|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Kalyanam, Kaly Sent: Wednesday, November 17, 2010 11:03 AM To: CLARK, ROBERT W; BICE, DAVID B Cc: Lent, Susan; Burkhardt, Janet | | {{#Wiki_filter:From: Kalyanam, Kaly Sent: Wednesday, November 17, 2010 11:03 AM To: CLARK, ROBERT W; BICE, DAVID B Cc: Lent, Susan; Burkhardt, Janet |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RAI on ANO-2 LAR dated June 17, 2010 (TAC No. ME4090) | | RAI on ANO-2 LAR dated June 17, 2010 (TAC No. ME4090) |
| Licensee: Entergy Operations, Inc. Plant: Arkansas Nuclear One, Unit 2 Docket No.: 50-368 | | Licensee: Entergy Operations, Inc. |
| | Plant: Arkansas Nuclear One, Unit 2 Docket No.: 50-368 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Request for Additional Information on License Amendment Request dated June 17, 2010, Technical Specification Change to Extend the Type A Test Frequency to 15 years TAC Nos.: ME4090 SUNSI Review Done: Yes. Publicly Available, Normal Release, Non-sensitive, From: N. Kalyanam To: Dave Bice/Robert Clark | | Request for Additional Information on License Amendment Request dated June 17, 2010, Technical Specification Change to Extend the Type A Test Frequency to 15 years TAC Nos.: ME4090 SUNSI Review Done: Yes. Publicly Available, Normal Release, Non-sensitive, From: N. Kalyanam To: Dave Bice/Robert Clark Dave/Bob, By letter dated June 17, 2010 (ADAMS Accession No. ML101680380), Entergy Operations, Inc. (Entergy) submitted to NRC for approval a License Amendment Request regarding Technical Specification Change to Extend the Type A Test Frequency to 15 Years. |
| | The TAC No. for this request is ME4090. |
| | The NRC Staff has reviewed the and determined that we require additional information to complete our review. A request for additional information appears below. |
| | The staff requests you to provide a response to the RAI within 60 days from the date of this email. Please let me know if this date cannot be met. |
| | Thanks Kaly REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION LICENSE AMENDMENT REQUEST FOR A PERMANENT EXTENSION TO THE INTEGRATED LEAK RATE TEST INTERVAL |
|
| |
|
| Dave/Bob,
| | ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NO. 50-368 TAC NO. ME4090 The Nuclear Regulatory Commission (NRC) staff is reviewing the Arkansas Nuclear One, Unit 2 (ANO-2 or the licensee) license amendment request (LAR) application dated June 17, 2010. The NRC staff has determined that the additional information requested below is needed to complete its review. |
| | | 1.1 Since degradation of bellows is a source for potential leakage, the staff requests the licensee to please identify any bellows used on penetrations through containment pressure retaining boundaries, and if present, provide information on their location, inspection, testing and operating experience with regard to detection of leakage. |
| By letter dated June 17, 2010 (ADAMS Accession No. ML101680380), Entergy Operations, Inc. (Entergy) submitted to NRC for approval a License Amendment Request regarding Technical Specification Change to Extend the Type A Test Frequency to 15 Years.
| | 1.2 The staff notes that the licensees stated intent, as indicated throughout the LAR (see sections 1.0, 2.0 and 4.0), is to implement a containment leakage rate testing program in accordance with the guidelines contained in NEI 94-01, Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J, dated October 2008. |
| The TAC No. for this request is ME4090.
| |
| | |
| The NRC Staff has reviewed the and determined that we require additional information to complete our review. A request for additional information appears below.
| |
| | |
| The staff requests you to provide a response to the RAI within 60 days from the date of this email. Please let me know if this date cannot be met.
