Acceptance Review of Licensing Action Transition from Westinghouse to Areva Nuclear Fuel - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2
ML100340961
Person / Time
Site: Calvert Cliffs  
Issue date: 02/23/2010
From: Pickett D
Plant Licensing Branch 1
To: George Gellrich
Calvert Cliffs
pickett , NRR/DORL, 415-1364
References
TAC ME2832, TAC ME2831
Download: ML100340961 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Fehrllary 23. 2010 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 SUB"IECT:

ACCEPTANCE REVIEW OF LICENSING ACTION RE: TRANSITION FROM WESTINGHOUSE TO AREVA NUCLEAR FUEL - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME2831 AND ME2832)

Dear Mr. Gellrich:

By letter dated November 23, 2009, Calvert Cliffs Nuclear Power Plant, LLC (the licensee) submitted a license amendment request for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. The proposed amendment request would modify the licensing basis and Technical Specifications to allow the use of AREVA Advanced CE-14 HTP fuel.

On January 7, 2010, the Nuclear Regulatory Commission (NRC) staff held a conference call with members of your staff to discuss deficiencies identified during the acceptance review of the amendment request. Specifically, the amendment request did not adequately identify and disposition safety evaluation limitations and conditions on the 15 AREVA topical reports being incorporated in the reference list of the Core Operating Limits Report. By letter dated January 11, 2010, you were informed of the above deficiencies. In addition, you were informed that the license amendment request would need to be supplemented by January 27,2010.

By letter dated January 26, 2010, supplemental information was submitted. The NRC staff has reviewed the supplemental information and concludes that it provides technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.

You will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.

If you have any questions, please contact me at 301-415-1364.

Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 cc: Distribution via Listserv

RidsNrrDorlLPL1-1 RidsAcrsAcnwMailCenter RidsNrrDssSrxb PClifford, Dss ML100340961 RidsNrrPMCalvertCliffs RidsNrrLASLittle RidsNrrDssSnpb OFFICE LPL1-1\\PM LPL1-1\\LA SRXB\\BC LPL1-1\\BC NAME DPickett SLittie GCranston Nsalcado DATE 02/21/10 02/16/10 0222/10 02/23/10