ML100690475: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/25/2009
| issue date = 05/25/2009
| title = 2009 Palisades Initial License Examination Administered Control Room JPMs
| title = 2009 Palisades Initial License Examination Administered Control Room JPMs
| author name = Valos N A
| author name = Valos N
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO/SRO-I SYS A TITLE:      HOT LEG INJECTION USING P-66B AND SPLIT FLOW CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


JPM: RO/SRO-I SYS A TITLE: HOT LEG INJECTION USING P-66B AND SPLIT FLOW
JPM: RO/SRO-I SYS A JOB PERFORMANCE MEASURE DATA PAGE Task:   Establish Hot Leg Injection per in-use EOP Alternate Path: NO Facility JPM #: NEW K/A:     006A2.02       Importance:       RO:3.9     SRO:   4.3 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: loss of flow path Task Standard: Hot Leg Injection flow established via HPSI Pump P-66B using EOP Supplement 20 split flow method.
 
Preferred Evaluation Location: Simulator         _X__       In Plant   ______
CANDIDATE: _____________________________________________
Preferred Evaluation Method:       Perform     _X__       Simulate   ______
 
EXAMINER: _____________________________________________
 
JPM: RO/SRO-I SYS A JOB PERFORMANCE MEASURE DATA PAGE Task: Establish Hot Leg Injection per in-use EOP  
 
Alternate Path: NO  
 
Facility JPM #: NEW
 
K/A: 006A2.02 Importance: RO: 3.9 SRO: 4.3
 
K/A Statement: Ability to (a) predict the im pacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use  
 
procedures to correct, control, or mitigate the consequences of those  
 
malfunctions or operations: loss of flow path  
 
Task Standard: Hot Leg Injection flow est ablished via HPSI Pump P-66B using EOP Supplement 20 split flow method.  
 
Preferred Evaluation Location: Simulator _X__ In Plant ______  
 
Preferred Evaluation Method: Perform _X__ Simulate ______  


==References:==
==References:==
EOP Supplement 20, Hot Leg Injection Via PZR EOP Supplement 4, HPSI and LPSI Flow Curves EOP-4.0, Loss of Coolant Accident Recovery Validation Time: __15__ minutes        Time Critical:  NO Candidate: ________________________________________________
Time Start: ________          Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______          UNSAT ______
Comments:
Examiner: _______________________________                  Date:    ______________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 9                          JUNE 2009


EOP Supplement 20, "Hot Leg Injection Via PZR"    EOP Supplement 4, "HPSI and LPSI Flow Curves" EOP-4.0, "Loss of Coolant Accident Recovery"
JPM: RO/SRO-I SYS A EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
EOP Supplement 20, Hot Leg Injection Via PZR EOP Supplement 4, HPSI and LPSI Flow Curves Also see Simulator Operator Instructions (last page of this document).
Validation Time: __15__ minutes  Time Critical: NO
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate: ________________________________________________
INITIAL CONDITIONS:
 
* Plant was tripped from 100% power.
Time Start: ________  Time Finish: ________
* EOP-4.0 (Loss of Coolant Accident) has been entered.
 
* Conditions for initiating Hot Leg Injection per Step 60 are met.
Performance Time:  ________  minutes
* The normal path for Hot Leg Injection per Step 60 is not available due to HPSI Train 2 to Cold Leg Valve, MO-3080, being failed in the open position.
 
* HPSI Pump P-66A tripped after SIAS initiated and could not be restarted.
Performance Rating: SAT______  UNSAT ______
INITIATING CUES:
 
The CRS has directed you to establish hot leg injection using EOP Supplement 20 section 2.0, the HPSI Pump P-66B and split flow method.
Comments:
PALISADES NUCLEAR PLANT                     Page 3 of 9                             JUNE 2009
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 9 JUNE 2009 JPM: RO/SRO-I SYS A EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
EOP Supplement 20, Hot Leg Injection Via PZR  
 
EOP Supplement 4, HPSI and LPSI Flow Curves  
 
Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have  
 
completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
Plant was tripped from 100% power. EOP-4.0 (Loss of Coolant Accident) has been entered. Conditions for initiating Hot Leg Injection per Step 60 are met. The normal path for Hot Leg Injection per Step 60 is not available due to HPSI Train 2 to Cold Leg Valve, MO-3080, being failed in the open position. HPSI Pump P-66A tripped after SIAS initiated and could not be restarted.
INITIATING CUES:  
 
The CRS has directed you to establish hot leg injection using EOP Supplement 20 section 2.0, the HPSI Pump P-66B and split flow method.  
 
PALISADES NUCLEAR PLANT Page 3 of 9 JUNE 2009 JPM: RO/SRO-I SYS A Proc. Step TASK ELEMENT 1 STANDARD Grade--- Candidate locates EOP Supplement 20 EOP Supplement 20 is in hand S  U Comment:
Evaluator:  Provide candidate with a working copy of EOP Supplement 20
 
Proc. Step TASK ELEMENT 2 STANDARD Grade 1 Record each occurrence of PZR Spray operation with a T greater than 200 F in the Reactor Logbook.
Operator notes this requirement for future action in this JPM.
Operator notes current temperatures for vapor phase, spray lines, and charging: determines
 
requirement is currently not applicable.
S  U Comment: 
 
Proc. Step TASK ELEMENT 3 STANDARD Grade 2 Ensure P-66B is operating within the limits of EOP Supplement 4.
Verifies P-66B flow is within EOP Supplement 4 S  U Comment: 
 
PALISADES NUCLEAR PLANT Page 4 of 9 JUNE 2009 JPM: RO/SRO-I SYS A Proc. Step TASK ELEMENT 4 STANDARD Grade 3 Ensure open the following valves:
Charging Line Stop, CV-2111 (already open) Auxiliary Spray, CV-2117
 
Charging Pump Discharge to Train 2, MO-3072 HPSI Pump B Discharge to Train 2, CV-3018  Verifies or places hand switches in OPEN and verifies associated Green light OFF and Red
 
light ON.
S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 5 STANDARD Grade 4 Stop ALL Charging Pumps Candidate determines all three Charging Pumps are operating and have electrical power
 
available. Candidate will stop P-55A, P-55B, and P-55C.
S  U Comment:  EVALUATOR NOTE: Candidate may also place Auto/Manual switches on Panel C-12 to MANUAL (this is not required to meet Standard).
CRITICAL STEP
 
Proc. Step TASK ELEMENT 6 STANDARD Grade 5 CLOSE the following valves:
Loop 1A, CV-2113
 
Loop 2A, CV-2115


Spray, CV-1057
JPM: RO/SRO-I SYS A Proc. Step            TASK ELEMENT 1                                      STANDARD                        Grade
  ---    Candidate locates EOP Supplement 20          EOP Supplement 20 is in hand                      S U Comment:
Evaluator: Provide candidate with a working copy of EOP Supplement 20 Proc. Step            TASK ELEMENT 2                                      STANDARD                        Grade Operator notes this requirement for future action Record each occurrence of PZR Spray           in this JPM.
1      operation with a T greater than 200°F in    Operator notes current temperatures for vapor      S U the Reactor Logbook.                          phase, spray lines, and charging: determines requirement is currently not applicable.
Comment:
Proc. Step            TASK ELEMENT 3                                      STANDARD                        Grade Ensure P-66B is operating within the limits 2                                                    Verifies P-66B flow is within EOP Supplement 4    S U of EOP Supplement 4.
Comment:
PALISADES NUCLEAR PLANT                        Page 4 of 9                                      JUNE 2009


JPM: RO/SRO-I SYS A Proc. Step            TASK ELEMENT 4                                    STANDARD                    Grade Ensure open the following valves:
Charging Line Stop, CV-2111 (already open)
Auxiliary Spray, CV-2117                    Verifies or places hand switches in OPEN and 3      Charging Pump Discharge to Train 2,        verifies associated Green light OFF and Red      S U MO-3072                                    light ON.
HPSI Pump B Discharge to Train 2, CV-3018 Comment:
CRITICAL STEP Proc. Step            TASK ELEMENT 5                                    STANDARD                    Grade Candidate determines all three Charging Pumps are operating and have electrical power 4      Stop ALL Charging Pumps                                                                      S U available. Candidate will stop P-55A, P-55B, and P-55C.
Comment:
EVALUATOR NOTE: Candidate may also place Auto/Manual switches on Panel C-12 to MANUAL (this is not required to meet Standard).
CRITICAL STEP Proc. Step            TASK ELEMENT 6                                    STANDARD                    Grade CLOSE the following valves:
Loop 1A, CV-2113                            Places hand switches for CV-2113, CV-2115, CV-1057, and CV-1059 to CLOSE.
5      Loop 2A, CV-2115                                                                            S U Verifies Green lights ON and Red lights OFF for Spray, CV-1057                              all the above valves.
Spray, CV-1059.
Spray, CV-1059.
Places hand switches for CV-2113, CV-2115, CV-1057, and CV-1059 to CLOSE.
Comment:
Verifies Green lights ON and Red lights OFF for all the above valves.
CRITICAL STEP PALISADES NUCLEAR PLANT                     Page 5 of 9                                     JUNE 2009
S  U Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 9 JUNE 2009 JPM: RO/SRO-I SYS A Proc. Step TASK ELEMENT 7 STANDARD Grade 6 Ensure open the following HPSI Train 1 valves: HPSI Train 1 Loop 1A, MO-3007
 
HPSI Train 1 Loop 1B, MO-3009
 
HPSI Train 1 Loop 2A, MO-3011
 
HSPI Train 1 Loop 2B, MO-3013 Verifies MO-3007, MO-3009, MO-3011, and MO-3013 Red lights ON and Green lights OFF.
S  U Comment: 
 
Proc. Step TASK ELEMENT 8 STANDARD Grade 7 CLOSE the following valves:
HPSI Train 2 Loop 2B, MO-3062
 
HPSI Train 2 Loop 2A, MO-3064
 
HPSI Train 2 Loop 1B, MO-3066
 
HSPI Train 2 Loop 1A, MO-3068 Places and holds hand switches for MO-3062, MO-3064, MO-3066, and MO-3068 to CLOSE
 
until Green lights ON and Red lights OFF.
S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 9 STANDARD Grade 8 Ensure HPSI flow of greater than or equal to 100 gpm to the Pressurizer through the


JPM: RO/SRO-I SYS A Proc. Step            TASK ELEMENT 7                                        STANDARD                    Grade Ensure open the following HPSI Train 1 valves:
HPSI Train 1 Loop 1A, MO-3007 Verifies MO-3007, MO-3009, MO-3011, and 6                                                                                                      S U HPSI Train 1 Loop 1B, MO-3009                  MO-3013 Red lights ON and Green lights OFF.
HPSI Train 1 Loop 2A, MO-3011 HSPI Train 1 Loop 2B, MO-3013 Comment:
Proc. Step            TASK ELEMENT 8                                        STANDARD                    Grade CLOSE the following valves:
HPSI Train 2 Loop 2B, MO-3062 Places and holds hand switches for MO-3062, 7      HPSI Train 2 Loop 2A, MO-3064                  MO-3064, MO-3066, and MO-3068 to CLOSE          S U until Green lights ON and Red lights OFF.
HPSI Train 2 Loop 1B, MO-3066 HSPI Train 2 Loop 1A, MO-3068 Comment:
CRITICAL STEP Proc. Step            TASK ELEMENT 9                                        STANDARD                    Grade Ensure HPSI flow of greater than or equal Operator checks flow is indicated on FIA-0212 8      to 100 gpm to the Pressurizer through the                                                      S U greater than 100 gpm.
charging line is indicated on FIA-0212.
charging line is indicated on FIA-0212.
Operator checks flow is indicated on FIA-0212
Comment:
 
PALISADES NUCLEAR PLANT                         Page 6 of 9                                     JUNE 2009
greater than 100 gpm.
S  U Comment:
 
PALISADES NUCLEAR PLANT Page 6 of 9 JUNE 2009 JPM: RO/SRO-I SYS A PALISADES NUCLEAR PLANT Page 7 of 9 JUNE 2009 Proc. Step TASK ELEMENT 10 STANDARD Grade--- Candidate informs the CRS that the Hot Leg Injection using P-66B and split flow
 
has been established per EOP
 
Supplement 20 section 2.0.
CRS informed.
S  U Comment: 
 
END OF TASK
 
JPM: RO/SRO-I SYS A SIMULATOR OPERATOR INSTRUCTIONS Initialize to any at power IC.
Enter malfunction SI01A (HPSI Pump P-66A fail) on PID SI02.
Enter malfunction RC01 (Hot Leg Rupture) on PID RC01.
Enter Overrride for MO-3080 to ON on PNL C-03.
Trip the Reactor and carry out the immedi ate actions of EOP-1.0 actions (including tripping of MFW Pumps). Trip all Primary Coolant Pumps.
Take P-66A handswitch to START (to give a red flag = attempt to restart provided in initiating cue.)  Perform Pre-RAS Actions of EOP Supplement 42.
Allow to run long enough to bring in RAS, then complete RAS verifications per EOP-4.0 Step 52 and EOP Supplement 42.
PALISADES NUCLEAR PLANT Page 8 of 9 JUNE 2009 JPM: RO/SRO-I SYS A CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


INITIAL CONDITIONS:  
JPM: RO/SRO-I SYS A Proc. Step            TASK ELEMENT 10                                  STANDARD              Grade Candidate informs the CRS that the Hot Leg Injection using P-66B and split flow
  ---                                                    CRS informed.                        S U has been established per EOP Supplement 20 section 2.0.
Comment:
END OF TASK PALISADES NUCLEAR PLANT                          Page 7 of 9                          JUNE 2009


Plant was tripped from 100% power. EOP-4.0 (Loss of Coolant Accident) has been entered. Conditions for initiating Hot Leg Injection per Step 60 are met. The normal path for Hot Leg Injection per Step 60 is not available due to HPSI Train 2 to Cold Leg Valve, MO-3080, being failed in the open position. HPSI Pump P-66A tripped after SIAS initiated and could not be restarted.
JPM: RO/SRO-I SYS A SIMULATOR OPERATOR INSTRUCTIONS
INITIATING CUES:
* Initialize to any at power IC.
* Enter malfunction SI01A (HPSI Pump P-66A fail) on PID SI02.
* Enter malfunction RC01 (Hot Leg Rupture) on PID RC01.
* Enter Overrride for MO-3080 to ON on PNL C-03.
* Trip the Reactor and carry out the immediate actions of EOP-1.0 actions (including tripping of MFW Pumps).
* Trip all Primary Coolant Pumps.
* Take P-66A handswitch to START (to give a red flag = attempt to restart provided in initiating cue.)
* Perform Pre-RAS Actions of EOP Supplement 42.
* Allow to run long enough to bring in RAS, then complete RAS verifications per EOP-4.0 Step 52 and EOP Supplement 42.
PALISADES NUCLEAR PLANT                Page 8 of 9                          JUNE 2009


JPM: RO/SRO-I SYS A CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* Plant was tripped from 100% power.
* EOP-4.0 (Loss of Coolant Accident) has been entered.
* Conditions for initiating Hot Leg Injection per Step 60 are met.
* The normal path for Hot Leg Injection per Step 60 is not available due to HPSI Train 2 to Cold Leg Valve, MO-3080, being failed in the open position.
* HPSI Pump P-66A tripped after SIAS initiated and could not be restarted.
INITIATING CUES:
The CRS has directed you to establish hot leg injection using EOP Supplement 20 section 2.0, the HPSI Pump P-66B and split flow method.
The CRS has directed you to establish hot leg injection using EOP Supplement 20 section 2.0, the HPSI Pump P-66B and split flow method.
PALISADES NUCLEAR PLANT Page 9 of 9 JUNE 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
PALISADES NUCLEAR PLANT                     Page 9 of 9                         JUNE 2009
 
JPM: RO/SRO-I SYS B TITLE:  SWAP PRESSURIZER PRESSURE CONTROL CHANNELS
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM: RO/SRO-I SYS B JOB PERFORMANCE MEASURE DATA PAGE  Task: Swap Pressurizer Pressure Control channels
 
Alternate Path: YES
 
Facility JPM #: 2005 NRC Exam
 
K/A: 010A4.01  Importance:  RO: 3.7  SRO: 3.5
 
K/A Statement: Ability to manually operate and/
or monitor in the control room: PZR spray valve
 
Task Standard: PIC-0101A placed in service; applicant recognizes failure of PIC-0101A and then switches back to PIC-0101B.


Preferred Evaluation Location: Simulator __X__  In Plant _____
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO/SRO-I SYS B TITLE:      SWAP PRESSURIZER PRESSURE CONTROL CHANNELS CANDIDATE: _____________________________________________
EXAMINER_____________________________________________


Preferred Evaluation Method: Perform __X__ Simulate _____  
JPM: RO/SRO-I SYS B JOB PERFORMANCE MEASURE DATA PAGE Task:    Swap Pressurizer Pressure Control channels Alternate Path: YES Facility JPM #: 2005 NRC Exam K/A: 010A4.01            Importance:    RO: 3.7        SRO: 3.5 K/A Statement: Ability to manually operate and/or monitor in the control room: PZR spray valve Task Standard: PIC-0101A placed in service; applicant recognizes failure of PIC-0101A and then switches back to PIC-0101B.
Preferred Evaluation Location: Simulator    __X__      In Plant    _____
Preferred Evaluation Method:     Perform     __X__     Simulate     _____


==References:==
==References:==
SOP-1A, Primary Coolant System ARP-4, Pressurizer Pressure Off Normal Hi-Lo Validation Time: 15 minutes      Time Critical:    NO Candidate: ________________________________________________
Time Start: ________        Time Finish:    ________
Performance Time:        ________ minutes Performance Rating:      SAT______      UNSAT ______
Comments:
Examiner: _______________________________              Date:    ______________
Signature PALISADES NUCLEAR PLANT                Page 2 of 10                            JUNE 2009


SOP-1A, Primary Coolant System    ARP-4, Pressurizer Pressure Off Normal Hi-Lo 
JPM: RO/SRO-I SYS B EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:           SOP-1A, section 7.2.2.b.3 Also see Simulator Operator Instructions (last page of this document).
 
READ TO CANDIDATE DIRECTION TO CANDIDATE:
Validation Time: 15 minutes  Time Critical: NO
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
 
INITIAL CONDITIONS:
Candidate: ________________________________________________
* The plant is at steady state 100% power.
 
* Pressurizer Pressure Controller PIC-0101B is selected and is in AUTO.
Time Start: ________  Time Finish: ________
* Pressurizer Pressure Controller PIC-0101A is in MANUAL at 50% demand.
 
INITIATING CUES:
Performance Time:  ________  minutes
The Control Room Supervisor has directed you to switch Pressurizer Pressure Controllers per SOP-1A for normal rotation of controllers.
 
PALISADES NUCLEAR PLANT                     Page 3 of 10                             JUNE 2009
Performance Rating: SAT______  UNSAT ______
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 10 JUNE 2009 JPM: RO/SRO-I SYS B EXAMINER COPY ONLY Tools/Equipment/Procedures Needed: SOP-1A, section 7.2.2.b.3 Also see Simulator Operator Instructions (last page of this document).  
 
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have  
 
completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
The plant is at steady state 100% power. Pressurizer Pressure Controller PIC-0101B is selected and is in AUTO.
Pressurizer Pressure Controller PIC-0101A is in MANUAL at 50% demand.  
 
INITIATING CUES:  
 
The Control Room Supervisor has directed you to switch Pressurizer Pressure Controllers per SOP-1A for normal rotation of controllers.  
 
PALISADES NUCLEAR PLANT Page 3 of 10 JUNE 2009 JPM: RO/SRO-I SYS B Proc.Step TASK ELEMENT 1 STANDARD Grade--- Obtain a copy of SOP-1A, Primary Coolant System procedure.
Candidate locates SOP-1A, Primary Coolant System. S  U Comment: 
 
Proc.Step TASK ELEMENT 2 STANDARD Grade--- Determine that Section 7.2.2.b.3 of SOP-1A should be used to alternate PZR Press
 
Controllers.
Reviews Section 7.2.2 PZR Press Control and
 
determines section 7.2.2.b.3 needs to be


performed.
JPM: RO/SRO-I SYS B Proc.Step              TASK ELEMENT 1                                        STANDARD                    Grade Obtain a copy of SOP-1A, Primary Coolant        Candidate locates SOP-1A, Primary Coolant
S U Comment:
  ---                                                                                                    S U System procedure.                                System.
Comment:
Proc.Step              TASK ELEMENT 2                                        STANDARD                    Grade Determine that Section 7.2.2.b.3 of SOP-1A      Reviews Section 7.2.2 PZR Press Control and
  ---    should be used to alternate PZR Press            determines section 7.2.2.b.3 needs to be      S U Controllers.                                    performed.
Comment:
EVALUATOR: provide candidate working copy of SOP-1A section 7.2.2.b.3.
EVALUATOR: provide candidate working copy of SOP-1A section 7.2.2.b.3.
 
Proc.Step             TASK ELEMENT 3                                       STANDARD                   Grade 3.a   Verify controller to be selected in MANUAL.     Verifies PIC-0101A is in MANUAL.               S U Comment:
Proc.Step TASK ELEMENT 3 STANDARD Grade 3.a Verify controller to be selected in MANUAL.
Proc.Step             TASK ELEMENT 4                                       STANDARD                   Grade Adjusts output signal on PIC-0101A to match Adjust output signal on PIC-0101A to match 3.b                                                    output signal on PIC-0101B for bumpless        S U output signal on PIC-0101B.
Verifies PIC-0101A is in MANUAL.
S U Comment:
 
Proc.Step TASK ELEMENT 4 STANDARD Grade 3.b Adjust output signal on PIC-0101A to match output signal on PIC-0101B.
Adjusts output signal on PIC-0101A to match
 
output signal on PIC-0101B for bumpless
 
transfer.
transfer.
S  U Comment:
Comment:
 
Proc.Step             TASK ELEMENT 5                                       STANDARD                   Grade PALISADES NUCLEAR PLANT                         Page 4 of 10                                   JUNE 2009
Proc.Step TASK ELEMENT 5 STANDARD GradePALISADES NUCLEAR PLANT Page 4 of 10 JUNE 2009 JPM: RO/SRO-I SYS B 3.c Place Selector Switch 1/PRC-0101 to Channel 'A'.
Places Selector Switch 1/PRC-0101 to
 
Channel 'A'.
S  U  Evaluator:  If asked, state th at AUTO CONTROL IS DESIRED.
CRITICAL STEP
 
Proc.Step TASK ELEMENT 6 STANDARD Grade 3.d.1 Ensure Pzr Htr Control Channel Selector Switch in CHAN A & B.
Ensures Pzr Htr Control Channel Selector
 
Switch in CHAN A & B.
S  U Comment: 
 
Proc.Step TASK ELEMENT 7 STANDARD Grade 3.d.2 Ensure PIC-0101A setpoint set at desired PCS pressure.
Ensures PIC-0101A setpoint set to 2060 psia.
S  U Comment: 
 
Proc.Step TASK ELEMENT 8 STANDARD Grade 3.d.3 Adjust PIC-0101A output to match indicated Pzr Press (red pointer) with setpoint press (Blue pointer).
Adjusts PIC-0101A output to match indicated
 
Pzr Press (red pointer) with setpoint press (Blue pointer).
S  U Comment: 
 
Proc.Step TASK ELEMENT 9 STANDARD GradePALISADES NUCLEAR PLANT Page 5 of 10 JUNE 2009 JPM: RO/SRO-I SYS B PALISADES NUCLEAR PLANT Page 6 of 10 JUNE 2009 3.d.4 Depress the "A" pushbutton on PIC-0101A to place it in AUTO.
Depresses the "A" pushbutton on PIC-0101A to
 
place it in AUTO.
S  U Comment:
CRITICAL STEP
 
Proc.Step TASK ELEMENT 10 STANDARD Grade 3.e Place the unselected controller in MANUAL with a 50% output signal.
Places PIC-0101B in MANUAL with a 50%
 
output signal.
S  U Comment: 
 
NOTE:  When PIC-0101B is placed in MANUAL control, after ~ 20 seconds, PIC-0101A output will slowly start to fail high (to 100% output). This will cause Pzr Press. to lower (sprays open, heaters to minimum.)
 
Proc.Step TASK ELEMENT 11 STANDARD Grade---- Applicant should recognize the failure by observing the output of PIC-0101A failing
 
high. EK-0753 Pzr Press Off Normal Hi-Lo
 
alarm will also alert applicant of the
 
problem. Place PIC-0101A back to MANUAL and reduce
 
controller output to restore Pzr Press to 2060
 
psia. S  U Comment:  EVALUATOR NOTE:  Candidate may place 1/PRC-0101 back to Channel 'B'. This is acceptable. If so, proceed with JPM at Task Element 15.
CRITICAL STEP
 
JPM: RO/SRO-I SYS B Proc.Step TASK ELEMENT 12 STANDARD Grade---- Refers to ARP-4 window 53 and informs CRS of the problem with PIC-0101A.
ARP-4 referenced for EK-0753 and CRS
 
informed of the problem with PIC-0101A. 
 
Candidate will inform CRS to refer to ONP-18, Pressurizer Pressure Control Malfunctions.
S  U  EVALUATOR:  When informed to reference ONP-18, direct the operator to place PIC-0101B back in service in AUTO.
 
Proc.Step TASK ELEMENT 13 STANDARD Grade 3.a Verify PIC-0101B is in MANUAL.
PIC-0101B is in MANUAL.
S  U Comment: 
 
Proc.Step TASK ELEMENT 14 STANDARD Grade 3.b Adjust output signal on PIC-0101B to match output signal on PIC-0101A or desired
 
output. Adjusts output signal on PIC-0101B to desired
 
output. S  U Comment: 
 
Proc.Step TASK ELEMENT 15 STANDARD Grade 3.c Place selector switch 1/PRC-0101 to Channel 'B'.
Places selector switch 1/PRC-0101 to
 
Channel 'B'.
S  U  Evaluator:  If asked, state that AUTO control is desired.
CRITICAL STEP PALISADES NUCLEAR PLANT Page 7 of 10 JUNE 2009 JPM: RO/SRO-I SYS B Proc.Step TASK ELEMENT 16 STANDARD Grade 3.d.1 PZR HTR Channel Selector Switch may be placed in CHAN B position.
Places PZR HTR Channel Selector Switch in
 
CHAN B or leaves in CHAN A & B.
S  U Comment:
Evaluator NOTE:  Candidate may place switch in CHAN B or leave in CHAN A & B based on note preceding step 3.d.1.
 
Proc.Step TASK ELEMENT 17 STANDARD Grade 3.d.2 Ensure PIC-0101B setpoint set at desired PCS pressure.
Ensures PIC-0101B setpoint set at 2060 psia.
S  U Comment: 
 
Proc.Step TASK ELEMENT 18 STANDARD Grade 3.d.3 Adjust PIC-0101B output to match indicated Pzr Press (red pointer) with setpoint press (Blue pointer).
Adjusts PIC-0101B output to match indicated
 
Pzr Press (red pointer) with setpoint press (Blue pointer).
S  U Comment:
Evaluator NOTE:  Correct performance of Task Element 18 or Task Element 19 is Critical. It is preferred to perform both.
CRITICAL STEP
 
Proc.Step TASK ELEMENT 19 STANDARD Grade 3.d.4 Depress the "A" pushbutton on PIC-0101B to place it in AUTO.
Depresses the "A" pushbutton on PIC-0101B to
 
place it in AUTO.
S  U Comment:
CRITICAL STEP END OF TASK PALISADES NUCLEAR PLANT Page 8 of 10 JUNE 2009 JPM: RO/SRO-I SYS B SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-17.
Build Event Trigger #1:
o Event ZDI2P(315), this is manual pushbutton on PIC-0101B Place RX05A (PIC-0101A failed high), 20 se cond time delay, on Event Trigger 1.
PALISADES NUCLEAR PLANT Page 9 of 10 JUNE 2009 JPM: RO/SRO-I SYS B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
 
The plant is at steady state 100% power. Pressurizer Pressure Controller PIC-0101B is selected and is in AUTO.
Pressurizer Pressure Controller PIC-0101A is in MANUAL at 50% demand.
 
INITIATING CUES:
 
The Control Room Supervisor has directed you to switch Pressurizer Pressure Controllers per SOP-1A for normal rotation of controllers.
 
PALISADES NUCLEAR PLANT Page 10 of 10 JUNE 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
 
JPM: RO/SRO-I/SRO-U SYS C TITLE: OPEN MAIN STEAM ISOLATION VALVES AFTER REACTOR IS CRITICAL
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________


JPM: RO/SRO-I/SRO-U SYS C JOB PERFORMANCE MEASURE DATA PAGE  Task: Open MSIVs
JPM: RO/SRO-I SYS B Place Selector Switch 1/PRC-0101 to              Places Selector Switch 1/PRC-0101 to 3.c                                                                                                      S U Channel 'A'.                                    Channel 'A'.
Evaluator: If asked, state that AUTO CONTROL IS DESIRED.
CRITICAL STEP Proc.Step              TASK ELEMENT 6                                      STANDARD                      Grade Ensure Pzr Htr Control Channel Selector          Ensures Pzr Htr Control Channel Selector 3.d.1                                                                                                    S U Switch in CHAN A & B.                            Switch in CHAN A & B.
Comment:
Proc.Step              TASK ELEMENT 7                                      STANDARD                      Grade Ensure PIC-0101A setpoint set at desired 3.d.2                                                    Ensures PIC-0101A setpoint set to 2060 psia. S U PCS pressure.
Comment:
Proc.Step              TASK ELEMENT 8                                      STANDARD                      Grade Adjust PIC-0101A output to match indicated      Adjusts PIC-0101A output to match indicated 3.d.3  Pzr Press (red pointer) with setpoint press      Pzr Press (red pointer) with setpoint press      S U (Blue pointer).                                  (Blue pointer).
Comment:
Proc.Step              TASK ELEMENT 9                                      STANDARD                      Grade PALISADES NUCLEAR PLANT                        Page 5 of 10                                    JUNE 2009


Alternate Path: One MSIV will not open requiring ADV operation to open
JPM: RO/SRO-I SYS B Depress the "A" pushbutton on PIC-0101A          Depresses the "A" pushbutton on PIC-0101A to 3.d.4                                                                                                      S U to place it in AUTO.                              place it in AUTO.
Comment:
CRITICAL STEP Proc.Step              TASK ELEMENT 10                                        STANDARD                    Grade Place the unselected controller in MANUAL        Places PIC-0101B in MANUAL with a 50%
3.e                                                                                                      S U with a 50% output signal.                        output signal.
Comment:
NOTE: When PIC-0101B is placed in MANUAL control, after ~ 20 seconds, PIC-0101A output will slowly start to fail high (to 100% output). This will cause Pzr Press. to lower (sprays open, heaters to minimum.)
Proc.Step              TASK ELEMENT 11                                        STANDARD                    Grade Applicant should recognize the failure by observing the output of PIC-0101A failing        Place PIC-0101A back to MANUAL and reduce
  ----  high. EK-0753 Pzr Press Off Normal Hi-Lo          controller output to restore Pzr Press to 2060  S U alarm will also alert applicant of the            psia.
problem.
Comment:
EVALUATOR NOTE: Candidate may place 1/PRC-0101 back to Channel 'B'. This is acceptable. If so, proceed with JPM at Task Element 15.
CRITICAL STEP PALISADES NUCLEAR PLANT                          Page 6 of 10                                    JUNE 2009


Facility JPM #: 2007 CERT SRO JPM
JPM: RO/SRO-I SYS B Proc.Step            TASK ELEMENT 12                                      STANDARD                      Grade ARP-4 referenced for EK-0753 and CRS Refers to ARP-4 window 53 and informs          informed of the problem with PIC-0101A.
  ----                                                                                                  S U CRS of the problem with PIC-0101A.            Candidate will inform CRS to refer to ONP-18, Pressurizer Pressure Control Malfunctions.
EVALUATOR: When informed to reference ONP-18, direct the operator to place PIC-0101B back in service in AUTO.
Proc.Step            TASK ELEMENT 13                                      STANDARD                      Grade 3.a    Verify PIC-0101B is in MANUAL.                PIC-0101B is in MANUAL.                          S U Comment:
Proc.Step            TASK ELEMENT 14                                      STANDARD                      Grade Adjust output signal on PIC-0101B to match Adjusts output signal on PIC-0101B to desired 3.b    output signal on PIC-0101A or desired                                                          S U output.
output.
Comment:
Proc.Step            TASK ELEMENT 15                                      STANDARD                      Grade Place selector switch 1/PRC-0101 to            Places selector switch 1/PRC-0101 to 3.c                                                                                                    S U Channel 'B'.                                  Channel 'B'.
Evaluator: If asked, state that AUTO control is desired.
CRITICAL STEP PALISADES NUCLEAR PLANT                      Page 7 of 10                                    JUNE 2009


K/A: 035 K6.01 Importance: RO: 3.2 SRO: 3.
JPM: RO/SRO-I SYS B Proc.Step              TASK ELEMENT 16                                      STANDARD                      Grade PZR HTR Channel Selector Switch may be          Places PZR HTR Channel Selector Switch in 3.d.1                                                                                                    S U placed in CHAN B position.                      CHAN B or leaves in CHAN A & B.
Comment:
Evaluator NOTE: Candidate may place switch in CHAN B or leave in CHAN A & B based on note preceding step 3.d.1.
Proc.Step              TASK ELEMENT 17                                      STANDARD                      Grade Ensure PIC-0101B setpoint set at desired 3.d.2                                                   Ensures PIC-0101B setpoint set at 2060 psia. S U PCS pressure.
Comment:
Proc.Step              TASK ELEMENT 18                                      STANDARD                      Grade Adjust PIC-0101B output to match indicated      Adjusts PIC-0101B output to match indicated 3.d.3   Pzr Press (red pointer) with setpoint press      Pzr Press (red pointer) with setpoint press      S U (Blue pointer).                                  (Blue pointer).
Comment:
Evaluator NOTE: Correct performance of Task Element 18 or Task Element 19 is Critical. It is preferred to perform both.
CRITICAL STEP Proc.Step              TASK ELEMENT 19                                      STANDARD                      Grade Depress the "A" pushbutton on PIC-0101B          Depresses the "A" pushbutton on PIC-0101B to 3.d.4                                                                                                    S U to place it in AUTO.                            place it in AUTO.
Comment:
CRITICAL STEP END OF TASK PALISADES NUCLEAR PLANT                        Page 8 of 10                                    JUNE 2009


K/A Statement: Knowledge of the effect of a loss or malfunction of the following will have on the S/Gs:  MSIVs
JPM: RO/SRO-I SYS B SIMULATOR OPERATOR INSTRUCTIONS
* Reset to IC-17.
* Build Event Trigger #1:
o Event ZDI2P(315), this is manual pushbutton on PIC-0101B Place RX05A (PIC-0101A failed high), 20 second time delay, on Event Trigger 1.
PALISADES NUCLEAR PLANT              Page 9 of 10                          JUNE 2009


Task Standard: Both MSIVs Open, MSIV bypasses closed, ADVs and TBV in AUTO  
JPM: RO/SRO-I SYS B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* The plant is at steady state 100% power.
* Pressurizer Pressure Controller PIC-0101B is selected and is in AUTO.
* Pressurizer Pressure Controller PIC-0101A is in MANUAL at 50% demand.
INITIATING CUES:
The Control Room Supervisor has directed you to switch Pressurizer Pressure Controllers per SOP-1A for normal rotation of controllers.
PALISADES NUCLEAR PLANT                Page 10 of 10                        JUNE 2009


Preferred Evaluation Location: Simulator _X__  In Plant ______
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO/SRO-I/SRO-U SYS C TITLE: OPEN MAIN STEAM ISOLATION VALVES AFTER REACTOR IS CRITICAL CANDIDATE: _____________________________________________
EXAMINER_____________________________________________


Preferred Evaluation Method: Perform _X__ Simulate ______  
JPM: RO/SRO-I/SRO-U SYS C JOB PERFORMANCE MEASURE DATA PAGE Task:    Open MSIVs Alternate Path: One MSIV will not open requiring ADV operation to open Facility JPM #: 2007 CERT SRO JPM K/A:    035 K6.01 Importance:        RO:    3.2    SRO:  3.6 K/A Statement: Knowledge of the effect of a loss or malfunction of the following will have on the S/Gs: MSIVs Task Standard: Both MSIVs Open, MSIV bypasses closed, ADVs and TBV in AUTO Preferred Evaluation Location: Simulator      _X__      In Plant    ______
Preferred Evaluation Method:       Perform     _X__     Simulate   ______


==References:==
==References:==
SOP-7, Main Steam System Validation Time: __15__ minutes        Time Critical: NO Candidate: _________________________________________
Time Start: ________        Time Finish:      ________
Performance Time:      ________ minutes Performance Rating:    SAT______          UNSAT ______
Comments:
Examiner: _______________________________                Date:    ______________
Signature PALISADES NUCLEAR PLANT              Page 2 of 10                          JUNE 2009


SOP-7, "Main Steam System"
JPM: RO/SRO-I/SRO-U SYS C EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-7, Main Steam System Also see Simulator Operator Instructions (last page of this document).
Validation Time: __15__ minutes  Time Critical: NO
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate: _________________________________________
INITIAL CONDITIONS:
 
The reactor is critical with power at the POAH. MSIV Bypass valves, MO-0501 and MO-0510 are open. Vacuum is established on the Main Turbine and the secondary plant is in the process of being started up.
Time Start: ________  Time Finish: ________
INITIATING CUES:
 
The CRS directs you to open the MSIVs per SOP-7, step 7.2.2.c.
Performance Time:  ________  minutes
PALISADES NUCLEAR PLANT               Page 3 of 10                           JUNE 2009
 
Performance Rating: SAT______  UNSAT ______
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 10 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS C EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
SOP-7, Main Steam System  
 
Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assi gned task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
The reactor is critical with power at the POAH. MSIV Bypass valves, MO-0501 and  
 
MO-0510 are open. Vacuum is established on the Main Turbine and the secondary plant is in the process of being started up.  
 
INITIATING CUES:  
 
The CRS directs you to open the MS IVs per SOP-7, step 7.2.2.c.  
 
PALISADES NUCLEAR PLANT Page 3 of 10 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS C Proc. Step TASK ELEMENT 1 STANDARD Grade--- Locate correct procedure Candidate locates SOP-7, section 7.2.2 S  U Comment:
Evaluator:  Provide candidate with a working copy of SOP-7, section 7.2.2.
 
Proc. Step TASK ELEMENT 2 STANDARD Grade 7.2.2.c LATCH MSIV solenoid valves. Candidate contacts Auxiliary Operator to latch all MSIV solenoids in the turbine building and 'D'
 
bus area.
S  U Comment:
SIM OPERATOR:  Use MS36 on P&ID MS02, DO NOT latch 'A' MSIV (MS25) but report that it is complete.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 3 STANDARD Grade d IF MSIVs opened after performance of Step 7.2.2c, THEN GO TO Step 7.2.2q.
Candidate determines that CV-0510, 'A' S/G
 
MSIV, did not open. Proceeds to step 7.2.2.e S  U Comment:
Evaluator:  Role play as CRS and direct candida te to proceed to step 7.2.2.e, if asked.
CRITICAL STEP
 
PALISADES NUCLEAR PLANT Page 4 of 10 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS C PALISADES NUCLEAR PLANT Page 5 of 10 JUNE 2009 Proc. Step TASK ELEMENT 4 STANDARD Grade e ENSURE CV-0511, Turbine Bypass to Condenser, remains CLOSED by
 
performing the following:
Candidate performs the following: ___ PLACEs PIC-0511, Turbine Bypass Valve Control to MANUAL. ___ Sets PIC-0511, Turbine Bypass Control Valve to CLOSE. ___ Has AO Close MV-CA390, Turbine Bypass CV-0511 A/S Isolation. ___ Has AO OPEN accumulator drain valve to bleed pressure from CV-0511 accumulator, THEN CLOSE the valve.
S  U Comment:
SIM OPERATOR:  Use MS35 on PIDMS03 to close air supply to CV-0511, then notify as AO that air supply is closed and accumulator is bled down
 
Proc. Step TASK ELEMENT 5 STANDARD Grade f PERFORM the following notifications of impending Steam Dump operation:
Candidate informs CRS to notify Chemistry and
 
to refer to ADMIN 4.00.
S  U Comment:
Evaluator:  Notify Candidate that the SE will perform this.
 
Proc. Step TASK ELEMENT 6 STANDARD Grade g CLOSE three of the four Steam Dump Air Supplies for the MSIV to be opened, listed
 
below: Candidate directs Auxiliary Operator to close the
 
following valves in the ADV control cabinet:
___ MV-CA779
 
___ MV-CA780
___ MV-CA781 OR MV-CA782 S  U Comment:  Evaluator NOTE:  LCO 3.7.4.A is applicable. If candidate asks, notify them that the CRS will take care of this.
SIM OPERATOR:  Use MS18, MS19, MS20 (or MS21) on PID MS01 to close these valves CRITICAL STEP
 
JPM: RO/SRO-I/SRO-U SYS C Proc. Step TASK ELEMENT 7 STANDARD Grade h, i PLACE HIC-0780A, Steam Generator E-50B Steam Dump to MANUAL.
OPERATE HIC-0780A toward 100%
OPEN position to equalize DP across
 
MSIV. Candidate: ___ Places HIC-0780A in Manual
___ Operates manual output lever to open ADV until MSIV CV-0510 opens.
S  U Comment:
Evaluator NOTE:  If candidate asks, inform them that the required notifications are made. Evaluator NOTE:  CV-0510 will latch when HIC-0780A reaches ~25% output.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 8 STANDARD Grade j WHEN MSIV opens, THEN PLACE HIC-0780A to CLOSE position.
Candidate Operates manual output lever to close ADV.
S  U Comment:
CRITICAL STEP


Proc. Step TASK ELEMENT 9 STANDARD Grade k OPEN Steam Dump Air Supplies closed in Step 7.2.2g above.
JPM: RO/SRO-I/SRO-U SYS C Proc. Step             TASK ELEMENT 1                                  STANDARD                         Grade
Candidate has AO open:
  ---      Locate correct procedure                  Candidate locates SOP-7, section 7.2.2              S U Comment:
___ MV-CA779
Evaluator: Provide candidate with a working copy of SOP-7, section 7.2.2.
Proc. Step             TASK ELEMENT 2                                  STANDARD                          Grade Candidate contacts Auxiliary Operator to latch 7.2.2.c    LATCH MSIV solenoid valves.                all MSIV solenoids in the turbine building and 'D'  S U bus area.
Comment:
SIM OPERATOR: Use MS36 on P&ID MS02, DO NOT latch 'A' MSIV (MS25) but report that it is complete.
CRITICAL STEP Proc. Step              TASK ELEMENT 3                                  STANDARD                          Grade IF MSIVs opened after performance of      Candidate determines that CV-0510, 'A' S/G d                                                                                                      S U Step 7.2.2c, THEN GO TO Step 7.2.2q.      MSIV, did not open. Proceeds to step 7.2.2.e Comment:
Evaluator: Role play as CRS and direct candidate to proceed to step 7.2.2.e, if asked.
CRITICAL STEP PALISADES NUCLEAR PLANT                Page 4 of 10                                    JUNE 2009


___ MV-CA780
JPM: RO/SRO-I/SRO-U SYS C Proc. Step              TASK ELEMENT 4                                    STANDARD                      Grade Candidate performs the following:
___ MV-CA781 OR MV-CA782 S  U Comment:
___ PLACEs PIC-0511, Turbine Bypass Valve Control to MANUAL.
SIM OPERATOR: Use MS18, MS19, MS20 (or MS21) on PID MS01 to open the valves that were closed in Task Element #6.
ENSURE CV-0511, Turbine Bypass to          ___ Sets PIC-0511, Turbine Bypass Control e      Condenser, remains CLOSED by                      Valve to CLOSE.                              S U performing the following:                  ___ Has AO Close MV-CA390, Turbine Bypass CV-0511 A/S Isolation.
CRITICAL STEP
___ Has AO OPEN accumulator drain valve to bleed pressure from CV-0511 accumulator, THEN CLOSE the valve.
Comment:
SIM OPERATOR: Use MS35 on PIDMS03 to close air supply to CV-0511, then notify as AO that air supply is closed and accumulator is bled down Proc. Step              TASK ELEMENT 5                                    STANDARD                      Grade PERFORM the following notifications of      Candidate informs CRS to notify Chemistry and f                                                                                                      S U impending Steam Dump operation:            to refer to ADMIN 4.00.
Comment:
Evaluator: Notify Candidate that the SE will perform this.
Proc. Step              TASK ELEMENT 6                                    STANDARD                      Grade Candidate directs Auxiliary Operator to close the following valves in the ADV control cabinet:
CLOSE three of the four Steam Dump Air g      Supplies for the MSIV to be opened, listed  ___ MV-CA779                                      S U below:                                      ___ MV-CA780
___ MV-CA781 OR MV-CA782 Comment:
Evaluator NOTE: LCO 3.7.4.A is applicable. If candidate asks, notify them that the CRS will take care of this.
SIM OPERATOR: Use MS18, MS19, MS20 (or MS21) on PID MS01 to close these valves CRITICAL STEP PALISADES NUCLEAR PLANT                Page 5 of 10                                    JUNE 2009


PALISADES NUCLEAR PLANT Page 6 of 10 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS C Proc. Step TASK ELEMENT 10 STANDARD Grade l IF both MSIVs did NOT open, THEN REPEAT Steps 7.2.2g through 7.2.2k for
JPM: RO/SRO-I/SRO-U SYS C Proc. Step             TASK ELEMENT 7                                    STANDARD                     Grade PLACE HIC-0780A, Steam Generator            Candidate:
E-50B Steam Dump to MANUAL.
___ Places HIC-0780A in Manual h, i    OPERATE HIC-0780A toward 100%                                                              S U OPEN position to equalize DP across        ___ Operates manual output lever to open ADV MSIV.                                            until MSIV CV-0510 opens.
Comment:
Evaluator NOTE: If candidate asks, inform them that the required notifications are made.
Evaluator NOTE: CV-0510 will latch when HIC-0780A reaches ~25% output.
CRITICAL STEP Proc. Step            TASK ELEMENT 8                                    STANDARD                    Grade WHEN MSIV opens, THEN PLACE                Candidate Operates manual output lever to j                                                                                                  S U HIC-0780A to CLOSE position.                close ADV.
Comment:
CRITICAL STEP Proc. Step            TASK ELEMENT 9                                    STANDARD                    Grade Candidate has AO open:
OPEN Steam Dump Air Supplies closed in      ___ MV-CA779 k                                                                                                  S U Step 7.2.2g above.                         ___ MV-CA780
___ MV-CA781 OR MV-CA782 Comment:
SIM OPERATOR: Use MS18, MS19, MS20 (or MS21) on PID MS01 to open the valves that were closed in Task Element #6.
CRITICAL STEP PALISADES NUCLEAR PLANT                Page 6 of 10                                  JUNE 2009


JPM: RO/SRO-I/SRO-U SYS C Proc. Step            TASK ELEMENT 10                                    STANDARD                        Grade IF both MSIVs did NOT open, THEN Candidate determines this step is N/A because l      REPEAT Steps 7.2.2g through 7.2.2k for                                                        S U both MSIVs are now open.
affected MSIV.
affected MSIV.
Candidate determines this step is N/A because
Comment:
 
Proc. Step           TASK ELEMENT 11                                   STANDARD                         Grade Candidate has AO:
both MSIVs are now open.
CLOSE CV-0511 accumulator drain valve.
S  U Comment:
___ CLOSE CV-0511 accumulator drain valve m, n      OPEN MV-CA390, Turbine Bypass                                                                 S U CV-0511 A/S Isol.                         ___ OPEN MV-CA390, Turbine Bypass CV-0511 A/S Isol.
 
Comment:
Proc. Step TASK ELEMENT 11 STANDARD Grade m, n CLOSE CV-0511 accumulator drain valve.
SIM OPERATOR: Use MS35 on PIDMS03 to open air supply to CV-0511.
OPEN MV-CA390, Turbine Bypass  
CRITICAL STEP Proc. Step           TASK ELEMENT 12                                   STANDARD                         Grade RETURN HIC-0780A to AUTO or the AS FOUND position.                           Candidate places HIC-0780A and CV-0511 in o, p                                                AUTO by depressing the 'A' button on their         S U RETURN PIC-0511 to AUTO or the AS          controllers and verifying the 'A' button lights.
 
FOUND position.
CV-0511 A/S Isol.
Comment:
Candidate has AO: ___ CLOSE CV-0511 accumulator drain valve
EVALUATOR NOTE: If asked, inform candidate that PIC-0511 and HIC-0780A should be placed back in AUTO.
___ OPEN MV-CA390, Turbine Bypass CV-0511 A/S Isol.
CRITICAL STEP PALISADES NUCLEAR PLANT               Page 7 of 10                                       JUNE 2009
S  U Comment:
SIM OPERATOR: Use MS35 on PIDMS03 to open air supply to CV-0511.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 12 STANDARD Grade o, p RETURN HIC-0780A to AUTO or the AS FOUND position.
RETURN PIC-0511 to AUTO or the AS FOUND position.
Candidate places HIC-0780A and CV-0511 in  
 
AUTO by depressing the 'A' button on their  
 
controllers and verifying the 'A' button lights.
S  U Comment:
EVALUATOR NOTE: If asked, inform candida te that PIC-0511 and HIC-0780A should be placed back in AUTO. CRITICAL STEP
 
PALISADES NUCLEAR PLANT Page 7 of 10 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS C PALISADES NUCLEAR PLANT Page 8 of 10 JUNE 2009 Proc. Step TASK ELEMENT 13 STANDARD Grade q CLOSE the following valves:
* MO-0501, MSIV CV-0501 Bypass (MZ-3)
* MO-0510, MSIV CV-0510 Bypass (MZ-2)
Candidate closes MO-0501 and MO-0510 by holding switch in the CLOSE position until
 
associated Green light is ON and Red light is
 
OFF. S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 14 STANDARD Grade--- Candidate informs the CRS that the MSIVs are open and the MSIV bypasses are
 
closed. CRS informed.
S  U Comment: 
 
END OF TASK
 
JPM: RO/SRO-I/SRO-U SYS C SIMULATOR OPERATOR INSTRUCTIONS IC-12 Open MSIV Bypass Valves
 
Close MSIVs
 
Trip 'B' MFP, start P-8A
 
Ensure Reactor Power is < 2% (limit for MSIV Bypass valves open)[insert Group 4 rods to approximately 35"]
 
Insert the following triggers:  Trigger: 1 Event: ZAO3F(62).gt.0.25  (ADV Controller reaches 25% output)
Action: irf ms25 latch  (opens MSIV)
 
PALISADES NUCLEAR PLANT Page 9 of 10 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS C CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
 
The reactor is critical with power at the POAH. MSIV Bypass valves, MO-0501 and


MO-0510 are open. Vacuum is established on the Main Turbine and the secondary plant is in the process of being warmed up.
JPM: RO/SRO-I/SRO-U SYS C Proc. Step            TASK ELEMENT 13                                    STANDARD                    Grade CLOSE the following valves:                Candidate closes MO-0501 and MO-0510 by holding switch in the CLOSE position until q
* MO-0501, MSIV CV-0501 Bypass (MZ-3)                                                      S U associated Green light is ON and Red light is
* MO-0510, MSIV CV-0510 Bypass (MZ-2)      OFF.
Comment:
CRITICAL STEP Proc. Step            TASK ELEMENT 14                                    STANDARD                    Grade Candidate informs the CRS that the MSIVs
  ---      are open and the MSIV bypasses are          CRS informed.                                  S U closed.
Comment:
END OF TASK PALISADES NUCLEAR PLANT                Page 8 of 10                                  JUNE 2009


INITIATING CUES:  
JPM: RO/SRO-I/SRO-U SYS C SIMULATOR OPERATOR INSTRUCTIONS IC-12 Open MSIV Bypass Valves Close MSIVs Trip 'B' MFP, start P-8A Ensure Reactor Power is < 2% (limit for MSIV Bypass valves open)[insert Group 4 rods to approximately 35]
Insert the following triggers:
Trigger: 1 Event: ZAO3F(62).gt.0.25 (ADV Controller reaches 25% output)
Action: irf ms25 latch (opens MSIV)
PALISADES NUCLEAR PLANT          Page 9 of 10                          JUNE 2009


JPM: RO/SRO-I/SRO-U SYS C CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
The reactor is critical with power at the POAH. MSIV Bypass valves, MO-0501 and MO-0510 are open. Vacuum is established on the Main Turbine and the secondary plant is in the process of being warmed up.
INITIATING CUES:
The CRS directs you to open the MSIVs per SOP-7 step 7.2.2.c.
The CRS directs you to open the MSIVs per SOP-7 step 7.2.2.c.
PALISADES NUCLEAR PLANT Page 10 of 10 JUNE 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
PALISADES NUCLEAR PLANT             Page 10 of 10                     JUNE 2009
 
JPM: RO/SRO-I/SRO-U SYS D TITLE: WITHDRAW SHUTDOWN GROUP CONTROL RODS
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM: RO/SRO-I/SRO-U SYS D JOB PERFORMANCE MEASURE DATA PAGE  Task: Withdraw Shutdown Group Control Rods
 
Alternate Path: YES - 1 rod sticks during withdrawal
 
Facility JPM #:  NEW
 
K/A: 001K4.13  Importance:  SRO: 3.4  RO:
3.4 K/A Statement: Knowledge of CRDS design f eatures/interlocks which provide for the following:  Operation of CRDS controls fo r withdrawing lingering rods and transferring rods and rod groups.
 
Task Standard: All Shutdown Group 'B' Control Rods withdrawn 66 inches.


Preferred Evaluation Location: Simulator __X__  In Plant ______
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO-I/SRO-U SYS D TITLE:        WITHDRAW SHUTDOWN GROUP CONTROL RODS CANDIDATE: _____________________________________________
EXAMINER_____________________________________________


Preferred Evaluation Method: Perform __X__ Simulate ______  
JPM: RO/SRO-I/SRO-U SYS D JOB PERFORMANCE MEASURE DATA PAGE Task:    Withdraw Shutdown Group Control Rods Alternate Path: YES - 1 rod sticks during withdrawal Facility JPM #:    NEW K/A:    001K4.13            Importance:      SRO:    3.4    RO:    3.4 K/A Statement: Knowledge of CRDS design features/interlocks which provide for the following: Operation of CRDS controls for withdrawing lingering rods and transferring rods and rod groups.
Task Standard: All Shutdown Group B Control Rods withdrawn 66 inches.
Preferred Evaluation Location: Simulator      __X__      In Plant    ______
Preferred Evaluation Method:       Perform     __X__       Simulate   ______


==References:==
==References:==
SOP-6, Reactor Control System ARP-5, Primary Coolant Pump Steam Generator and Rod Drives Scheme EK-09 (C-12)
Validation Time: __20___ minutes          Time Critical:  NO Candidate: ________________________________________
Time Start: ________        Time Finish:      ________
Performance Time:      ________ minutes Performance Rating:    SAT______          UNSAT ______
Comments:
Examiner: _______________________________                  Date:    ______________
Signature PALISADES NUCLEAR PLANT                  Page 2 of 13                          JUNE 2009


SOP-6, "Reactor Control System"    ARP-5, "Primary Coolant Pu mp Steam Generator and Rod Drives Scheme EK-09 (C-12)"
JPM: RO/SRO-I/SRO-U SYS D EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-6, Reactor Control System ARP-5, Primary Coolant Pump Steam Generator and Rod Drives Scheme Also see Simulator Operator Instructions (last page of this document).
Validation Time: __20___  minutes  Time Critical: NO
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate: ________________________________________
INITIAL CONDITIONS:
 
Preparations for a critical approach are in progress per GOP-3, Mode 3 525&deg;F To MODE 2. GOP-3 is completed through step 2.1.a.
Time Start: ________  Time Finish: ________
INITIATING CUES:
 
The Control Room Supervisor has directed you to perform Section 7.1.2 of SOP-6, "Reactor Control System" for withdrawal of Shutdown Group B Control Rods. Section 7.1.1 has already been performed.
Performance Time:  ________  minutes
PALISADES NUCLEAR PLANT                    Page 3 of 13                            JUNE 2009
 
Performance Rating: SAT______  UNSAT ______
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 13 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS D PALISADES NUCLEAR PLANT Page 3 of 13 JUNE 2009 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
SOP-6, Reactor Control System ARP-5, Primary Coolant Pump Steam Generator and Rod Drives Scheme  
 
Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have  
 
completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
Preparations for a critical approach are in progress per GOP-3, "Mode 3   525&deg;F To MODE 2.GOP-3 is completed through step 2.1.a.  
 
INITIATING CUES:  
 
The Control Room Supervisor has directed you to perform Section 7.1.2 of SOP-6, "Reactor Control System" for withdrawal of Shutdown Group 'B' Control Rods. Section 7.1.1 has already been performed.  
 
JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 1 STANDARD Grade--- Obtains current procedure.
Obtains and refers to SOP-6, Section 7.1.2.
S  U Comment:
Evaluator:  Provide a working copy of SOP-6, section 7.1.2 to candidate.
 
Proc.Step TASK ELEMENT 2 STANDARD Grade SOP-6 7.1.2.a Ensure all rods of Group 'A' are withdrawn greater than or equal to 128 inches.
Candidate checks PPC (page 420) and/or
 
Panel C-02 display to verify Group 'A' rods are


JPM: RO/SRO-I/SRO-U SYS D Proc.Step              TASK ELEMENT 1                                      STANDARD                      Grade
  ---    Obtains current procedure.                      Obtains and refers to SOP-6, Section 7.1.2.      S U Comment:
Evaluator: Provide a working copy of SOP-6, section 7.1.2 to candidate.
Proc.Step              TASK ELEMENT 2                                      STANDARD                      Grade SOP-6                                                    Candidate checks PPC (page 420) and/or Ensure all rods of Group A are withdrawn Panel C-02 display to verify Group A rods are  S U 7.1.2.a  greater than or equal to 128 inches.
above 128 inches.
above 128 inches.
S  U Comment:
Comment:
 
Proc.Step             TASK ELEMENT 3                                     STANDARD                       Grade SOP-6 Place Group Selector Switch to B position. Group Selector Switch placed in B position. S U 7.1.2.b Comment:
Proc.Step TASK ELEMENT 3 STANDARD Grade SOP-6 7.1.2.b Place Group Selector Switch to 'B' position.
CRITICAL STEP Proc.Step             TASK ELEMENT 4                                     STANDARD                       Grade SOP-6   Place Mode Selector Switch to MG (Manual Mode Selector Switch placed in MG position.     S U 7.1.2.c  Group) position.
Group Selector Switch placed in 'B' position.
Comment:
S U Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                        Page 4 of 13                                    JUNE 2009
CRITICAL STEP
 
Proc.Step TASK ELEMENT 4 STANDARD Grade SOP-6 7.1.2.c Place Mode Selector Switch to MG (Manual Group) position.
Mode Selector Switch placed in MG position.
S U Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 13 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS D PALISADES NUCLEAR PLANT Page 5 of 13 JUNE 2009 Proc.Step TASK ELEMENT 5 STANDARD Grade SOP-6 7.1.2.d Operate Raise-Lower Switch to RAISE position.
Raise-Lower Switch place in RAISE position.
S  U Comment:
CRITICAL STEP
 
Proc.Step TASK ELEMENT 6 STANDARD Grade SOP-6 7.1.2.e Monitor Nuclear Instrumentation (NI) for response during rod movement.
NIs monitored as rods are moved.
S  U Comment:
Evaluator Note: Group 'B' rods PIP/SPI diffe rence alarms on PPC are expected alarms as described by SOP-6 section 5.3.
 
Proc.Step TASK ELEMENT 7 STANDARD Grade SOP-6 7.1.2.f Stop movement of rods approximately every 33 inches (should not exceed 35 inches) of  


JPM: RO/SRO-I/SRO-U SYS D Proc.Step            TASK ELEMENT 5                                    STANDARD                      Grade SOP-6    Operate Raise-Lower Switch to RAISE Raise-Lower Switch place in RAISE position. S U 7.1.2.d  position.
Comment:
CRITICAL STEP Proc.Step            TASK ELEMENT 6                                      STANDARD                    Grade SOP-6    Monitor Nuclear Instrumentation (NI) for NIs monitored as rods are moved.              S U 7.1.2.e  response during rod movement.
Comment:
Evaluator Note: Group B rods PIP/SPI difference alarms on PPC are expected alarms as described by SOP-6 section 5.3.
Proc.Step            TASK ELEMENT 7                                    STANDARD                      Grade SOP-6    Stop movement of rods approximately every Control Rod motion stopped prior to exceeding 33 inches (should not exceed 35 inches) of                                                    S U 7.1.2.f                                                35 inches of movement.
rod movement.
rod movement.
Control Rod motion stopped prior to exceeding
Comment:
 
Proc.Step             TASK ELEMENT 8                                     STANDARD                     Grade SOP-6   WHEN rod motion has stopped, THEN             Candidate observes SUR indication on Panel S U 7.1.2.f.1 OBSERVE proper reduction in startup rate.     C-02 and/or PPC.
35 inches of movement.
Comment:
S  U Comment:
PALISADES NUCLEAR PLANT                       Page 5 of 13                                   JUNE 2009
 
Proc.Step TASK ELEMENT 8 STANDARD Grade SOP-6 7.1.2.f.1 WHEN rod motion has stopped, THEN OBSERVE proper reduction in startup rate.
Candidate observes SUR indication on Panel  
 
C-02 and/or PPC.
S U Comment: 
 
JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 9 STANDARD Grade SOP-6 7.1.2.f.2 PERFORM Control Rod alignment verification Uses at least one of following methods to verify
 
all Group 'B' rods are within 2 inches of each
 
other: -TURN Rod Selector Switch for Group 'B' through all of its positions AND COMPARE
 
Control Rod positions. - Use the PPC Control Rod position indication for Group 'B' rods.
S  U Comment:
EVALUATOR NOTE:
IF candidate attempts to level Control Rod #15 after first 33-inch pull, as CRS inform them to follow procedure and not level rods until procedure criteria is met (i.e. more than 2 inches).
 
Proc.Step TASK ELEMENT 10 STANDARD Grade SOP-6 7.1.2.d Continue Group 'B' withdrawal:
Operate Raise-Lower Switch to RAISE position.
Raise-Lower Switch place in RAISE position.
S  U Comment:
EVALUATOR NOTE:
When Rod 18 is > 45 inches, it will become stuck.
CRITICAL STEP
 
Proc.Step TASK ELEMENT 11 STANDARD Grade SOP-6 7.1.2.e Monitor Nuclear Instrumentation (NI) for response during rod movement.
NIs monitored as rods are moved.
S  U Comment: 
 
PALISADES NUCLEAR PLANT Page 6 of 13 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 12 STANDARD Grade ARP-5 Window 11 Alarm EK-0911 "Rod Position 4 Inches Deviation," Annunciates Control Rod motion stopped by releasing
 
Raise-Lower switch.
ARP-5 referenced for window 11 S  U Comment:
CRITICAL STEP
 
Proc.Step TASK ELEMENT 13 STANDARD Grade ARP-5 Window 11 IDENTIFY affected Control Rod AND extent of its deviation.
On PPC display 411, Rod 18 identified OR
 
confirm on Panel C-02 by placing Group 'B'
 
Selector Switch to "18" S  U Comment:
CRITICAL STEP
 
Proc.Step TASK ELEMENT 14 STANDARD Grade ARP-5 Window 11 COMPARE affected rod position with secondary rod position.
Verifies Rod 18 position is 4 inches lower than
 
remaining rods in Group 'B' using available
 
indications. Also notes that Rod 15 is more
 
than 2 inches different from remainder of
 
group. S  U Comment: 
 
Proc.Step TASK ELEMENT 15 STANDARD Grade ARP-5 Window 11 REPOSITION Control Rod in Manual Individual as necessary to clear alarm per
 
SOP-6 Refers to SOP-6, section 7.4.
S  U Comment:
Evaluator:  Provide candidate with a working copy of SOP-6, section 7.4 PALISADES NUCLEAR PLANT Page 7 of 13 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 16 STANDARD Grade SOP-6 7.4.a REFER to Step 4.4.1 SOP-6 Step 4.4.1 reviewed.
S  U Comment:
NOTE:  Step 7.4.b is not applicable; step 7.4.
c and d have already been performed in ARP-5 actions.
 
Proc.Step TASK ELEMENT 17 STANDARD Grade SOP-6 7.4.e PLACE Rod Selector Switch in the position for the rod to be moved.
Rod Selector Switch for Group 'B' placed in
 
position '18' S  U Comment:
CRITICAL STEP
 
Proc.Step TASK ELEMENT 18 STANDARD Grade SOP-6 7.4.f TURN Group Selector Switch to the position for the group containing the rod to be
 
moved. Group Selector Switch placed in 'Group B'
 
position.
S  U Comment: 
 
Proc.Step TASK ELEMENT 19 STANDARD Grade SOP-6 7.4.g PLACE Mode Selector Switch to MI (Manual Individual) position.
Mode Selector Switch placed in 'MI' position.
S  U Comment:
NOTE:  This deletes the stuck rod malfunction.
CRITICAL STEP PALISADES NUCLEAR PLANT Page 8 of 13 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 20 STANDARD Grade SOP-6 7.4.h Withdraw selected rod to clear 4-inch deviation alarm. ___ Operates ROD CONTROL joystick to
 
RAISE. ___ Rod 18 withdrawn to be within 2.0" of other Group 'B' rods. ___ Observes 4-Inch Deviation alarm clears.
S  U Comment:
CRITICAL STEP
 
Proc.Step TASK ELEMENT 21 STANDARD Grade SOP-6 7.4.h Withdraw selected rod to level Rod 15. ___ Rod Selector Switch for Group 'B' placed in position '15' ___ Operates ROD CONTROL joystick to RAISE. ___ Rod 15 withdrawn to be within 2.0" of other Group 'B' rods.
S  U Comment: 
 
Proc.Step TASK ELEMENT 22 STANDARD Grade SOP-6 7.4.i PLACE the Group Selector Switch to desired position.
Group Selector Switch placed in 'Group B'
 
position.
S  U Comment:
 
PALISADES NUCLEAR PLANT Page 9 of 13 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 23 STANDARD Grade SOP-6 7.4.j PLACE the Mode Selector Switch in MS (Manual Sequential) or as directed by the


Shift Manager.
JPM: RO/SRO-I/SRO-U SYS D Proc.Step              TASK ELEMENT 9                                        STANDARD                    Grade Uses at least one of following methods to verify all Group B rods are within 2 inches of each other:
Mode Selector Switch place in MG position S U Comment:
SOP-6    PERFORM Control Rod alignment                  -TURN Rod Selector Switch for Group B S U 7.1.2.f.2 verification                                  through all of its positions AND COMPARE Control Rod positions.
EVALUATOR: If asked as Shift Manager: direct Mode Selector Switch be placed in the Manual Group (MG) position.
                                                        - Use the PPC Control Rod position indication for Group B rods.
CRITICAL STEP
Comment:
EVALUATOR NOTE: IF candidate attempts to level Control Rod #15 after first 33-inch pull, as CRS inform them to follow procedure and not level rods until procedure criteria is met (i.e. more than 2 inches).
Proc.Step              TASK ELEMENT 10                                      STANDARD                    Grade Continue Group B withdrawal:
SOP-6 Operate Raise-Lower Switch to RAISE            Raise-Lower Switch place in RAISE position.      S U 7.1.2.d position.
Comment:
EVALUATOR NOTE: When Rod 18 is > 45 inches, it will become stuck.
CRITICAL STEP Proc.Step              TASK ELEMENT 11                                      STANDARD                    Grade SOP-6    Monitor Nuclear Instrumentation (NI) for NIs monitored as rods are moved.                  S U 7.1.2.e  response during rod movement.
Comment:
PALISADES NUCLEAR PLANT                      Page 6 of 13                                      JUNE 2009


Proc.Step TASK ELEMENT 24 STANDARD Grade SOP-6 7.1.2.d Continue withdrawal of Group 'B' rods:
JPM: RO/SRO-I/SRO-U SYS D Proc.Step               TASK ELEMENT 12                                    STANDARD                     Grade ARP-5                                                    Control Rod motion stopped by releasing Alarm EK-0911 Rod Position 4 Inches            Raise-Lower switch.
Operate Raise-Lower Switch to RAISE position.
Window                                                                                                    S U Deviation, Annunciates 11                                                    ARP-5 referenced for window 11 Comment:
Raise-Lower Switch place in RAISE position.
CRITICAL STEP Proc.Step              TASK ELEMENT 13                                    STANDARD                      Grade ARP-5                                                    On PPC display 411, Rod 18 identified OR IDENTIFY affected Control Rod AND extent Window                                                    confirm on Panel C-02 by placing Group B       S U of its deviation.
S U Comment:
11                                                    Selector Switch to 18 Comment:
CRITICAL STEP
CRITICAL STEP Proc.Step              TASK ELEMENT 14                                    STANDARD                      Grade Verifies Rod 18 position is 4 inches lower than ARP-5                                                    remaining rods in Group B using available COMPARE affected rod position with Window                                                    indications. Also notes that Rod 15 is more      S U secondary rod position.
11                                                    than 2 inches different from remainder of group.
Comment:
Proc.Step              TASK ELEMENT 15                                    STANDARD                      Grade ARP-5    REPOSITION Control Rod in Manual Window    Individual as necessary to clear alarm per      Refers to SOP-6, section 7.4.                   S U 11    SOP-6 Comment:
Evaluator: Provide candidate with a working copy of SOP-6, section 7.4 PALISADES NUCLEAR PLANT                        Page 7 of 13                                    JUNE 2009


Proc.Step TASK ELEMENT 25 STANDARD Grade SOP-6 7.1.2.e Monitor Nuclear Instrumentation (NI) for response during rod movement.
JPM: RO/SRO-I/SRO-U SYS D Proc.Step             TASK ELEMENT 16                                    STANDARD                       Grade SOP-6 REFER to Step 4.4.1                              SOP-6 Step 4.4.1 reviewed.                      S U 7.4.a Comment:
NIs monitored as rods are moved.
NOTE: Step 7.4.b is not applicable; step 7.4.c and d have already been performed in ARP-5 actions.
S U Comment:
Proc.Step              TASK ELEMENT 17                                    STANDARD                      Grade SOP-6    PLACE Rod Selector Switch in the position        Rod Selector Switch for Group B placed in S U 7.4.e   for the rod to be moved.                        position 18 Comment:
CRITICAL STEP Proc.Step              TASK ELEMENT 18                                    STANDARD                      Grade SOP-6    TURN Group Selector Switch to the position Group Selector Switch placed in Group B for the group containing the rod to be                                                          S U 7.4.f                                                    position.
moved.
Comment:
Proc.Step              TASK ELEMENT 19                                    STANDARD                      Grade SOP-6    PLACE Mode Selector Switch to MI (Manual Mode Selector Switch placed in MI position. S U 7.4.g  Individual) position.
Comment:
NOTE: This deletes the stuck rod malfunction.
CRITICAL STEP PALISADES NUCLEAR PLANT                        Page 8 of 13                                    JUNE 2009


Proc.Step TASK ELEMENT 26 STANDARD Grade SOP-6 7.1.2.f Stop movement of rods approximately every 33 inches (should not exceed 35 inches) of  
JPM: RO/SRO-I/SRO-U SYS D Proc.Step             TASK ELEMENT 20                                      STANDARD                   Grade
___ Operates ROD CONTROL joystick to RAISE.
SOP-6   Withdraw selected rod to clear 4-inch          ___ Rod 18 withdrawn to be within 2.0" of      S U 7.4.h  deviation alarm.                                    other Group B rods.
___ Observes 4-Inch Deviation alarm clears.
Comment:
CRITICAL STEP Proc.Step            TASK ELEMENT 21                                      STANDARD                  Grade
___ Rod Selector Switch for Group B placed in position 15 SOP-6                                                  ___ Operates ROD CONTROL joystick to Withdraw selected rod to level Rod 15.              RAISE.                                    S U 7.4.h
___ Rod 15 withdrawn to be within 2.0" of other Group B rods.
Comment:
Proc.Step            TASK ELEMENT 22                                      STANDARD                  Grade SOP-6    PLACE the Group Selector Switch to            Group Selector Switch placed in Group B S U 7.4.i  desired position.                              position.
Comment:
PALISADES NUCLEAR PLANT                      Page 9 of 13                                  JUNE 2009


JPM: RO/SRO-I/SRO-U SYS D Proc.Step            TASK ELEMENT 23                                    STANDARD                      Grade SOP-6    PLACE the Mode Selector Switch in MS (Manual Sequential) or as directed by the      Mode Selector Switch place in MG position      S U 7.4.j  Shift Manager.
Comment:
EVALUATOR: If asked as Shift Manager: direct Mode Selector Switch be placed in the Manual Group (MG) position.
CRITICAL STEP Proc.Step            TASK ELEMENT 24                                    STANDARD                      Grade Continue withdrawal of Group B rods:
SOP-6 Operate Raise-Lower Switch to RAISE            Raise-Lower Switch place in RAISE position. S U 7.1.2.d position.
Comment:
CRITICAL STEP Proc.Step            TASK ELEMENT 25                                      STANDARD                    Grade SOP-6    Monitor Nuclear Instrumentation (NI) for NIs monitored as rods are moved.              S U 7.1.2.e  response during rod movement.
Comment:
Proc.Step            TASK ELEMENT 26                                    STANDARD                      Grade SOP-6    Stop movement of rods approximately every Control Rod motion stopped prior to exceeding 33 inches (should not exceed 35 inches) of                                                    S U 7.1.2.f                                                  35 inches of movement.
rod movement.
rod movement.
Control Rod motion stopped prior to exceeding
Comment:
 
PALISADES NUCLEAR PLANT                       Page 10 of 13                                   JUNE 2009
35 inches of movement.
S  U Comment:
PALISADES NUCLEAR PLANT Page 10 of 13 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS D PALISADES NUCLEAR PLANT Page 11 of 13 JUNE 2009 Proc.Step TASK ELEMENT 27 STANDARD Grade SOP-6 7.1.2.f.1 WHEN rod motion has stopped, THEN OBSERVE proper reduction in startup rate.
Candidate observes SUR indication on Panel
 
C-02 and/or PPC.
S  U Comment: 
 
Proc.Step TASK ELEMENT 28 STANDARD Grade SOP-6 7.1.2.f.2 PERFORM Control Rod alignment verification Uses at least one of following methods to verify
 
all Group 'B' rods are within 2 inches of each
 
other: -TURN Rod Selector Switch for Group 'B' through all of its positions AND COMPARE
 
Control Rod positions. - Use the PPC Control Rod position indication for Group 'B' rods.
S  U Comment:  EVALUATOR: Stop JPM when Group 'B' reaches approximately 69" (i.e. after second 33-inch pull).
EVALUATOR: Inform candidate that task is complete.
 
END OF TASK
 
JPM: RO/SRO-I/SRO-U SYS D SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-5.
 
Insert Shutdown Group 'B' rods and part length rods to bottom of core using RD05B and RD05G. After these rods are fully inserted, then clear both malfunctions.
 
Ensure Dropped Rod alarm NOT on (May need to pull part length rods to 3.6")
 
Ensure Mode Select switch is in 'MS' position
 
Setup Event Trigger 1:  Event: rdsr(18)>45
 
Place malfunction RD16-18-5 (PIDRC02)
(=rod 18 stuck) on Event Trigger 1
 
Setup Event Trigger 2:  Event: ZDI2P(267) (this is Rod Control Mode Select Switch in MI position)  Action: dmf rd16-18
 
PALISADES NUCLEAR PLANT Page 12 of 13 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS D CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
 
Preparations for a critical approach are in progress per GOP-3, "Mode 3  525&deg;F To MODE 2."  GOP-3 is completed through step 2.1.a. 
 
INITIATING CUES:
 
The Control Room Supervisor has directed you to perform Section 7.1.2 of SOP-6, "Reactor Control System" for withdrawal of Shutdown Group 'B' Control Rods. Section 7.1.1 has already been performed.
 
PALISADES NUCLEAR PLANT Page 13 of 13 JUNE 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
 
JPM: RO/SRO-I SYS E TITLE: PERFORM A DIESEL GENERATOR (D/G)
VOLTAGE TEST ON 1-1 D/G
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM: RO/SRO-I SYS E JOB PERFORMANCE MEASURE DATA PAGE  Task: Perform Diesel Generator Surv eillance MO-7A-1 and MO-7A-2
 
Alternate Path: NO
 
Facility JPM #: PL-OPS-EDG-005J


K/A: 064A4.06 Importance: RO: 3.9  SRO: 3.9
JPM: RO/SRO-I/SRO-U SYS D Proc.Step              TASK ELEMENT 27                                    STANDARD                    Grade SOP-6    WHEN rod motion has stopped, THEN            Candidate observes SUR indication on Panel S U 7.1.2.f.1 OBSERVE proper reduction in startup rate. C-02 and/or PPC.
Comment:
Proc.Step              TASK ELEMENT 28                                    STANDARD                    Grade Uses at least one of following methods to verify all Group B rods are within 2 inches of each other:
SOP-6    PERFORM Control Rod alignment                -TURN Rod Selector Switch for Group B S U 7.1.2.f.2 verification                                through all of its positions AND COMPARE Control Rod positions.
                                                      - Use the PPC Control Rod position indication for Group B rods.
Comment:
EVALUATOR: Stop JPM when Group B reaches approximately 69 (i.e. after second 33-inch pull).
EVALUATOR: Inform candidate that task is complete.
END OF TASK PALISADES NUCLEAR PLANT                    Page 11 of 13                                      JUNE 2009


K/A Statement: Manual start, l oading, and stopping of the ED/G
JPM: RO/SRO-I/SRO-U SYS D SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-5.
Insert Shutdown Group B rods and part length rods to bottom of core using RD05B and RD05G. After these rods are fully inserted, then clear both malfunctions.
Ensure Dropped Rod alarm NOT on (May need to pull part length rods to 3.6")
Ensure Mode Select switch is in 'MS' position Setup Event Trigger 1:
Event: rdsr(18)>45 Place malfunction RD16-18-5 (PIDRC02) (=rod 18 stuck) on Event Trigger 1 Setup Event Trigger 2:
Event: ZDI2P(267) (this is Rod Control Mode Select Switch in MI position)
Action: dmf rd16-18 PALISADES NUCLEAR PLANT              Page 12 of 13                          JUNE 2009


Task Standard: 1-1 D/G Auto Voltage Regulator High and Low Limits verified.  
JPM: RO/SRO-I/SRO-U SYS D CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Preparations for a critical approach are in progress per GOP-3, Mode 3  525&deg;F To MODE 2. GOP-3 is completed through step 2.1.a.
INITIATING CUES:
The Control Room Supervisor has directed you to perform Section 7.1.2 of SOP-6, "Reactor Control System" for withdrawal of Shutdown Group B Control Rods. Section 7.1.1 has already been performed.
PALISADES NUCLEAR PLANT                Page 13 of 13                        JUNE 2009


Preferred Evaluation Location: Simulator __X__  In Plant _____
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO/SRO-I SYS E TITLE:      PERFORM A DIESEL GENERATOR (D/G)
VOLTAGE TEST ON 1-1 D/G CANDIDATE: _____________________________________________
EXAMINER_____________________________________________


Preferred Evaluation Method: Perform __X__ Simulate _____  
JPM: RO/SRO-I SYS E JOB PERFORMANCE MEASURE DATA PAGE Task: Perform Diesel Generator Surveillance MO-7A-1 and MO-7A-2 Alternate Path: NO Facility JPM #: PL-OPS-EDG-005J K/A: 064A4.06 Importance:          RO: 3.9          SRO: 3.9 K/A Statement: Manual start, loading, and stopping of the ED/G Task Standard: 1-1 D/G Auto Voltage Regulator High and Low Limits verified.
Preferred Evaluation Location: Simulator      __X__        In Plant    _____
Preferred Evaluation Method:       Perform     __X__       Simulate   _____


==References:==
==References:==
MO-7A-1, Emergency Diesel Generator 1-1 Validation Time: 10 minutes        Time Critical:    NO Candidate: ___________________________________________________
Time Start: ________        Time Finish:      ________
Performance Time:      ________ minutes Performance Rating:    SAT______          UNSAT ______
Comments:
Examiner: _______________________________                  Date:    ______________
Signature PALISADES NUCLEAR PLANT                  Page 2 of 10                          JUNE 2009


MO-7A-1, "Emergency Diesel Generator 1-1"
JPM: RO/SRO-I SYS E EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
MO-7A-1, Emergency Diesel Generator 1-1, Section 5.6 Also see Simulator Operator Instructions (last page of this document).
Validation Time: 10 minutes  Time Critical: NO
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate: ___________________________________________________
INITIAL CONDITIONS:
 
* Diesel Generator 1-1 running unloaded at 60 Hz.
Time Start: ________  Time Finish: ________
* MO-7A-1, "Emergency Diesel Generator 1-1" is in progress; all steps up to 5.6 are completed.
 
* Month is January.
Performance Time:  ________  minutes
* Plant is in Mode 1.
 
* Auxiliary Operator is stationed at EC-22, Diesel Generator 1-1 Local Panel.
Performance Rating: SAT______  UNSAT ______
INITIATING CUES:
 
* During performance of MO-7A-1, the Control Room Supervisor directs you to perform Section 5.6 "Voltage Regulator Test."
Comments:
PALISADES NUCLEAR PLANT                     Page 3 of 10                           JUNE 2009
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 10 JUNE 2009 JPM: RO/SRO-I SYS E EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
MO-7A-1, "Emergency Diesel Generator 1-1", Section 5.6 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assi gned task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS: Diesel Generator 1-1 running unloaded at 60 Hz. MO-7A-1, "Emergency Diesel Generator 1-1" is in progress; all steps up to 5.6 are completed. Month is January. Plant is in Mode 1. Auxiliary Operator is stationed at EC-22, Diesel Generator 1-1 Local Panel.  
 
INITIATING CUES: During performance of MO-7A-1, the C ontrol Room Supervisor directs you to perform Section 5.6 "Voltage Regulator Test."  
 
PALISADES NUCLEAR PLANT Page 3 of 10 JUNE 2009 JPM: RO/SRO-I SYS E Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Operator obtains a copy of MO-7A-1, Section 5.6 MO-7A-1, Section 5.6 obtained
 
S  U Comment:
Evaluator:  Provide a working copy of MO-7A-1, Section 5.6.


Proc. Step TASK ELEMENT 2 STANDARD Grade 5.6.1 DETERMINE the Voltage Regulator Mode Select switch position from the table for the month -..
JPM: RO/SRO-I SYS E Proc. Step             TASK ELEMENT 1                                      STANDARD                       Grade Operator obtains a copy of MO-7A-1, MO-7A-1, Section 5.6 obtained n/a    Section 5.6                                                                                      S U Comment:
AND PERFORM the following:
Evaluator: Provide a working copy of MO-7A-1, Section 5.6.
Voltage Regulator Mode Select Switch Position is "AUTO" for month of January Operator determines that the Voltage Regulator Mode Select switch position is "AUTO".
Proc. Step              TASK ELEMENT 2                                      STANDARD                      Grade DETERMINE the Voltage Regulator Mode Select switch position from the table for the month .. AND PERFORM the following:           Operator determines that the Voltage Regulator 5.6.1                                                  Mode Select switch position is AUTO.           S U Voltage Regulator Mode Select Switch Position is AUTO for month of January Comment:
S U Comment:
NOTE: The Voltage Regulator Mode Select switch position is determined by the Month of the test.
NOTE: The Voltage Regulator Mode Select switch position is determined by the Month of the test.
EVALUATOR:
EVALUATOR: If asked as System Engineer what switch position to use, CUE that the procedure, MO-7A-1 is to be followed.
If asked as System Engineer what switch position to use, CUE that the procedure, MO-7A-1 is to be followed.
Proc. Step             TASK ELEMENT 3                                     STANDARD                       Grade IF position is AUTO, THEN ENSURE Voltage Regulator Mode Select switch is verified Voltage Regulator Mode Select switch is in 5.6.1a                                                  in AUTO position.                                S U the AUTO position (location C-04 panel).
 
Comment:
Proc. Step TASK ELEMENT 3 STANDARD Grade   5.6.1a IF position is AUTO, THEN ENSURE Voltage Regulator Mode Select switch is in the AUTO position (location C-04 panel).
EVALUATOR: If candidate places this switch in MANUAL, then this task element is a failed critical step.
Voltage Regulator Mode Select switch is verified in AUTO position.
PALISADES NUCLEAR PLANT                         Page 4 of 10                                     JUNE 2009
S  U Comment:
EVALUATOR: If candidate places this switch in MANUAL, then this task element is a failed critical step.
 
PALISADES NUCLEAR PLANT Page 4 of 10 JUNE 2009 JPM: RO/SRO-I SYS E Proc. Step TASK ELEMENT 4 STANDARD Grade 5.6.1b.1 IF position is MANUAL, THEN PERFORM the following: -
Operator determines that this step is not applicable.
S  U Comment: 
 
Proc. Step TASK ELEMENT 5 STANDARD Grade 5.6.1b.2 IF the plant is in Mode 1, 2, 3, or 4, THEN PERFORM off-site source checks.
Operator determines that this step is not applicable.
S  U Comment: 
 
Proc. Step TASK ELEMENT 6 STANDARD Grade 5.6.2 DETERMINE the switch from the table for the performance month -. AND
 
PERFORM the Following:
Operator determines that the Field Rheostat switch on C-04 is to be used.
S  U Comment:
NOTE:  The Field Rheostat switch on C-04 is determined by the Month of the test.
EVALUATOR:
If asked as System Engineer what switch to use, CUE The procedure, MO-7A-1 is to be followed.


PALISADES NUCLEAR PLANT Page 5 of 10 JUNE 2009 JPM: RO/SRO-I SYS E Proc. Step TASK ELEMENT 7 STANDARD Grade 5.6.2a Slowly raise generator voltage to between 2575 VAC and 2625 VAC on EVI-1107L, Local Volt Meter or as directed by the  
JPM: RO/SRO-I SYS E Proc. Step             TASK ELEMENT 4                                        STANDARD                      Grade IF position is MANUAL, THEN PERFORM              Operator determines that this step is not 5.6.1b.1  the following:                                  applicable.                                        S U Comment:
Proc. Step              TASK ELEMENT 5                                        STANDARD                      Grade IF the plant is in Mode 1, 2, 3, or 4, THEN      Operator determines that this step is not 5.6.1b.2  PERFORM off-site source checks.                  applicable.                                        S U Comment:
Proc. Step              TASK ELEMENT 6                                        STANDARD                       Grade DETERMINE the switch from the table for Operator determines that the Field Rheostat the performance month . AND 5.6.2                                                    switch on C-04 is to be used.                      S U PERFORM the Following:
Comment:
NOTE: The Field Rheostat switch on C-04 is determined by the Month of the test.
EVALUATOR: If asked as System Engineer what switch to use, CUE The procedure, MO-7A-1 is to be followed.
PALISADES NUCLEAR PLANT                          Page 5 of 10                                      JUNE 2009


JPM: RO/SRO-I SYS E Proc. Step              TASK ELEMENT 7                                        STANDARD                      Grade Slowly raise generator voltage to between Operator adjusts generator voltage between 2575 VAC and 2625 VAC on EVI-1107L, 2575 VAC and 2625 VAC on EVI-1107L with the 5.6.2a    Local Volt Meter or as directed by the                                                            S U Field Rheostat switch on C-04.
System Engineer.
System Engineer.
Operator adjusts generator voltage between 2575 VAC and 2625 VAC on EVI-1107L with the
Comment:
 
EVALUATOR: If asked as System Engineer what generator voltage limits to use, CUE that the procedure, MO-7A-1 is to be followed.
Field Rheostat switch on C-04.
EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
S  U Comment:
CRITICAL STEP Proc. Step             TASK ELEMENT 8                                       STANDARD                     Grade Recorded generator and field voltages (from RECORD generator voltage and field EC-22 panel:
EVALUATOR:
voltage (location EC-22 panel)
If asked as System Engineer what generator voltage limits to use, CUE that the procedure, MO-7A-1 is to be followed.
Local Volt Meter (EVI-1107L) Volts: 2575 to 5.6.2b    Local Volt Meter (EVI-1107L) Volts: ____                                                       S U 2625 Field Voltage (EVI-1107DC) Volts: ____
EVALUATOR:
Field Voltage (EVI-1107DC) Volts: __80V_
If asked as AO to report local generato r voltage, USE voltage indication on C-04 for the local voltage reading.
Comment:
CRITICAL STEP
EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
 
EVALUATOR: If asked as AO to report field voltage, REPORT: field voltage reads 80 V on EVI-1107DC.
Proc. Step TASK ELEMENT 8 STANDARD Grade 5.6.2b RECORD generator voltage and field voltage (location EC-22 panel) Local Volt Meter (EVI-1107L) Volts: ____  Field Voltage (EVI-1107DC) Volts: ____
PALISADES NUCLEAR PLANT                           Page 6 of 10                                   JUNE 2009
Recorded generator and field voltages (from EC-22 panel:
Local Volt Meter (EVI-1107L) Volts:
2575 to 2625 Field Voltage (EVI-1107DC) Volts:
__80V_  S  U Comment:
EVALUATOR:
If asked as AO to report local generato r voltage, USE voltage indication on C-04 for the local voltage reading.
EVALUATOR:
If asked as AO to report field voltage, REPORT: field voltage reads 80 V on EVI-1107DC.
 
PALISADES NUCLEAR PLANT Page 6 of 10 JUNE 2009 JPM: RO/SRO-I SYS E Proc. Step TASK ELEMENT 9 STANDARD Grade 5.6.2c Slowly lower generator voltage to between 2275 VAC and 2325 VAC on EVI-1107L, Local Volt Meter or as directed by the


JPM: RO/SRO-I SYS E Proc. Step              TASK ELEMENT 9                                        STANDARD                      Grade Slowly lower generator voltage to between Operator adjusts generator voltage between 2275 VAC and 2325 VAC on EVI-1107L, 2275 VAC and 2325 VAC on EVI-1107L with the 5.6.2c    Local Volt Meter or as directed by the                                                            S U Field Rheostat switch on C-04.
System Engineer.
System Engineer.
Operator adjusts generator voltage between 2275 VAC and 2325 VAC on EVI-1107L with the
Comment:
 
EVALUATOR: If asked as System Engineer what generator voltage limits to use, CUE that the procedure, MO-7A-1 is to be followed.
Field Rheostat switch on C-04.
EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
S  U Comment:
CRITICAL STEP Proc. Step             TASK ELEMENT 10                                       STANDARD                     Grade Recorded generator and field voltages (from RECORD generator voltage and field EC-22 panel:
EVALUATOR:
voltage (location EC-22 panel)
If asked as System Engineer what generator voltage limits to use, CUE that the procedure, MO-7A-1 is to be followed.
Local Volt Meter (EVI-1107L) Volts: 2275 to 5.6.2d    Local Volt Meter (EVI-1107L0 Volts: ____                                                       S U 2325 Field Voltage (EVI-1107DC)n Volts: ____
EVALUATOR:
Field Voltage (EVI-1107DC) Volts: __70V_
If asked as AO to report local generato r voltage, USE voltage indication on C-04 for the local voltage reading.
Comment:
CRITICAL STEP
EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
 
EVALUATOR: If asked as AO to report field voltage, REPORT: field voltage reads 70 V on EVI-1107DC.
Proc. Step TASK ELEMENT 10 STANDARD Grade 5.6.2d RECORD generator voltage and field voltage (location EC-22 panel) Local Volt Meter (EVI-1107L0 Volts: ____ Field Voltage (EVI-1107DC)n Volts: ____
PALISADES NUCLEAR PLANT                           Page 7 of 10                                   JUNE 2009
Recorded generator and field voltages (from EC-22 panel:
Local Volt Meter (EVI-1107L) Volts:
2275 to 2325 Field Voltage (EVI-1107DC) Volts:
__70V_  S  U Comment:
EVALUATOR:
If asked as AO to report local generato r voltage, USE voltage indication on C-04 for the local voltage reading.
EVALUATOR:
If asked as AO to report field voltage, REPORT: field voltage reads 70 V on EVI-1107DC.
 
PALISADES NUCLEAR PLANT Page 7 of 10 JUNE 2009 JPM: RO/SRO-I SYS E PALISADES NUCLEAR PLANT Page 8 of 10 JUNE 2009 Proc. Step TASK ELEMENT 11 STANDARD Grade 5.6.2e RAISE generator voltage to 2400 VAC (2390 VAC - 2410 VAC) on EVI-1107L, Local Volt Meter.
Generator voltage raised to between 2390 VAC and 2410 VAC on EVI-1107L with the Field
 
Rheostat switch on C-04.
S  U Comment:
EVALUATOR:
If asked as AO to report local generato r voltage, USE voltage indication on C-04 for the local voltage reading.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 12 STANDARD Grade 5.6.3  ENSURE Voltage Regulator Mode Select switch is in AUTO position (location C-04 panel). Performed By: Signed, Time and Dated
 
Verified By: Signed, Time and Dated Voltage Regulator Mode Select switch verified in the AUTO position Performed By: N/A
 
Verified By: Signed, Time and Dated S  U Comment:
EVALUATOR:
Operator will not sign the Performed By line, the Verified By line will be signed (Voltage Selector switch in proper position and not manipulated)
 
Proc. Step TASK ELEMENT 13 STANDARD Grade n/a Notify CRS that 1-1 D/G Voltage Regulator Test has been completed per Section 5.6 of
 
MO-7A-1, for 1-1 D/G.
CRS notified that Section 5.6 of MO-7A-1 for Voltage Regulator Test Complete.
S  U Comment: 
 
END OF TASK
 
JPM: RO/SRO-I SYS E SIMULATOR OPERATOR INSTRUCTIONS Any at power IC can be used. Start EDG 1-1 in UNIT. Clear Local Alarm guage board on PIDED08, using ED27.
 
PALISADES NUCLEAR PLANT Page 9 of 10 JUNE 2009 JPM: RO/SRO-I SYS E CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:


Diesel Generator 1-1 running unloaded at 60 Hz. MO-7A-1, "Emergency Diesel Generator 1-1" is in progress; all steps up to 5.6 are completed. Month is January. Plant is in Mode 1. Auxiliary Operator is stationed at EC-22, Diesel Generator 1-1 Local Panel.  
JPM: RO/SRO-I SYS E Proc. Step            TASK ELEMENT 11                                      STANDARD                    Grade RAISE generator voltage to 2400 VAC            Generator voltage raised to between 2390 VAC (2390 VAC - 2410 VAC) on EVI-1107L,            and 2410 VAC on EVI-1107L with the Field 5.6.2e    Local Volt Meter.                              Rheostat switch on C-04.                         S U Comment:
EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.
CRITICAL STEP Proc. Step            TASK ELEMENT 12                                      STANDARD                    Grade ENSURE Voltage Regulator Mode Select Voltage Regulator Mode Select switch verified switch is in AUTO position (location C-04 in the AUTO position panel).
5.6.3                                                                                                    S U Performed By: N/A Performed By: Signed, Time and Dated Verified By: Signed, Time and Dated Verified By: Signed, Time and Dated Comment:
EVALUATOR: Operator will not sign the Performed By line, the Verified By line will be signed (Voltage Selector switch in proper position and not manipulated)
Proc. Step            TASK ELEMENT 13                                      STANDARD                    Grade Notify CRS that 1-1 D/G Voltage Regulator CRS notified that Section 5.6 of MO-7A-1 for Test has been completed per Section 5.6 of n/a                                                    Voltage Regulator Test Complete.                 S U MO-7A-1, for 1-1 D/G.
Comment:
END OF TASK PALISADES NUCLEAR PLANT                        Page 8 of 10                                    JUNE 2009


INITIATING CUES:  
JPM: RO/SRO-I SYS E SIMULATOR OPERATOR INSTRUCTIONS Any at power IC can be used.
Start EDG 1-1 in UNIT.
Clear Local Alarm guage board on PIDED08, using ED27.
PALISADES NUCLEAR PLANT              Page 9 of 10                    JUNE 2009


JPM: RO/SRO-I SYS E CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* Diesel Generator 1-1 running unloaded at 60 Hz.
* MO-7A-1, "Emergency Diesel Generator 1-1" is in progress; all steps up to 5.6 are completed.
* Month is January.
* Plant is in Mode 1.
* Auxiliary Operator is stationed at EC-22, Diesel Generator 1-1 Local Panel.
INITIATING CUES:
During performance of MO-7A-1, the Control Room Supervisor directs you to perform Section 5.6 "Voltage Regulator Test."
During performance of MO-7A-1, the Control Room Supervisor directs you to perform Section 5.6 "Voltage Regulator Test."
PALISADES NUCLEAR PLANT Page 10 of 10 JUNE 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
PALISADES NUCLEAR PLANT               Page 10 of 10                           JUNE 2009
 
JPM: RO/SRO-I/SRO-U SYS F TITLE: PLACE A CONTAINMENT RADIATION MONITOR IN SERVICE
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM: RO/SRO-I/SRO-U SYS F JOB PERFORMANCE MEASURE DATA PAGE  Task: Operate the Area Radiation Monitoring System
 
Alternate Path: YES - Operate light fails to illuminate when tested
 
Facility JPM #: 2007 NRC SRO JPM
 
K/A: 072A4.01  Importance:  RO:  3.0  SRO: 3.3 
 
K/A Statement: Ability to manua lly operate and/or monitor in the Control Room:  Alarm and setpoint checks and adjustments.
 
Task Standard: Candidate recognizes that the radiation monitor "
operate" light will not illuminate and refers to attachment 2 to troubleshoot the monitor. 
 
Implementation of attachment 2 will restore the "operate" light.


Preferred Evaluation Location: Simulator _X_  In Plant ______
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO-I/SRO-U SYS F TITLE:      PLACE A CONTAINMENT RADIATION MONITOR IN SERVICE CANDIDATE: _____________________________________________
EXAMINER_____________________________________________


Preferred Evaluation Method: Perform _X_ Simulate ______  
JPM: RO/SRO-I/SRO-U SYS F JOB PERFORMANCE MEASURE DATA PAGE Task:    Operate the Area Radiation Monitoring System Alternate Path: YES - Operate light fails to illuminate when tested Facility JPM #: 2007 NRC SRO JPM K/A:    072A4.01            Importance:        RO:  3.0      SRO:  3.3 K/A Statement: Ability to manually operate and/or monitor in the Control Room: Alarm and setpoint checks and adjustments.
Task Standard: Candidate recognizes that the radiation monitor operate light will not illuminate and refers to attachment 2 to troubleshoot the monitor.
Implementation of attachment 2 will restore the operate light.
Preferred Evaluation Location: Simulator        _X_  In Plant    ______
Preferred Evaluation Method:       Perform     _X_   Simulate   ______


==References:==
==References:==
SOP-39, Area Radiation Monitoring System Validation Time: _10_ minutes          Time Critical: NO Candidate: _______________________________________________
Time Start: ________          Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______          UNSAT ______
Comments:
Examiner: _______________________________                  Date:  ______________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 9                          JUNE 2009


SOP-39, "Area Radiation Monitoring System"
JPM: RO/SRO-I/SRO-U SYS F EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-39 section 7.4.2 Also see Simulator Operator Instructions (last page of this document).
Validation Time: _10_ minutes  Time Critical: NO
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate: _______________________________________________
INITIAL CONDITIONS:
 
* The Plant is operating at 100% power.
Time Start: ________  Time Finish: ________
* I&C Department has just completed maintenance on Containment Radiation Monitor RIA-1805.
 
* CL-39 for RIA-1805 has been completed INITIATING CUES:
Performance Time:  ________  minutes
 
Performance Rating: SAT______  UNSAT ______
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 9 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS F EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
SOP-39 section 7.4.2  
 
Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have  
 
completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
The Plant is operating at 100% power. I&C Department has just completed maintenance on Containment Radiation Monitor RIA-1805. CL-39 for RIA-1805 has been completed INITIATING CUES:  
 
The Control Room Supervisor directs you to place Containment Radiation Monitor, RIA-1805, in service per SOP-39, step 7.4.2.
The Control Room Supervisor directs you to place Containment Radiation Monitor, RIA-1805, in service per SOP-39, step 7.4.2.
Another operator will answer any front panel alarms.  
Another operator will answer any front panel alarms.
 
PALISADES NUCLEAR PLANT                     Page 3 of 9                             JUNE 2009
PALISADES NUCLEAR PLANT Page 3 of 9 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS F Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Operator locates SOP-39, section 7.4.2 SOP-39, section 7.4.2 is located S  U Comment:
Evaluator:  Provide candidate with a working copy of SOP-39, section 7.4.2.
 
Proc. Step TASK ELEMENT 2 STANDARD Grade 7.4.2.a REFER TO Attachment 3, Checklist CL 39, "Area Monitors System Checklist." Candidate determines that this step is N/A per initial conditions.
S  U Comment:
Evaluator:  If asked, inform candidate that CL-39 has been completed for RIA-1805.
 
Proc. Step TASK ELEMENT 3 STANDARD Grade 7.4.2.b CHECK operate light illuminated.
Operator recognizes that the OPERATE light is not illuminated.
S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 4 STANDARD Grade 7.4.2.c IF operate light NOT illuminated, THEN REFER TO Attachment 2, "System Malfunctions and Troubleshooting." Operator refers to Attachment 2, section 4.1 for
 
Containment Radiation Monitors Operate light
 
not illuminated.
S  U Comment:
PALISADES NUCLEAR PLANT Page 4 of 9 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS F Proc. Step TASK ELEMENT 5 STANDARD Grade 4.1.a PRESS AND HOLD operate light.
Operate light pressed and held S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 6 STANDARD Grade 4.1.b CHECK other three monitors not tripped.
Operator verifies Orange and Red (Trip 1 and Trip 2) lights not illuminated for RIA-1806, 1807
 
and 1808.
S  U Comment: 
 
Proc. Step TASK ELEMENT 7 STANDARD Grade 4.1.c PLACE Selector Switch momentarily to CHECK position AND RELEASE.
RIA-1805 selector switch placed in CHECK
 
position and released.
S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 8 STANDARD Grade 4.1.d RELEASE operate light.
Operate light is released S  U Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 9 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS F Proc. Step TASK ELEMENT 9 STANDARD Grade 4.1.e RESET all alarms.
Operator resets: ____ AMBER Trip 1
____ RED Trip 2


by depressing associated indicating light.
JPM: RO/SRO-I/SRO-U SYS F Proc. Step              TASK ELEMENT 1                                      STANDARD                    Grade n/a    Operator locates SOP-39, section 7.4.2        SOP-39, section 7.4.2 is located                  S U Comment:
S U Comment:
Evaluator: Provide candidate with a working copy of SOP-39, section 7.4.2.
CRITICAL STEP  
Proc. Step              TASK ELEMENT 2                                      STANDARD                    Grade REFER TO Attachment 3, Checklist CL 39,      Candidate determines that this step is N/A per 7.4.2.a                                                                                                  S U "Area Monitors System Checklist."            initial conditions.
Comment:
Evaluator: If asked, inform candidate that CL-39 has been completed for RIA-1805.
Proc. Step              TASK ELEMENT 3                                      STANDARD                    Grade Operator recognizes that the OPERATE light is 7.4.2.b  CHECK operate light illuminated.                                                               S U not illuminated.
Comment:
CRITICAL STEP Proc. Step              TASK ELEMENT 4                                      STANDARD                    Grade IF operate light NOT illuminated, THEN        Operator refers to Attachment 2, section 4.1 for 7.4.2.c  REFER TO Attachment 2, "System                Containment Radiation Monitors Operate light      S U Malfunctions and Troubleshooting."            not illuminated.
Comment:
PALISADES NUCLEAR PLANT                        Page 4 of 9                                    JUNE 2009


Proc. Step TASK ELEMENT 10 STANDARD Grade 4.1.f IF operate light still not illuminated, THEN DECLARE the associated monitor
JPM: RO/SRO-I/SRO-U SYS F Proc. Step         TASK ELEMENT 5                                          STANDARD                     Grade 4.1.a    PRESS AND HOLD operate light.                Operate light pressed and held                    S U Comment:
CRITICAL STEP Proc. Step          TASK ELEMENT 6                                          STANDARD                    Grade Operator verifies Orange and Red (Trip 1 and 4.1.b    CHECK other three monitors not tripped.      Trip 2) lights not illuminated for RIA-1806, 1807  S U and 1808.
Comment:
Proc. Step          TASK ELEMENT 7                                          STANDARD                    Grade PLACE Selector Switch momentarily to        RIA-1805 selector switch placed in CHECK 4.1.c                                                                                                    S U CHECK position AND RELEASE.                  position and released.
Comment:
CRITICAL STEP Proc. Step          TASK ELEMENT 8                                          STANDARD                    Grade 4.1.d    RELEASE operate light.                      Operate light is released                          S U Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                      Page 5 of 9                                      JUNE 2009


JPM: RO/SRO-I/SRO-U SYS F Proc. Step              TASK ELEMENT 9                                          STANDARD                      Grade Operator resets:
____    AMBER Trip 1 4.1.e    RESET all alarms.                                                                                  S U
____    RED Trip 2 by depressing associated indicating light.
Comment:
CRITICAL STEP Proc. Step            TASK ELEMENT 10                                          STANDARD                      Grade IF operate light still not illuminated, THEN Operator determines this step is not applicable 4.1.f    DECLARE the associated monitor                                                                      S U because Operate light is illuminated.
inoperable AND REFER TO 4.2 below.
inoperable AND REFER TO 4.2 below.
Operator determines this step is not applicable
Comment:
 
Proc. Step             TASK ELEMENT 11                                         STANDARD                     Grade 7.4.2.d   RESET all alarms.                                 Operator verifies all alarms reset.             S U Comment:
because Operate light is illuminated.
Proc. Step             TASK ELEMENT 12                                         STANDARD                     Grade IF operate light still NOT illuminated, THEN DECLARE the associated monitor Operator determines this step is not applicable 7.4.2.e  inoperable. Refer to Attachment 2,                                                                 S U because Operate light is illuminated.
S  U Comment:
          "System Malfunctions and Troubleshooting.
 
Comment:
Proc. Step TASK ELEMENT 11 STANDARD Grade 7.4.2.d RESET all alarms.
PALISADES NUCLEAR PLANT                             Page 6 of 9                                     JUNE 2009
Operator verifies all alarms reset.
S U Comment:
 
Proc. Step TASK ELEMENT 12 STANDARD Grade 7.4.2.e IF operate light still NOT illuminated, THEN DECLARE the associated monitor  
 
inoperable. Refer to Attachment 2, "System Malfunctions and
 
Troubleshooting.
Operator determines this step is not applicable
 
because Operate light is illuminated.
S  U Comment: 
 
PALISADES NUCLEAR PLANT Page 6 of 9 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS F Proc. Step TASK ELEMENT 13 STANDARD Grade n/a Operator informs Control Room Supervisor that Containment Radiation Monitor
 
RIA-1805 has been placed in service.
CRS Notified S  U Comment:
 
END OF TASK PALISADES NUCLEAR PLANT Page 7 of 9 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS F SIMULATOR OPERATOR INSTRUCTIONS Reset to any IC
 
Insert OR RIA-1805-G to off on panel C-11A rear
 
Create Event Trigger 1 as follows:
 
for Event .not.ZDI4P(341).and.ZDI4P(339) for Action dor RIA-1805-G
 
PALISADES NUCLEAR PLANT Page 8 of 9 JUNE 2009 JPM: RO/SRO-I/SRO-U SYS F CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:


The Plant is operating at 100% power. I&C Department has just completed maintenance on Containment Radiation Monitor RIA-1805. CL-39 for RIA-1805 has been completed
JPM: RO/SRO-I/SRO-U SYS F Proc. Step            TASK ELEMENT 13                                STANDARD              Grade Operator informs Control Room Supervisor n/a    that Containment Radiation Monitor           CRS Notified                        S U RIA-1805 has been placed in service.
Comment:
END OF TASK PALISADES NUCLEAR PLANT                      Page 7 of 9                        JUNE 2009


INITIATING CUES:  
JPM: RO/SRO-I/SRO-U SYS F SIMULATOR OPERATOR INSTRUCTIONS Reset to any IC Insert OR RIA-1805-G to off on panel C-11A rear Create Event Trigger 1 as follows:
for Event  .not.ZDI4P(341).and.ZDI4P(339) for Action  dor RIA-1805-G PALISADES NUCLEAR PLANT                Page 8 of 9                  JUNE 2009


JPM: RO/SRO-I/SRO-U SYS F CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* The Plant is operating at 100% power.
* I&C Department has just completed maintenance on Containment Radiation Monitor RIA-1805.
* CL-39 for RIA-1805 has been completed INITIATING CUES:
The Control Room Supervisor directs you to place Containment Radiation Monitor, RIA-1805, in service per SOP-39, step 7.4.2.
The Control Room Supervisor directs you to place Containment Radiation Monitor, RIA-1805, in service per SOP-39, step 7.4.2.
Another operator will answer any front panel alarms.
Another operator will answer any front panel alarms.
PALISADES NUCLEAR PLANT Page 9 of 9 JUNE 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
PALISADES NUCLEAR PLANT                 Page 9 of 9                       JUNE 2009
 
JPM:  RO SYS G TITLE: VENT THE QUENCH TANK TO THE WASTE GAS SURGE TANK
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM: RO SYS G JOB PERFORMANCE MEASURE DATA PAGE  Task: Vent Quench Tank
 
Alternate Path: NO
 
Facility JPM #: 2007 AUDIT SRO JPM
 
K/A: 007A1.03 Importance:  RO:  2.7  SRO: 2.9 
 
K/A Statement: Ability to predict and/or m onitor changes in parameters (to prevent exceeding design limits) associated with operating the PRTS control
 
including:  Maintaining quench tank pressure
 
Task Standard: Quench Tank pressure is 6 psig and Waste Gas Surge Tank pressure is maintained within limits.


Preferred Evaluation Location: Simulator _X__  In Plant ______
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYS G TITLE: VENT THE QUENCH TANK TO THE WASTE GAS SURGE TANK CANDIDATE: _____________________________________________
EXAMINER_____________________________________________


Preferred Evaluation Method: Perform _X__ Simulate ______  
JPM: RO SYS G JOB PERFORMANCE MEASURE DATA PAGE Task:    Vent Quench Tank Alternate Path: NO Facility JPM #: 2007 AUDIT SRO JPM K/A:    007A1.03    Importance:        RO:      2.7  SRO:  2.9 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRTS control including: Maintaining quench tank pressure Task Standard: Quench Tank pressure is 6 psig and Waste Gas Surge Tank pressure is maintained within limits.
Preferred Evaluation Location: Simulator        _X__    In Plant    ______
Preferred Evaluation Method:       Perform     _X__     Simulate   ______


==References:==
==References:==
SOP-1A, Primary Coolant System Validation Time: _15_ minutes          Time Critical: NO Candidate: _______________________________________
Time Start: ________          Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______          UNSAT ______
Comments:
Examiner: _______________________________                Date:    ______________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 9                        JUNE 2009


SOP-1A, "Primary Coolant System"
JPM: RO SYS G EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-1A section 7.4.3 Also see Simulator Operator Instructions (last page of this document).
Validation Time: _15_  minutes  Time Critical: NO
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate: _______________________________________
INITIAL CONDITIONS:
 
The plant is in MODE 1 full power. It is believed that there is a nitrogen leak into the Quench Tank. Quench Tank Pressure is currently 12 psig, and is rising very slowly (less than 1 psi per hour).
Time Start: ________  Time Finish: ________
INITIATING CUES:
 
In preparation for troubleshooting and maintenance you are to vent the Quench Tank to the Waste Gas Surge Tank per SOP-1A, 7.4.3 to 6 psig. An Auxiliary Operator is stationed at Radwaste Panel C-40. The Waste Gas System is lined up for operation per SOP-18A, as required by SOP-1A, 7.4.3.b.
Performance Time:  ________  minutes
PALISADES NUCLEAR PLANT                     Page 3 of 9                             JUNE 2009
 
Performance Rating: SAT______  UNSAT ______
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 9 JUNE 2009 JPM: RO SYS G EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
SOP-1A section 7.4.3  
 
Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
 
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have  
 
completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
The plant is in MODE 1 full power. It is believed that there is a nitrogen leak into the  
 
Quench Tank. Quench Tank Pressure is currently 12 psig, and is rising very slowly (less than 1 psi per hour).  
 
INITIATING CUES:  
 
In preparation for troubleshooting and maintenanc e you are to vent the Quench Tank to the Waste Gas Surge Tank per SOP-1A, 7.4.3 to 6 psig. An Auxiliary Operator is stationed at Radwaste Panel C-40. The Wast e Gas System is lined up for operation per SOP-18A, as required by SOP-1A, 7.4.3.b.
PALISADES NUCLEAR PLANT Page 3 of 9 JUNE 2009 JPM: RO SYS G Proc. Step TASK ELEMENT 1 STANDARD Grade--- Locate SOP-1A Candidate locates SOP-1A, 7.4.3 S  U Comment:
Evaluator:
Provide a working copy of SOP-1A, Section 7.4.3.
 
Proc. Step TASK ELEMENT 2 STANDARD Grade 7.4.3.a NOTE: Waste Gas Surge Tank pressure should not exceed 18.5 psia during this
 
evolution. Lifting of RV-1111, Waste Gas
 
Surge Tank Relief is imminent if pressure
 
in the Waste Gas Surge Tank exceeds
 
18.5 psia.
 
STATION an Auxiliary Operator at C-40 Radwaste Panel to monitor T-67, Waste
 
Gas Surge Tank pressure and Waste Gas
 
Compressor operations Candidate reads NOTE


AO Stationed at C-40 per initial conditions S  U Comment:
JPM: RO SYS G Proc. Step              TASK ELEMENT 1                                        STANDARD                    Grade
Evaluator: Notify the candidate that you will not be role playing the AO. For communications with the AO, they must call them at Panel C-40.
  ---    Locate SOP-1A                                  Candidate locates SOP-1A, 7.4.3                  S U Comment:
Evaluator: Provide a working copy of SOP-1A, Section 7.4.3.
Proc. Step              TASK ELEMENT 2                                        STANDARD                    Grade NOTE: Waste Gas Surge Tank pressure should not exceed 18.5 psia during this        Candidate reads NOTE evolution. Lifting of RV-1111, Waste Gas Surge Tank Relief is imminent if pressure in the Waste Gas Surge Tank exceeds 18.5 psia.
7.4.3.a                                                                                                    S U STATION an Auxiliary Operator at C-40 Radwaste Panel to monitor T-67, Waste Gas Surge Tank pressure and Waste Gas          AO Stationed at C-40 per initial conditions Compressor operations Comment:
Evaluator: Notify the candidate that you will not be role playing the AO. For communications with the AO, they must call them at Panel C-40.
SIM OPERATOR (as AO): Report that you are at Panel C-40 and will maintain WGST pressure <18.5 psia.
SIM OPERATOR (as AO): Report that you are at Panel C-40 and will maintain WGST pressure <18.5 psia.
Proc. Step              TASK ELEMENT 3                                        STANDARD                    Grade ENSURE Waste Gas System lined up for operation. Refer to System Operating b                                                    Per initial conditions                            S U Procedure SOP-18A, "Radioactive Waste System - Gaseous."
Comment:
SIM OPERATOR (as AO): Report that Waste Gas System is lined up.
PALISADES NUCLEAR PLANT                        Page 4 of 9                                      JUNE 2009


Proc. Step TASK ELEMENT 3 STANDARD Grade b ENSURE Waste Gas System lined up for operation. Refer to System Operating
JPM: RO SYS G Proc. Step               TASK ELEMENT 4                                     STANDARD                     Grade NOTE: Waste Gas Surge Tank pressure             Candidate reads note will rise slightly when performing the next two steps.
 
c, d    OPEN CV-1101, Containment Vent                   Candidate positions switches for CV-1101 and   S U Header Isolation.                                CV-1102 to OPEN. Verifies Red light ON, OPEN CV-1102, Containment Vent                  Green light OFF Header Isolation.
Procedure SOP-18A, "Radioactive Waste
Comment:
 
SIM OPERATOR (as AO): Report that you understand WGST pressure will rise.
System - Gaseous." Per initial conditions S  U Comment:  SIM OPERATOR (as AO): Report that Waste Gas System is lined up.
CRITICAL STEP Proc. Step               TASK ELEMENT 5                                     STANDARD                     Grade CAUTION Waste Gas Surge Tank pressure will rise         Candidate reads caution and ensures he has rapidly when performing the next step. The       the AO on the phone Control Operator should be in constant communication with the Auxiliary Operator e      to control pressure in the Waste Gas                                                             S U Surge Tank during performance of the next step.
PALISADES NUCLEAR PLANT Page 4 of 9 JUNE 2009 JPM: RO SYS G Proc. Step TASK ELEMENT 4 STANDARD Grade c, d NOTE: Waste Gas Surge Tank pressure will rise slightly when performing the next  
Candidate takes CV-0152 to OPEN. Verifies OPEN CV-0152, Quench Tank Vent.                  Red light ON, Green light OFF.
 
Comment:
two steps.  
SIM OPERATOR (as AO): Report that you are ready.
 
CRITICAL STEP PALISADES NUCLEAR PLANT                           Page 5 of 9                                   JUNE 2009
OPEN CV-1101, Containment Vent  
 
Header Isolation.
OPEN CV-1102, Containment Vent Header Isolation.
Candidate reads note
 
Candidate positions switches for CV-1101 and CV-1102 to OPEN. Verifies Red light ON, Green light OFF S  U Comment: SIM OPERATOR (as AO): Report that you understand WGST pressure will rise.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 5 STANDARD Grade e CAUTION Waste Gas Surge Tank pressure will rise rapidly when performing the next step. The  
 
Control Operator should be in constant communication with the Auxiliary Operator  
 
to control pressure in the Waste Gas  
 
Surge Tank during performance of the next  
 
step. OPEN CV-0152, Quench Tank Vent.
Candidate reads caution and ensures he has the AO on the phone
 
Candidate takes CV-0152 to OPEN. Verifies Red light ON, Green light OFF.
S  U Comment: SIM OPERATOR (as AO): Report that you are ready.
CRITICAL STEP
 
PALISADES NUCLEAR PLANT Page 5 of 9 JUNE 2009 JPM: RO SYS G Proc. Step TASK ELEMENT 6 STANDARD Grade f IF Waste Gas Surge Tank pressure reaches approximately 18 psia, THEN


JPM: RO SYS G Proc. Step              TASK ELEMENT 6                                    STANDARD                      Grade IF Waste Gas Surge Tank pressure Candidate closes CV-0152 when AO informs f      reaches approximately 18 psia, THEN                                                          S U that WGST pressure is 18 psia.
CLOSE CV-0152, Quench Tank Vent.
CLOSE CV-0152, Quench Tank Vent.
Candidate closes CV-0152 when AO informs
Comment:
 
SIM OPERATOR (as AO): maintain constant communications:
that WGST pressure is 18 psia.
* After CV-0152 is opened AND when EK-1368 (C-40 Off-Normal alarm) comes in, inform candidate that WGST pressure is 16.5 psia and rising. Continue to monitor WGST pressure on Instructor Station and inform candidate when pressure reaches 18 psia.
S  U Comment:
* Continue monitoring WGST pressure on Instructor Station after CV-0152 is closed and inform candidate when WGST pressure is 15 psia.
SIM OPERATOR (as AO): maintain constant communications: After CV-0152 is opened AND when EK-1368 (C-40 Off-Normal alarm) comes in, inform candidate that WGST pressure is 16.5 psia and rising. Continue to monitor WGST pressure on Instructor Station and inform candidate when  
CRITICAL STEP Proc. Step             TASK ELEMENT 7                                   STANDARD                     Grade REPEAT Steps e and f until PIA-0116, Candidate repeats steps e. and f. as necessary g      Quench Tank Pressure reaches 3 psig or                                                       S U to lower Quench Tank pressure to 6 psig.
 
pressure reaches 18 psia. Continue monitoring WGST pressure on Instructor Station after CV-0152 is closed and inform candidate when WGST pressure is 15 psia.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 7 STANDARD Grade g REPEAT Steps e and f until PIA-0116, Quench Tank Pressure reaches 3 psig or  
 
as directed by the CRS.
as directed by the CRS.
Candidate repeats steps e. and f. as necessary
Comment:
 
CRITICAL STEP Proc. Step             TASK ELEMENT 8                                   STANDARD                     Grade ENSURE CLOSED CV-0152, Quench h                                                  Candidate verifies Green light ON for CV-0152. S U Tank Vent.
to lower Quench Tank pressure to 6 psig.
Comment:
S  U Comment:
PALISADES NUCLEAR PLANT                       Page 6 of 9                                     JUNE 2009
CRITICAL STEP
 
Proc. Step TASK ELEMENT 8 STANDARD Grade h ENSURE CLOSED CV-0152, Quench Tank Vent.
Candidate verifies Green light ON for CV-0152.
S U Comment: 
 
PALISADES NUCLEAR PLANT Page 6 of 9 JUNE 2009 JPM: RO SYS G PALISADES NUCLEAR PLANT Page 7 of 9 JUNE 2009 Proc. Step TASK ELEMENT 9 STANDARD Grade i, j CLOSE CV-1101, Containment Vent Header Isolation.
CLOSE CV-1102, Containment Vent Header Isolation Candidate positions handswitches for CV-1101
 
and CV-1102 to CLOSE and verifies Green light
 
ON, Red light OFF.
S  U Comment:
 
Proc. Step TASK ELEMENT 10 STANDARD Grade k IF an Auxiliary Operator was stationed at C-40 Panel, THEN NOTIFY the Auxiliary
 
Operator the vent is complete Candidate notifies AO that vent is complete.
S  U Comment:  SIM OPERATOR (as AO): Report that you understand that vent is complete.
 
Proc. Step TASK ELEMENT 11 STANDARD Grade--- Candidate notifies CRS that vent is complete and Quench Tank pressure is
 
6 psig. CRS notified S  U Comment: 
 
END OF TASK
 
JPM: RO SYS G SIMULATOR OPERATOR INSTRUCTIONS Any IC  Create event trigger 2:  Event:  0 Action: set thksn2sup=26.0
 
Activate trigger 2
 
Raise Quench tank pressure to 12 psig utilizing CV-0150 and CV-1358
 
Monitor Waste Gas Surge Tank pressure when requested by:
o Start the Monitor program by clicking on "Monitor" on the instructor station control panel o Type "WPPPT67" into the input field and hit enter
 
OR  o Read WGST pressure on PIDWP01
 
PALISADES NUCLEAR PLANT Page 8 of 9 JUNE 2009 JPM: RO SYS G CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
 
The plant is in MODE 1 full power. It is believed that there is a nitrogen leak into the
 
Quench Tank. Pressure is currently at 12 psig, and is rising very slowly (less than 1 psi
 
per hour).
 
INITIATING CUES:
 
In preparation for troubleshooting and maintenanc e you are to vent the Quench Tank to the Waste Gas Surge Tank per SOP-1A, 7.4.3 to 6 psig. An Auxiliary Operator is stationed at Radwaste Panel C-40. The Wast e Gas System is lined up for operation per SOP-18A, as required by SOP-1A, 7.4.3.b.
PALISADES NUCLEAR PLANT Page 9 of 9 JUNE 2009 NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE
 
JPM: RO/SRO-I SYS H TITLE:  INITIATE A CONTAINMENT PURGE
 
CANDIDATE: _____________________________________________
 
EXAMINER: _____________________________________________
 
JPM: RO/SRO-I SYS H JOB PERFORMANCE MEASURE DATA PAGE  Task: Initiate a Containment Purge per SOP-24, Ventilation and Air Conditioning System Alternate Path: YES
 
Facility JPM #: 2005 NRC JPM


K/A: 029A2.03  Importance: RO: 2.7   SRO: 3.1 
JPM: RO SYS G Proc. Step              TASK ELEMENT 9                                      STANDARD                      Grade CLOSE CV-1101, Containment Vent Header Isolation.                              Candidate positions handswitches for CV-1101 i, j                                                  and CV-1102 to CLOSE and verifies Green light    S U CLOSE CV-1102, Containment Vent ON, Red light OFF.
Header Isolation Comment:
Proc. Step            TASK ELEMENT 10                                      STANDARD                      Grade IF an Auxiliary Operator was stationed at k      C-40 Panel, THEN NOTIFY the Auxiliary          Candidate notifies AO that vent is complete. S U Operator the vent is complete Comment:
SIM OPERATOR (as AO): Report that you understand that vent is complete.
Proc. Step            TASK ELEMENT 11                                      STANDARD                      Grade Candidate notifies CRS that vent is
  ---    complete and Quench Tank pressure is          CRS notified                                    S U 6 psig.
Comment:
END OF TASK PALISADES NUCLEAR PLANT                        Page 7 of 9                                    JUNE 2009


K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Purge System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Startup operations and the associated required valve lineups
JPM: RO SYS G SIMULATOR OPERATOR INSTRUCTIONS Any IC Create event trigger 2:
Event: 0 Action: set thksn2sup=26.0 Activate trigger 2 Raise Quench tank pressure to 12 psig utilizing CV-0150 and CV-1358 Monitor Waste Gas Surge Tank pressure when requested by:
o Start the Monitor program by clicking on "Monitor" on the instructor station control panel o Type "WPPPT67" into the input field and hit enter OR o Read WGST pressure on PIDWP01 PALISADES NUCLEAR PLANT              Page 8 of 9                              JUNE 2009


Task Standard: Initiate a Containment Purge. Subsequently terminate the Containment Purge based on plant ventilation fan status.  
JPM: RO SYS G CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
The plant is in MODE 1 full power. It is believed that there is a nitrogen leak into the Quench Tank. Pressure is currently at 12 psig, and is rising very slowly (less than 1 psi per hour).
INITIATING CUES:
In preparation for troubleshooting and maintenance you are to vent the Quench Tank to the Waste Gas Surge Tank per SOP-1A, 7.4.3 to 6 psig. An Auxiliary Operator is stationed at Radwaste Panel C-40. The Waste Gas System is lined up for operation per SOP-18A, as required by SOP-1A, 7.4.3.b.
PALISADES NUCLEAR PLANT                  Page 9 of 9                              JUNE 2009


Preferred Evaluation Location: Simulator __X__  In Plant _____
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO/SRO-I SYS H TITLE:    INITIATE A CONTAINMENT PURGE CANDIDATE: _____________________________________________
EXAMINER_____________________________________________


Preferred Evaluation Method: Perform __X__ Simulate _____  
JPM: RO/SRO-I SYS H JOB PERFORMANCE MEASURE DATA PAGE Task:    Initiate a Containment Purge per SOP-24, Ventilation and Air Conditioning System Alternate Path: YES Facility JPM #: 2005 NRC JPM K/A:    029A2.03              Importance:        RO:2.7        SRO:    3.1 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Purge System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Startup operations and the associated required valve lineups Task Standard: Initiate a Containment Purge. Subsequently terminate the Containment Purge based on plant ventilation fan status.
Preferred Evaluation Location: Simulator          __X__    In Plant    _____
Preferred Evaluation Method:         Perform     __X__     Simulate   _____


==References:==
==References:==
SOP-24, Ventilation and Air Conditioning System HP 6.14, Containment Purge SOP-38, Gaseous Process Monitoring System ARP-7, EK-1127, Main Exhaust Fan V-6A trip Validation Time: __20___ minutes            Time Critical: NO Candidate: ________________________________________________________
Time Start: ________          Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______          UNSAT ______
Comments:
Examiner: _______________________________                  Date:    ______________
Signature PALISADES NUCLEAR PLANT                    Page 2 of 9                          JUNE 2009


SOP-24, Ventilation and Air Conditioning System    HP 6.14, Containment Purge SOP-38, Gaseous Process Monitoring System ARP-7, EK-1127, Main Exhaust Fan V-6A trip
JPM: RO/SRO-I SYS H EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-24, section 7.2.5.
Validation Time: __20___  minutes  Time Critical: NO
 
Candidate: ________________________________________________________
 
Time Start: ________  Time Finish: ________
 
Performance Time:  ________  minutes
 
Performance Rating: SAT______  UNSAT ______
 
Comments:
 
Examiner: _______________________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 9 JUNE 2009 JPM: RO/SRO-I SYS H EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
SOP-24, section 7.2.5.  
 
Also see Simulator Operator Instructions (last page of this document).
Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE  
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
DIRECTION TO CANDIDATE:  
INITIAL CONDITIONS:
 
The plant is in MODE 5 with the PCS vented to Containment.
I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will  
INITIATING CUES:
 
The Control Room Supervisor has directed you to initiate a Containment Purge per SOP-24, Ventilation and Air Conditioning System section 7.2.5. The CRS has also informed you that an AO has been briefed and is standing by awaiting your instructions. The CRS also informs you that the RGEM system is in operation per SOP-38, Gaseous Process Monitoring System.
provide initiating cues and reports on other ac tions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have  
PALISADES NUCLEAR PLANT                     Page 3 of 9                             JUNE 2009
 
completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:  
 
The plant is in MODE 5 with the PCS vented to Containment.  
 
INITIATING CUES:  
 
The Control Room Supervisor has directed you to initiate a Containment Purge per  
 
SOP-24, "Ventilation and Air Conditioning Syste m" section 7.2.5. The CRS has also informed you that an AO has been brie fed and is standing by awaiting your instructions. The CRS also informs you t hat the RGEM system is in operation per SOP-38, Gaseous Process Monitoring System.  
 
PALISADES NUCLEAR PLANT Page 3 of 9 JUNE 2009 JPM: RO/SRO-I SYS H Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of SOP-24, Ventilation and Air Conditioning System procedure.
Candidate obtains SOP-24, Ventilation and Air
 
Conditioning System procedure.
S  U Comment:
Evaluator:  When applicant indicates where to find a current copy of procedure provide a copy of SOP-24, Ventilation and Air Conditioning System procedure. Evaluator:  If candidate asks to see the Batch Card inform candidate that he doesn't need to see it, but to inform me of the start and stop times of the release so that it can
 
be recorded.
 
Proc.Step TASK ELEMENT 2 STANDARD Grade 7.2.5.a Notify the RETS/REMP Supervisor or Duty HP to ensure requirements of HP 6.14, Containment Purge, are met.
RETS/REMP Supervisor or Duty HP notified S  U Comment:
Evaluator:  Role play as CRS and notify candidate that RETS/REMP Supervisor has been informed.
Proc.Step TASK ELEMENT 3 STANDARD Grade 7.2.5.b Ensure one Main Exhaust Fan operating.
Candidate verifies Main Exhaust Fan V-6A running on panel C-13.
S  U Comment: 
 
PALISADES NUCLEAR PLANT Page 4 of 9 JUNE 2009 JPM: RO/SRO-I SYS H PALISADES NUCLEAR PLANT Page 5 of 9 JUNE 2009 Proc.Step TASK ELEMENT 4 STANDARD Grade 7.2.5.c Ensure RGEM system is in operation per SOP-38, Gaseous Process Monitoring System. From Initiating Cue.
S  U Comment: 


Proc.Step TASK ELEMENT 5 STANDARD Grade 7.2.5.d Ensure the following Test Tap Valves are Locked Closed and capped:
JPM: RO/SRO-I SYS H Proc.Step             TASK ELEMENT 1                                    STANDARD                     Grade Obtain a copy of SOP-24, Ventilation and      Candidate obtains SOP-24, Ventilation and Air N/A                                                                                                  S U Air Conditioning System procedure.             Conditioning System procedure.
MV-VA506 MV-VA508 MV-VA505 Ensure the following Test Tap Valves are Locked Closed and capped:
Comment:
MV-VA506 MV-VA508 MV-VA505 S U Comment:
Evaluator: When applicant indicates where to find a current copy of procedure provide a copy of SOP-24, Ventilation and Air Conditioning System procedure.
EVALUATOR: When candidate calls AO, role play as AO and report after approximately 2 minutes that MV-VA506, MV-VA508, and MV-VA505 are locked closed and capped.  
Evaluator: If candidate asks to see the Batch Card inform candidate that he doesn't need to see it, but to inform me of the start and stop times of the release so that it can be recorded.
Proc.Step              TASK ELEMENT 2                                    STANDARD                    Grade Notify the RETS/REMP Supervisor or Duty 7.2.5.a  HP to ensure requirements of HP 6.14,          RETS/REMP Supervisor or Duty HP notified      S U Containment Purge, are met.
Comment:
Evaluator: Role play as CRS and notify candidate that RETS/REMP Supervisor has been informed.
Proc.Step              TASK ELEMENT 3                                    STANDARD                    Grade Candidate verifies Main Exhaust Fan V-6A 7.2.5.b  Ensure one Main Exhaust Fan operating.                                                        S U running on panel C-13.
Comment:
PALISADES NUCLEAR PLANT                      Page 4 of 9                                    JUNE 2009


Proc.Step TASK ELEMENT 6 STANDARD Grade 7.2.5.e INSERT key and OPEN the following Purge Supply and Exhaust Valves:
JPM: RO/SRO-I SYS H Proc.Step             TASK ELEMENT 4                                      STANDARD                    Grade Ensure RGEM system is in operation per 7.2.5.c  SOP-38, Gaseous Process Monitoring            From Initiating Cue.                          S U System.
Comment:
Proc.Step            TASK ELEMENT 5                                      STANDARD                   Grade Ensure the following Test Tap Valves are      Ensure the following Test Tap Valves are 7.2.5.d  Locked Closed and capped:                      Locked Closed and capped:                      S U MV-VA506      MV-VA508      MV-VA505          MV-VA506        MV-VA508      MV-VA505 Comment:
EVALUATOR: When candidate calls AO, role play as AO and report after approximately 2 minutes that MV-VA506, MV-VA508, and MV-VA505 are locked closed and capped.
Proc.Step            TASK ELEMENT 6                                      STANDARD                    Grade Key inserted and the following Purge Supply INSERT key and OPEN the following Purge       and Exhaust Valves opened and verifies Supply and Exhaust Valves:                    associated Red light ON and Green light OFF:
* CV-1805 (key 272)
* CV-1805 (key 272)
* CV-1805 (key 272) ____
* CV-1806 (key 274)
* CV-1806 (key 274)
* CV-1806 (key 274) ____
7.2.5.e                                                                                                S U
* CV-1807 (key 275)
* CV-1807 (key 275)
* CV-1807 (key 275) ____
* CV-1808 (key 277)
* CV-1808 (key 277)
* CV-1808 (key 277) ____
* CV-1813 (key 273)
* CV-1813 (key 273)
* CV-1813 (key 273) ____
* CV-1814 (key 276)
* CV-1814 (key 276)
Key inserted and the following Purge Supply and Exhaust Valves opened and verifies
associated Red light ON and Green light OFF:
* CV-1805 (key 272) ____
* CV-1806 (key 274) ____
* CV-1807 (key 275) ____
* CV-1808 (key 277) ____
* CV-1813 (key 273) ____
* CV-1814 (key 276) ____
* CV-1814 (key 276) ____
S  U Comment:
Comment:
CRITICAL STEP
CRITICAL STEP PALISADES NUCLEAR PLANT                       Page 5 of 9                                   JUNE 2009
 
JPM: RO/SRO-I SYS H Proc.Step TASK ELEMENT 7 STANDARD Grade 7.2.5.f Record the time the valves were opened in the Control Room Logbook.
Record the time the valves were opened in the
 
Control Room Logbook.
S  U Comment:
Evaluator:  Role play as CRS and inform candidate that these times have been logged.
 
Proc.Step TASK ELEMENT 8 STANDARD Grade 7.2.5.g START Air Room Purge Supply Fan V-46.
START Air Room Purge Supply Fan V-46.
S  U Comment:
NOTE:  After Purge Supply Fan is started, the V-6A Main Exhaust Fan will TRIP, and V-6B Standby Fan will not start. This will require that the Containment Purge be manually terminated.
CRITICAL STEP
 
Proc.Step TASK ELEMENT 9 STANDARD Grade--- Main Exhaust V-6A trips.
Applicant refers to ARP-7, EK-1127, Main Exhaust Fan V-6A or B trip.
S  U Comment: 
 
Proc.Step TASK ELEMENT 10 STANDARD Grade ARP-7 ARP-7, EK-1127 directs starting the STANDBY Main Exhaust Fan V-6B.
Candidate attempts to start V-6B and
 
determines it will not start.
S  U Comment: 
 
PALISADES NUCLEAR PLANT Page 6 of 9 JUNE 2009 JPM: RO/SRO-I SYS H PALISADES NUCLEAR PLANT Page 7 of 9 JUNE 2009 Proc.Step TASK ELEMENT 11 STANDARD Grade ARP-7 Per ARP-7, EK-1127, secure any radioactive waste gas batch per SOP-18A
 
and shutdown any plant ventilation air flow
 
per SOP-24.
Candidate stops Air Room Supply Fan V-46.
S  U Comment:
Evaluator:  If asked, role play as SRO and state that no heavy load movements are in progress in the Containment or SFP and that no core alterations or movement of fuel is
 
occurring in Containment or SFP.
CRITICAL STEP


Proc.Step TASK ELEMENT 12 STANDARD Grade--- Manually CLOSE all OPEN purge control valves. The Applicant may use EOP Supplement 6, Containment Isolation as a
JPM: RO/SRO-I SYS H Proc.Step              TASK ELEMENT 7                                      STANDARD                  Grade Record the time the valves were opened in      Record the time the valves were opened in the 7.2.5.f                                                                                                S U the Control Room Logbook.                      Control Room Logbook.
Comment:
Evaluator: Role play as CRS and inform candidate that these times have been logged.
Proc.Step             TASK ELEMENT 8                                      STANDARD                   Grade 7.2.5.g  START Air Room Purge Supply Fan V-46.          START Air Room Purge Supply Fan V-46.          S U Comment:
NOTE: After Purge Supply Fan is started, the V-6A Main Exhaust Fan will TRIP, and V-6B Standby Fan will not start. This will require that the Containment Purge be manually terminated.
CRITICAL STEP Proc.Step              TASK ELEMENT 9                                      STANDARD                  Grade Applicant refers to ARP-7, EK-1127, Main
  ---    Main Exhaust V-6A trips.                                                                      S U Exhaust Fan V-6A or B trip.
Comment:
Proc.Step            TASK ELEMENT 10                                      STANDARD                  Grade ARP-7, EK-1127 directs starting the            Candidate attempts to start V-6B and ARP-7                                                                                                  S U STANDBY Main Exhaust Fan V-6B.                determines it will not start.
Comment:
PALISADES NUCLEAR PLANT                      Page 6 of 9                                    JUNE 2009


JPM: RO/SRO-I SYS H Proc.Step            TASK ELEMENT 11                                      STANDARD                      Grade Per ARP-7, EK-1127, secure any radioactive waste gas batch per SOP-18A ARP-7                                                    Candidate stops Air Room Supply Fan V-46.        S U and shutdown any plant ventilation air flow per SOP-24.
Comment:
Evaluator: If asked, role play as SRO and state that no heavy load movements are in progress in the Containment or SFP and that no core alterations or movement of fuel is occurring in Containment or SFP.
CRITICAL STEP Proc.Step            TASK ELEMENT 12                                      STANDARD                      Grade Candidate closes all OPEN purge control Manually CLOSE all OPEN purge control valves and verifies associated Red light OFF valves. The Applicant may use EOP and Green light ON. The Applicant may use Supplement 6, Containment Isolation as a EOP Supplement 6, Containment Isolation as a guide.
guide.
guide.
* CV-1805 (key 272)
* CV-1805 (key 272)
* CV-1806 (key 274)
* CV-1807 (key 275)
* CV-1808 (key 277)
* CV-1813 (key 273)
* CV-1814 (key 276)
Candidate closes all OPEN purge control valves and verifies associated Red light OFF
and Green light ON. The Applicant may use
EOP Supplement 6, Containment Isolation as a
guide.
* CV-1805 (key 272) ____
* CV-1805 (key 272) ____
  ---
* CV-1806 (key 274)                                                                          S U
* CV-1806 (key 274) ____
* CV-1806 (key 274) ____
* CV-1807 (key 275)
* CV-1807 (key 275) ____
* CV-1807 (key 275) ____
* CV-1808 (key 277)
* CV-1808 (key 277) ____
* CV-1808 (key 277) ____
* CV-1813 (key 273)
* CV-1813 (key 273) ____
* CV-1813 (key 273) ____
* CV-1814 (key 276)
* CV-1814 (key 276) ____
* CV-1814 (key 276) ____
S  U Comment:
Comment:
Evaluator: Candidate may start securing other ventilation systems, but stop JPM when Containment Purge is isolated.
Evaluator: Candidate may start securing other ventilation systems, but stop JPM when Containment Purge is isolated.
CRITICAL STEP
CRITICAL STEP END OF TASK PALISADES NUCLEAR PLANT                       Page 7 of 9                                     JUNE 2009
 
END OF TASK  
 
JPM: RO/SRO-I SYS H SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-1
 
Ensure V-6A in service.
 
Create Event Trigger #1: Event: ZDI1P(524)
[this is Purge Fan V-46 HS to CLOSE]
 
Place the following overrides on Panel PAL09M1 (C-13 left side) on Event Trigger #1
 
with a 10 second time delay:  V-6A-1, Main Exhaust V-6A Trip to ON  V-6B-1, Main Exhaust V-6B Trip to ON  PALISADES NUCLEAR PLANT Page 8 of 9 JUNE 2009 JPM: RO/SRO-I SYS H CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
 
The plant is in MODE 5 with the PCS vented to Containment.
 
INITIATING CUES:
 
The Control Room Supervisor has directed you to initiate a Containment Purge per


SOP-24, "Ventilation and Air Conditioning Syste m" section 7.2.5. The CRS has also informed you that an AO has been brie fed and is standing by awaiting your instructions.
JPM: RO/SRO-I SYS H SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-1 Ensure V-6A in service.
The CRS also informs you that the RGEM system is in operation per SOP-38, Gaseous Process Monitoring System.
Create Event Trigger #1: Event: ZDI1P(524) [this is Purge Fan V-46 HS to CLOSE]
Place the following overrides on Panel PAL09M1 (C-13 left side) on Event Trigger #1 with a 10 second time delay:
V-6A-1, Main Exhaust V-6A Trip to ON V-6B-1, Main Exhaust V-6B Trip to ON PALISADES NUCLEAR PLANT                Page 8 of 9                          JUNE 2009


PALISADES NUCLEAR PLANT Page 9 of 9 JUNE 2009}}
JPM: RO/SRO-I SYS H CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
The plant is in MODE 5 with the PCS vented to Containment.
INITIATING CUES:
The Control Room Supervisor has directed you to initiate a Containment Purge per SOP-24, Ventilation and Air Conditioning System section 7.2.5. The CRS has also informed you that an AO has been briefed and is standing by awaiting your instructions. The CRS also informs you that the RGEM system is in operation per SOP-38, Gaseous Process Monitoring System.
PALISADES NUCLEAR PLANT                 Page 9 of 9                         JUNE 2009}}

Latest revision as of 22:01, 13 November 2019

2009 Palisades Initial License Examination Administered Control Room JPMs
ML100690475
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/25/2009
From: Valos N
Operations Branch III
To:
Entergy Nuclear Operations
References
Download: ML100690475 (79)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO-I SYS A TITLE: HOT LEG INJECTION USING P-66B AND SPLIT FLOW CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO/SRO-I SYS A JOB PERFORMANCE MEASURE DATA PAGE Task: Establish Hot Leg Injection per in-use EOP Alternate Path: NO Facility JPM #: NEW K/A: 006A2.02 Importance: RO:3.9 SRO: 4.3 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: loss of flow path Task Standard: Hot Leg Injection flow established via HPSI Pump P-66B using EOP Supplement 20 split flow method.

Preferred Evaluation Location: Simulator _X__ In Plant ______

Preferred Evaluation Method: Perform _X__ Simulate ______

References:

EOP Supplement 20, Hot Leg Injection Via PZR EOP Supplement 4, HPSI and LPSI Flow Curves EOP-4.0, Loss of Coolant Accident Recovery Validation Time: __15__ minutes Time Critical: NO Candidate: ________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 9 JUNE 2009

JPM: RO/SRO-I SYS A EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EOP Supplement 20, Hot Leg Injection Via PZR EOP Supplement 4, HPSI and LPSI Flow Curves Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Plant was tripped from 100% power.
  • EOP-4.0 (Loss of Coolant Accident) has been entered.
  • Conditions for initiating Hot Leg Injection per Step 60 are met.
  • The normal path for Hot Leg Injection per Step 60 is not available due to HPSI Train 2 to Cold Leg Valve, MO-3080, being failed in the open position.
  • HPSI Pump P-66A tripped after SIAS initiated and could not be restarted.

INITIATING CUES:

The CRS has directed you to establish hot leg injection using EOP Supplement 20 section 2.0, the HPSI Pump P-66B and split flow method.

PALISADES NUCLEAR PLANT Page 3 of 9 JUNE 2009

JPM: RO/SRO-I SYS A Proc. Step TASK ELEMENT 1 STANDARD Grade

--- Candidate locates EOP Supplement 20 EOP Supplement 20 is in hand S U Comment:

Evaluator: Provide candidate with a working copy of EOP Supplement 20 Proc. Step TASK ELEMENT 2 STANDARD Grade Operator notes this requirement for future action Record each occurrence of PZR Spray in this JPM.

1 operation with a T greater than 200°F in Operator notes current temperatures for vapor S U the Reactor Logbook. phase, spray lines, and charging: determines requirement is currently not applicable.

Comment:

Proc. Step TASK ELEMENT 3 STANDARD Grade Ensure P-66B is operating within the limits 2 Verifies P-66B flow is within EOP Supplement 4 S U of EOP Supplement 4.

Comment:

PALISADES NUCLEAR PLANT Page 4 of 9 JUNE 2009

JPM: RO/SRO-I SYS A Proc. Step TASK ELEMENT 4 STANDARD Grade Ensure open the following valves:

Charging Line Stop, CV-2111 (already open)

Auxiliary Spray, CV-2117 Verifies or places hand switches in OPEN and 3 Charging Pump Discharge to Train 2, verifies associated Green light OFF and Red S U MO-3072 light ON.

HPSI Pump B Discharge to Train 2, CV-3018 Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade Candidate determines all three Charging Pumps are operating and have electrical power 4 Stop ALL Charging Pumps S U available. Candidate will stop P-55A, P-55B, and P-55C.

Comment:

EVALUATOR NOTE: Candidate may also place Auto/Manual switches on Panel C-12 to MANUAL (this is not required to meet Standard).

CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade CLOSE the following valves:

Loop 1A, CV-2113 Places hand switches for CV-2113, CV-2115, CV-1057, and CV-1059 to CLOSE.

5 Loop 2A, CV-2115 S U Verifies Green lights ON and Red lights OFF for Spray, CV-1057 all the above valves.

Spray, CV-1059.

Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 9 JUNE 2009

JPM: RO/SRO-I SYS A Proc. Step TASK ELEMENT 7 STANDARD Grade Ensure open the following HPSI Train 1 valves:

HPSI Train 1 Loop 1A, MO-3007 Verifies MO-3007, MO-3009, MO-3011, and 6 S U HPSI Train 1 Loop 1B, MO-3009 MO-3013 Red lights ON and Green lights OFF.

HPSI Train 1 Loop 2A, MO-3011 HSPI Train 1 Loop 2B, MO-3013 Comment:

Proc. Step TASK ELEMENT 8 STANDARD Grade CLOSE the following valves:

HPSI Train 2 Loop 2B, MO-3062 Places and holds hand switches for MO-3062, 7 HPSI Train 2 Loop 2A, MO-3064 MO-3064, MO-3066, and MO-3068 to CLOSE S U until Green lights ON and Red lights OFF.

HPSI Train 2 Loop 1B, MO-3066 HSPI Train 2 Loop 1A, MO-3068 Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 9 STANDARD Grade Ensure HPSI flow of greater than or equal Operator checks flow is indicated on FIA-0212 8 to 100 gpm to the Pressurizer through the S U greater than 100 gpm.

charging line is indicated on FIA-0212.

Comment:

PALISADES NUCLEAR PLANT Page 6 of 9 JUNE 2009

JPM: RO/SRO-I SYS A Proc. Step TASK ELEMENT 10 STANDARD Grade Candidate informs the CRS that the Hot Leg Injection using P-66B and split flow

--- CRS informed. S U has been established per EOP Supplement 20 section 2.0.

Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 7 of 9 JUNE 2009

JPM: RO/SRO-I SYS A SIMULATOR OPERATOR INSTRUCTIONS

  • Initialize to any at power IC.
  • Enter malfunction SI01A (HPSI Pump P-66A fail) on PID SI02.
  • Enter malfunction RC01 (Hot Leg Rupture) on PID RC01.
  • Enter Overrride for MO-3080 to ON on PNL C-03.
  • Trip the Reactor and carry out the immediate actions of EOP-1.0 actions (including tripping of MFW Pumps).
  • Trip all Primary Coolant Pumps.
  • Take P-66A handswitch to START (to give a red flag = attempt to restart provided in initiating cue.)
  • Perform Pre-RAS Actions of EOP Supplement 42.
  • Allow to run long enough to bring in RAS, then complete RAS verifications per EOP-4.0 Step 52 and EOP Supplement 42.

PALISADES NUCLEAR PLANT Page 8 of 9 JUNE 2009

JPM: RO/SRO-I SYS A CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Plant was tripped from 100% power.
  • EOP-4.0 (Loss of Coolant Accident) has been entered.
  • Conditions for initiating Hot Leg Injection per Step 60 are met.
  • The normal path for Hot Leg Injection per Step 60 is not available due to HPSI Train 2 to Cold Leg Valve, MO-3080, being failed in the open position.
  • HPSI Pump P-66A tripped after SIAS initiated and could not be restarted.

INITIATING CUES:

The CRS has directed you to establish hot leg injection using EOP Supplement 20 section 2.0, the HPSI Pump P-66B and split flow method.

PALISADES NUCLEAR PLANT Page 9 of 9 JUNE 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO-I SYS B TITLE: SWAP PRESSURIZER PRESSURE CONTROL CHANNELS CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO/SRO-I SYS B JOB PERFORMANCE MEASURE DATA PAGE Task: Swap Pressurizer Pressure Control channels Alternate Path: YES Facility JPM #: 2005 NRC Exam K/A: 010A4.01 Importance: RO: 3.7 SRO: 3.5 K/A Statement: Ability to manually operate and/or monitor in the control room: PZR spray valve Task Standard: PIC-0101A placed in service; applicant recognizes failure of PIC-0101A and then switches back to PIC-0101B.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SOP-1A, Primary Coolant System ARP-4, Pressurizer Pressure Off Normal Hi-Lo Validation Time: 15 minutes Time Critical: NO Candidate: ________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 10 JUNE 2009

JPM: RO/SRO-I SYS B EXAMINER COPY ONLY Tools/Equipment/Procedures Needed: SOP-1A, section 7.2.2.b.3 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The plant is at steady state 100% power.
  • Pressurizer Pressure Controller PIC-0101B is selected and is in AUTO.
  • Pressurizer Pressure Controller PIC-0101A is in MANUAL at 50% demand.

INITIATING CUES:

The Control Room Supervisor has directed you to switch Pressurizer Pressure Controllers per SOP-1A for normal rotation of controllers.

PALISADES NUCLEAR PLANT Page 3 of 10 JUNE 2009

JPM: RO/SRO-I SYS B Proc.Step TASK ELEMENT 1 STANDARD Grade Obtain a copy of SOP-1A, Primary Coolant Candidate locates SOP-1A, Primary Coolant

--- S U System procedure. System.

Comment:

Proc.Step TASK ELEMENT 2 STANDARD Grade Determine that Section 7.2.2.b.3 of SOP-1A Reviews Section 7.2.2 PZR Press Control and

--- should be used to alternate PZR Press determines section 7.2.2.b.3 needs to be S U Controllers. performed.

Comment:

EVALUATOR: provide candidate working copy of SOP-1A section 7.2.2.b.3.

Proc.Step TASK ELEMENT 3 STANDARD Grade 3.a Verify controller to be selected in MANUAL. Verifies PIC-0101A is in MANUAL. S U Comment:

Proc.Step TASK ELEMENT 4 STANDARD Grade Adjusts output signal on PIC-0101A to match Adjust output signal on PIC-0101A to match 3.b output signal on PIC-0101B for bumpless S U output signal on PIC-0101B.

transfer.

Comment:

Proc.Step TASK ELEMENT 5 STANDARD Grade PALISADES NUCLEAR PLANT Page 4 of 10 JUNE 2009

JPM: RO/SRO-I SYS B Place Selector Switch 1/PRC-0101 to Places Selector Switch 1/PRC-0101 to 3.c S U Channel 'A'. Channel 'A'.

Evaluator: If asked, state that AUTO CONTROL IS DESIRED.

CRITICAL STEP Proc.Step TASK ELEMENT 6 STANDARD Grade Ensure Pzr Htr Control Channel Selector Ensures Pzr Htr Control Channel Selector 3.d.1 S U Switch in CHAN A & B. Switch in CHAN A & B.

Comment:

Proc.Step TASK ELEMENT 7 STANDARD Grade Ensure PIC-0101A setpoint set at desired 3.d.2 Ensures PIC-0101A setpoint set to 2060 psia. S U PCS pressure.

Comment:

Proc.Step TASK ELEMENT 8 STANDARD Grade Adjust PIC-0101A output to match indicated Adjusts PIC-0101A output to match indicated 3.d.3 Pzr Press (red pointer) with setpoint press Pzr Press (red pointer) with setpoint press S U (Blue pointer). (Blue pointer).

Comment:

Proc.Step TASK ELEMENT 9 STANDARD Grade PALISADES NUCLEAR PLANT Page 5 of 10 JUNE 2009

JPM: RO/SRO-I SYS B Depress the "A" pushbutton on PIC-0101A Depresses the "A" pushbutton on PIC-0101A to 3.d.4 S U to place it in AUTO. place it in AUTO.

Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 10 STANDARD Grade Place the unselected controller in MANUAL Places PIC-0101B in MANUAL with a 50%

3.e S U with a 50% output signal. output signal.

Comment:

NOTE: When PIC-0101B is placed in MANUAL control, after ~ 20 seconds, PIC-0101A output will slowly start to fail high (to 100% output). This will cause Pzr Press. to lower (sprays open, heaters to minimum.)

Proc.Step TASK ELEMENT 11 STANDARD Grade Applicant should recognize the failure by observing the output of PIC-0101A failing Place PIC-0101A back to MANUAL and reduce


high. EK-0753 Pzr Press Off Normal Hi-Lo controller output to restore Pzr Press to 2060 S U alarm will also alert applicant of the psia.

problem.

Comment:

EVALUATOR NOTE: Candidate may place 1/PRC-0101 back to Channel 'B'. This is acceptable. If so, proceed with JPM at Task Element 15.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 6 of 10 JUNE 2009

JPM: RO/SRO-I SYS B Proc.Step TASK ELEMENT 12 STANDARD Grade ARP-4 referenced for EK-0753 and CRS Refers to ARP-4 window 53 and informs informed of the problem with PIC-0101A.


S U CRS of the problem with PIC-0101A. Candidate will inform CRS to refer to ONP-18, Pressurizer Pressure Control Malfunctions.

EVALUATOR: When informed to reference ONP-18, direct the operator to place PIC-0101B back in service in AUTO.

Proc.Step TASK ELEMENT 13 STANDARD Grade 3.a Verify PIC-0101B is in MANUAL. PIC-0101B is in MANUAL. S U Comment:

Proc.Step TASK ELEMENT 14 STANDARD Grade Adjust output signal on PIC-0101B to match Adjusts output signal on PIC-0101B to desired 3.b output signal on PIC-0101A or desired S U output.

output.

Comment:

Proc.Step TASK ELEMENT 15 STANDARD Grade Place selector switch 1/PRC-0101 to Places selector switch 1/PRC-0101 to 3.c S U Channel 'B'. Channel 'B'.

Evaluator: If asked, state that AUTO control is desired.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 7 of 10 JUNE 2009

JPM: RO/SRO-I SYS B Proc.Step TASK ELEMENT 16 STANDARD Grade PZR HTR Channel Selector Switch may be Places PZR HTR Channel Selector Switch in 3.d.1 S U placed in CHAN B position. CHAN B or leaves in CHAN A & B.

Comment:

Evaluator NOTE: Candidate may place switch in CHAN B or leave in CHAN A & B based on note preceding step 3.d.1.

Proc.Step TASK ELEMENT 17 STANDARD Grade Ensure PIC-0101B setpoint set at desired 3.d.2 Ensures PIC-0101B setpoint set at 2060 psia. S U PCS pressure.

Comment:

Proc.Step TASK ELEMENT 18 STANDARD Grade Adjust PIC-0101B output to match indicated Adjusts PIC-0101B output to match indicated 3.d.3 Pzr Press (red pointer) with setpoint press Pzr Press (red pointer) with setpoint press S U (Blue pointer). (Blue pointer).

Comment:

Evaluator NOTE: Correct performance of Task Element 18 or Task Element 19 is Critical. It is preferred to perform both.

CRITICAL STEP Proc.Step TASK ELEMENT 19 STANDARD Grade Depress the "A" pushbutton on PIC-0101B Depresses the "A" pushbutton on PIC-0101B to 3.d.4 S U to place it in AUTO. place it in AUTO.

Comment:

CRITICAL STEP END OF TASK PALISADES NUCLEAR PLANT Page 8 of 10 JUNE 2009

JPM: RO/SRO-I SYS B SIMULATOR OPERATOR INSTRUCTIONS

  • Reset to IC-17.
  • Build Event Trigger #1:

o Event ZDI2P(315), this is manual pushbutton on PIC-0101B Place RX05A (PIC-0101A failed high), 20 second time delay, on Event Trigger 1.

PALISADES NUCLEAR PLANT Page 9 of 10 JUNE 2009

JPM: RO/SRO-I SYS B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The plant is at steady state 100% power.
  • Pressurizer Pressure Controller PIC-0101B is selected and is in AUTO.
  • Pressurizer Pressure Controller PIC-0101A is in MANUAL at 50% demand.

INITIATING CUES:

The Control Room Supervisor has directed you to switch Pressurizer Pressure Controllers per SOP-1A for normal rotation of controllers.

PALISADES NUCLEAR PLANT Page 10 of 10 JUNE 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO-I/SRO-U SYS C TITLE: OPEN MAIN STEAM ISOLATION VALVES AFTER REACTOR IS CRITICAL CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO/SRO-I/SRO-U SYS C JOB PERFORMANCE MEASURE DATA PAGE Task: Open MSIVs Alternate Path: One MSIV will not open requiring ADV operation to open Facility JPM #: 2007 CERT SRO JPM K/A: 035 K6.01 Importance: RO: 3.2 SRO: 3.6 K/A Statement: Knowledge of the effect of a loss or malfunction of the following will have on the S/Gs: MSIVs Task Standard: Both MSIVs Open, MSIV bypasses closed, ADVs and TBV in AUTO Preferred Evaluation Location: Simulator _X__ In Plant ______

Preferred Evaluation Method: Perform _X__ Simulate ______

References:

SOP-7, Main Steam System Validation Time: __15__ minutes Time Critical: NO Candidate: _________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 10 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS C EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-7, Main Steam System Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The reactor is critical with power at the POAH. MSIV Bypass valves, MO-0501 and MO-0510 are open. Vacuum is established on the Main Turbine and the secondary plant is in the process of being started up.

INITIATING CUES:

The CRS directs you to open the MSIVs per SOP-7, step 7.2.2.c.

PALISADES NUCLEAR PLANT Page 3 of 10 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS C Proc. Step TASK ELEMENT 1 STANDARD Grade

--- Locate correct procedure Candidate locates SOP-7, section 7.2.2 S U Comment:

Evaluator: Provide candidate with a working copy of SOP-7, section 7.2.2.

Proc. Step TASK ELEMENT 2 STANDARD Grade Candidate contacts Auxiliary Operator to latch 7.2.2.c LATCH MSIV solenoid valves. all MSIV solenoids in the turbine building and 'D' S U bus area.

Comment:

SIM OPERATOR: Use MS36 on P&ID MS02, DO NOT latch 'A' MSIV (MS25) but report that it is complete.

CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade IF MSIVs opened after performance of Candidate determines that CV-0510, 'A' S/G d S U Step 7.2.2c, THEN GO TO Step 7.2.2q. MSIV, did not open. Proceeds to step 7.2.2.e Comment:

Evaluator: Role play as CRS and direct candidate to proceed to step 7.2.2.e, if asked.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 10 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS C Proc. Step TASK ELEMENT 4 STANDARD Grade Candidate performs the following:

___ PLACEs PIC-0511, Turbine Bypass Valve Control to MANUAL.

ENSURE CV-0511, Turbine Bypass to ___ Sets PIC-0511, Turbine Bypass Control e Condenser, remains CLOSED by Valve to CLOSE. S U performing the following: ___ Has AO Close MV-CA390, Turbine Bypass CV-0511 A/S Isolation.

___ Has AO OPEN accumulator drain valve to bleed pressure from CV-0511 accumulator, THEN CLOSE the valve.

Comment:

SIM OPERATOR: Use MS35 on PIDMS03 to close air supply to CV-0511, then notify as AO that air supply is closed and accumulator is bled down Proc. Step TASK ELEMENT 5 STANDARD Grade PERFORM the following notifications of Candidate informs CRS to notify Chemistry and f S U impending Steam Dump operation: to refer to ADMIN 4.00.

Comment:

Evaluator: Notify Candidate that the SE will perform this.

Proc. Step TASK ELEMENT 6 STANDARD Grade Candidate directs Auxiliary Operator to close the following valves in the ADV control cabinet:

CLOSE three of the four Steam Dump Air g Supplies for the MSIV to be opened, listed ___ MV-CA779 S U below: ___ MV-CA780

___ MV-CA781 OR MV-CA782 Comment:

Evaluator NOTE: LCO 3.7.4.A is applicable. If candidate asks, notify them that the CRS will take care of this.

SIM OPERATOR: Use MS18, MS19, MS20 (or MS21) on PID MS01 to close these valves CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 10 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS C Proc. Step TASK ELEMENT 7 STANDARD Grade PLACE HIC-0780A, Steam Generator Candidate:

E-50B Steam Dump to MANUAL.

___ Places HIC-0780A in Manual h, i OPERATE HIC-0780A toward 100% S U OPEN position to equalize DP across ___ Operates manual output lever to open ADV MSIV. until MSIV CV-0510 opens.

Comment:

Evaluator NOTE: If candidate asks, inform them that the required notifications are made.

Evaluator NOTE: CV-0510 will latch when HIC-0780A reaches ~25% output.

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade WHEN MSIV opens, THEN PLACE Candidate Operates manual output lever to j S U HIC-0780A to CLOSE position. close ADV.

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 9 STANDARD Grade Candidate has AO open:

OPEN Steam Dump Air Supplies closed in ___ MV-CA779 k S U Step 7.2.2g above. ___ MV-CA780

___ MV-CA781 OR MV-CA782 Comment:

SIM OPERATOR: Use MS18, MS19, MS20 (or MS21) on PID MS01 to open the valves that were closed in Task Element #6.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 6 of 10 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS C Proc. Step TASK ELEMENT 10 STANDARD Grade IF both MSIVs did NOT open, THEN Candidate determines this step is N/A because l REPEAT Steps 7.2.2g through 7.2.2k for S U both MSIVs are now open.

affected MSIV.

Comment:

Proc. Step TASK ELEMENT 11 STANDARD Grade Candidate has AO:

CLOSE CV-0511 accumulator drain valve.

___ CLOSE CV-0511 accumulator drain valve m, n OPEN MV-CA390, Turbine Bypass S U CV-0511 A/S Isol. ___ OPEN MV-CA390, Turbine Bypass CV-0511 A/S Isol.

Comment:

SIM OPERATOR: Use MS35 on PIDMS03 to open air supply to CV-0511.

CRITICAL STEP Proc. Step TASK ELEMENT 12 STANDARD Grade RETURN HIC-0780A to AUTO or the AS FOUND position. Candidate places HIC-0780A and CV-0511 in o, p AUTO by depressing the 'A' button on their S U RETURN PIC-0511 to AUTO or the AS controllers and verifying the 'A' button lights.

FOUND position.

Comment:

EVALUATOR NOTE: If asked, inform candidate that PIC-0511 and HIC-0780A should be placed back in AUTO.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 7 of 10 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS C Proc. Step TASK ELEMENT 13 STANDARD Grade CLOSE the following valves: Candidate closes MO-0501 and MO-0510 by holding switch in the CLOSE position until q

  • MO-0501, MSIV CV-0501 Bypass (MZ-3) S U associated Green light is ON and Red light is
  • MO-0510, MSIV CV-0510 Bypass (MZ-2) OFF.

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 14 STANDARD Grade Candidate informs the CRS that the MSIVs

--- are open and the MSIV bypasses are CRS informed. S U closed.

Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 8 of 10 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS C SIMULATOR OPERATOR INSTRUCTIONS IC-12 Open MSIV Bypass Valves Close MSIVs Trip 'B' MFP, start P-8A Ensure Reactor Power is < 2% (limit for MSIV Bypass valves open)[insert Group 4 rods to approximately 35]

Insert the following triggers:

Trigger: 1 Event: ZAO3F(62).gt.0.25 (ADV Controller reaches 25% output)

Action: irf ms25 latch (opens MSIV)

PALISADES NUCLEAR PLANT Page 9 of 10 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS C CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The reactor is critical with power at the POAH. MSIV Bypass valves, MO-0501 and MO-0510 are open. Vacuum is established on the Main Turbine and the secondary plant is in the process of being warmed up.

INITIATING CUES:

The CRS directs you to open the MSIVs per SOP-7 step 7.2.2.c.

PALISADES NUCLEAR PLANT Page 10 of 10 JUNE 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO-I/SRO-U SYS D TITLE: WITHDRAW SHUTDOWN GROUP CONTROL RODS CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO/SRO-I/SRO-U SYS D JOB PERFORMANCE MEASURE DATA PAGE Task: Withdraw Shutdown Group Control Rods Alternate Path: YES - 1 rod sticks during withdrawal Facility JPM #: NEW K/A: 001K4.13 Importance: SRO: 3.4 RO: 3.4 K/A Statement: Knowledge of CRDS design features/interlocks which provide for the following: Operation of CRDS controls for withdrawing lingering rods and transferring rods and rod groups.

Task Standard: All Shutdown Group B Control Rods withdrawn 66 inches.

Preferred Evaluation Location: Simulator __X__ In Plant ______

Preferred Evaluation Method: Perform __X__ Simulate ______

References:

SOP-6, Reactor Control System ARP-5, Primary Coolant Pump Steam Generator and Rod Drives Scheme EK-09 (C-12)

Validation Time: __20___ minutes Time Critical: NO Candidate: ________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-6, Reactor Control System ARP-5, Primary Coolant Pump Steam Generator and Rod Drives Scheme Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Preparations for a critical approach are in progress per GOP-3, Mode 3 525°F To MODE 2. GOP-3 is completed through step 2.1.a.

INITIATING CUES:

The Control Room Supervisor has directed you to perform Section 7.1.2 of SOP-6, "Reactor Control System" for withdrawal of Shutdown Group B Control Rods. Section 7.1.1 has already been performed.

PALISADES NUCLEAR PLANT Page 3 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 1 STANDARD Grade

--- Obtains current procedure. Obtains and refers to SOP-6, Section 7.1.2. S U Comment:

Evaluator: Provide a working copy of SOP-6, section 7.1.2 to candidate.

Proc.Step TASK ELEMENT 2 STANDARD Grade SOP-6 Candidate checks PPC (page 420) and/or Ensure all rods of Group A are withdrawn Panel C-02 display to verify Group A rods are S U 7.1.2.a greater than or equal to 128 inches.

above 128 inches.

Comment:

Proc.Step TASK ELEMENT 3 STANDARD Grade SOP-6 Place Group Selector Switch to B position. Group Selector Switch placed in B position. S U 7.1.2.b Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 4 STANDARD Grade SOP-6 Place Mode Selector Switch to MG (Manual Mode Selector Switch placed in MG position. S U 7.1.2.c Group) position.

Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 5 STANDARD Grade SOP-6 Operate Raise-Lower Switch to RAISE Raise-Lower Switch place in RAISE position. S U 7.1.2.d position.

Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 6 STANDARD Grade SOP-6 Monitor Nuclear Instrumentation (NI) for NIs monitored as rods are moved. S U 7.1.2.e response during rod movement.

Comment:

Evaluator Note: Group B rods PIP/SPI difference alarms on PPC are expected alarms as described by SOP-6 section 5.3.

Proc.Step TASK ELEMENT 7 STANDARD Grade SOP-6 Stop movement of rods approximately every Control Rod motion stopped prior to exceeding 33 inches (should not exceed 35 inches) of S U 7.1.2.f 35 inches of movement.

rod movement.

Comment:

Proc.Step TASK ELEMENT 8 STANDARD Grade SOP-6 WHEN rod motion has stopped, THEN Candidate observes SUR indication on Panel S U 7.1.2.f.1 OBSERVE proper reduction in startup rate. C-02 and/or PPC.

Comment:

PALISADES NUCLEAR PLANT Page 5 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 9 STANDARD Grade Uses at least one of following methods to verify all Group B rods are within 2 inches of each other:

SOP-6 PERFORM Control Rod alignment -TURN Rod Selector Switch for Group B S U 7.1.2.f.2 verification through all of its positions AND COMPARE Control Rod positions.

- Use the PPC Control Rod position indication for Group B rods.

Comment:

EVALUATOR NOTE: IF candidate attempts to level Control Rod #15 after first 33-inch pull, as CRS inform them to follow procedure and not level rods until procedure criteria is met (i.e. more than 2 inches).

Proc.Step TASK ELEMENT 10 STANDARD Grade Continue Group B withdrawal:

SOP-6 Operate Raise-Lower Switch to RAISE Raise-Lower Switch place in RAISE position. S U 7.1.2.d position.

Comment:

EVALUATOR NOTE: When Rod 18 is > 45 inches, it will become stuck.

CRITICAL STEP Proc.Step TASK ELEMENT 11 STANDARD Grade SOP-6 Monitor Nuclear Instrumentation (NI) for NIs monitored as rods are moved. S U 7.1.2.e response during rod movement.

Comment:

PALISADES NUCLEAR PLANT Page 6 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 12 STANDARD Grade ARP-5 Control Rod motion stopped by releasing Alarm EK-0911 Rod Position 4 Inches Raise-Lower switch.

Window S U Deviation, Annunciates 11 ARP-5 referenced for window 11 Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 13 STANDARD Grade ARP-5 On PPC display 411, Rod 18 identified OR IDENTIFY affected Control Rod AND extent Window confirm on Panel C-02 by placing Group B S U of its deviation.

11 Selector Switch to 18 Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 14 STANDARD Grade Verifies Rod 18 position is 4 inches lower than ARP-5 remaining rods in Group B using available COMPARE affected rod position with Window indications. Also notes that Rod 15 is more S U secondary rod position.

11 than 2 inches different from remainder of group.

Comment:

Proc.Step TASK ELEMENT 15 STANDARD Grade ARP-5 REPOSITION Control Rod in Manual Window Individual as necessary to clear alarm per Refers to SOP-6, section 7.4. S U 11 SOP-6 Comment:

Evaluator: Provide candidate with a working copy of SOP-6, section 7.4 PALISADES NUCLEAR PLANT Page 7 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 16 STANDARD Grade SOP-6 REFER to Step 4.4.1 SOP-6 Step 4.4.1 reviewed. S U 7.4.a Comment:

NOTE: Step 7.4.b is not applicable; step 7.4.c and d have already been performed in ARP-5 actions.

Proc.Step TASK ELEMENT 17 STANDARD Grade SOP-6 PLACE Rod Selector Switch in the position Rod Selector Switch for Group B placed in S U 7.4.e for the rod to be moved. position 18 Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 18 STANDARD Grade SOP-6 TURN Group Selector Switch to the position Group Selector Switch placed in Group B for the group containing the rod to be S U 7.4.f position.

moved.

Comment:

Proc.Step TASK ELEMENT 19 STANDARD Grade SOP-6 PLACE Mode Selector Switch to MI (Manual Mode Selector Switch placed in MI position. S U 7.4.g Individual) position.

Comment:

NOTE: This deletes the stuck rod malfunction.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 8 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 20 STANDARD Grade

___ Operates ROD CONTROL joystick to RAISE.

SOP-6 Withdraw selected rod to clear 4-inch ___ Rod 18 withdrawn to be within 2.0" of S U 7.4.h deviation alarm. other Group B rods.

___ Observes 4-Inch Deviation alarm clears.

Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 21 STANDARD Grade

___ Rod Selector Switch for Group B placed in position 15 SOP-6 ___ Operates ROD CONTROL joystick to Withdraw selected rod to level Rod 15. RAISE. S U 7.4.h

___ Rod 15 withdrawn to be within 2.0" of other Group B rods.

Comment:

Proc.Step TASK ELEMENT 22 STANDARD Grade SOP-6 PLACE the Group Selector Switch to Group Selector Switch placed in Group B S U 7.4.i desired position. position.

Comment:

PALISADES NUCLEAR PLANT Page 9 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 23 STANDARD Grade SOP-6 PLACE the Mode Selector Switch in MS (Manual Sequential) or as directed by the Mode Selector Switch place in MG position S U 7.4.j Shift Manager.

Comment:

EVALUATOR: If asked as Shift Manager: direct Mode Selector Switch be placed in the Manual Group (MG) position.

CRITICAL STEP Proc.Step TASK ELEMENT 24 STANDARD Grade Continue withdrawal of Group B rods:

SOP-6 Operate Raise-Lower Switch to RAISE Raise-Lower Switch place in RAISE position. S U 7.1.2.d position.

Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 25 STANDARD Grade SOP-6 Monitor Nuclear Instrumentation (NI) for NIs monitored as rods are moved. S U 7.1.2.e response during rod movement.

Comment:

Proc.Step TASK ELEMENT 26 STANDARD Grade SOP-6 Stop movement of rods approximately every Control Rod motion stopped prior to exceeding 33 inches (should not exceed 35 inches) of S U 7.1.2.f 35 inches of movement.

rod movement.

Comment:

PALISADES NUCLEAR PLANT Page 10 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D Proc.Step TASK ELEMENT 27 STANDARD Grade SOP-6 WHEN rod motion has stopped, THEN Candidate observes SUR indication on Panel S U 7.1.2.f.1 OBSERVE proper reduction in startup rate. C-02 and/or PPC.

Comment:

Proc.Step TASK ELEMENT 28 STANDARD Grade Uses at least one of following methods to verify all Group B rods are within 2 inches of each other:

SOP-6 PERFORM Control Rod alignment -TURN Rod Selector Switch for Group B S U 7.1.2.f.2 verification through all of its positions AND COMPARE Control Rod positions.

- Use the PPC Control Rod position indication for Group B rods.

Comment:

EVALUATOR: Stop JPM when Group B reaches approximately 69 (i.e. after second 33-inch pull).

EVALUATOR: Inform candidate that task is complete.

END OF TASK PALISADES NUCLEAR PLANT Page 11 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-5.

Insert Shutdown Group B rods and part length rods to bottom of core using RD05B and RD05G. After these rods are fully inserted, then clear both malfunctions.

Ensure Dropped Rod alarm NOT on (May need to pull part length rods to 3.6")

Ensure Mode Select switch is in 'MS' position Setup Event Trigger 1:

Event: rdsr(18)>45 Place malfunction RD16-18-5 (PIDRC02) (=rod 18 stuck) on Event Trigger 1 Setup Event Trigger 2:

Event: ZDI2P(267) (this is Rod Control Mode Select Switch in MI position)

Action: dmf rd16-18 PALISADES NUCLEAR PLANT Page 12 of 13 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS D CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Preparations for a critical approach are in progress per GOP-3, Mode 3 525°F To MODE 2. GOP-3 is completed through step 2.1.a.

INITIATING CUES:

The Control Room Supervisor has directed you to perform Section 7.1.2 of SOP-6, "Reactor Control System" for withdrawal of Shutdown Group B Control Rods. Section 7.1.1 has already been performed.

PALISADES NUCLEAR PLANT Page 13 of 13 JUNE 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO-I SYS E TITLE: PERFORM A DIESEL GENERATOR (D/G)

VOLTAGE TEST ON 1-1 D/G CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO/SRO-I SYS E JOB PERFORMANCE MEASURE DATA PAGE Task: Perform Diesel Generator Surveillance MO-7A-1 and MO-7A-2 Alternate Path: NO Facility JPM #: PL-OPS-EDG-005J K/A: 064A4.06 Importance: RO: 3.9 SRO: 3.9 K/A Statement: Manual start, loading, and stopping of the ED/G Task Standard: 1-1 D/G Auto Voltage Regulator High and Low Limits verified.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

MO-7A-1, Emergency Diesel Generator 1-1 Validation Time: 10 minutes Time Critical: NO Candidate: ___________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 10 JUNE 2009

JPM: RO/SRO-I SYS E EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

MO-7A-1, Emergency Diesel Generator 1-1, Section 5.6 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Diesel Generator 1-1 running unloaded at 60 Hz.
  • Month is January.
  • Plant is in Mode 1.
  • Auxiliary Operator is stationed at EC-22, Diesel Generator 1-1 Local Panel.

INITIATING CUES:

  • During performance of MO-7A-1, the Control Room Supervisor directs you to perform Section 5.6 "Voltage Regulator Test."

PALISADES NUCLEAR PLANT Page 3 of 10 JUNE 2009

JPM: RO/SRO-I SYS E Proc. Step TASK ELEMENT 1 STANDARD Grade Operator obtains a copy of MO-7A-1, MO-7A-1, Section 5.6 obtained n/a Section 5.6 S U Comment:

Evaluator: Provide a working copy of MO-7A-1, Section 5.6.

Proc. Step TASK ELEMENT 2 STANDARD Grade DETERMINE the Voltage Regulator Mode Select switch position from the table for the month .. AND PERFORM the following: Operator determines that the Voltage Regulator 5.6.1 Mode Select switch position is AUTO. S U Voltage Regulator Mode Select Switch Position is AUTO for month of January Comment:

NOTE: The Voltage Regulator Mode Select switch position is determined by the Month of the test.

EVALUATOR: If asked as System Engineer what switch position to use, CUE that the procedure, MO-7A-1 is to be followed.

Proc. Step TASK ELEMENT 3 STANDARD Grade IF position is AUTO, THEN ENSURE Voltage Regulator Mode Select switch is verified Voltage Regulator Mode Select switch is in 5.6.1a in AUTO position. S U the AUTO position (location C-04 panel).

Comment:

EVALUATOR: If candidate places this switch in MANUAL, then this task element is a failed critical step.

PALISADES NUCLEAR PLANT Page 4 of 10 JUNE 2009

JPM: RO/SRO-I SYS E Proc. Step TASK ELEMENT 4 STANDARD Grade IF position is MANUAL, THEN PERFORM Operator determines that this step is not 5.6.1b.1 the following: applicable. S U Comment:

Proc. Step TASK ELEMENT 5 STANDARD Grade IF the plant is in Mode 1, 2, 3, or 4, THEN Operator determines that this step is not 5.6.1b.2 PERFORM off-site source checks. applicable. S U Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade DETERMINE the switch from the table for Operator determines that the Field Rheostat the performance month . AND 5.6.2 switch on C-04 is to be used. S U PERFORM the Following:

Comment:

NOTE: The Field Rheostat switch on C-04 is determined by the Month of the test.

EVALUATOR: If asked as System Engineer what switch to use, CUE The procedure, MO-7A-1 is to be followed.

PALISADES NUCLEAR PLANT Page 5 of 10 JUNE 2009

JPM: RO/SRO-I SYS E Proc. Step TASK ELEMENT 7 STANDARD Grade Slowly raise generator voltage to between Operator adjusts generator voltage between 2575 VAC and 2625 VAC on EVI-1107L, 2575 VAC and 2625 VAC on EVI-1107L with the 5.6.2a Local Volt Meter or as directed by the S U Field Rheostat switch on C-04.

System Engineer.

Comment:

EVALUATOR: If asked as System Engineer what generator voltage limits to use, CUE that the procedure, MO-7A-1 is to be followed.

EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade Recorded generator and field voltages (from RECORD generator voltage and field EC-22 panel:

voltage (location EC-22 panel)

Local Volt Meter (EVI-1107L) Volts: 2575 to 5.6.2b Local Volt Meter (EVI-1107L) Volts: ____ S U 2625 Field Voltage (EVI-1107DC) Volts: ____

Field Voltage (EVI-1107DC) Volts: __80V_

Comment:

EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.

EVALUATOR: If asked as AO to report field voltage, REPORT: field voltage reads 80 V on EVI-1107DC.

PALISADES NUCLEAR PLANT Page 6 of 10 JUNE 2009

JPM: RO/SRO-I SYS E Proc. Step TASK ELEMENT 9 STANDARD Grade Slowly lower generator voltage to between Operator adjusts generator voltage between 2275 VAC and 2325 VAC on EVI-1107L, 2275 VAC and 2325 VAC on EVI-1107L with the 5.6.2c Local Volt Meter or as directed by the S U Field Rheostat switch on C-04.

System Engineer.

Comment:

EVALUATOR: If asked as System Engineer what generator voltage limits to use, CUE that the procedure, MO-7A-1 is to be followed.

EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.

CRITICAL STEP Proc. Step TASK ELEMENT 10 STANDARD Grade Recorded generator and field voltages (from RECORD generator voltage and field EC-22 panel:

voltage (location EC-22 panel)

Local Volt Meter (EVI-1107L) Volts: 2275 to 5.6.2d Local Volt Meter (EVI-1107L0 Volts: ____ S U 2325 Field Voltage (EVI-1107DC)n Volts: ____

Field Voltage (EVI-1107DC) Volts: __70V_

Comment:

EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.

EVALUATOR: If asked as AO to report field voltage, REPORT: field voltage reads 70 V on EVI-1107DC.

PALISADES NUCLEAR PLANT Page 7 of 10 JUNE 2009

JPM: RO/SRO-I SYS E Proc. Step TASK ELEMENT 11 STANDARD Grade RAISE generator voltage to 2400 VAC Generator voltage raised to between 2390 VAC (2390 VAC - 2410 VAC) on EVI-1107L, and 2410 VAC on EVI-1107L with the Field 5.6.2e Local Volt Meter. Rheostat switch on C-04. S U Comment:

EVALUATOR: If asked as AO to report local generator voltage, USE voltage indication on C-04 for the local voltage reading.

CRITICAL STEP Proc. Step TASK ELEMENT 12 STANDARD Grade ENSURE Voltage Regulator Mode Select Voltage Regulator Mode Select switch verified switch is in AUTO position (location C-04 in the AUTO position panel).

5.6.3 S U Performed By: N/A Performed By: Signed, Time and Dated Verified By: Signed, Time and Dated Verified By: Signed, Time and Dated Comment:

EVALUATOR: Operator will not sign the Performed By line, the Verified By line will be signed (Voltage Selector switch in proper position and not manipulated)

Proc. Step TASK ELEMENT 13 STANDARD Grade Notify CRS that 1-1 D/G Voltage Regulator CRS notified that Section 5.6 of MO-7A-1 for Test has been completed per Section 5.6 of n/a Voltage Regulator Test Complete. S U MO-7A-1, for 1-1 D/G.

Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 8 of 10 JUNE 2009

JPM: RO/SRO-I SYS E SIMULATOR OPERATOR INSTRUCTIONS Any at power IC can be used.

Start EDG 1-1 in UNIT.

Clear Local Alarm guage board on PIDED08, using ED27.

PALISADES NUCLEAR PLANT Page 9 of 10 JUNE 2009

JPM: RO/SRO-I SYS E CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Diesel Generator 1-1 running unloaded at 60 Hz.
  • Month is January.
  • Plant is in Mode 1.
  • Auxiliary Operator is stationed at EC-22, Diesel Generator 1-1 Local Panel.

INITIATING CUES:

During performance of MO-7A-1, the Control Room Supervisor directs you to perform Section 5.6 "Voltage Regulator Test."

PALISADES NUCLEAR PLANT Page 10 of 10 JUNE 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO-I/SRO-U SYS F TITLE: PLACE A CONTAINMENT RADIATION MONITOR IN SERVICE CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO/SRO-I/SRO-U SYS F JOB PERFORMANCE MEASURE DATA PAGE Task: Operate the Area Radiation Monitoring System Alternate Path: YES - Operate light fails to illuminate when tested Facility JPM #: 2007 NRC SRO JPM K/A: 072A4.01 Importance: RO: 3.0 SRO: 3.3 K/A Statement: Ability to manually operate and/or monitor in the Control Room: Alarm and setpoint checks and adjustments.

Task Standard: Candidate recognizes that the radiation monitor operate light will not illuminate and refers to attachment 2 to troubleshoot the monitor.

Implementation of attachment 2 will restore the operate light.

Preferred Evaluation Location: Simulator _X_ In Plant ______

Preferred Evaluation Method: Perform _X_ Simulate ______

References:

SOP-39, Area Radiation Monitoring System Validation Time: _10_ minutes Time Critical: NO Candidate: _______________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 9 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS F EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-39 section 7.4.2 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The Plant is operating at 100% power.
  • I&C Department has just completed maintenance on Containment Radiation Monitor RIA-1805.
  • CL-39 for RIA-1805 has been completed INITIATING CUES:

The Control Room Supervisor directs you to place Containment Radiation Monitor, RIA-1805, in service per SOP-39, step 7.4.2.

Another operator will answer any front panel alarms.

PALISADES NUCLEAR PLANT Page 3 of 9 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS F Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Operator locates SOP-39, section 7.4.2 SOP-39, section 7.4.2 is located S U Comment:

Evaluator: Provide candidate with a working copy of SOP-39, section 7.4.2.

Proc. Step TASK ELEMENT 2 STANDARD Grade REFER TO Attachment 3, Checklist CL 39, Candidate determines that this step is N/A per 7.4.2.a S U "Area Monitors System Checklist." initial conditions.

Comment:

Evaluator: If asked, inform candidate that CL-39 has been completed for RIA-1805.

Proc. Step TASK ELEMENT 3 STANDARD Grade Operator recognizes that the OPERATE light is 7.4.2.b CHECK operate light illuminated. S U not illuminated.

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 4 STANDARD Grade IF operate light NOT illuminated, THEN Operator refers to Attachment 2, section 4.1 for 7.4.2.c REFER TO Attachment 2, "System Containment Radiation Monitors Operate light S U Malfunctions and Troubleshooting." not illuminated.

Comment:

PALISADES NUCLEAR PLANT Page 4 of 9 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS F Proc. Step TASK ELEMENT 5 STANDARD Grade 4.1.a PRESS AND HOLD operate light. Operate light pressed and held S U Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade Operator verifies Orange and Red (Trip 1 and 4.1.b CHECK other three monitors not tripped. Trip 2) lights not illuminated for RIA-1806, 1807 S U and 1808.

Comment:

Proc. Step TASK ELEMENT 7 STANDARD Grade PLACE Selector Switch momentarily to RIA-1805 selector switch placed in CHECK 4.1.c S U CHECK position AND RELEASE. position and released.

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade 4.1.d RELEASE operate light. Operate light is released S U Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 9 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS F Proc. Step TASK ELEMENT 9 STANDARD Grade Operator resets:

____ AMBER Trip 1 4.1.e RESET all alarms. S U

____ RED Trip 2 by depressing associated indicating light.

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 10 STANDARD Grade IF operate light still not illuminated, THEN Operator determines this step is not applicable 4.1.f DECLARE the associated monitor S U because Operate light is illuminated.

inoperable AND REFER TO 4.2 below.

Comment:

Proc. Step TASK ELEMENT 11 STANDARD Grade 7.4.2.d RESET all alarms. Operator verifies all alarms reset. S U Comment:

Proc. Step TASK ELEMENT 12 STANDARD Grade IF operate light still NOT illuminated, THEN DECLARE the associated monitor Operator determines this step is not applicable 7.4.2.e inoperable. Refer to Attachment 2, S U because Operate light is illuminated.

"System Malfunctions and Troubleshooting.

Comment:

PALISADES NUCLEAR PLANT Page 6 of 9 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS F Proc. Step TASK ELEMENT 13 STANDARD Grade Operator informs Control Room Supervisor n/a that Containment Radiation Monitor CRS Notified S U RIA-1805 has been placed in service.

Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 7 of 9 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS F SIMULATOR OPERATOR INSTRUCTIONS Reset to any IC Insert OR RIA-1805-G to off on panel C-11A rear Create Event Trigger 1 as follows:

for Event .not.ZDI4P(341).and.ZDI4P(339) for Action dor RIA-1805-G PALISADES NUCLEAR PLANT Page 8 of 9 JUNE 2009

JPM: RO/SRO-I/SRO-U SYS F CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The Plant is operating at 100% power.
  • I&C Department has just completed maintenance on Containment Radiation Monitor RIA-1805.
  • CL-39 for RIA-1805 has been completed INITIATING CUES:

The Control Room Supervisor directs you to place Containment Radiation Monitor, RIA-1805, in service per SOP-39, step 7.4.2.

Another operator will answer any front panel alarms.

PALISADES NUCLEAR PLANT Page 9 of 9 JUNE 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYS G TITLE: VENT THE QUENCH TANK TO THE WASTE GAS SURGE TANK CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO SYS G JOB PERFORMANCE MEASURE DATA PAGE Task: Vent Quench Tank Alternate Path: NO Facility JPM #: 2007 AUDIT SRO JPM K/A: 007A1.03 Importance: RO: 2.7 SRO: 2.9 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRTS control including: Maintaining quench tank pressure Task Standard: Quench Tank pressure is 6 psig and Waste Gas Surge Tank pressure is maintained within limits.

Preferred Evaluation Location: Simulator _X__ In Plant ______

Preferred Evaluation Method: Perform _X__ Simulate ______

References:

SOP-1A, Primary Coolant System Validation Time: _15_ minutes Time Critical: NO Candidate: _______________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 9 JUNE 2009

JPM: RO SYS G EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-1A section 7.4.3 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The plant is in MODE 1 full power. It is believed that there is a nitrogen leak into the Quench Tank. Quench Tank Pressure is currently 12 psig, and is rising very slowly (less than 1 psi per hour).

INITIATING CUES:

In preparation for troubleshooting and maintenance you are to vent the Quench Tank to the Waste Gas Surge Tank per SOP-1A, 7.4.3 to 6 psig. An Auxiliary Operator is stationed at Radwaste Panel C-40. The Waste Gas System is lined up for operation per SOP-18A, as required by SOP-1A, 7.4.3.b.

PALISADES NUCLEAR PLANT Page 3 of 9 JUNE 2009

JPM: RO SYS G Proc. Step TASK ELEMENT 1 STANDARD Grade

--- Locate SOP-1A Candidate locates SOP-1A, 7.4.3 S U Comment:

Evaluator: Provide a working copy of SOP-1A, Section 7.4.3.

Proc. Step TASK ELEMENT 2 STANDARD Grade NOTE: Waste Gas Surge Tank pressure should not exceed 18.5 psia during this Candidate reads NOTE evolution. Lifting of RV-1111, Waste Gas Surge Tank Relief is imminent if pressure in the Waste Gas Surge Tank exceeds 18.5 psia.

7.4.3.a S U STATION an Auxiliary Operator at C-40 Radwaste Panel to monitor T-67, Waste Gas Surge Tank pressure and Waste Gas AO Stationed at C-40 per initial conditions Compressor operations Comment:

Evaluator: Notify the candidate that you will not be role playing the AO. For communications with the AO, they must call them at Panel C-40.

SIM OPERATOR (as AO): Report that you are at Panel C-40 and will maintain WGST pressure <18.5 psia.

Proc. Step TASK ELEMENT 3 STANDARD Grade ENSURE Waste Gas System lined up for operation. Refer to System Operating b Per initial conditions S U Procedure SOP-18A, "Radioactive Waste System - Gaseous."

Comment:

SIM OPERATOR (as AO): Report that Waste Gas System is lined up.

PALISADES NUCLEAR PLANT Page 4 of 9 JUNE 2009

JPM: RO SYS G Proc. Step TASK ELEMENT 4 STANDARD Grade NOTE: Waste Gas Surge Tank pressure Candidate reads note will rise slightly when performing the next two steps.

c, d OPEN CV-1101, Containment Vent Candidate positions switches for CV-1101 and S U Header Isolation. CV-1102 to OPEN. Verifies Red light ON, OPEN CV-1102, Containment Vent Green light OFF Header Isolation.

Comment:

SIM OPERATOR (as AO): Report that you understand WGST pressure will rise.

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade CAUTION Waste Gas Surge Tank pressure will rise Candidate reads caution and ensures he has rapidly when performing the next step. The the AO on the phone Control Operator should be in constant communication with the Auxiliary Operator e to control pressure in the Waste Gas S U Surge Tank during performance of the next step.

Candidate takes CV-0152 to OPEN. Verifies OPEN CV-0152, Quench Tank Vent. Red light ON, Green light OFF.

Comment:

SIM OPERATOR (as AO): Report that you are ready.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 9 JUNE 2009

JPM: RO SYS G Proc. Step TASK ELEMENT 6 STANDARD Grade IF Waste Gas Surge Tank pressure Candidate closes CV-0152 when AO informs f reaches approximately 18 psia, THEN S U that WGST pressure is 18 psia.

CLOSE CV-0152, Quench Tank Vent.

Comment:

SIM OPERATOR (as AO): maintain constant communications:

  • After CV-0152 is opened AND when EK-1368 (C-40 Off-Normal alarm) comes in, inform candidate that WGST pressure is 16.5 psia and rising. Continue to monitor WGST pressure on Instructor Station and inform candidate when pressure reaches 18 psia.
  • Continue monitoring WGST pressure on Instructor Station after CV-0152 is closed and inform candidate when WGST pressure is 15 psia.

CRITICAL STEP Proc. Step TASK ELEMENT 7 STANDARD Grade REPEAT Steps e and f until PIA-0116, Candidate repeats steps e. and f. as necessary g Quench Tank Pressure reaches 3 psig or S U to lower Quench Tank pressure to 6 psig.

as directed by the CRS.

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade ENSURE CLOSED CV-0152, Quench h Candidate verifies Green light ON for CV-0152. S U Tank Vent.

Comment:

PALISADES NUCLEAR PLANT Page 6 of 9 JUNE 2009

JPM: RO SYS G Proc. Step TASK ELEMENT 9 STANDARD Grade CLOSE CV-1101, Containment Vent Header Isolation. Candidate positions handswitches for CV-1101 i, j and CV-1102 to CLOSE and verifies Green light S U CLOSE CV-1102, Containment Vent ON, Red light OFF.

Header Isolation Comment:

Proc. Step TASK ELEMENT 10 STANDARD Grade IF an Auxiliary Operator was stationed at k C-40 Panel, THEN NOTIFY the Auxiliary Candidate notifies AO that vent is complete. S U Operator the vent is complete Comment:

SIM OPERATOR (as AO): Report that you understand that vent is complete.

Proc. Step TASK ELEMENT 11 STANDARD Grade Candidate notifies CRS that vent is

--- complete and Quench Tank pressure is CRS notified S U 6 psig.

Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 7 of 9 JUNE 2009

JPM: RO SYS G SIMULATOR OPERATOR INSTRUCTIONS Any IC Create event trigger 2:

Event: 0 Action: set thksn2sup=26.0 Activate trigger 2 Raise Quench tank pressure to 12 psig utilizing CV-0150 and CV-1358 Monitor Waste Gas Surge Tank pressure when requested by:

o Start the Monitor program by clicking on "Monitor" on the instructor station control panel o Type "WPPPT67" into the input field and hit enter OR o Read WGST pressure on PIDWP01 PALISADES NUCLEAR PLANT Page 8 of 9 JUNE 2009

JPM: RO SYS G CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The plant is in MODE 1 full power. It is believed that there is a nitrogen leak into the Quench Tank. Pressure is currently at 12 psig, and is rising very slowly (less than 1 psi per hour).

INITIATING CUES:

In preparation for troubleshooting and maintenance you are to vent the Quench Tank to the Waste Gas Surge Tank per SOP-1A, 7.4.3 to 6 psig. An Auxiliary Operator is stationed at Radwaste Panel C-40. The Waste Gas System is lined up for operation per SOP-18A, as required by SOP-1A, 7.4.3.b.

PALISADES NUCLEAR PLANT Page 9 of 9 JUNE 2009

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO/SRO-I SYS H TITLE: INITIATE A CONTAINMENT PURGE CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO/SRO-I SYS H JOB PERFORMANCE MEASURE DATA PAGE Task: Initiate a Containment Purge per SOP-24, Ventilation and Air Conditioning System Alternate Path: YES Facility JPM #: 2005 NRC JPM K/A: 029A2.03 Importance: RO:2.7 SRO: 3.1 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Purge System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Startup operations and the associated required valve lineups Task Standard: Initiate a Containment Purge. Subsequently terminate the Containment Purge based on plant ventilation fan status.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SOP-24, Ventilation and Air Conditioning System HP 6.14, Containment Purge SOP-38, Gaseous Process Monitoring System ARP-7, EK-1127, Main Exhaust Fan V-6A trip Validation Time: __20___ minutes Time Critical: NO Candidate: ________________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 9 JUNE 2009

JPM: RO/SRO-I SYS H EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-24, section 7.2.5.

Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The plant is in MODE 5 with the PCS vented to Containment.

INITIATING CUES:

The Control Room Supervisor has directed you to initiate a Containment Purge per SOP-24, Ventilation and Air Conditioning System section 7.2.5. The CRS has also informed you that an AO has been briefed and is standing by awaiting your instructions. The CRS also informs you that the RGEM system is in operation per SOP-38, Gaseous Process Monitoring System.

PALISADES NUCLEAR PLANT Page 3 of 9 JUNE 2009

JPM: RO/SRO-I SYS H Proc.Step TASK ELEMENT 1 STANDARD Grade Obtain a copy of SOP-24, Ventilation and Candidate obtains SOP-24, Ventilation and Air N/A S U Air Conditioning System procedure. Conditioning System procedure.

Comment:

Evaluator: When applicant indicates where to find a current copy of procedure provide a copy of SOP-24, Ventilation and Air Conditioning System procedure.

Evaluator: If candidate asks to see the Batch Card inform candidate that he doesn't need to see it, but to inform me of the start and stop times of the release so that it can be recorded.

Proc.Step TASK ELEMENT 2 STANDARD Grade Notify the RETS/REMP Supervisor or Duty 7.2.5.a HP to ensure requirements of HP 6.14, RETS/REMP Supervisor or Duty HP notified S U Containment Purge, are met.

Comment:

Evaluator: Role play as CRS and notify candidate that RETS/REMP Supervisor has been informed.

Proc.Step TASK ELEMENT 3 STANDARD Grade Candidate verifies Main Exhaust Fan V-6A 7.2.5.b Ensure one Main Exhaust Fan operating. S U running on panel C-13.

Comment:

PALISADES NUCLEAR PLANT Page 4 of 9 JUNE 2009

JPM: RO/SRO-I SYS H Proc.Step TASK ELEMENT 4 STANDARD Grade Ensure RGEM system is in operation per 7.2.5.c SOP-38, Gaseous Process Monitoring From Initiating Cue. S U System.

Comment:

Proc.Step TASK ELEMENT 5 STANDARD Grade Ensure the following Test Tap Valves are Ensure the following Test Tap Valves are 7.2.5.d Locked Closed and capped: Locked Closed and capped: S U MV-VA506 MV-VA508 MV-VA505 MV-VA506 MV-VA508 MV-VA505 Comment:

EVALUATOR: When candidate calls AO, role play as AO and report after approximately 2 minutes that MV-VA506, MV-VA508, and MV-VA505 are locked closed and capped.

Proc.Step TASK ELEMENT 6 STANDARD Grade Key inserted and the following Purge Supply INSERT key and OPEN the following Purge and Exhaust Valves opened and verifies Supply and Exhaust Valves: associated Red light ON and Green light OFF:

  • CV-1805 (key 272)
  • CV-1805 (key 272) ____
  • CV-1806 (key 274)
  • CV-1806 (key 274) ____

7.2.5.e S U

  • CV-1807 (key 275)
  • CV-1807 (key 275) ____
  • CV-1808 (key 277)
  • CV-1808 (key 277) ____
  • CV-1813 (key 273)
  • CV-1813 (key 273) ____
  • CV-1814 (key 276)
  • CV-1814 (key 276) ____

Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 9 JUNE 2009

JPM: RO/SRO-I SYS H Proc.Step TASK ELEMENT 7 STANDARD Grade Record the time the valves were opened in Record the time the valves were opened in the 7.2.5.f S U the Control Room Logbook. Control Room Logbook.

Comment:

Evaluator: Role play as CRS and inform candidate that these times have been logged.

Proc.Step TASK ELEMENT 8 STANDARD Grade 7.2.5.g START Air Room Purge Supply Fan V-46. START Air Room Purge Supply Fan V-46. S U Comment:

NOTE: After Purge Supply Fan is started, the V-6A Main Exhaust Fan will TRIP, and V-6B Standby Fan will not start. This will require that the Containment Purge be manually terminated.

CRITICAL STEP Proc.Step TASK ELEMENT 9 STANDARD Grade Applicant refers to ARP-7, EK-1127, Main

--- Main Exhaust V-6A trips. S U Exhaust Fan V-6A or B trip.

Comment:

Proc.Step TASK ELEMENT 10 STANDARD Grade ARP-7, EK-1127 directs starting the Candidate attempts to start V-6B and ARP-7 S U STANDBY Main Exhaust Fan V-6B. determines it will not start.

Comment:

PALISADES NUCLEAR PLANT Page 6 of 9 JUNE 2009

JPM: RO/SRO-I SYS H Proc.Step TASK ELEMENT 11 STANDARD Grade Per ARP-7, EK-1127, secure any radioactive waste gas batch per SOP-18A ARP-7 Candidate stops Air Room Supply Fan V-46. S U and shutdown any plant ventilation air flow per SOP-24.

Comment:

Evaluator: If asked, role play as SRO and state that no heavy load movements are in progress in the Containment or SFP and that no core alterations or movement of fuel is occurring in Containment or SFP.

CRITICAL STEP Proc.Step TASK ELEMENT 12 STANDARD Grade Candidate closes all OPEN purge control Manually CLOSE all OPEN purge control valves and verifies associated Red light OFF valves. The Applicant may use EOP and Green light ON. The Applicant may use Supplement 6, Containment Isolation as a EOP Supplement 6, Containment Isolation as a guide.

guide.

  • CV-1805 (key 272)
  • CV-1805 (key 272) ____

---

  • CV-1806 (key 274) S U
  • CV-1806 (key 274) ____
  • CV-1807 (key 275)
  • CV-1807 (key 275) ____
  • CV-1808 (key 277)
  • CV-1808 (key 277) ____
  • CV-1813 (key 273)
  • CV-1813 (key 273) ____
  • CV-1814 (key 276)
  • CV-1814 (key 276) ____

Comment:

Evaluator: Candidate may start securing other ventilation systems, but stop JPM when Containment Purge is isolated.

CRITICAL STEP END OF TASK PALISADES NUCLEAR PLANT Page 7 of 9 JUNE 2009

JPM: RO/SRO-I SYS H SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-1 Ensure V-6A in service.

Create Event Trigger #1: Event: ZDI1P(524) [this is Purge Fan V-46 HS to CLOSE]

Place the following overrides on Panel PAL09M1 (C-13 left side) on Event Trigger #1 with a 10 second time delay:

V-6A-1, Main Exhaust V-6A Trip to ON V-6B-1, Main Exhaust V-6B Trip to ON PALISADES NUCLEAR PLANT Page 8 of 9 JUNE 2009

JPM: RO/SRO-I SYS H CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The plant is in MODE 5 with the PCS vented to Containment.

INITIATING CUES:

The Control Room Supervisor has directed you to initiate a Containment Purge per SOP-24, Ventilation and Air Conditioning System section 7.2.5. The CRS has also informed you that an AO has been briefed and is standing by awaiting your instructions. The CRS also informs you that the RGEM system is in operation per SOP-38, Gaseous Process Monitoring System.

PALISADES NUCLEAR PLANT Page 9 of 9 JUNE 2009