ML111290331: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/09/2011
| issue date = 05/09/2011
| title = EOC Public Meeting on 5/5/11 Summary
| title = EOC Public Meeting on 5/5/11 Summary
| author name = Giessner J B
| author name = Giessner J
| author affiliation = NRC/RGN-III/DRP/B4
| author affiliation = NRC/RGN-III/DRP/B4
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 9, 2011 LICENSEE:     Entergy Nuclear Operations, Inc.
-4352 May 9, 2011 LICENSEE:
FACILITY:     Palisades Nuclear Plant
Entergy Nuclear Operations, Inc.
FACILITY:
Palisades Nuclear Plant


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE MAY 5, 2011, PUBLIC MEETING TO DISCUSS THE 2010 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 5, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College, South Haven, Michigan
OF THE MAY 5, 2011, PUBLIC MEETING TO DISCUSS THE 2010 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 5, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College, South Haven, Michigan. The meeting was between NRC Region III management and Entergy Nuclear Operations representatives to discuss the NRCs assessment of the safety performance of Palisades Nuclear Generating Plant for the period from January 1, 2010, through December 31, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111020200 and ML111020149, respectively.
. The meeting was between NRC Region III management and Entergy Nuclear Operations representatives to discuss the NRC's assessment of the safety performance of Palisades Nuclear Generating Plant for the period from January 1, 20 10, through December 31, 20
The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2010, which was documented in the March 4, 2011, End-Of-Cycle assessment letter (ML110620625).
: 10. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111020200 and ML111020149, respectively.
The licensee then provided a response to the NRCs assessment. The licensee presentation can be found in ADAMS under ML111260486. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. The NRC officials answered questions regarding operation at the site, security, license renewal, equipment reliability, dry fuel storage, emergency planning, and the U. S. response to issues in Japan. Slides used to describe the NRC's ROP process and Palisades Power Station 2010 performance can be found in ADAMS under ML111160502. A list of principal meeting attendees can be found in the attached enclosure.
The NRC began the meeting with an overview of the NRC's Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of Palisades performance in 20 10, which was documented in the March 4, 201 1, End-Of-Cycle assessment letter (ML110620625). The licensee then provided a response to the NRC's assessment. The licensee presentation can be found in ADAMS under ML111260486.
                                            /RA/
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-255; 72-007 License No. DPR-20
The NRC officials answered questions regarding operation at the site, security, license renewal, equipment reliability, dry fuel storage, emergency planning
, and the U. S. response to issues in Japan. Slides used to describe the NRC's ROP process and Palisades Power Station 2010 performance can be found in ADAMS under ML111160502.
A list of principal meeting attendees can be found in the attached enclosure.
    /RA/ John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50
-255; 72-007 License No. DPR
-20


==Enclosure:==
==Enclosure:==
As Stated
As Stated cc w/encl: Distribution via ListServ


cc w/encl:  Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 9, 2011 LICENSEE:         Entergy Nuclear Operations, Inc.
 
FACILITY:         Palisades Nuclear Plant
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
-4352 May 9, 2011 LICENSEE:
Entergy Nuclear Operations, Inc.
FACILITY:
Palisades Nuclear Plant


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE MAY 5, 2011, PUBLIC MEETING TO DISCUSS THE 2010 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 5, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College, South Haven, Michigan
OF THE MAY 5, 2011, PUBLIC MEETING TO DISCUSS THE 2010 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 5, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College, South Haven, Michigan. The meeting was between NRC Region III management and Entergy Nuclear Operations representatives to discuss the NRCs assessment of the safety performance of Palisades Nuclear Generating Plant for the period from January 1, 2010, through December 31, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111020200 and ML111020149, respectively.
. The meeting was between NRC Region III management and Entergy Nuclear Operations representatives to discuss the NRC's assessment of the safety performance of Palisades Nuclear Generating Plant for the period from January 1, 2010, through December 31, 2010.
The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2010, which was documented in the March 4, 2011, End-Of-Cycle assessment letter (ML110620625).
The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111 020200 and ML111020149, respectively.
The licensee then provided a response to the NRCs assessment. The licensee presentation can be found in ADAMS under ML111260486. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. The NRC officials answered questions regarding operation at the site, security, license renewal, equipment reliability, dry fuel storage, emergency planning, and the U. S. response to issues in Japan. Slides used to describe the NRC's ROP process and Palisades Power Station 2010 performance can be found in ADAMS under ML111160502. A list of principal meeting attendees can be found in the attached enclosure.
The NRC began the meeting with an overview of the NRC's Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of Palisades performance in 2010, which was documented in the March 4, 2011, End
John B. Giessner, Chief - /RA/
-Of-Cycle assessment letter (ML110620625
Branch 4 Division of Reactor Projects Docket No. 50-255; 72-007 License No. DPR-20
). The licensee then provided a response to the NRC's assessment. The licensee presentation can be found in ADAMS under ML111260486.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
The NRC officials answered questions regarding operation at the site, security, license renewal, equipment reliability, dry fuel storage, emergency planning, and the U. S. response to issues in Japan. Slides used to describe the NRC's ROP process and Palisades Power Station 2010 performance can be found in ADAMS under ML111160502.
A list of principal meeting attendees can be found in the attached enclosure.
John B. Giessner, Chief
  - /RA/ Branch 4 Division of Reactor Projects Docket No. 50
-255; 72-007 License No. DPR
-20


==Enclosure:==
==Enclosure:==
As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME:
As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\EOC Mtg Summary\Palisades EOC Summary.docx Publicly Available         Non-Publicly Available           Sensitive       Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE       RIII                     RIII NAME         SShah:dtp                 JGiessner DATE         05/06/11                 05/09/11 OFFICIAL RECORD COPY
G:\DRPIII\1-Secy\1-Work In Progress
\EOC Mtg Summary
\Palisades EOC Summary.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII     NAME SShah:dtp JGiessner   DATE 05/06/11 05/09/11   OFFICIAL RECORD COPY PUBLIC MEETING PRINCIPAL ATTENDEES May 5, 2011 Nuclear Regulatory Commission J. Giessner, Branch Chief, Division of Reactor Projects, RIII A. Stone, Branch Chief, Division of Reactor Safety, RIII R. Edwards, Division Nuclear Materials Safety, RIII J. Ellegood, Senior Resident Inspector T. Taylor, Resident Inspector V. Mitlying, Public Affairs Officer, RIII M. Chawla, NRC Project manager, Palisades Entergy Employees T. Kirwin, Site Vice
-President D. Hamilton, Plant Manager P. Anderson, Licensing Manager M. Savage, Public Affairs Manager Other Attendees


M. Bowen, MDEQ D. Glender, MDEQ D. Asselin, MDEQ D. Staiger, Kalamazoo W. Adams, Kalamazoo K. Chadwick, Kalamazoo
PUBLIC MEETING PRINCIPAL ATTENDEES May 5, 2011 Nuclear Regulatory Commission J. Giessner, Branch Chief, Division of Reactor Projects, RIII A. Stone, Branch Chief, Division of Reactor Safety, RIII R. Edwards, Division Nuclear Materials Safety, RIII J. Ellegood, Senior Resident Inspector T. Taylor, Resident Inspector V. Mitlying, Public Affairs Officer, RIII M. Chawla, NRC Project manager, Palisades Entergy Employees T. Kirwin, Site Vice-President D. Hamilton, Plant Manager P. Anderson, Licensing Manager M. Savage, Public Affairs Manager Other Attendees M. Bowen, MDEQ D. Glender, MDEQ D. Asselin, MDEQ D. Staiger, Kalamazoo W. Adams, Kalamazoo K. Chadwick, Kalamazoo M. Morris, K.N.O.W & Plow Shares G. Theodore, K.N.O.W R. Burr, City of South Haven A. Lersten, H-P News H. Rumney, Public D. Williams, Public M. Middaugh, Public


M. Morris, K.N.O.W & Plow Shares G. Theodore, K.N.O.W R. Burr, City of South Haven A. Lersten, H
Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated May 9, 2011.
-P News H. Rumney, Public D. Williams, Public M. Middaugh, Public
 
Letter to Entergy Nuclear Operations, Inc.
from J. Giessner dated May 9, 2011.


==SUBJECT:==
==SUBJECT:==
Line 83: Line 53:
==SUMMARY==
==SUMMARY==
OF THE MAY 5, 2011, PUBLIC MEETING TO DISCUSS THE 2010 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:
OF THE MAY 5, 2011, PUBLIC MEETING TO DISCUSS THE 2010 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:
Daniel Merzke RidsNrrPMPalisades Resource RidsNrrDorlLpl3
Daniel Merzke RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}}
-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson
 
Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}}

Latest revision as of 00:58, 13 November 2019

EOC Public Meeting on 5/5/11 Summary
ML111290331
Person / Time
Site: Palisades  Entergy icon.png
Issue date: 05/09/2011
From: Jack Giessner
Reactor Projects Region 3 Branch 4
To:
References
Download: ML111290331 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 9, 2011 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE MAY 5, 2011, PUBLIC MEETING TO DISCUSS THE 2010 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 5, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College, South Haven, Michigan. The meeting was between NRC Region III management and Entergy Nuclear Operations representatives to discuss the NRCs assessment of the safety performance of Palisades Nuclear Generating Plant for the period from January 1, 2010, through December 31, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111020200 and ML111020149, respectively.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2010, which was documented in the March 4, 2011, End-Of-Cycle assessment letter (ML110620625).

The licensee then provided a response to the NRCs assessment. The licensee presentation can be found in ADAMS under ML111260486. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. The NRC officials answered questions regarding operation at the site, security, license renewal, equipment reliability, dry fuel storage, emergency planning, and the U. S. response to issues in Japan. Slides used to describe the NRC's ROP process and Palisades Power Station 2010 performance can be found in ADAMS under ML111160502. A list of principal meeting attendees can be found in the attached enclosure.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-255;72-007 License No. DPR-20

Enclosure:

As Stated cc w/encl: Distribution via ListServ

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 9, 2011 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE MAY 5, 2011, PUBLIC MEETING TO DISCUSS THE 2010 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 5, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College, South Haven, Michigan. The meeting was between NRC Region III management and Entergy Nuclear Operations representatives to discuss the NRCs assessment of the safety performance of Palisades Nuclear Generating Plant for the period from January 1, 2010, through December 31, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111020200 and ML111020149, respectively.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2010, which was documented in the March 4, 2011, End-Of-Cycle assessment letter (ML110620625).

The licensee then provided a response to the NRCs assessment. The licensee presentation can be found in ADAMS under ML111260486. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. The NRC officials answered questions regarding operation at the site, security, license renewal, equipment reliability, dry fuel storage, emergency planning, and the U. S. response to issues in Japan. Slides used to describe the NRC's ROP process and Palisades Power Station 2010 performance can be found in ADAMS under ML111160502. A list of principal meeting attendees can be found in the attached enclosure.

John B. Giessner, Chief - /RA/

Branch 4 Division of Reactor Projects Docket No. 50-255;72-007 License No. DPR-20

Enclosure:

As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\EOC Mtg Summary\Palisades EOC Summary.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SShah:dtp JGiessner DATE 05/06/11 05/09/11 OFFICIAL RECORD COPY

PUBLIC MEETING PRINCIPAL ATTENDEES May 5, 2011 Nuclear Regulatory Commission J. Giessner, Branch Chief, Division of Reactor Projects, RIII A. Stone, Branch Chief, Division of Reactor Safety, RIII R. Edwards, Division Nuclear Materials Safety, RIII J. Ellegood, Senior Resident Inspector T. Taylor, Resident Inspector V. Mitlying, Public Affairs Officer, RIII M. Chawla, NRC Project manager, Palisades Entergy Employees T. Kirwin, Site Vice-President D. Hamilton, Plant Manager P. Anderson, Licensing Manager M. Savage, Public Affairs Manager Other Attendees M. Bowen, MDEQ D. Glender, MDEQ D. Asselin, MDEQ D. Staiger, Kalamazoo W. Adams, Kalamazoo K. Chadwick, Kalamazoo M. Morris, K.N.O.W & Plow Shares G. Theodore, K.N.O.W R. Burr, City of South Haven A. Lersten, H-P News H. Rumney, Public D. Williams, Public M. Middaugh, Public

Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated May 9, 2011.

SUBJECT:

SUMMARY

OF THE MAY 5, 2011, PUBLIC MEETING TO DISCUSS THE 2010 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

Daniel Merzke RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource