| title = Calvert Cliffs Nuclear Power Plant, Unit No. 1 - Correction Letter to License Amendment No. 297 (TAC ME2831)
| title = Correction Letter to License Amendment No. 297
| author name = Pickett D V
| author name = Pickett D
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1
| addressee name = Gellrich G H
| addressee name = Gellrich G
| addressee affiliation = Calvert Cliffs Nuclear Power Plant, LLC
| addressee affiliation = Calvert Cliffs Nuclear Power Plant, LLC
| docket = 05000317
| docket = 05000317
| license number = DPR-053
| license number = DPR-053
| contact person = Pickett D V, NRR/DORL/LPL1-1, 415-1364
| contact person = Pickett D, NRR/DORL/LPL1-1, 415-1364
| case reference number = TAC ME2831
| case reference number = TAC ME2831
| document type = Letter, License-Operating (New/Renewal/Amendments) DKT 50
| document type = Letter, License-Operating (New/Renewal/Amendments) DKT 50
| page count = 4
| page count = 4
| project = TAC:ME2831
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 23, 2011 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
==SUBJECT:==
CORRECTION LETTER TO LICENSE AMENDMENT NO. 297 - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. ME2831)
==Dear Mr. Gellrich:==
By letter dated February 18, 2011, the Nuclear Regulatory Commission (NRC) issued Amendment No. 297 to Renewed Facility Operating License No. DPR-53 for the Calvert Cliffs Nuclear Power Plant, Unit NO.1. The amendment revised the licensing basis and the Technical Specifications to allow the use of AREVA Advanced CE-14 HTP fuel in the Calvert Cliffs reactors as proposed in your application dated November 23,2009.
The transition from Westinghouse to AREVA fuel will be accomplished over three refueling cycles beginning with Calvert Cliffs Unit No.2 during the refueling outage which is currently ongoing. AREVA fuel will not be introduced into Calvert Cliffs Unit No.1 until the refueling outage scheduled for February 2012.
The license amendment issued for Unit No. 1 inadvertently stated that the amendment would be implemented within 30 days. However, as stated in your correspondence, the amendment will be implemented within 60 days of completion of the Unit 1 2012 refueling outage. A corrected license amendment for Unit No. 1 is enclosed.
Please contact me at 301-415-1364 if you have any questions.
Sincerely, Douglas V. Pickett, Senior Project Manager Plant licenSing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-317
==Enclosure:==
Amendment No. 297 to DPR-53 cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CALVERT CLIFFS NUCLEAR POWER PLANT, LLC DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO.1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 297 Renewed license No. DPR-53
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A.      The application for amendment by Calvert Cliffs Nuclear Power Plant, Inc. (the licensee) dated November 23,2009, as supplemented by letters dated January 26, April 22, July 23, August 9, October 29, November 19, December 30,2010, and January 14, January 18, January 28, February 11, and February 15, 2011, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.      The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.      There is reasonable assurance (I) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.      The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.      The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraphs 2.C.2. and 2.C.3 of Renewed Facility Operating license No. DPR-53 are hereby amended to read as follows:
                                                - 2
: 2.      Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 297, are hereby incorporated into the renewed license.
The licensee shall operate the facility in accordance with the Technical Specifications.
: 3.      Additional Conditions The Additional Conditions contained in Appendix C as revised through Amendment No. 297 are hereby incorporated into this license. Calvert Cliffs Nuclear Power Plant, LLC shall operate the facility in accordance with the Additional Conditions.
: 3.      This amendment is effective immediately and shall be implemented within 60 days of completion of the Unit 1 2012 refueling outage.
FOR THE NUCLEAR REGULATORY COMMISSION Nancy L Salgado, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
==Attachment:==
Changes to the License and Technical Specifications Date of Issuance: February 18, 2011 Correction letter dated February 23, 2011
February 23, 2011 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Plant, Inc.
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
==SUBJECT:==
CORRECTION LETTER TO LICENSE AMENDMENT NO. 297 - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. ME2831)
==Dear Mr. Gellrich:==
By letter dated February 18, 2011, the Nuclear Regulatory Commission (NRC) issued Amendment No. 297 to Renewed Facility Operating License No. DPR-53 for the Calvert Cliffs Nuclear Power Plant, Unit No.1. The amendment revised the licensing basis and the Technical Specifications to allow the use of AREVA Advanced CE-14 HTP fuel in the Calvert Cliffs reactors as proposed in your application dated November 23,2009.
The transition from Westinghouse to AREVA fuel will be accomplished over three refueling cycles beginning with Calvert Cliffs Unit No.2 during the refueling outage which is currently ongoing. AREVA fuel will not be introduced into Calvert Cliffs Unit No.1 until the refueling outage scheduled for February 2012.
The license amendment issued for Unit No. 1 inadvertently stated that the amendment would be implemented within 30 days. However, as stated in your correspondence, the amendment will be implemented within 60 days of completion of the Unit 1 2012 refueling outage. A corrected license amendment for Unit No.1 is enclosed.
Please contact me at 301-415-1364 if you have any questions.
Sincerely,
                                                /raj Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-317
==Enclosure:==
Amendment No. 297 to DPR-53 cc w/encl: Distribution via Listserv DISTRIBUTION: See next page PUBLIC                          LPL1-1 rlf                    RidsNrrDorlLpL 1-1 RidsNrrPMCalvertCliffs          RidsOgcMailCenter              RidsAcrsAcnwMailCenter GDentel,R1                      RidsNrrLASLittle Adams Accession No ML110530199 OFFICE LPL 1-1/PM                LPL 1-1/LA            LPL 1-1/BC NAME      DPickett              SLittle                NSalgado DATE      02/23/11              02/23/11              02123/11 OFFICIAL RECORD COpy}}

Latest revision as of 03:15, 13 November 2019

Correction Letter to License Amendment No. 297
ML110530199
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 02/23/2011
From: Pickett D
Plant Licensing Branch 1
To: George Gellrich
Calvert Cliffs
Pickett D, NRR/DORL/LPL1-1, 415-1364
References
TAC ME2831
Download: ML110530199 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 23, 2011 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

CORRECTION LETTER TO LICENSE AMENDMENT NO. 297 - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. ME2831)

Dear Mr. Gellrich:

By letter dated February 18, 2011, the Nuclear Regulatory Commission (NRC) issued Amendment No. 297 to Renewed Facility Operating License No. DPR-53 for the Calvert Cliffs Nuclear Power Plant, Unit NO.1. The amendment revised the licensing basis and the Technical Specifications to allow the use of AREVA Advanced CE-14 HTP fuel in the Calvert Cliffs reactors as proposed in your application dated November 23,2009.

The transition from Westinghouse to AREVA fuel will be accomplished over three refueling cycles beginning with Calvert Cliffs Unit No.2 during the refueling outage which is currently ongoing. AREVA fuel will not be introduced into Calvert Cliffs Unit No.1 until the refueling outage scheduled for February 2012.

The license amendment issued for Unit No. 1 inadvertently stated that the amendment would be implemented within 30 days. However, as stated in your correspondence, the amendment will be implemented within 60 days of completion of the Unit 1 2012 refueling outage. A corrected license amendment for Unit No. 1 is enclosed.

Please contact me at 301-415-1364 if you have any questions.

Sincerely, Douglas V. Pickett, Senior Project Manager Plant licenSing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-317

Enclosure:

Amendment No. 297 to DPR-53 cc w/encl: Distribution via Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CALVERT CLIFFS NUCLEAR POWER PLANT, LLC DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO.1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 297 Renewed license No. DPR-53

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Calvert Cliffs Nuclear Power Plant, Inc. (the licensee) dated November 23,2009, as supplemented by letters dated January 26, April 22, July 23, August 9, October 29, November 19, December 30,2010, and January 14, January 18, January 28, February 11, and February 15, 2011, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (I) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraphs 2.C.2. and 2.C.3 of Renewed Facility Operating license No. DPR-53 are hereby amended to read as follows:

- 2

2. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 297, are hereby incorporated into the renewed license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3. Additional Conditions The Additional Conditions contained in Appendix C as revised through Amendment No. 297 are hereby incorporated into this license. Calvert Cliffs Nuclear Power Plant, LLC shall operate the facility in accordance with the Additional Conditions.
3. This amendment is effective immediately and shall be implemented within 60 days of completion of the Unit 1 2012 refueling outage.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L Salgado, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the License and Technical Specifications Date of Issuance: February 18, 2011 Correction letter dated February 23, 2011

February 23, 2011 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Plant, Inc.

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

CORRECTION LETTER TO LICENSE AMENDMENT NO. 297 - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. ME2831)

Dear Mr. Gellrich:

By letter dated February 18, 2011, the Nuclear Regulatory Commission (NRC) issued Amendment No. 297 to Renewed Facility Operating License No. DPR-53 for the Calvert Cliffs Nuclear Power Plant, Unit No.1. The amendment revised the licensing basis and the Technical Specifications to allow the use of AREVA Advanced CE-14 HTP fuel in the Calvert Cliffs reactors as proposed in your application dated November 23,2009.

The transition from Westinghouse to AREVA fuel will be accomplished over three refueling cycles beginning with Calvert Cliffs Unit No.2 during the refueling outage which is currently ongoing. AREVA fuel will not be introduced into Calvert Cliffs Unit No.1 until the refueling outage scheduled for February 2012.

The license amendment issued for Unit No. 1 inadvertently stated that the amendment would be implemented within 30 days. However, as stated in your correspondence, the amendment will be implemented within 60 days of completion of the Unit 1 2012 refueling outage. A corrected license amendment for Unit No.1 is enclosed.

Please contact me at 301-415-1364 if you have any questions.

Sincerely,

/raj Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-317

Enclosure:

Amendment No. 297 to DPR-53 cc w/encl: Distribution via Listserv DISTRIBUTION: See next page PUBLIC LPL1-1 rlf RidsNrrDorlLpL 1-1 RidsNrrPMCalvertCliffs RidsOgcMailCenter RidsAcrsAcnwMailCenter GDentel,R1 RidsNrrLASLittle Adams Accession No ML110530199 OFFICE LPL 1-1/PM LPL 1-1/LA LPL 1-1/BC NAME DPickett SLittle NSalgado DATE 02/23/11 02/23/11 02123/11 OFFICIAL RECORD COpy