{{#Wiki_filter:I 94 j 7 Masters, Anthony From: Sent: To: Cc:  
{{#Wiki_filter:I 94 j 7 Masters, Anthony From:                       Thomas, George Sent:                       Tuesday, December 29, 2009 9:04 AM To:                         Lake, Louis Cc:                         Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; nausdj@ornl.gov; Masters, Anthony


==Subject:==
==Subject:==
Attachments:
CR-3 Revised Engineering and Repair Work Flow Chart as of 12-28-09 Attachments:                Engg & Repair Work Flow'12-28-09.pdf Categories:                  Perform Review Attached is the revised (as of 12-28-09) Engineering and Repair Work Flow chart for CR-3.
Categories:
Thanks.
Thomas, George Tuesday, December 29, 2009 9:04 AM Lake, Louis Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; nausdj@ornl.gov; Masters, Anthony CR-3 Revised Engineering and Repair Work Flow Chart as of 12-28-09 Engg & Repair Work Flow'12-28-09.pdf Perform Review Attached is the revised (as of 12-28-09)
George
Engineering and Repair Work Flow chart for CR-3.Thanks.George V" Indicates Completed Task A S&L Calc: Loss of Load fuel (date TBD)Decay Heat Removal LoAd EC 75218 Rev (for fuel load)SGT Engineering  
 
&Construction Input (Repair Preparations)
V" Indicates Completed Task                                                     A S&L Calc: Loss of         Load fuel (date TBD)
SGT Engineering
Decay Heat Removal         LoAd EC 75218 Rev (for fuel load)
&Construction Input (Permanent Repair)MPR Calc A S&L Calc: Polar I'on Tendon Crane Loads Fini#&Sequence r]Pli Abaqus EC Mod EC Mod, Analysis of Phase 2 Phase 3 MPR Tendon De Removal# &Sequence EC 7521B EC 75219 IPR 3D te Element ,nalysis MPR Tendon Analysis Sequence~EC ModPhase 5 Re-Tensioning
SGT Engineering &                                          SGT Engineering &
~ EC 75221 Reinforcement Re-tensioning
Construction Input                                        Construction Input (Repair Preparations)                                       (Permanent Repair)
~&Concrete  
MPR Calc         A S&L Calc: Polar           I'   IPR 3D              MPR Tendon on Tendon
& Post-Repai1r iPlacem'ent Testing Permanent Repair L ---1}}
* Crane Loads             Fini te Element            Analysis
                #&Sequence                           r]             ,nalysis              Sequence Pli Abaqus     EC Mod                 EC Mod,                                       ~EC Mod Analysis of   Phase 2               Phase 3                                       >* Phase 5 MPR Tendon   De                     Removal                                       Re-Tensioning
                  # &Sequence   EC 7521B               EC 75219                                       ~EC 75221 Reinforcement           Re-tensioning
                                                                                          ~&Concrete             & Post-Repai1r iPlacem'ent               Testing PermanentRepair L ---
1}}

Latest revision as of 08:48, 13 November 2019

Email - Subject: Revised Engineering/Repair Work Flow Chart
ML102910574
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/29/2009
From: George Thomas
Office of New Reactors
To: Lake L
NRC/RGN-II
References
FOIA/PA-2010-0116
Download: ML102910574 (2)


Text

I 94 j 7 Masters, Anthony From: Thomas, George Sent: Tuesday, December 29, 2009 9:04 AM To: Lake, Louis Cc: Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; nausdj@ornl.gov; Masters, Anthony

Subject:

CR-3 Revised Engineering and Repair Work Flow Chart as of 12-28-09 Attachments: Engg & Repair Work Flow'12-28-09.pdf Categories: Perform Review Attached is the revised (as of 12-28-09) Engineering and Repair Work Flow chart for CR-3.

Thanks.

George

V" Indicates Completed Task A S&L Calc: Loss of Load fuel (date TBD)

Decay Heat Removal LoAd EC 75218 Rev (for fuel load)

SGT Engineering & SGT Engineering &

Construction Input Construction Input (Repair Preparations) (Permanent Repair)

MPR Calc A S&L Calc: Polar I' IPR 3D MPR Tendon on Tendon

  • Crane Loads Fini te Element Analysis
  1. &Sequence r] ,nalysis Sequence Pli Abaqus EC Mod EC Mod, ~EC Mod Analysis of Phase 2 Phase 3 >* Phase 5 MPR Tendon De Removal Re-Tensioning
  1. &Sequence EC 7521B EC 75219 ~EC 75221 Reinforcement Re-tensioning

~&Concrete & Post-Repai1r iPlacem'ent Testing PermanentRepair L ---