETs indicate 600&#xba;F.
: 6. Total LPSI/HPSI flow is NOT adequate per EOP Supplement 4. 7. SIRW tank level is 38% and lowering slowly.
: 8. Containment isolation has occurr ed as designed and EOP Supplement 6 for Containment Isolation is in progress. 9. A release is NOT occurring through the plant stack or steam dumps. 10. Containment Gamma Monitors (RIA
-2321 and 2322) are indicating 5E4R/hr. 11. Reactor Vessel Level Monitoring Syst em (RVLMS) indicates ALL red lights. 12. Failed fuel analysis is in progress with no results to report yet.  
: 13. Obtained Meteorological Data is as follows:


JPM SRO ADMIN 4 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
: 1. The Reactor has tripped.
: 2. A LOCA is in progress.
: 3. Pressurizer level is offscale LOW.
: 4. PCS pressure is 100 psia.
: 5. CETs indicate 600&#xba;F.
: 6. Total LPSI/HPSI flow is NOT adequate per EOP Supplement 4.
: 7. SIRW tank level is 38% and lowering slowly.
: 8. Containment isolation has occurred as designed and EOP Supplement 6 for Containment Isolation is in progress.
: 9. A release is NOT occurring through the plant stack or steam dumps.
: 10. Containment Gamma Monitors (RIA-2321 and 2322) are indicating 5E4R/hr.
: 11. Reactor Vessel Level Monitoring System (RVLMS) indicates ALL red lights.
: 12. Failed fuel analysis is in progress with no results to report yet.
: 13. Obtained Meteorological Data is as follows:
QN = 0.0 QI = 0.0 Wind Speed = 1.1 Stability Class = G Wind Direction = 235 (from)
QN = 0.0 QI = 0.0 Wind Speed = 1.1 Stability Class = G Wind Direction = 235 (from)
Weather is clear with no precipitation  
Weather is clear with no precipitation INITIATING CUES:
 
During activation of the Site Emergency Plan, you are the Shift Manager (acting as the Site Emergency Director). You are to classify the event given the above information and determine any required Protective Action Recommendations, and complete an Event Notification Form. No previous event declaration has been made.
INITIATING CUES:  
 
During activation of the Site Emergency Plan, you are the Shift Manager (acting as the Site Emergency Director). You are to classify the event given the above information  
 
and determine any required Protective Action Recommendations, and complete an  
 
Event Notification Form. No previous event declaration has been made.
This JPM is Time Critical.
This JPM is Time Critical.
PALISADES NUCLEAR PLANT Page 9 of 9 May 2009}}
PALISADES NUCLEAR PLANT                 Page 9 of 9                           May 2009}}

Latest revision as of 22:02, 13 November 2019

2009 Palisades Proposed Admin JPMs
ML100690431
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/25/2009
From: Valos N
NRC/RGN-III/DRS/OLB
To:
Entergy Nuclear Operations
References
Download: ML100690431 (66)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO ADMIN 1a TITLE: DETERMINE FEEDWATER RESERVE INVENTORY CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM RO/SRO ADMIN 1a JOB PERFORMANCE MEASURE DATA PAGE Task: Determine Feedwater Reserve Inventory Alternate Path: N/A Facility JPM #: Modified RO-A.1a 2008 AUDIT K/A: 2.1.25 Importance: RO: 3.9 SRO: 4.2 K/A Statement: Ability to interpret reference materials such as graphs, curves, tables, etc.

Task Standard: Feedwater reserve inventory calculated to last 3.9 to 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

Preferred Evaluation Location: ANY __X__

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

EOP Supplement 2, PCS Cooldown Strategy Validation Time: 10 minutes Time Critical: NO Candidate: ___________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 9 MAY 2009

JPM RO/SRO ADMIN 1a EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EOP Supplement 2, PCS Cooldown Strategy Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

With the plant at 100% power, a loss of offsite power occurs. The reactor was manually tripped and the operators transitioned to EOP-8.0. The following plant conditions exist:

  • Offsite power is not expected to be restored for at least 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
  • Bus 13 is out of service and not expected to be restored for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />
  • It is 30 minutes after shutdown
  • T-81 gravity feed to T-2 is not aligned
  • T-2 is at 86%, T-81 is at 85%, and T-939 is at 58%
  • Cold leg temperatures are stable at 535°F INITIATING CUES:

The CRS has directed you to complete EOP Supplement 2, PCS Cooldown Strategy.

Calculation of minimum cooldown rate (section 5.0 step 6) is NOT required at this time.

PALISADES NUCLEAR PLANT Page 3 of 9 MAY 2009

JPM RO/SRO ADMIN 1a Proc. Step TASK ELEMENT 1 STANDARD Grade Locate EOP Supplement 2, PCS n/a EOP Supplement 2 LOCATED S U Cooldown Strategy Comment:

Evaluator: Provides a working copy of EOP Supplement 2.

Proc. Step TASK ELEMENT 2 STANDARD Grade CONDENSATE STORAGE TANK T-2 T-2 inventory = 94,000 gallons RECORDED 1.1 DETERMINE AND RECORD Condensate S U Storage Tank T-2 level using the T-2 (93,000 to 95,000 allowed) inventory curve Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade DEMINERALIZED WATER TANK T-939 IF any of the following conditions exist:

2.1 DETERMINES T-939 water is NOT available S U THEN Demineralized Water Tank T-939 is available Comment:

NOTE: Loss of Bus 13 combined with loss of Bus 1E (due to loss of offsite power) results in inability to power P-936 to transfer T-936 water to T-2.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 9 MAY 2009

JPM RO/SRO ADMIN 1a Proc. Step TASK ELEMENT 4 STANDARD Grade If any of the following conditions Determines T-81 is NOT available 3.1 exist..THEN Primary System Makeup S U Tank T-81 is available.

