Plan - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg)
ML15149A166
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/28/2015
From: Steven Orth
Plant Support Branch II
To: Davison K
Northern States Power Co
References
Download: ML15149A166 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 May 28, 2015 Mr. Kevin Davison Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - INFORMATION REQUEST TO SUPPORT THE NRC ANNUAL BASELINE EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION

Dear Mr. Davison:

This letter is to request information to support the Emergency Action Level and Emergency Plan change inspection that will be conducted during the third quarter of 2015. This inspection will be performed as an in-office review and in accordance with the U.S. Nuclear Regulatory Commission (NRC) baseline inspection procedure IP 71114.04.

In the past, this inspection was conducted at the end of the calendar year, and all requests were made informally to your staff. However, in order to increase efficiency and timeliness of the review, and promote consistency of document requests across the sites, this request is being sent to all operating reactor licensees in Region III.

The list of requested documents needed for this inspection from each site is enclosed. We are requesting that these documents are for the time period specified in the list, as applicable.

The point of contact for this request is Ms. Michelle Garza, Region III Emergency Preparedness Inspector, and can be reached at (630) 829-9719. We will keep in close communications with the Emergency Preparedness staff at your site regarding this request and the inspection when performed.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

K. Davison In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506

Enclosure:

Emergency Action Level and Emergency Plan Changes Inspection Document Request cc w/encl: Distribution via LISTSERV

EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION DOCUMENT REQUEST We request that all information listed below be received no later than July 17, 2015. The information is preferred electronically on a CD-ROM. Send the information requested to the NRC Region III office:

U.S. NRC Region III Attn: Michelle Garza, DRS 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Documents Requested:

1. Current revision of the Emergency Plan
2. Current Emergency Action Level (EAL) scheme
3. Most recent NRC-approved Emergency Plan and EAL
4. On Shift Staffing Analysis baseline
5. Most recent Evacuation Time Estimate
6. Governing site document for Title 10, Code of Federal Regulations (CFR) Part 50.54(q) evaluation process
7. Title 10 CFR 50.54(q) evaluator training program and qualification records
8. Title 10 CFR 50.54(q) evaluations that were completed between October 31, 2014 and June 30, 2015
9. For each change evaluation, the previous documents and proposed documents, and the associated 50.54(q) screen and evaluation (if performed)
10. Corrective Action Program entries related to EAL and Emergency Plan changes dated between October 31, 2014 and June 30, 2015.

K. Davison In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506

Enclosure:

Emergency Action Level and Emergency Plan Changes Inspection Document Request cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl:

Kimyata MorganButler RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML15149A166 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MGarza:cl SOrth DATE 05/13/15 05/28/15 OFFICIAL RECORD COPY