ML110610475: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML110610475
| number = ML110610475
| issue date = 03/04/2011
| issue date = 03/04/2011
| title = Prairie Island Nuclear Generating Plant, Unit 1 - Request for Additional Information Related to Request to Revise the Technical Specification 3.8.1, AC Sources - Operating, Footnote Requiring Battery Charger Modifications
| title = Request for Additional Information Related to Request to Revise the Technical Specification 3.8.1, AC Sources - Operating, Footnote Requiring Battery Charger Modifications
| author name = Wengert T J
| author name = Wengert T
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Schimmel M A
| addressee name = Schimmel M
| addressee affiliation = Northern States Power Co
| addressee affiliation = Northern States Power Co
| docket = 05000282
| docket = 05000282
Line 13: Line 13:
| document type = Request for Additional Information (RAI), Letter
| document type = Request for Additional Information (RAI), Letter
| page count = 4
| page count = 4
| project = TAC:ME5426
| stage = RAI
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-6001 March 4, 2011 Mr. Mark A. Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642
==SUBJECT:==
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST TO REVISE THE TECHNICAL SPECIFICATION 3.8.1, "AC SOURCES - OPERATING,"
FOOTNOTE REQUIRING BATTERY CHARGER MODIFICATIONS (TAC NO. ME5426)
==Dear Mr. Schimmel:==
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated February 3,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110350055), the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, requested a license amendment to revise the Technical Specification (TS) 3.8.1, <lAC Sources - Operating", Surveillance Requirement (SR) 3.8.1.10 footnote requiring battery charger modifications for Prairie Island Nuclear Generating Plant (PINGP),
Unit 1.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with Mr. Dale Vincent of your staff on March 1, 2011, it was agreed that you would provide a response to this request within 14 days of the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff'resources.
M. Schimmel                                - 2 If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.
Sincerely,
                                          - =te",-~:--c~~
Thomas J. Wengert, Senior Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282
==Enclosure:==
Request for Additional Information cc w/encl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 DOCKET NO. 50-282 By letter dated February 3, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110350055), the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, requested a license amendment to revise the Technical Specification (TS) 3.8.1, !lAC Sources - Operating", Surveillance Requirement (SR) 3.8.1.10 footnote requiring battery charger modifications for Prairie Island Nuclear Generating Plant (PINGP), Unit 1. To complete its review, the U.S. Nuclear Regulatory Comrnission staff requests the following additional information.
: 1.      Provide a comparison of the major electrical parameters, including the minimum voltage requirement (drop-out and reset) of the alternating current (AC) input breaker/contactor, for the existing and proposed new battery chargers. Discuss in detail the electrical parameters for the proposed new charger that are different from the existing 12 Battery Charger and how these parameters were determined to be acceptable.
: 2.      Discuss whether the description of the existing and new battery chargers will be provided in a future revision of the PINGP Updated Final Safety Analysis Report (UFSAR).
: 3.      Confirm that the proposed new battery charger can recharge its associated battery to the fully charged state within 24 hours while supplying its normal loads after a battery discharge to the bounding design basis event discharge state in accordance with PINGP UFSAR Section 8.5.3 and TS SR 3.8.4.2.
: 4.      Industry operating experience has shown that momentary overvoltage or undervoltage transients experienced during switching, fault or lightning-related perturbations can trigger a self-protecting lockout feature in battery chargers resulting in disabling the chargers. Provide details on the magnitude and duration of transient and sustained overvoltage/undervoltage conditions resulting from grid perturbations (or the emergency diesel generator system) that have been evaluated for operation of the proposed battery charger.
: 5.      TS SR 3.8.1.10 NOTE 3 states that the 12 Battery Charger is not required to be energized during performance of SR 3.8.1.1 O(c) until the completion of Unit 1 2011 refueling outage. The license amendment request proposes a footnote stating that the battery charger equipment will be modified during or prior to the Unit 1 2011 refueling outage. State why NOTE 3 was not modified to apply only until the new equipment has been installed and tested.
Enclosure
M. Schimmel If circumstances result in the need to revise the requested response date. please contact me at (301) 415-4037.
Sincerely, IRAJ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282
==Enclosure:==
Request for Additional Information cc wtencl: Distribution via ListServ DISTRIBUTION:
PUBLIC                                LPL3-1 RtF                      RidsNrrDorlLpl3-1 Resource RidsNRRPMPrairielsland Resource        RidsNrrLABTully Resource        RidsNrrDirsltsb Resource RidsAcrsAcnw_MaiICTR Resource          RidsOgcRp Resource              PSahay, NRR RidsRgn3MailCenter Resource            RidsNrrDeEeeb Resource          GMatharu, NRR MHamm, NRR                            RidsNrrDorlDpr Resource ADAMS Accession Number' ML110610475 OFFICE    LPL3-1/PM      LPL3-1/LA    NRR/DE/EEEB/BC (A) ~IRS"TSB/BC              I LPL3-1/BC NAME      TWengert      BTuily        RMathew                  RElliott            I RPascarelli ITBeltz for DATE      03103/11      03/03/11      03/03/11                03/03/11            I 03/04/11 OFFICIAL RECORD COpy}}

