(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML110610475 | | | number = ML110610475 |
| | issue date = 03/04/2011 | | | issue date = 03/04/2011 |
| | title = Prairie Island Nuclear Generating Plant, Unit 1 - Request for Additional Information Related to Request to Revise the Technical Specification 3.8.1, AC Sources - Operating, Footnote Requiring Battery Charger Modifications | | | title = Request for Additional Information Related to Request to Revise the Technical Specification 3.8.1, AC Sources - Operating, Footnote Requiring Battery Charger Modifications |
| | author name = Wengert T J | | | author name = Wengert T |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = Schimmel M A | | | addressee name = Schimmel M |
| | addressee affiliation = Northern States Power Co | | | addressee affiliation = Northern States Power Co |
| | docket = 05000282 | | | docket = 05000282 |
Line 13: |
Line 13: |
| | document type = Request for Additional Information (RAI), Letter | | | document type = Request for Additional Information (RAI), Letter |
| | page count = 4 | | | page count = 4 |
| | | project = TAC:ME5426 |
| | | stage = RAI |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-6001 March 4, 2011 Mr. Mark A. Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642 |
| | |
| | ==SUBJECT:== |
| | PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST TO REVISE THE TECHNICAL SPECIFICATION 3.8.1, "AC SOURCES - OPERATING," |
| | FOOTNOTE REQUIRING BATTERY CHARGER MODIFICATIONS (TAC NO. ME5426) |
| | |
| | ==Dear Mr. Schimmel:== |
| | |
| | By letter to the U.S. Nuclear Regulatory Commission (NRC) dated February 3,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110350055), the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, requested a license amendment to revise the Technical Specification (TS) 3.8.1, <lAC Sources - Operating", Surveillance Requirement (SR) 3.8.1.10 footnote requiring battery charger modifications for Prairie Island Nuclear Generating Plant (PINGP), |
| | Unit 1. |
| | The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with Mr. Dale Vincent of your staff on March 1, 2011, it was agreed that you would provide a response to this request within 14 days of the date of this letter. |
| | The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff'resources. |
| | |
| | M. Schimmel - 2 If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037. |
| | Sincerely, |
| | - =te",-~:--c~~ |
| | Thomas J. Wengert, Senior Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282 |
| | |
| | ==Enclosure:== |
| | |
| | Request for Additional Information cc w/encl: Distribution via ListServ |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 DOCKET NO. 50-282 By letter dated February 3, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110350055), the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, requested a license amendment to revise the Technical Specification (TS) 3.8.1, !lAC Sources - Operating", Surveillance Requirement (SR) 3.8.1.10 footnote requiring battery charger modifications for Prairie Island Nuclear Generating Plant (PINGP), Unit 1. To complete its review, the U.S. Nuclear Regulatory Comrnission staff requests the following additional information. |
| | : 1. Provide a comparison of the major electrical parameters, including the minimum voltage requirement (drop-out and reset) of the alternating current (AC) input breaker/contactor, for the existing and proposed new battery chargers. Discuss in detail the electrical parameters for the proposed new charger that are different from the existing 12 Battery Charger and how these parameters were determined to be acceptable. |
| | : 2. Discuss whether the description of the existing and new battery chargers will be provided in a future revision of the PINGP Updated Final Safety Analysis Report (UFSAR). |
| | : 3. Confirm that the proposed new battery charger can recharge its associated battery to the fully charged state within 24 hours while supplying its normal loads after a battery discharge to the bounding design basis event discharge state in accordance with PINGP UFSAR Section 8.5.3 and TS SR 3.8.4.2. |
| | : 4. Industry operating experience has shown that momentary overvoltage or undervoltage transients experienced during switching, fault or lightning-related perturbations can trigger a self-protecting lockout feature in battery chargers resulting in disabling the chargers. Provide details on the magnitude and duration of transient and sustained overvoltage/undervoltage conditions resulting from grid perturbations (or the emergency diesel generator system) that have been evaluated for operation of the proposed battery charger. |
| | : 5. TS SR 3.8.1.10 NOTE 3 states that the 12 Battery Charger is not required to be energized during performance of SR 3.8.1.1 O(c) until the completion of Unit 1 2011 refueling outage. The license amendment request proposes a footnote stating that the battery charger equipment will be modified during or prior to the Unit 1 2011 refueling outage. State why NOTE 3 was not modified to apply only until the new equipment has been installed and tested. |
| | Enclosure |
| | |
| | M. Schimmel If circumstances result in the need to revise the requested response date. please contact me at (301) 415-4037. |
| | Sincerely, IRAJ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282 |
| | |
| | ==Enclosure:== |
| | |
| | Request for Additional Information cc wtencl: Distribution via ListServ DISTRIBUTION: |
| | PUBLIC LPL3-1 RtF RidsNrrDorlLpl3-1 Resource RidsNRRPMPrairielsland Resource RidsNrrLABTully Resource RidsNrrDirsltsb Resource RidsAcrsAcnw_MaiICTR Resource RidsOgcRp Resource PSahay, NRR RidsRgn3MailCenter Resource RidsNrrDeEeeb Resource GMatharu, NRR MHamm, NRR RidsNrrDorlDpr Resource ADAMS Accession Number' ML110610475 OFFICE LPL3-1/PM LPL3-1/LA NRR/DE/EEEB/BC (A) ~IRS"TSB/BC I LPL3-1/BC NAME TWengert BTuily RMathew RElliott I RPascarelli ITBeltz for DATE 03103/11 03/03/11 03/03/11 03/03/11 I 03/04/11 OFFICIAL RECORD COpy}} |
Letter Sequence RAI |
---|
|
|
MONTHYEARL-PI-10-098, Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.102010-10-14014 October 2010 Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 Project stage: Request L-PI-11-016, License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.2011-02-0303 February 2011 License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. Project stage: Request ML1104702792011-02-16016 February 2011 Notice of Forthcoming Meeting with Licensee for Prairie Island Nuclear Generating Plant, Unit 1 to Discuss License Amendment Request to Revise Surveillance Requirement Footnote in Technical Specification 3.8.1, AC Sources - Operating. Project stage: Meeting ML1104904292011-02-16016 February 2011 Acceptance Review of LAR to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating Project stage: Acceptance Review ML1106600792011-03-0303 March 2011 March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant Project stage: Meeting ML1106104752011-03-0404 March 2011 Request for Additional Information Related to Request to Revise the Technical Specification 3.8.1, AC Sources - Operating, Footnote Requiring Battery Charger Modifications Project stage: RAI L-PI-11-024, Supplement to License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.2011-03-15015 March 2011 Supplement to License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. Project stage: Supplement ML1107401932011-03-22022 March 2011 Summary of March 3, 2011, Meeting to Discuss the Licensee'S February 3, 2011, License Amendment Request to Revise Surveillance Requirement Footnote in Technical Specification 3.8.1, AC Sources - Operating. Project stage: Meeting ML1110205512011-04-29029 April 2011 Issuance of Amendment Revision to Surveillance Requirements Footnote in Technical Specification 3.8.1, AC Sources - Operating Project stage: Approval 2011-03-15
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23096A3082023-04-0707 April 2023 Notification of Inspection an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23055B0562023-02-27027 February 2023 Request for Information for NRC Commercial Grade Dedication Inspection Inspection Report 05000282/2023010 and 05000306/2023010 ML23053A1432023-02-22022 February 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Prairie Island Nuclear Generating Plant ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment ML22145A4152022-05-25025 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000282/2022402 05000306/2022402 ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22130A5792022-05-11011 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21321A0452021-11-10010 November 2021 Request for Additional Information: Prairie Island 24-Month Cycle Amendment Request ML21305A0102021-10-29029 October 2021 NRR E-mail Capture - Request for Additional Information Prairie Island Cooling Water Amendment ML21252A0122021-08-30030 August 2021 NRR E-mail Capture - Request for Additional Information Amendment Request to Adopt TSTF-471 and 517-T for Prairie Island ML21147A5232021-06-0303 June 2021 Prarie Island Nuclear Generating Plant, Units 1 and 2 - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21131A0752021-05-10010 May 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2021004; 05000306/2021004 ML21099A0972021-04-0909 April 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000282/2021012 and 05000306/2021012 ML21062A0532021-03-0202 March 2021 Information Request to Support Upcomng Problem Identification and Resolution (Pi&R) Inspection at the Prairie Island Nuclear Generating Plant ML21033A6112021-02-0101 February 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000282/2021010 and 05000306/2021010 ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 ML20189A1782020-07-0606 July 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2020004; 05000306/2020004 ML20133K0692020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20077K6242020-04-13013 April 2020 License Amendment Request - Request for Additional Information ML20052F4102020-02-21021 February 2020 Notification of Nrc Design Bases Assurance Inspection (Programs) (05000282/202010; 05000306/202010) and Initial Request for Information ML20035F1552020-02-0404 February 2020 NRR E-mail Capture - Request for Additional Information Monticello and Prairie Island Alternative Requests to Adopt Code Cases N-786-3 and N-789-3 (Epids: L-2019-LLR-0078 and L-2019-LLR-0079) ML19233A0032019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Prairie Island Relief Requests 1-RR-10 and 2-RR-10 ML19057A1652019-02-26026 February 2019 NRR E-mail Capture - Request for Additional Information Prairie Island 50.69 Amendment Request ML18313A0832018-11-0707 November 2018 NRR E-mail Capture - Request for Additional Information Prairie Island NFPA-805 License Condition Modification Amendment Request ML18264A1912018-09-19019 September 2018 NRC Information Request (9/19/2018); Part B Items (Onsite) IP 71111.08 - E-Mailed 09/19/18 (DRS-M.Holmberg) ML18235A2982018-08-23023 August 2018 NRR E-mail Capture - Request for Additional Information Prairie Island TSTF-425 License Amendment Request ML18169A4202018-06-25025 June 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Modify Renewed Facility Operating License Paragraph 2.C(4)(c) ML18025C0152018-01-24024 January 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000282/2018011; 05000306/2018011 (DRS-A.Dunlop) ML17277B3332017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information Prairie Island Special Heavy Lifting Devices LAR ML17249A9232017-09-0606 September 2017 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2017004; 05000306/2017004 (Exf) ML17235A9982017-08-23023 August 2017 NRR E-mail Capture - Request for Additional Information Prairie Island EAL Scheme Change ML17221A3892017-08-0909 August 2017 NRR E-mail Capture - Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request Dated February 23, 2017 Emergency Response Organization ML17219A0762017-08-0707 August 2017 NRR E-mail Capture - Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request Dated February 23, 2017 Emergency Response Organization ML17038A5132017-02-0707 February 2017 NRR E-mail Capture - Prairie Island NFPA 805 LAR, PRA RAI 21.01 ML17018A4272017-01-18018 January 2017 NRR E-mail Capture - Request for Additional Information: Prairie Island License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action ML16326A3532016-11-18018 November 2016 NRR E-mail Capture - Draft Request for Information Related to Prairie Island NFPA-805 License Amendment ML16265A1652016-09-20020 September 2016 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000282/2016004; 05000306/2016004 (Gfo) ML16189A2052016-07-0707 July 2016 Notification of NRC Inspection and Request for Information ML16113A1612016-04-21021 April 2016 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML16075A0802016-03-15015 March 2016 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 Request for Additional Information Related to License Amendment Request to Adopt TSTF-523, GL 2008-01, Managing Gas Accumulation ML16008A1092016-01-0808 January 2016 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests for Additional Information (Afpb) License Amendment Request to Adopt NFPA 805 ML15195A6562015-07-10010 July 2015 Prairie Island Notification of NRC Inspection and Request for Information ML15149A1662015-05-28028 May 2015 Plan - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15121A6512015-04-29029 April 2015 Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) Inspection Report 05000282/2015007; 05000306/2015007 (Jen) 2023-09-05
[Table view] Category:Letter
MONTHYEARIR 05000282/20230042024-02-0101 February 2024 Integrated Inspection Report 05000282/2023004 and 05000306/2023004 ML23356A1232024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report IR 07200010/20234012023-12-20020 December 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 IR 05000282/20234012023-12-13013 December 2023 Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23304A1632023-11-15015 November 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000282/20230032023-11-0808 November 2023 Integrated Inspection Report 05000282/2023003 and 05000306/2023003 ML23311A3572023-11-0707 November 2023 Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0 ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant ML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy IR 05000282/20230052023-08-30030 August 2023 Updated Inspected Plan for Prairie Island Nuclear Generating Plant Report 05000282/2023005 and 05000306/2023005 IR 05000282/20230102023-08-17017 August 2023 NRC Inspection Report 05000282/2023010 and 05000306/2023010 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence IR 05000282/20230022023-08-0303 August 2023 Integrated Inspection Report 05000282/2023002 and 05000306/2023002 ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT ML23181A0192023-06-30030 June 2023 Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report IR 05000282/20234202023-06-0101 June 2023 Security Baseline Inspection Report 05000282/2023420 and 05000306/2023420 ML23150A1722023-05-30030 May 2023 Preparation and Scheduling of Operator Licensing Examinations 2024-02-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-6001 March 4, 2011 Mr. Mark A. Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST TO REVISE THE TECHNICAL SPECIFICATION 3.8.1, "AC SOURCES - OPERATING,"
FOOTNOTE REQUIRING BATTERY CHARGER MODIFICATIONS (TAC NO. ME5426)
Dear Mr. Schimmel:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated February 3,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110350055), the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, requested a license amendment to revise the Technical Specification (TS) 3.8.1, <lAC Sources - Operating", Surveillance Requirement (SR) 3.8.1.10 footnote requiring battery charger modifications for Prairie Island Nuclear Generating Plant (PINGP),
Unit 1.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with Mr. Dale Vincent of your staff on March 1, 2011, it was agreed that you would provide a response to this request within 14 days of the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff'resources.