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade ADD the available tank inventories:

Total Inventory = 94,000 gallons RECORDED 4.1 (Step 1.1 T-2) + (Step 2.2 T-939) = (Total S U (93,000 to 95,000 allowed) inventory)

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade DETERMINE AND RECORD present TC Initial = 535 °F RECORDED (given in initial 5.1 S U highest PCS Loop TC (TC Initial) conditions)

Comment:

Proc. Step TASK ELEMENT 7 STANDARD Grade DETERMINE AND RECORD inventory Required Sensible Heat Removal Inventory =

required to remove sensible heat using TC 42,000 gallons RECORDED 5.2 S U Initial temperature and the Sensible Heat Removal curve. (41,000 to 43,000 allowed)

Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 9 MAY 2009

JPM RO/SRO ADMIN 1a Proc. Step TASK ELEMENT 8 STANDARD Grade SUBTRACT Step 5.2 results from Step 4.1 Inventory Available to remove decay heat =

results: 52,000 gallons RECORDED 5.3 S U (Step 4.1 Total FW) - (Step 5.2 Sensible (94,000 - 42,000 = 52,000)

Heat) = (Inventory for decay heat removal) (50,000 to 54,000 allowed)

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 9 STANDARD Grade DETERMINE AND RECORD the time interval available for heat removal using the following:

Applicable Decay Heat Removal curve Time interval available for heat removal for the number of PCPs operating = 4.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> RECORDED 5.4 S U Graph line for elapsed time after (Interpolation may be used) shutdown (3.7 to 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> allowed)

Amount of inventory available to remove decay heat (graph)

Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 6 of 9 MAY 2009

JPM RO/SRO ADMIN 1a Proc. Step TASK ELEMENT 10 STANDARD Grade If the time interval available for heat removal is less than eight hours, THEN PERFORM the following: Shift Manager Informed that time interval 5.5.a a. Inform the Shift Manager of the available for heat removal = 4.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> S U available interval and that additional (3.7 to 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> allowed) inventory sources are required.

Comment:

EVALUATOR: Notify candidate that the Shift Manager will have someone else identify potential inventory sources that can be made available in the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per step 5.b of section 5.0.

Proc. Step TASK ELEMENT 11 STANDARD Grade Notify the CRS EOP Supplement 2 is complete [reported time interval available CRS NOTIFIED that EOP Supplement 2 task is n/a for heat removal and available inventory complete S U sources]

Comment:

Evaluator: If notified as CRS, Acknowledge.

END OF TASK PALISADES NUCLEAR PLANT Page 7 of 9 MAY 2009

JPM RO/SRO ADMIN 1a SIMULATOR OPERATOR INSTRUCTIONS NONE PALISADES NUCLEAR PLANT Page 8 of 9 MAY 2009

JPM RO/SRO ADMIN 1a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

With the plant at 100% power, a loss of offsite power occurs. The reactor was manually tripped and the operators transitioned to EOP-8.0. The following plant conditions exist:

  • Offsite power is not expected to be restored for at least 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
  • Bus 13 is out of service and not expected to be restored for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />
  • It is 30 minutes after shutdown
  • T-81 gravity feed to T-2 is not aligned
  • T-2 is at 86%, T-81 is at 85%, and T-939 is at 58%
  • Cold leg temperatures are stable at 535°F INITIATING CUES:

The CRS has directed you to complete EOP Supplement 2, PCS Cooldown Strategy.

Calculation of minimum cooldown rate (section 5.0 step 6) is NOT required at this time.

PALISADES NUCLEAR PLANT Page 9 of 9 MAY 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO ADMIN 1b TITLE: PERFORM A PCS HEATUP DETERMINATION CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM RO ADMIN 1b JOB PERFORMANCE MEASURE DATA PAGE Task: Perform PCS Heatup Determination Alternate Path: N/A Facility JPM #: RO-A.1b 2008AUDIT K/A: 2.1.25 Importance: RO: 3.9 SRO: 4.2 K/A Statement: Ability to interpret reference materials such as graphs, curves, tables etc.

Task Standard: Allowable Shutdown Cooling outage time calculated to be 28 minutes (27 minutes to 29 minutes).

Preferred Evaluation Location: ANY __X__

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SOP-3, Safety Injection and Shutdown Cooling System ONP-17, Loss of Shutdown Cooling Validation Time: 15 minutes Time Critical: NO Candidate: ________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 8 May 2009

JPM RO ADMIN 1b EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-3, Safety Injection and Shutdown Cooling System ONP-17, Loss of Shutdown Cooling Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Ten days after a plant shutdown, PCS temperature is 114ºF
  • The Reactor cavity is flooded to a level of 629'
  • The Pressurizer manway is removed
  • Shutdown Cooling is in operation, but must be shutdown for the maximum time allowable INITIATING CUES:

The CRS directs you to determine how long (in minutes) Shutdown Cooling may be secured in accordance with SOP-3, Section 7.3.7.

PALISADES NUCLEAR PLANT Page 3 of 8 May 2009

JPM RO ADMIN 1b Proc. Step TASK ELEMENT 1 STANDARD Grade Locates SOP-3, Safety Injection And n/a Shutdown Cooling System, Section 7.3.7, Section 7.3.7 of SOP-3 LOCATED S U PCS Heatup Rate Determination Comment:

Evaluator: Provides a working copy of SOP-3, section 7.3.7.

Proc. Step TASK ELEMENT 2 STANDARD Grade DETERMINE Approximate Time to 200°F time from appropriate curve in ONP-17, Attachment 1, Approximate Time to 200°F 7.3.7a Loss of Shutdown Cooling, for S U Curves, of ONP-17 LOCATED existing/anticipated PCS conditions and convert to hours.

Comment:

Evaluator: Provide a working copy of ONP-17, Attachment 1.

Proc. Step TASK ELEMENT 3 STANDARD Grade (ONP-DETERMINE PCS level using all available 17, PCS level 629 feet (given in initial conditions) S U indications.

Att.1) 1.

Comment:

Proc. Step TASK ELEMENT 4 STANDARD Grade (ONP-DETERMINE PCS temperature using any PCS temperature 114°F (given in initial 17, S U of the following: conditions)

Att.1) 2.

Comment:

PALISADES NUCLEAR PLANT Page 4 of 8 May 2009

JPM RO ADMIN 1b Proc. Step TASK ELEMENT 5 STANDARD Grade Page #8 of Attachment 1 REFERED TO:

Uses Refueling Cavity Flooded to 629' to determine time to 200ºF (ONP17, REFER TO appropriate page in this USES "10 Days" (time after reactor shutdown) S U Att.1) 5. attachment for PCS conditions and 114ºF point (initial PCS temperature) and DETERMINES time to 200ºF is ~2 hours Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade DETERMINE PCS heatup rate as follows:

7.3.7b (200°F - TINITIAL)_______________ Heatup rate CALCULATED to be ~43ºF / hour S U Approximate Time to 200°F (Hours)

Comment:

NOTE: Heatup rate is calculated by dividing 86ºF (200ºF - 114ºF) by 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

CRITICAL STEP Proc. Step TASK ELEMENT 7 STANDARD Grade DETERMINE the allowable Shutdown CALCULATES allowable Shutdown Cooling 7.3.7c. Cooling outage time (heatup rate > S U outage time to be 28 minutes (27 - 29 minutes).

20°F/Hr)

Comment:

NOTE: Allowable outage time calculated by dividing 20ºF (maximum allowed heatup) by 43ºF / hour (previously calculated heatup rate) and converting to minutes.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 8 May 2009

JPM RO ADMIN 1b Proc. Step TASK ELEMENT 8 STANDARD Grade Notifies the CRS that securing Shutdown CRS NOTIFIED Shutdown Cooling can be n/a Cooling has been calculated at S U secured for approximately 28 minutes.

approximately 28 minutes.

Comment:

Evaluator: If notified by Operator of time for securing Shutdown Cooling, Acknowledge.

END OF TASK PALISADES NUCLEAR PLANT Page 6 of 8 May 2009

JPM RO ADMIN 1b SIMULATOR OPERATOR INSTRUCTIONS NONE PALISADES NUCLEAR PLANT Page 7 of 8 May 2009

JPM RO ADMIN 1b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Ten days after a plant shutdown, PCS temperature is 114ºF
  • The Reactor cavity is flooded to a level of 629'
  • The Pressurizer manway is removed
  • Shutdown Cooling is in operation, but must be shutdown for the maximum time allowable INITIATING CUES:

The CRS directs you to determine how long (in minutes) Shutdown Cooling may be secured in accordance with SOP-3, Section 7.3.7.

PALISADES NUCLEAR PLANT Page 8 of 8 May 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: SRO ADMIN 1b TITLE: MONITOR PCS HEATUP/COOLDOWN WITH THE PPC CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM SRO ADMIN 1b JOB PERFORMANCE MEASURE DATA PAGE Task: Operate the Palisades Plant Computer System Alternate Path: N/A Facility JPM #: PPC-JPM-02 K/A: 2.1.19 Importance: RO: 3.9 SRO: 3.8 K/A Statement: Ability to use plant computers to evaluate system or component status.

Task Standard: Commence monitoring a PCS heatup/cooldown using Page 372 SDC 15 Minute Rate Trend, of the PPC.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

GOP-2, MODE 5 To MODE 3 525°F PO-2, PCS Heatup/Cooldown Operations Validation Time: 10 minutes Time Critical: NO Candidate: __________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 7 May 2009

JPM SRO ADMIN 1b EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

  • PO-2, PCS Heatup/Cooldown Operations Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A Plant refueling has just been completed.
  • GCL-2, Mode 5 to Mode 3 525°F Checklist is in progress.
  • Two PCPs are in service.
  • Technical Specification Surveillance Procedure PO-2, PCS Heatup/Cooldown Operations, has just been authorized by the CRS.
  • No equipment is out of service, all systems are OPERABLE.

INITIATING CUES:

  • The CRS directs you to setup for monitoring a PCS heatup via the PPC, utilizing Page 361 PCS 15 Minute Rate Trend per PO-2, step 5.1.1.

PALISADES NUCLEAR PLANT Page 3 of 7 May 2009

JPM SRO ADMIN 1b Proc. Step TASK ELEMENT 1 STANDARD Grade Locate PO-2, PCS Heatup/Cooldown n/a Step 5.1.1 of PO-2 LOCATED S U Operations, step 5.1.1 Comment:

EVALUATOR: Provide Operator a working copy of PO-2, step 5.1.1.

Proc. Step TASK ELEMENT 2 STANDARD Grade Main menu screen SELECTED.

SELECT the Operator Mode Support 5.1.1b Operator Mode Support screen SELECTED S U screen from the main menu from main menu screen.

Comment:

EVALUATOR NOTE: Operator may go straight to PPC page 361 (task element 3).

Proc. Step TASK ELEMENT 3 STANDARD Grade SELECT any of the following, as applicable, to monitor PCS heatup/cooldown rate: Page 361 PCS 15 Minute Trend page 5.1.1c S U SELECTED Page 361 PCS 15 Minute Rate Trend Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 4 STANDARD Grade START 15 minute automatic reports as 5.1.1d follows: F7 key HCR Reports DEPRESSED S U DEPRESS F7 key HCR Reports Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 May 2009

JPM SRO ADMIN 1b Proc. Step TASK ELEMENT 5 STANDARD Grade START 15 minute automatic reports as follows:

5.1.1d Cyclic Printout Enabled SELECTED S U SELECT the Cyclic Printout Enabled response Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade START 15 minute automatic reports as follows: One (1) or Y is TYPED AND Update Hardkey is 5.1.1d S U TYPE a one (1) AND DEPRESS the DEPRESSED.

UPDATE Hardkey to start the reports.

Comment:

NOTE: The Heatup/Cooldown print out is on a 15 minute timer that is always running.

When the printout is enabled, the next print timeout could be anywhere from 1 second to 15 minutes later.

Evaluator: If Operator checks that the printout is printing and it is not, STATE that the hardcopy printout is not required and to continue.

CRITICAL STEP Proc. Step TASK ELEMENT 7 STANDARD Grade Notify the CRS that heatup/cooldown CRS notified that heatup/cooldown monitoring by 5.1.1d monitoring of the SDC by PPC, Page 361 is S U PPC in progress in progress Comment:

EVALUATOR: If notified as CRS that PPC monitoring is in progress, Acknowledge.

END OF TASK PALISADES NUCLEAR PLANT Page 5 of 7 May 2009

JPM SRO ADMIN 1b SIMULATOR OPERATOR INSTRUCTIONS IC-3, Ready to come off S/D Cooling.

PALISADES NUCLEAR PLANT Page 6 of 7 May 2009

JPM SRO ADMIN 1b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • A Plant refueling has just been completed.
  • GCL-2, Mode 5 to Mode 3 525°F Checklist is in progress.
  • Two PCPs are in service.
  • Technical Specification Surveillance Procedure PO-2, PCS Heatup/Cooldown Operations, has just been authorized by the CRS.
  • No equipment is out of service, all systems are OPERABLE.

INITIATING CUES:

The CRS directs you to setup for monitoring a PCS heatup via the PPC, utilizing Page 361 PCS 15 Minute Rate Trend per PO-2, step 5.1.1.

PALISADES NUCLEAR PLANT Page 7 of 7 May 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO ADMIN 2 TITLE: PERFORM SHO-1 SURVEILLANCE CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM RO ADMIN 2 JOB PERFORMANCE MEASURE DATA PAGE Task: Complete the SHO-1 Surveillance Alternate Path: N/A Facility JPM #: RO-A.2 2008 AUDIT K/A: 2.2.12 Importance: RO: 3.7 SRO: 4.1 K/A Statement: Knowledge of surveillance procedures Task Standard: Identification of two out-of-spec readings during the performance of SHO-1 for Wide Range Nuclear Instruments and B Steam Generator Pressure Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SHO-1, Operators Shift Items Modes 1, 2, 3, and 4 Validation Time: 20 minutes Time Critical: NO Candidate: __________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 11 May 2009

JPM RO ADMIN 2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

  • SHO-1, Attachment 1, Shift Surveillance Data Sheet
  • Red ink pen Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The plant is at 100% power.
  • It is Monday, 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.

INITIATING CUES:

You have been directed to take the readings of SHO-1, Items 5.1.1 through and including 5.1.14 on pages 1,2,3,4, and 5 for A Shift. ALL remaining readings have already been taken by another NCO.

PALISADES NUCLEAR PLANT Page 3 of 11 May 2009

JPM RO ADMIN 2 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Partially completed copy of SHO-1 located LOCATES copy of partially completed SHO-1 S U Comment:

Evaluator: Provides Operator with a partially completed copy of SHO-1.

Proc. Step TASK ELEMENT 2 STANDARD Grade CHECKS all channels agree within 1%

Power Range Nuclear Instrumentation:

RECORDS readings in Shift A Readings 5.1.1 Record data and check all channels agree S U column within 1%

INITIALS "RECRD BY" Comment:

NOTE: Surveillance steps may be performed in any order.

Proc. Step TASK ELEMENT 3 STANDARD Grade CHECKS all channels agree within 1%

Thermal Margin Monitor T Power:

RECORDS readings in Shift A Readings 5.1.2 Record data and check all channels agree S U column within 1%

INITIALS "RECRD BY" Comment:

PALISADES NUCLEAR PLANT Page 4 of 11 May 2009

JPM RO ADMIN 2 Proc. Step TASK ELEMENT 4 STANDARD Grade Thermal Margin Monitor Functions, NI/T Power Deviation Meter (C-27): CHECKS NI/T and TMM Primary Screens updating Check NI/T Comparator varying as 5.1.3 S U expected for changes between NI/T RECORDS a in Shift A Readings column Power INITIALS RECRD BY Check TMM Primary Screens updating Comment:

Proc. Step TASK ELEMENT 5 STANDARD Grade CHECKS TMM System Status Screen Power Axial Shape Index: Density status OK 5.1.4 Check TMM System Status Screen S U RECORDS a in Shift A Readings column Power Density status OK INITIALS RECRD BY Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade CHECKS TMM System Status Screen TC PCS Cold Leg Temperature: < 543.5°F Check TMM System Status Screen TC Check TMM System Status Screen Trip 5.1.5 <543.5°F Status Box indicates TC: OK S U Check TMM System Status Screen Trip RECORDS a in Shift A Readings column Status Box indicates TC: OK INITIALS RECRD BY Comment:

PALISADES NUCLEAR PLANT Page 5 of 11 May 2009

JPM RO ADMIN 2 Proc. Step TASK ELEMENT 7 STANDARD Grade Wide Range Nuclear Instrumentation (NIs): CHECKS data within 11/2 decades 5.1.6 S U Record data and check NIs agree within RECORDS data in Shift A Readings column 11/2 decades Comment:

NOTE: Data for NI 1/3 is NOT within 11/2 decades Proc. Step TASK ELEMENT 8 STANDARD Grade Wide Range Nuclear Instrumentation DETERMINES NI 1/3 not within 11/2 decades (NIs): CIRCLES in RED NI-1/3A reading 5.1.6 S U Determine out of tolerance data for NI 1/3 INITIALS RECRD BY

  • Identifies out of tolerance reading May NOTIFY CRS of the out of spec reading Comment:

Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance should continue: RESPOND to continue with the surveillance.

  • NOTE: INITIALS RECRD BY is not part of the critical step CRITICAL STEP Proc. Step TASK ELEMENT 9 STANDARD Grade CHECKS no Deviation lights lit for NI 5, 6, 7 Quadrant Power Tilt: and 8 Check NI Channels 5, 6, 7 and 8 VERIFIES no alarms (EK-06C3) 5.1.7 S U Deviation lights not lit RECORDS a in Shift A Readings column No alarms (EK-06C3)

INITIALS RECRD BY Comment:

PALISADES NUCLEAR PLANT Page 6 of 11 May 2009

JPM RO ADMIN 2 Proc. Step TASK ELEMENT 10 STANDARD Grade Steam Generator Pressure: RECORDS S/G pressures in Shift A 5.1.8 Readings column S U Record data and check all channels for each S/G agree within 40 psi CHECKS S/G pressures within 40 psi Comment:

NOTE: Data for PIC-0752C indication for B S/G is > 40 psi out of agreement.

Proc. Step TASK ELEMENT 11 STANDARD Grade DETERMINES PIC-0752C indication for B S/G is >40 psi out of agreement with the other three for B S/G Steam Generator Pressure:

5.1.8 CIRCLES in RED at least PIC-0752C reading S U Record data and check all channels for (may circle all four) each S/G agree within 40 psi

  • INITIALS RECRD BY May NOTIFY CRS of the out of spec reading Comment:

Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance should continue: RESPOND to continue with the surveillance.

  • NOTE: INITIALS RECRD BY is not part of the critical step CRITICAL STEP Proc. Step TASK ELEMENT 12 STANDARD Grade RECORDS S/G levels in Shift A Readings Steam Generator Level: column 5.1.9 Record data and check all channels for S U CHECKS S/G levels within 4%

each S/G agree within 4%

INITIALS RECRD BY Comment:

PALISADES NUCLEAR PLANT Page 7 of 11 May 2009

JPM RO ADMIN 2 Proc. Step TASK ELEMENT 13 STANDARD Grade RECORDS PCS flow in Shift A Readings Primary Coolant Flow: column 5.1.10 Record data and check all channels agree S U CHECKS PCS flows within 5%

within 5%

INITIALS RECRD BY Comment:

Proc. Step TASK ELEMENT 14 STANDARD Grade PZR Code Safety Relief Valve Position RECORDS PZR Safety Relief temperatures Indication Temperature: readings ranging from approx. 100° to 120°F in 5.1.11 Shift A Readings column S U Record data and check temperatures are consistent with plant conditions INITIALS RECRD BY Comment:

Note: These reading are ambient and consistent with plant conditions.

Proc. Step TASK ELEMENT 15 STANDARD Grade PORV Position Indication Temperature:

Record data and check temperatures are RECORDS N/A in this block (does not apply 5.1.12 S U consistent with plant conditions and other for plant conditions)

PORV indications Comment:

PALISADES NUCLEAR PLANT Page 8 of 11 May 2009

JPM RO ADMIN 2 Proc. Step TASK ELEMENT 16 STANDARD Grade RECORDS PZR pressures in Shift A Readings column PZR Pressure:

CHECKS pressures within 40 psia 5.1.13 Record data and check all agree within S U 40 psi and Mode 1 pressure 2010 psia Checks PZR pressure between 2010 psia and and 2100 psia 2100 psia INITIALS RECRD BY Comment:

Proc. Step TASK ELEMENT 17 STANDARD Grade Thermal Margin Low Pressure Trip RECORDS TMM low pressures in Shift A Channels: Readings column Record data and: CHECKS Channels A and C agree within 5.1.14 85 psi S U Check Channels A and C agree within 85 psi CHECKS Channels B and D agree within 85 psi Check Channels B and D agree within 85 psi INITIALS RECRD BY Comment:

Proc. Step TASK ELEMENT 18 STANDARD Grade Return completed SHO-1 to CRS Completed SHO-1 RETURNED to the CRS n/a Inform CRS of out of spec readings (if not CRS INFORMED of the out of spec readings S U already done) (if not already done)

Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 9 of 11 May 2009

JPM RO ADMIN 2 SIMULATOR OPERATOR INSTRUCTIONS

  • Reset to any full power IC.
  • Insert the following or use CAE file o OVERRIDE NI-1/3A Wide Range Log Meter indication to failed low (NI PWR-1 @ 0.75) o OVERRIDE PIC-0752C to indicate ~860# (Value = 0.71) o OVRD NI-4-PWR-1 @ 1.0.
  • Ensure "A" Channel TMM VHPT setpoint is at normal value.
  • Ensure NI @ 100.1%, i.e., accurate.
  • Ensure copies of SHO-1, Attachment 1, page 1, 2, 3, 4, and 5 are available with Section 5.1.14 grayed out.
  • Ensure Simulator clipboard copy of SHO-1, Attachment 1 is the current revision.

PALISADES NUCLEAR PLANT Page 10 of 11 May 2009

JPM RO ADMIN 2 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The plant is at 100% power
  • It is Monday, 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> INITIATING CUES:

You have been directed to take the readings of SHO-1, Items 5.1.1 through and including 5.1.14 on pages 1,2,3,4, and 5 for A Shift. ALL remaining readings have already been taken by another NCO.

PALISADES NUCLEAR PLANT Page 11 of 11 May 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: SRO ADMIN 2 TITLE: REVIEW SHO-1 SURVEILLANCE CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM SRO ADMIN 2 JOB PERFORMANCE MEASURE DATA PAGE Task: Conduct Surveillance Testing Alternate Path: N/A Facility JPM #: NEW K/A: 2.2.12 Importance: RO: 3.7 SRO: 4.1 K/A Statement: Knowledge of surveillance procedures Task Standard: Identification of two out-of-spec readings during the performance of SHO-1 for Wide Range Nuclear Instrumentation and B Steam Generator Pressure AND the identification of the appropriate Technical Specification LCO action statement entries due to the out-of-spec readings.

Preferred Evaluation Location: ANY __X__

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SHO-1, Operators Shift Items Modes 1, 2, 3, and 4 Validation Time: 15 minutes Time Critical: NO Candidate: _________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 7 MAY 2009

JPM SRO ADMIN 2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

Completed SHO-1, Attachment 1, Shift Surveillance Data Sheet for Monday Technical Specifications Technical Specifications Bases Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The plant is at 100% power.
  • It is Monday, 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />.
  • You are an on-shift SRO.
  • SHO-1, Shift Surveillance Data Sheet, was completed at 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br />.
  • The plant is in Mode 1.

INITIATING CUES:

  • The Shift Manager directs you to complete a supervisory review of completed SHO-1 in accordance with step 5.3 of SHO-1.

Evaluator Note: Provide candidate with completed SHO-1 for Monday with one data point for S/G Pressure and one for NI-1/3A are below the acceptance range. Do NOT circle the readings in red. Bad data should be for 'C' shift only.

PALISADES NUCLEAR PLANT Page 3 of 7 MAY 2009

JPM SRO ADMIN 2 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Partially completed copy of SHO-1 located LOCATES copy of partially completed SHO-1 S U Comment:

Evaluator: Provides Operator with a copy of SHO-1 completed for Monday (all three shifts).

Proc. Step TASK ELEMENT 2 STANDARD Grade At the end of each day, an On Shift SRO shall review the data sheets applicable to that day for REVIEW SHO-1 Monday entries to ensure completion of applicable items and ensure 5.3.1 all applicable components have been proper disposition of off-normal items. This is S U inspected. documented by sign-off on Attachment 1, "Shift Surveillance Data Sheet."

Comment:

Proc. Step TASK ELEMENT 3 STANDARD Grade Wide Range Nuclear Instrumentation DETERMINES NI 1/3 not within 11/2 decades (NIs):

5.1.6 CIRCLES in RED NI-1/3A entry for C-shift S U Determine out of tolerance data for NI 1/3 May NOTIFY CRS of the out of spec reading Identifies out of tolerance entry for A-shift Comment:

Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance review should continue: RESPOND to continue with the surveillance review.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 MAY 2009

JPM SRO ADMIN 2 Proc. Step TASK ELEMENT 4 STANDARD Grade DETERMINES PIC-0752C indication for B S/G is >40 psi out of agreement with the other Steam Generator Pressure: three for B S/G for C-shift.

5.1.8 Reviews data and checks all channels for S U CIRCLES in RED PIC-0752C reading (may each S/G agree within 40 psi circle others as well)

May NOTIFY CRS of the out of spec reading Comment:

Evaluator Cue: If notified as the CRS of the out of spec reading: Acknowledge. If asked if the surveillance review should continue: RESPOND to continue with the surveillance review.

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade Attachment 1 5.3 Reviewed: space signed.

The following TS Conditions are identified for the inoperable NI instrumentation:

At the end of each day, an On Shift SRO

  • LCO 3.3.1.B that day for completion of applicable 5.3 items and ensure proper disposition of The following TS Conditions are identified for S U off-normal items. This is documented by the inoperable S/G pressure instrument:

sign-off on Attachment 1, "Shift

  • LCO 3.3.1.A LCO 3.3.9.A MAY be identified for the inoperable NI instrumentation for LCO Annex entry (since it applies in MODES 3, 4 and 5):

Comment:

Evaluator Cue: If asked as the CRS to disposition the out of spec readings:

Acknowledge and inform candidate that they need to determine proper disposition of the off-normal items.

CRITICAL STEP END OF TASK PALISADES NUCLEAR PLANT Page 5 of 7 MAY 2009

JPM SRO ADMIN 2 SIMULATOR OPERATOR INSTRUCTIONS IF Simulator is used for conducting this JPM, then perform the following:

  • Reset to any full power IC.
  • Insert the following or use CAE file o OVERRIDE NI-1/3A Wide Range Log Meter indication to failed low (NI-3 PWR-1 @ 0.75) o OVERRIDE PIC-0752C to indicate ~860# (Value = 0.71) o OVRD NI-4-PWR-1 @ 1.0.
  • Ensure "A" Channel TMM VHPT setpoint is at normal value.
  • Ensure NI @ 100.1%, i.e., accurate.
  • Ensure copies of SHO-1, Attachment 1, page 1, 2, 3, 4, and 5 are available with Section 5.1.14 grayed out.
  • Ensure Simulator clipboard copy of SHO-1, Attachment 1 is the current revision.

PALISADES NUCLEAR PLANT Page 6 of 7 MAY 2009

JPM SRO ADMIN 2 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The plant is at 100% power.
  • It is Monday, 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />.
  • You are an on-shift SRO.
  • SHO-1, Shift Surveillance Data Sheet, was completed at 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br />.
  • The plant is in Mode 1.

INITIATING CUES:

The Shift Manager directs you to complete a supervisory review of completed SHO-1 in accordance with step 5.3 of SHO-1.

PALISADES NUCLEAR PLANT Page 7 of 7 MAY 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: SRO ADMIN 3 TITLE: CALCULATE MAXIMUM PERMISSIBLE STAY TIME CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM SRO ADMIN 3 JOB PERFORMANCE MEASURE DATA PAGE Task: Determine maximum permissible stay time Alternate Path: N/A Facility JPM #: NEW K/A: 2.3.4 Importance: RO: 3.2 SRO: 3.7 K/A Statement: Knowledge of radiation exposure limits under normal or emergency conditions.

Task Standard: Maximum time to perform Task #3 is calculated to be 51.4 to 51.9 minutes.

Preferred Evaluation Location: ANY __X__

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

EI-2.1, Site Emergency Director EN-RP-201, Dosimetry Administration Validation Time: 20 minutes Time Critical: NO Candidate: _____________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 7 MAY 2009

JPM SRO ADMIN 3 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EI-2.1, Site Emergency Director READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The plant was at 100% power when a Steam Generator Tube Rupture occurred. A General Emergency was declared due to the plant conditions (fuel failure is also evident). Worker #1 has received 1.85 R TEDE this year prior to this event. Worker #1 has performed the following task for this event:

TIME DOSE

  1. TASK REQUIRED RATE 1 Closed A S/G ASDV air supply isolation valves 4 min 17.75 R/hr The Shift Manager then determined that the B S/G should have been isolated instead of A S/G. The following outside the Control Room tasks are now required:

TIME DOSE

  1. TASK REQUIRED RATE 2 Open A S/G ASDV air supply isolation valves 3 min 17.75 R/hr 3 Manually open MO-0510, A S/G MSIV Bypass Valve unknown 25.5 R/hr 4 Close B S/G ASDV air supply isolation valves 3 min 17.75 R/hr NOTE: Assume no dose is received while traveling between tasks.

INITIATING CUES:

Worker #1 is the only worker available to perform Tasks 2, 3 and 4. Your task is to determine the maximum time for Worker #1 to perform Task #3 without exceeding any established emergency dose limits. Report your results to the Shift Manager.

PALISADES NUCLEAR PLANT Page 3 of 7 MAY 2009

JPM SRO ADMIN 3 Proc.Step TASK ELEMENT 1 STANDARD Grade Determine dose received while performing

--- Calculates dose received at 1.18 R. S U Task #1.

Comment:

(17.75 R/hr) (1hr/60 min) (4 min) = 1.183 R CRITICAL STEP Proc.Step TASK ELEMENT 2 STANDARD Grade Determine dose to be received while

--- Calculates dose received at 0.878 R. S U performing Task #2.

Comment:

(17.75 R/hr) (1hr/60 min) (3 min) = 0.8875 R CRITICAL STEP Proc.Step TASK ELEMENT 3 STANDARD Grade Determine dose to be received while

--- Calculates dose received at 0.878 R. S U performing Task #4.

Comment:

(17.75 R/hr) (1hr/60 min) (3 min) = 0.8875 R CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 MAY 2009

JPM SRO ADMIN 3 Proc.Step TASK ELEMENT 4 STANDARD Grade Dose remaining determined to be 22.064 R.

Determine dose remaining from emergency Candidate may use EI-2.1, Site Emergency

--- S U dose limits. Director to determine 25R emergency dose limit.

Comment:

(25R) - (1.183R) - (2) (0.8875R) = 22.042 R EVALUATOR: If candidate asks which emergency dose limit is being considered for Task #3, inform them that this would be for protection of large populations. Also if asked, inform candidate that they do not desire to volunteer dose limit above 25R.

CRITICAL STEP Proc.Step TASK ELEMENT 5 STANDARD Grade Determine time available for Worker #1 to

--- complete Task #3 without exceeding Time available calculated to be 51.9 min. S U emergency dose level.

Comment:

(Available Dose)/(Dose Rate) = (22.042 R)/(25.5 R/hr) = 0.8644 hr (60 min/Hr) = 51.86 minutes (accept 51.9 to 51.4 minutes)

CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade Inform the Shift Manager that Worker #1 will Inform the Shift Manager of calculation exceed 25 R emergency dose limit if Task #3 n/a results. S U takes more than 51.9 minutes.

Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 5 of 7 MAY 2009

JPM SRO ADMIN 3 SIMULATOR OPERATOR INSTRUCTIONS

  • No Simulator setup required.

PALISADES NUCLEAR PLANT Page 6 of 7 MAY 2009

JPM SRO ADMIN 3 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The plant was at 100% power when a Steam Generator Tube Rupture occurs. A General Emergency was declared due to the plant conditions (fuel failure is also evident). Worker #1 has received 1.85 R TEDE this year. The following task has been performed by Worker #1:

TIME DOSE

  1. TASK REQUIRED RATE 1 Closed A S/G ASDV air supply isolation valves 4 min 17.75 R/hr The Shift Manager has determined that the wrong S/G has been isolated. The following outside the Control Room tasks are now required:

TIME DOSE

  1. TASK REQUIRED RATE 2 Open A S/G ASDV air supply isolation valves 3 min 17.75 R/hr 3 Manually open MO-0510, A S/G MSIV Bypass Valve unknown 25.5 R/hr 4 Close B S/G ASDV air supply isolation valves 3 min 17.75 R/hr NOTE: Assume no dose is received while traveling between tasks.

INITIATING CUES:

Worker #1 is the only worker available to perform Tasks 2, 3 and 4. Your task is to determine the maximum time for Worker #1 to perform Task #3 without exceeding any established emergency dose limits. Report your results to the Shift Manager.

PALISADES NUCLEAR PLANT Page 7 of 7 MAY 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO ADMIN 4 TITLE: OBTAIN METEOROLOGICAL DATA FOR EMERGENCY NOTIFICATION FORM CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM RO ADMIN 4 JOB PERFORMANCE MEASURE DATA PAGE Task: Obtain Meteorological Data for Emergency Notification Form Alternate Path: N/A Facility JPM #: RO-A.4 2008 NRC K/A: 2.4.39 Importance: RO: 3.9 K/A Statement: Knowledge of RO responsibilities in emergency plan implementation Task Standard: EI-6.7, Attachment 1, completed with correct data obtained Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

EI-3.0, Communications and Notifications EI-6.0, Offsite Dose Calculation and Recommendations for Protective Actions EI-6.7, Plant Site Meteorological System Validation Time: 10 minutes Time Critical: NO Candidate: __________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 8 May 2009

JPM RO ADMIN 4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EI-6.7, Attachment 1 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Shift Manager, acting as the Site Emergency Director, has declared an Alert condition. A thunderstorm is in progress.

INITIATING CUES:

The Shift Manager has directed you to obtain Meteorological Data by completing of EI-6.7, utilizing the Meteorological Data display in the Control Room.

PALISADES NUCLEAR PLANT Page 3 of 8 May 2009

JPM RO ADMIN 4 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Correct Procedure located EI-6.7, Attachment 1 located S U Comment:

Evaluator: Provide candidate with a Working Copy.

EVALUATOR NOTE: EI-6.7 Attachment 1 is completed by referencing steps 5.1.3 and 5.1.4. Due to wind speed and wind direction at 10 meters unavailable, 60 meter data is used.

Proc. Step TASK ELEMENT 2 STANDARD Grade On EI-6.7 Att. 1 data recorded as follows:

Obtain meteorological data from the PPC, page 351 WS, Wind Speed = 6.93 mph 5.1.3 S U WS, Wind Speed (WS60) _9_MPH 9 mph X .77 = 6.93 MPH

( X ) 60 meters, *corrected Comment:

NOTE: WS60 must be used. WS60 multiplied by 0.77 to obtain corrected wind speed.

CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade Obtain meteorological data from the PPC, On EI-6.7 Att. 1 data recorded as follows:

page 351 5.1.3 WD, Wind Direction = 73° from S U WD, Wind Direction (WD60) ____°

( X ) 60 meters Comment:

NOTE: WD60 must be used.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 8 May 2009

JPM RO ADMIN 4 Proc. Step TASK ELEMENT 4 STANDARD Grade Obtain meteorological data from the PPC, page 351 On EI-6.7 Att. 1 data recorded as follows:

5.1.4 Stability Class (STAB) ____ S U Stability Class = C Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade On EI-6.7 Att. 1 data recorded as follows:

EI-6.7, Attachment 1 completed: Date: Todays date n/a S U Date:, Time:, Completed By: Time: Current time Completed By: Operators name Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade Notify the CRS that EI-6.7 Attachment 1 Operator notifies CRS of completion of EI-6.7, n/a completed. Attachment 1. S U Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 5 of 8 May 2009

JPM RO ADMIN 4 SIMULATOR OPERATOR INSTRUCTIONS

1. Reset to IC 17
2. Remove the following two PPC points from service by using MFs PC20 and PC 21 on PID PC02. These MFs will cause a V or invalid display from the Met Tower 10 meter height. Candidate will have to use the 60 meter readings and use a conversion factor of 0.77 to obtain appropriate data. (ENSURE these MFs are changed back after JPM is completed)
  • MWD10
  • MWS10
3. Provide a Working Copy of EI-6.7, Att. 1 to evaluator.
4. Use Remote Functions (RF) on PID PC02 to modify the following (after all RFs are changed, then use UPDATE NOW and respond YES):
  • WS60 = 9 (change RF to this value)
  • WD60 = 73 degrees FROM (change RF to this value)
  • Stability = C (no change needed since RF should already say 3)
5. Candidate may use PPC monitor in Simulator Computer Room for this JPM: ensure it is up and running.

PALISADES NUCLEAR PLANT Page 6 of 8 May 2009

Proc No EI-6.7 Attachment 1 Revision 7 Page 1 of 1 PLANT SITE METEOROLOGICAL SYSTEM WORKSHEET ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY

1. WS, Wind Speed = 6.93 mph ( ) 10 meters (X) 60 meters, *corrected (See Step 5.1.3 or 5.2.6)
  • Multiply by 0.77 ( 9 MPH X 0.77 = 6.93 MPH)
2. WD, Wind Direction = 73 ° from ( ) 10 meters (X) 60 meters (See Step 5.1.3 or 5.2.6)

(see Step 5.1.4 or 5.2.7)

3. Stability Class = C Date: __TODAY_____ Time: __NOW___ Completed By: __JOE OPERATOR_______

ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY PALISADES NUCLEAR PLANT Page 7 of 8 May 2009

JPM RO ADMIN 4 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The Shift Manager, acting as the Site Emergency Director, has declared an Alert condition. A thunderstorm is in progress.

INITIATING CUES:

The Shift Manager has directed you to obtain Meteorological Data by completing Attachment 1 of EI-6.7, utilizing Meteorological Data display in the Control Room.

PALISADES NUCLEAR PLANT Page 8 of 8 May 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: SRO ADMIN 4 TITLE: CLASSIFY EVENT AND DETERMINE PAR CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM SRO ADMIN 4 JOB PERFORMANCE MEASURE DATA PAGE Task: Classify an Event and Determine PARs - Protective Action Recommendations Alternate Path: N/A Facility JPM #: SRO-A.4 2003 NRC K/A: 2.4.41, 2.4.44 Importance: RO:4.1, 4.0 SRO: 4.1, 4.4 K/A Statement: (2.4.41) Knowledge of the emergency action level threshholds and classifications.

(2.4.44) Knowledge of emergency plan protective action recommendations.

Task Standard: Event classified as a General Emergency and PAR is evacuation of 2 mile radius and 5 miles in Areas 1 and 2, within 30 minutes.

Preferred Evaluation Location: Simulator __X__ In Plant ______

Preferred Evaluation Method: Perform __X__ Simulate ______

References:

EI-1, Emergency Classifications and Actions EI-3, Communications and Notifications EI-6.13, Protective Action Recommendations for Offsite Populations Validation Time: __30__ minutes Time Critical: YES Candidate: __________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 9 May 2009

JPM SRO ADMIN 4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EI-1 Attachment 1 EI-3 EI-6.13 Attachment 1 READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. The Reactor has tripped.
2. A LOCA is in progress.
3. Pressurizer level is offscale LOW.
4. PCS pressure is 100 psia.
5. CETs indicate 600ºF.
6. Total LPSI/HPSI flow is NOT adequate per EOP Supplement 4.
7. SIRW tank level is 38% and lowering slowly.
8. Containment isolation has occurred as designed and EOP Supplement 6 for Containment Isolation is in progress.
9. A release is NOT occurring through the plant stack or steam dumps.
10. Containment Gamma Monitors (RIA-2321 and 2322) are indicating 5E4R/hr.
11. Reactor Vessel Level Monitoring System (RVLMS) indicates ALL red lights
12. Failed fuel analysis is in progress with no results to report yet.
13. Obtained Meteorological Data is as follows:

QN = 0.0 QI = 0.0 Wind Speed = 1.1 Stability Class = G Wind Direction = 235 (from)

Weather is clear with no precipitation INITIATING CUES:

During activation of the Site Emergency Plan, you are the Shift Manager (acting as the Site Emergency Director). You are to classify the event given the above information and determine any required Protective Action Recommendations, and complete an Event Notification Form. No previous event declaration has been made.

This JPM is Time Critical.

PALISADES NUCLEAR PLANT Page 3 of 9 May 2009

JPM SRO ADMIN 4 Proc.Step TASK ELEMENT 1 STANDARD Grade Locates procedure to determine Emergency Locates EI-1 and refers to Attachment 1, Hot EI-1 S U Classification. Conditions (PCS > 200 degrees F).

Comment:

EVALUATOR: Candidate may use placard of site emergency plan classifications or use paper copy from EI-1, attachment 1.

Proc.Step TASK ELEMENT 2 STANDARD Grade EI-1 Refers to lower right-hand corner of EI-1, Refers to "Fission Product Barriers" section Attachment 1, Hot Conditions S U Att 1 (lower right-hand corner)

(PCS > 200 degrees F).

Comment:

Proc.Step TASK ELEMENT 3 STANDARD Grade

___ Refers to Table F1

___ Determines a LOSS of Fuel Cladding (based on Containment Gamma monitors readings (item 5)

___ Determines a LOSS of PCS Barrier (based EI-1 Determines status of fission product on leak rate and PCS subcooling)(item 2) S U Att 1 barriers. OR based on Containment Gamma Monitor readings.

___ Determines a POTENTIAL LOSS of Containment Barrier (based on Containment Gamma monitors readings).(item 6)

Comment:

EVALUATOR: If candidate refers to EI-11, inform them "That procedure will be performed by the TSC."

Proc.Step TASK ELEMENT 4 STANDARD Grade PALISADES NUCLEAR PLANT Page 4 of 9 May 2009

JPM SRO ADMIN 4 EI-1 Declares a GENERAL EMERGENCY per FG1 Declares Emergency Classification. based on status of fission product barriers (loss S U Att 1 of TWO and potential loss of THIRD).

Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 5 STANDARD Grade EI-1 Prepares Emergency Actions/Notifications Obtains EI-1, Attachment 2 and fills out per S U Att 2 form. attached KEY.

Comment:

NOTE: This Task Element may be performed at any time during the JPM. Filling out this form is NOT required for this JPM; however a key is attached in case candidate fills out the form.

NOTE: It is NOT the intent of this JPM to have candidate actually make the notifications.

Proc.Step TASK ELEMENT 6 STANDARD Grade EI-3 Obtains EI-3, Attachment 1 and fills out per Prepares Event Notification Form. S U Att 1 attached KEY.

Comment:

NOTE: KEY is attached to this JPM.

NOTE: EI-3, Attachment 2, "Palisades Event Technical Data Sheet" is NOT required during this JPM.

NOTE: Candidate may use computer on Control Room island area to prepare this form.

PALISADES NUCLEAR PLANT Page 5 of 9 May 2009

JPM SRO ADMIN 4 Proc.Step TASK ELEMENT 7 STANDARD Grade Obtains EI-6.13 and corresponding Attachment 1 and determines:

EI-6.13 Determines Protective Action

___ Evacuate 5 mile in Areas 1 and 2 S U Att 1 Recommendations (PARs).

(minimum GE recommendation on bottom of Pg 1 of Attachment 1)

Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 8 STANDARD Grade Palisades Event Notification Form completely EI-3 Completes filling out Palisades Event filled per attached KEY AND form is approved S U Att 1 Notification Form. (Candidate initials, date, and time entered at bottom of form)

Comment:

NOTE: Candidate may use computer on back-bar of Control Room island area to complete and print this form.

CRITICAL STEP END OF TASK PALISADES NUCLEAR PLANT Page 6 of 9 May 2009

JPM SRO ADMIN 4 ANSWER KEY PALISADES NUCLEAR PLANT Page 7 of 9 May 2009

JPM SRO ADMIN 4 SIMULATOR OPERATOR INSTRUCTIONS No Simulator setup required.

It is preferred that this JPM be done separately from the simulator. If, by chance, candidate IS in the simulator while doing this JPM, THEN ensure the IC does NOT have a release in progress.

ENSURE ALL DATA IS CLEARED FROM EP NOTIFICATION COMPUTER ON BACK-BAR OF CRS ISLAND PRIOR TO NEXT USE OF THIS JPM.

PALISADES NUCLEAR PLANT Page 8 of 9 May 2009

JPM SRO ADMIN 4 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

1. The Reactor has tripped.
2. A LOCA is in progress.
3. Pressurizer level is offscale LOW.
4. PCS pressure is 100 psia.
5. CETs indicate 600ºF.
6. Total LPSI/HPSI flow is NOT adequate per EOP Supplement 4.
7. SIRW tank level is 38% and lowering slowly.
8. Containment isolation has occurred as designed and EOP Supplement 6 for Containment Isolation is in progress.
9. A release is NOT occurring through the plant stack or steam dumps.
10. Containment Gamma Monitors (RIA-2321 and 2322) are indicating 5E4R/hr.
11. Reactor Vessel Level Monitoring System (RVLMS) indicates ALL red lights.
12. Failed fuel analysis is in progress with no results to report yet.
13. Obtained Meteorological Data is as follows:

QN = 0.0 QI = 0.0 Wind Speed = 1.1 Stability Class = G Wind Direction = 235 (from)

Weather is clear with no precipitation INITIATING CUES:

During activation of the Site Emergency Plan, you are the Shift Manager (acting as the Site Emergency Director). You are to classify the event given the above information and determine any required Protective Action Recommendations, and complete an Event Notification Form. No previous event declaration has been made.

This JPM is Time Critical.

PALISADES NUCLEAR PLANT Page 9 of 9 May 2009