Latest revision as of 03:35, 13 November 2019

Request for Additional Information Related to Request to Revise the Technical Specification 3.8.1, AC Sources - Operating, Footnote Requiring Battery Charger Modifications
ML110610475
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 03/04/2011
From: Thomas Wengert
Plant Licensing Branch III
To: Schimmel M
Northern States Power Co
Wengert, Thomas
References
TAC ME5426
Download: ML110610475 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-6001 March 4, 2011 Mr. Mark A. Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST TO REVISE THE TECHNICAL SPECIFICATION 3.8.1, "AC SOURCES - OPERATING,"

FOOTNOTE REQUIRING BATTERY CHARGER MODIFICATIONS (TAC NO. ME5426)

Dear Mr. Schimmel:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated February 3,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110350055), the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, requested a license amendment to revise the Technical Specification (TS) 3.8.1, <lAC Sources - Operating", Surveillance Requirement (SR) 3.8.1.10 footnote requiring battery charger modifications for Prairie Island Nuclear Generating Plant (PINGP),

Unit 1.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with Mr. Dale Vincent of your staff on March 1, 2011, it was agreed that you would provide a response to this request within 14 days of the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff'resources.

M. Schimmel - 2 If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.

Sincerely,

- =te",-~:--c~~

Thomas J. Wengert, Senior Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282

Enclosure:

Request for Additional Information cc w/encl: Distribution via ListServ

REQUEST FOR ADDITIONAL INFORMATION NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 DOCKET NO. 50-282 By letter dated February 3, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110350055), the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, requested a license amendment to revise the Technical Specification (TS) 3.8.1, !lAC Sources - Operating", Surveillance Requirement (SR) 3.8.1.10 footnote requiring battery charger modifications for Prairie Island Nuclear Generating Plant (PINGP), Unit 1. To complete its review, the U.S. Nuclear Regulatory Comrnission staff requests the following additional information.

1. Provide a comparison of the major electrical parameters, including the minimum voltage requirement (drop-out and reset) of the alternating current (AC) input breaker/contactor, for the existing and proposed new battery chargers. Discuss in detail the electrical parameters for the proposed new charger that are different from the existing 12 Battery Charger and how these parameters were determined to be acceptable.
2. Discuss whether the description of the existing and new battery chargers will be provided in a future revision of the PINGP Updated Final Safety Analysis Report (UFSAR).
3. Confirm that the proposed new battery charger can recharge its associated battery to the fully charged state within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while supplying its normal loads after a battery discharge to the bounding design basis event discharge state in accordance with PINGP UFSAR Section 8.5.3 and TS SR 3.8.4.2.
4. Industry operating experience has shown that momentary overvoltage or undervoltage transients experienced during switching, fault or lightning-related perturbations can trigger a self-protecting lockout feature in battery chargers resulting in disabling the chargers. Provide details on the magnitude and duration of transient and sustained overvoltage/undervoltage conditions resulting from grid perturbations (or the emergency diesel generator system) that have been evaluated for operation of the proposed battery charger.
5. TS SR 3.8.1.10 NOTE 3 states that the 12 Battery Charger is not required to be energized during performance of SR 3.8.1.1 O(c) until the completion of Unit 1 2011 refueling outage. The license amendment request proposes a footnote stating that the battery charger equipment will be modified during or prior to the Unit 1 2011 refueling outage. State why NOTE 3 was not modified to apply only until the new equipment has been installed and tested.

Enclosure

M. Schimmel If circumstances result in the need to revise the requested response date. please contact me at (301) 415-4037.

Sincerely, IRAJ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282

Enclosure:

Request for Additional Information cc wtencl: Distribution via ListServ DISTRIBUTION:

PUBLIC LPL3-1 RtF RidsNrrDorlLpl3-1 Resource RidsNRRPMPrairielsland Resource RidsNrrLABTully Resource RidsNrrDirsltsb Resource RidsAcrsAcnw_MaiICTR Resource RidsOgcRp Resource PSahay, NRR RidsRgn3MailCenter Resource RidsNrrDeEeeb Resource GMatharu, NRR MHamm, NRR RidsNrrDorlDpr Resource ADAMS Accession Number' ML110610475 OFFICE LPL3-1/PM LPL3-1/LA NRR/DE/EEEB/BC (A) ~IRS"TSB/BC I LPL3-1/BC NAME TWengert BTuily RMathew RElliott I RPascarelli ITBeltz for DATE 03103/11 03/03/11 03/03/11 03/03/11 I 03/04/11 OFFICIAL RECORD COpy