M. Schimmel - 2 If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.
Sincerely,
- =te",-~:--c~~
Thomas J. Wengert, Senior Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 DOCKET NO. 50-282 By letter dated February 3, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110350055), the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, requested a license amendment to revise the Technical Specification (TS) 3.8.1, !lAC Sources - Operating", Surveillance Requirement (SR) 3.8.1.10 footnote requiring battery charger modifications for Prairie Island Nuclear Generating Plant (PINGP), Unit 1. To complete its review, the U.S. Nuclear Regulatory Comrnission staff requests the following additional information.
- 1. Provide a comparison of the major electrical parameters, including the minimum voltage requirement (drop-out and reset) of the alternating current (AC) input breaker/contactor, for the existing and proposed new battery chargers. Discuss in detail the electrical parameters for the proposed new charger that are different from the existing 12 Battery Charger and how these parameters were determined to be acceptable.
- 2. Discuss whether the description of the existing and new battery chargers will be provided in a future revision of the PINGP Updated Final Safety Analysis Report (UFSAR).
- 3. Confirm that the proposed new battery charger can recharge its associated battery to the fully charged state within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while supplying its normal loads after a battery discharge to the bounding design basis event discharge state in accordance with PINGP UFSAR Section 8.5.3 and TS SR 3.8.4.2.
- 4. Industry operating experience has shown that momentary overvoltage or undervoltage transients experienced during switching, fault or lightning-related perturbations can trigger a self-protecting lockout feature in battery chargers resulting in disabling the chargers. Provide details on the magnitude and duration of transient and sustained overvoltage/undervoltage conditions resulting from grid perturbations (or the emergency diesel generator system) that have been evaluated for operation of the proposed battery charger.
- 5. TS SR 3.8.1.10 NOTE 3 states that the 12 Battery Charger is not required to be energized during performance of SR 3.8.1.1 O(c) until the completion of Unit 1 2011 refueling outage. The license amendment request proposes a footnote stating that the battery charger equipment will be modified during or prior to the Unit 1 2011 refueling outage. State why NOTE 3 was not modified to apply only until the new equipment has been installed and tested.
Enclosure
M. Schimmel If circumstances result in the need to revise the requested response date. please contact me at (301) 415-4037.
Sincerely, IRAJ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282
Enclosure:
Request for Additional Information cc wtencl: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 RtF RidsNrrDorlLpl3-1 Resource RidsNRRPMPrairielsland Resource RidsNrrLABTully Resource RidsNrrDirsltsb Resource RidsAcrsAcnw_MaiICTR Resource RidsOgcRp Resource PSahay, NRR RidsRgn3MailCenter Resource RidsNrrDeEeeb Resource GMatharu, NRR MHamm, NRR RidsNrrDorlDpr Resource ADAMS Accession Number' ML110610475 OFFICE LPL3-1/PM LPL3-1/LA NRR/DE/EEEB/BC (A) ~IRS"TSB/BC I LPL3-1/BC NAME TWengert BTuily RMathew RElliott I RPascarelli ITBeltz for DATE 03103/11 03/03/11 03/03/11 03/03/11 I 03/04/11 OFFICIAL RECORD COpy