| |
| | |
| Thanks
| |
| | |
| Kaly
| |
| | |
| REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION LICENSE AMENDMENT REQUEST FOR A PERMANENT EXTENSION TO THE INTEGRATED LEAK RATE TEST INTERVAL
| |
| | |
| ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NO. 50-368 TAC NO. ME4090 | |
| | |
| The Nuclear Regulatory Commission (NRC) staff is reviewing the Arkansas Nuclear One, Unit 2 (ANO-2 or the licensee) license amendment request (LAR) application dated June 17, 2010. The NRC staff has determined that the additional information requested below is needed to complete its review. | |
| | |
| 1.1 Since degradation of bellows is a source for potential leakage, the staff requests the licensee to please identify any bellows used on penetrations through containment pressure retaining boundaries, and if present, provide information on their location, inspection, testing and operating experience with regard to detection of leakage. | |
| | |
| 1.2 The staff notes that the licensee's stated intent, as indicated throughout the LAR (see sections 1.0, 2.0 and 4.0), is to implement a containment leakage rate testing program in accordance with the guidelines contained in NEI 94-01, Revision 2-A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J," dated October 2008. | |
| However, in page 5 of the LAR, the licensee states the following: | | However, in page 5 of the LAR, the licensee states the following: |
| The proposed change replaces the reference to RG 1.163 with a reference to NEI 94-01; however, the proposed TS change is worded to indicate that the Appendix J Testing Program must be in accordance with NRC-reviewed and accepted guidelines (i.e., NEI 94-01), with the specific version of those guidelines specified in the Appendix J Testing Program Plan. These proposed TS changes are consistent with the regulatory requirement to include the implement ation document used to develop the performance-based leakage testing program, by general reference, in the plant TS, and assures that only NRC-reviewed and accepted guidance is used to develop the program. In addition, these changes will allow the use of later NRC-accepted versions of NEI 94-01 without the unnecessary burden of processing a license amendment. | | The proposed change replaces the reference to RG 1.163 with a reference to NEI 94-01; however, the proposed TS change is worded to indicate that the Appendix J Testing Program must be in accordance with NRC-reviewed and accepted guidelines (i.e., NEI 94-01), with the specific version of those guidelines specified in the Appendix J Testing Program Plan. These proposed TS changes are consistent with the regulatory requirement to include the implementation document used to develop the performance-based leakage testing program, by general reference, in the plant TS, and assures that only NRC-reviewed and accepted guidance is used to develop the program. In addition, these changes will allow the use of later NRC-accepted versions of NEI 94-01 without the unnecessary burden of processing a license amendment. |
| | The above is not consistent with the intent of the LAR nor does it reflect that any changes to the containment Type A testing program that are not in accordance with the guidance provided with NEI-94-01, Rev 2-A would require NRC approval before implementation.. The staff requests that the licensee revise or clarify the statement made in page 5 of the LAR. |
| | 2.1 In order for the NRC staff to assess the proper and effective implementation of the Type B and Type C local leak rate testing program, the licensee is requested to provide: |
|
| |
|
| The above is not consistent with the intent of the LAR nor does it reflect that any changes to the containment Type A testing program that are not in accordance with the guidance provided with NEI-94-01, Rev 2-A would require NRC approval before implementation.. The staff requests that the licensee revise or clarify the statement made in page 5 of the LAR. 2.1 In order for the NRC staff to assess the proper and effective implementation of the Type B and Type C local leak rate testing program, the licensee is requested to provide:
| | (a) A table of all containment pressure boundary components at ANO-2 that are subject to the Type B and Type C testing, under the Containment Leakage Rate Testing Program, with the current test frequency and the approximate dates (or refueling outage) of the last test and the next scheduled test. |
| (a) A table of all containment pressure boundary components at ANO-2 that are subject to the Type B and Type C testing, under the Containment Leakage Rate Testing Program, with the current test frequency and the approximate dates (or refueling outage) of the last test and the next scheduled test. (b) Provide a summary of performance results for Type B and Type C testing that would support the maximum and minimum Pathway Leakage values detailed in section 4.2 of the LAR. (c) A summary table of LLRT results of those containment penetrations (including their test schedule intervals) that have not demonstrated acceptable performance history in accordance with the Containment Leakage Rate Program and a discussion of the causes and corrective actions taken. (d) Discuss how these interval was implemented in the current 10 CFR Appendix J Testing Program Plan using Regulatory Guide (RG) 1.163 (September 1995) as the implementing document. In addition, discuss how these interval will be implemented using NEI 94-01, Revision 2-A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J," as the implementing document. (e) A discussion of whether there have been any refueling outages since the last Type A test in which the combined leakage from Type B and Type C tests did not meet the acceptance criteria. Provide a discussion of the results, cause(s), and corrective actions taken. | | (b) Provide a summary of performance results for Type B and Type C testing that would support the maximum and minimum Pathway Leakage values detailed in section 4.2 of the LAR. |
| | (c) A summary table of LLRT results of those containment penetrations (including their test schedule intervals) that have not demonstrated acceptable performance history in accordance with the Containment Leakage Rate Program and a discussion of the causes and corrective actions taken. |
| | (d) Discuss how these interval was implemented in the current 10 CFR Appendix J Testing Program Plan using Regulatory Guide (RG) 1.163 (September 1995) as the implementing document. In addition, discuss how these interval will be implemented using NEI 94-01, Revision 2-A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J," as the implementing document. |
| | (e) A discussion of whether there have been any refueling outages since the last Type A test in which the combined leakage from Type B and Type C tests did not meet the acceptance criteria. Provide a discussion of the results, cause(s), and corrective actions taken. |
| | 2.2 Please provide a summarized Table containing the previous ANO-2 ILRT Type A tests data, including the completion dates of the last two tests, actual as-found results data as well as the allowable T.S acceptance criterion values for those tests that confirm that the containment structure leakage is acceptable. |
| | 2.3 In regards to the ANO-2 Containment Inservice Inspection Plan (CISI), an extension to a 15-year ILRT interval would span at least four ISI inspection periods. Please provide a schedule, with approximate dates (or refueling outage) of the next general visual examinations to be performed in order to satisfy the requirements of NEI 94-01 Rev. 2-A, section 9.2.3.2. |
| | 2.4 Consistent with NRC Information Notice 2004-09, "Corrosion of Steel Containment and Containment Liner," discuss the operating experience and evaluation results, if any, of the potential for, or presence of corrosive conditions at the junction of the metal liner and interior concrete floor, including the potential for stagnant water behind a degraded floor seal area that may promote pitting corrosion. |
| | 2.5 In response to Condition 4 in Section 4.1 of the NRC SE for topical report NEI 94-01, Revision 2-A, the ANO-2 response in Item 4 of the Table on page 5 of 14 |
|
| |
|
| 2.2 Please provide a summarized Table containing the previous ANO-2 ILRT Type A tests data, including the completion dates of the last two tests, actual as-found results data as well as the allowable T.S acceptance criterion values for those tests that confirm that the containment structure leakage is acceptable. 2.3 In regards to the ANO-2 Containment Inservice Inspection Plan (CISI), an extension to a 15-year ILRT interval would span at least four ISI inspection periods. Please provide a schedule, with approximate dates (or refueling outage) of the next general visual examinations to be performed in order to satisfy the requirements of NEI 94-01 Rev. 2-A, section 9.2.3.2.
| | of the LAR states that, The design change process will address any testing requirements for this potential and any future containment structure modifications. |
| 2.4 Consistent with NRC Information Notice 2004-09, "Corrosion of Steel Containment and Containment Liner," discuss the operating experience and evaluation results, if any, of the potential for, or presence of corrosive conditions at the junction of the metal liner and interior concrete floor, including the potential for stagnant water behind a degraded floor seal area that may promote pitting corrosion.
| | (a) Describe how the above statement addresses the requirements of Condition 4 of Section 4.1 and as discussed in Section 3.1.4 of the NRC safety evaluation for NEI 94-01, Revision 2-A, with regard to major and minor containment repairs and modifications. |
| 2.5 In response to Condition 4 in Section 4.1 of the NRC SE for topical report NEI 94-01, Revision 2-A, the ANO-2 response in Item 4 of the Table on page 5 of 14 of the LAR states that, "The design change process will address any testing requirements for this potential and any future containment structure modifications."
| | (b) Address why it is appropriate to make reference to a design change process," which is not subject to NRC review, in an application for a licensing action. |
| (a) Describe how the above statement addresses the requirements of Condition 4 of Section 4.1 and as discussed in Section 3.1.4 of the NRC safety evaluation for NEI 94-01, Revision 2-A, with regard to major and minor containment repairs and modifications. | | (c) Clarify whether the repair/replacement program, which includes associated post modification testing for the NMP2 containment structure, is performed as part of the CISI program in accordance with 10 CFR 50.55a(g)(4) or as part of the "station design change process." |
| | | 3.1 The discussion of PRA quality relies on a Peer Review of the ANO2 Probabilistic Risk Analysis (PRA). For the ANO2 PRA model used to support the application, please (a) Provide a list of findings from the ANO2 PRA peer review relevant to this submittal (b) Explain how these items were addressed for this application. |
| (b) Address why it is appropriate to make reference to a "design change process," which is not subject to NRC review, in an application for a licensing action. | | E-mail Properties Mail Envelope Properties (94A2A4408AC65F42AC084527534CF4161A385F0365) |
| | |
| (c) Clarify whether the repair/replacement program, which includes associated post modification testing for the NMP2 containment structure, is performed as part of the CISI program in accordance with 10 CFR 50.55a(g)(4) or as part of the "station design change process." | |
| 3.1 The discussion of PRA quality relies on a Peer Review of the ANO2 Probabilistic Risk Analysis (PRA). For the ANO2 PRA model used to support the application, please (a) Provide a list of findings from the ANO2 PRA peer review relevant to this submittal | |
| | |
| (b) Explain how these items were addressed for this application. | |
| E-mail Properties Mail Envelope Properties (94A2A4408AC65F42AC084527534CF4161A385F0365) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RAI on ANO-2 LAR dated June 17, 2010 (TAC No. ME4090) | | RAI on ANO-2 LAR dated June 17, 2010 (TAC No. ME4090) |
| | | Sent Date: 11/17/2010 11:02:51 AM Received Date: 11/17/2010 11:02:51 AM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov Recipients: |
| Sent Date: 11/17/2010 11:02:51 AM Received Date: 11/17/2010 11:02:51 AM From: Kalyanam, Kaly | |
| | |
| Created By: Kaly.Kalyanam@nrc.gov | |
| | |
| Recipients: | |
| RCLARK@entergy.com (CLARK, ROBERT W) | | RCLARK@entergy.com (CLARK, ROBERT W) |
| Tracking Status: None DBICE@entergy.com (BICE, DAVID B) | | Tracking Status: None DBICE@entergy.com (BICE, DAVID B) |
| Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan) | | |
| | Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan) |
| Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet) | | Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet) |
| Tracking Status: None | | Tracking Status: None Post Office: |
| | | HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 21390 11/17/2010 Options Expiration Date: |
| Post Office: | | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} |
| HQCLSTR01.nrc.gov | |
| | |
| Files Size Date & Time | |
| | |
| MESSAGE 21390 11/17/2010 | |
| | |
| Options Expiration Date: | |
| Priority: olImportanceNormal ReplyRequested: False Return Notification: False | |
| | |
| Sensitivity: olNormal Recipients received:}} | |
Letter Sequence RAI |
---|
|
|
MONTHYEARML1016803802010-06-17017 June 2010 License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years Project stage: Other ML1017601262010-06-25025 June 2010 Acceptance Review Email Technical Specification Change to Extend Type a Test Frequency to 15 Years Project stage: Acceptance Review ML1032103022010-11-17017 November 2010 Request for Additional Information Email, License Amendment Request, Revise Technical Specification 6.5.16, Containment Leakage Rate Testing Program, to Extend Type a Test Frequency to 15 Years Project stage: RAI ML1032202362010-11-18018 November 2010 Request for Additional Information, Email, License Amendment Request, Revise Technical Specification 6.5.16, Containment Leakage Rate Testing Program, to Extend Type a Test Frequency to 15 Years - Revision 1 Project stage: RAI 2CAN011102, Response to the Request for Additional Information Regarding License Amendment Request Technical Specification Change to Extend Type a Test Frequency to 15 Years2011-01-17017 January 2011 Response to the Request for Additional Information Regarding License Amendment Request Technical Specification Change to Extend Type a Test Frequency to 15 Years Project stage: Request 2CAN011104, Response to the Request for Clarification Regarding License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2011-01-20020 January 2011 Response to the Request for Clarification Regarding License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years Project stage: Request 2CAN011109, Response to Request for Additional Clarifications Regarding License Amendment Request Technical Specification Change to Extend Type a Test Frequency to 15 Years2011-01-31031 January 2011 Response to Request for Additional Clarifications Regarding License Amendment Request Technical Specification Change to Extend Type a Test Frequency to 15 Years Project stage: Request ML1104606762011-02-15015 February 2011 Request for Additional Information Email, Round 2, License Amendment Request, Revise Technical Specification 6.5.16, Containment Leakage Rate Testing Program, to Extend Type a Test Frequency to 15 Years Project stage: RAI 2CAN031101, Response to the Request for Additional Information Regarding License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2011-03-0707 March 2011 Response to the Request for Additional Information Regarding License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years Project stage: Request ML1108000342011-04-0707 April 2011 Issuance of Amendment No. 292 to Revise Technical Specification 6.5.16, Containment Leakage Rate Testing Program, to Extend Type a Test Frequency to 15 Years Project stage: Approval 2011-01-17
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24227A0072024-08-13013 August 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 2 - Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) - EPID L-2024-LLR-0048 ML24218A0652024-08-0202 August 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Arkansas Nuclear One, Unit 1 - License Amendment Request - Request for Review and Approval Changes to SAR and to a Confirmatory Order - Pzr Htr Emergency Power Supply - EPID L-2024-LLA-0092 ML24180A0022024-06-26026 June 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 1 and 2 - Proposed Alternatives for Examinations of SG Pressure Retaining Welds and Full Penetrations Nozzles - EPID L-2024-LLR-0038 ML24149A3672024-05-28028 May 2024 August 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24117A0262024-04-26026 April 2024 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Typographical Errors in Technical Specifications ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program 2024-08-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23019A0672023-01-19019 January 2023 Inservice Inspection Request for Information ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22213A1662022-08-0101 August 2022 Information Request, Security IR 2022401 ML22208A0542022-07-26026 July 2022 Request for Information ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22159A3242022-06-0909 June 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22122A2952022-05-0404 May 2022 Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21286A7132021-10-15015 October 2021 ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21236A3222021-09-19019 September 2021 Request for Information ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21204A0842021-07-28028 July 2021 ANO Phase 4 2021013 RFI Gap ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21026A2682021-01-26026 January 2021 Request for Information ML21022A0842021-01-22022 January 2021 Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping - Arkansas Nuclear One,Units 1 and 2 -Entergy Operations, Inc. NON-PROPRIETARY Redacted ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20324A6412020-11-19019 November 2020 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-034 ML20316A0102020-11-0202 November 2020 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Concerning Relief Request EN-20-RR-01 ML20262H0752020-09-17017 September 2020 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20260H4762020-09-0909 September 2020 NRR E-mail Capture - ANO-1 Final RAI License Amendment Request to Revise Lov Relay Allowable Values ML20154K7622020-06-0101 June 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20119A0982020-04-28028 April 2020 Notification of Inspection (NRC Inspection Report 05000368/2020003 and Request for Information ML20106E8522020-04-13013 April 2020 Information Request, NRC Inspection Report 05000313/2020410 and 05000368/2020410 ML20065H7992020-03-0606 March 2020 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Revise Loss of Voltage Relay Allowable Values ML20055E9092020-02-24024 February 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Revise Control Element Assembly Drop Time ML20036D3092020-02-0505 February 2020 NRR E-mail Capture - ANO-2 - Final RAI Alternative Request VRR-ANO2-2019-1 ML20013C7472020-01-10010 January 2020 NRR E-mail Capture - ANO-1 and 2 -- Final RAI #2 LAR to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19316A0242019-11-0707 November 2019 NRR E-mail Capture - ANO-1 - - Final RAI Concerning Relief Request ANO1-ISI-033 (L-2019-LLR-0100) ML19280A0402019-10-0707 October 2019 NRR E-mail Capture - ANO-1 and 2 - Final RAI #1 License Amendment Request to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19339F5902019-09-23023 September 2019 Request for Information: Arkansas Nuclear One, IR 05000313/2019-004 Occupational Radiation Safety Inspection ML19281E0032019-08-0505 August 2019 ANO 2019 PIR Request for Information ML19203A0122019-07-16016 July 2019 Request for Information - Inservice Inspection Activities (NRC Inspection Report 05000313/2019004) ML19106A4322019-04-16016 April 2019 NRR E-mail Capture - ANO-2 Final RAI Re LAR to Add TS Actions to Address Inoperability of the Containment Building Sump ML19058A8332019-02-27027 February 2019 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-032 2024-05-22
[Table view] |
Text
From: Kalyanam, Kaly Sent: Wednesday, November 17, 2010 11:03 AM To: CLARK, ROBERT W; BICE, DAVID B Cc: Lent, Susan; Burkhardt, Janet
Subject:
RAI on ANO-2 LAR dated June 17, 2010 (TAC No. ME4090)
Licensee: Entergy Operations, Inc.
Plant: Arkansas Nuclear One, Unit 2 Docket No.: 50-368
Subject:
Request for Additional Information on License Amendment Request dated June 17, 2010, Technical Specification Change to Extend the Type A Test Frequency to 15 years TAC Nos.: ME4090 SUNSI Review Done: Yes. Publicly Available, Normal Release, Non-sensitive, From: N. Kalyanam To: Dave Bice/Robert Clark Dave/Bob, By letter dated June 17, 2010 (ADAMS Accession No. ML101680380), Entergy Operations, Inc. (Entergy) submitted to NRC for approval a License Amendment Request regarding Technical Specification Change to Extend the Type A Test Frequency to 15 Years.
The TAC No. for this request is ME4090.
The NRC Staff has reviewed the and determined that we require additional information to complete our review. A request for additional information appears below.
The staff requests you to provide a response to the RAI within 60 days from the date of this email. Please let me know if this date cannot be met.
Thanks Kaly REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION LICENSE AMENDMENT REQUEST FOR A PERMANENT EXTENSION TO THE INTEGRATED LEAK RATE TEST INTERVAL
ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NO. 50-368 TAC NO. ME4090 The Nuclear Regulatory Commission (NRC) staff is reviewing the Arkansas Nuclear One, Unit 2 (ANO-2 or the licensee) license amendment request (LAR) application dated June 17, 2010. The NRC staff has determined that the additional information requested below is needed to complete its review.
1.1 Since degradation of bellows is a source for potential leakage, the staff requests the licensee to please identify any bellows used on penetrations through containment pressure retaining boundaries, and if present, provide information on their location, inspection, testing and operating experience with regard to detection of leakage.
1.2 The staff notes that the licensees stated intent, as indicated throughout the LAR (see sections 1.0, 2.0 and 4.0), is to implement a containment leakage rate testing program in accordance with the guidelines contained in NEI 94-01, Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J, dated October 2008.
However, in page 5 of the LAR, the licensee states the following:
The proposed change replaces the reference to RG 1.163 with a reference to NEI 94-01; however, the proposed TS change is worded to indicate that the Appendix J Testing Program must be in accordance with NRC-reviewed and accepted guidelines (i.e., NEI 94-01), with the specific version of those guidelines specified in the Appendix J Testing Program Plan. These proposed TS changes are consistent with the regulatory requirement to include the implementation document used to develop the performance-based leakage testing program, by general reference, in the plant TS, and assures that only NRC-reviewed and accepted guidance is used to develop the program. In addition, these changes will allow the use of later NRC-accepted versions of NEI 94-01 without the unnecessary burden of processing a license amendment.
The above is not consistent with the intent of the LAR nor does it reflect that any changes to the containment Type A testing program that are not in accordance with the guidance provided with NEI-94-01, Rev 2-A would require NRC approval before implementation.. The staff requests that the licensee revise or clarify the statement made in page 5 of the LAR.
2.1 In order for the NRC staff to assess the proper and effective implementation of the Type B and Type C local leak rate testing program, the licensee is requested to provide:
(a) A table of all containment pressure boundary components at ANO-2 that are subject to the Type B and Type C testing, under the Containment Leakage Rate Testing Program, with the current test frequency and the approximate dates (or refueling outage) of the last test and the next scheduled test.
(b) Provide a summary of performance results for Type B and Type C testing that would support the maximum and minimum Pathway Leakage values detailed in section 4.2 of the LAR.
(c) A summary table of LLRT results of those containment penetrations (including their test schedule intervals) that have not demonstrated acceptable performance history in accordance with the Containment Leakage Rate Program and a discussion of the causes and corrective actions taken.
(d) Discuss how these interval was implemented in the current 10 CFR Appendix J Testing Program Plan using Regulatory Guide (RG) 1.163 (September 1995) as the implementing document. In addition, discuss how these interval will be implemented using NEI 94-01, Revision 2-A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J," as the implementing document.
(e) A discussion of whether there have been any refueling outages since the last Type A test in which the combined leakage from Type B and Type C tests did not meet the acceptance criteria. Provide a discussion of the results, cause(s), and corrective actions taken.
2.2 Please provide a summarized Table containing the previous ANO-2 ILRT Type A tests data, including the completion dates of the last two tests, actual as-found results data as well as the allowable T.S acceptance criterion values for those tests that confirm that the containment structure leakage is acceptable.
2.3 In regards to the ANO-2 Containment Inservice Inspection Plan (CISI), an extension to a 15-year ILRT interval would span at least four ISI inspection periods. Please provide a schedule, with approximate dates (or refueling outage) of the next general visual examinations to be performed in order to satisfy the requirements of NEI 94-01 Rev. 2-A, section 9.2.3.2.
2.4 Consistent with NRC Information Notice 2004-09, "Corrosion of Steel Containment and Containment Liner," discuss the operating experience and evaluation results, if any, of the potential for, or presence of corrosive conditions at the junction of the metal liner and interior concrete floor, including the potential for stagnant water behind a degraded floor seal area that may promote pitting corrosion.
2.5 In response to Condition 4 in Section 4.1 of the NRC SE for topical report NEI 94-01, Revision 2-A, the ANO-2 response in Item 4 of the Table on page 5 of 14
of the LAR states that, The design change process will address any testing requirements for this potential and any future containment structure modifications.
(a) Describe how the above statement addresses the requirements of Condition 4 of Section 4.1 and as discussed in Section 3.1.4 of the NRC safety evaluation for NEI 94-01, Revision 2-A, with regard to major and minor containment repairs and modifications.
(b) Address why it is appropriate to make reference to a design change process," which is not subject to NRC review, in an application for a licensing action.
(c) Clarify whether the repair/replacement program, which includes associated post modification testing for the NMP2 containment structure, is performed as part of the CISI program in accordance with 10 CFR 50.55a(g)(4) or as part of the "station design change process."
3.1 The discussion of PRA quality relies on a Peer Review of the ANO2 Probabilistic Risk Analysis (PRA). For the ANO2 PRA model used to support the application, please (a) Provide a list of findings from the ANO2 PRA peer review relevant to this submittal (b) Explain how these items were addressed for this application.
E-mail Properties Mail Envelope Properties (94A2A4408AC65F42AC084527534CF4161A385F0365)
Subject:
RAI on ANO-2 LAR dated June 17, 2010 (TAC No. ME4090)
Sent Date: 11/17/2010 11:02:51 AM Received Date: 11/17/2010 11:02:51 AM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov Recipients:
RCLARK@entergy.com (CLARK, ROBERT W)
Tracking Status: None DBICE@entergy.com (BICE, DAVID B)
Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)
Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 21390 11/17/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: