ML11131A000: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 12, 2011 Mr. Preston Gillespie Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 OCONEE NUCLEAR STATION, UNITS 1,2, AND 3, CLOSEOUT OF GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NOS. MD7843, MD7844, AND MD7845)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 12, 2011 Mr. Preston Gillespie Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672
 
==SUBJECT:==
OCONEE NUCLEAR STATION, UNITS 1,2, AND 3, CLOSEOUT OF GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NOS. MD7843, MD7844, AND MD7845)


==Dear Mr. Gillespie:==
==Dear Mr. Gillespie:==


On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL: A description of the results of evaluations that were performed pursuant to the above requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.
On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:
In your letters dated letters dated October 13, 2008 (ADAMS Accession No. ML082900490  
(a)    A description of the results of evaluations that were performed pursuant to the above requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; (b)    A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, (c)    A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.
), March 12, 2009 (ADAMS Accession No. ML090760975), August 19, 2009 (ADAMS Accession No. ML092330103), March 2,2010 (ADAMS Accession No. ML100640032), September 24, 2010 (ADAMS Accession No. ML102720395), and March 23. 2011 (ADAMS Accession No. ML110900189).
In your letters dated letters dated October 13, 2008 (ADAMS Accession No. ML082900490 ),
Duke Energy Carolinas, LLC (the licensee) provided responses to GL 2008-01 for Oconee Nuclear Station, Units 1, 2, and 3. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request. Consequently, your GL response is considered closed and no further information or action is requested of you with the exception of any commitments you have made with respect to the GL responses.
March 12, 2009 (ADAMS Accession No. ML090760975), August 19, 2009 (ADAMS Accession No. ML092330103), March 2,2010 (ADAMS Accession No. ML100640032), September 24, 2010 (ADAMS Accession No. ML102720395), and March 23. 2011 (ADAMS Accession No.
Notwithstanding, the NRC's Region II staff may decide to perform (and would P. Gillespie -2 contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666).
ML110900189). Duke Energy Carolinas, LLC (the licensee) provided responses to GL 2008-01 for Oconee Nuclear Station, Units 1, 2, and 3. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request.
The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured. If you have any questions, please call me at 301-415-1345. )k In Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: Distribution via Listserv P. Gillespie contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666).
Consequently, your GL response is considered closed and no further information or action is requested of you with the exception of any commitments you have made with respect to the GL responses. Notwithstanding, the NRC's Region II staff may decide to perform (and would
The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured. If you have any questions, please call me at 301-415-1345.
 
Sincerely, IRA! John Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: Distribution via Listserv DISTRIBUTION:
P. Gillespie                                     -2 contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
PUBLIC LPLlI-1 RlF RidsAcrsAcnw_MailCtr Resource RidsNrrDorlDpr Resource RidsNrrDorlLp2-1 Resource RidsNrrDssSrxb Resource RidsNrrLAMOBrien Resource (hard copy) RidsNrrPMOconee Resource (hard copy) RidsOgcRp Resource RidsRgn2MailCenter Resource d t d 4/29/11 ADAMS A ccesslon N o. ML11131AOOO  
If you have any questions, please call me at 301-415-1345.
*B IY memo a e OFFICE NRR/LPL2-1/PM NRRlLPL2-1/LA NRRlSRXB/BC NRRlLPL2-1/BC NRRlLPL2-1/PM NAME JStang MO'Brien (SLittle for) AUlses* GKulesa JStang DATE 5/12/11 5/11111 04/29/2011 5112111 5/12/11 OFFICIAL RECORD COpy}}
Sin~:      )k I n Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: Distribution via Listserv
 
P. Gillespie                                     -2 contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
If you have any questions, please call me at 301-415-1345.
Sincerely, IRA!
John Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLlI-1 RlF RidsAcrsAcnw_MailCtr Resource RidsNrrDorlDpr Resource RidsNrrDorlLp2-1 Resource RidsNrrDssSrxb Resource RidsNrrLAMOBrien Resource (hard copy)
RidsNrrPMOconee Resource (hard copy)
RidsOgcRp Resource RidsRgn2MailCenter Resource ADAMS A ccesslon No. ML11131AOOO                                     *BIY memo d ated 4/29/11 OFFICE NRR/LPL2-1/PM NRRlLPL2-1/LA NRRlSRXB/BC                   NRRlLPL2-1/BC NRRlLPL2-1/PM MO'Brien NAME      JStang            (SLittle for)       AUlses*         GKulesa           JStang DATE       5/12/11           5/11111             04/29/2011       5112111           5/12/11 OFFICIAL RECORD COpy}}

Revision as of 00:47, 13 November 2019

Close Out of Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (TAC Nos. MD7843, MD7844, and MD7845)
ML11131A000
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/12/2011
From: Stang J
Plant Licensing Branch II
To: Gillespie P
Duke Energy Carolinas
Gillespie P
References
TAC MD7843, TAC MD7844, TAC MD7845
Download: ML11131A000 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 12, 2011 Mr. Preston Gillespie Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672

SUBJECT:

OCONEE NUCLEAR STATION, UNITS 1,2, AND 3, CLOSEOUT OF GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NOS. MD7843, MD7844, AND MD7845)

Dear Mr. Gillespie:

On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:

(a) A description of the results of evaluations that were performed pursuant to the above requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; (b) A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, (c) A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.

In your letters dated letters dated October 13, 2008 (ADAMS Accession No. ML082900490 ),

March 12, 2009 (ADAMS Accession No. ML090760975), August 19, 2009 (ADAMS Accession No. ML092330103), March 2,2010 (ADAMS Accession No. ML100640032), September 24, 2010 (ADAMS Accession No. ML102720395), and March 23. 2011 (ADAMS Accession No.

ML110900189). Duke Energy Carolinas, LLC (the licensee) provided responses to GL 2008-01 for Oconee Nuclear Station, Units 1, 2, and 3. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request.

Consequently, your GL response is considered closed and no further information or action is requested of you with the exception of any commitments you have made with respect to the GL responses. Notwithstanding, the NRC's Region II staff may decide to perform (and would

P. Gillespie -2 contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions, please call me at 301-415-1345.

Sin~: )k I n Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: Distribution via Listserv

P. Gillespie -2 contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions, please call me at 301-415-1345.

Sincerely, IRA!

John Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPLlI-1 RlF RidsAcrsAcnw_MailCtr Resource RidsNrrDorlDpr Resource RidsNrrDorlLp2-1 Resource RidsNrrDssSrxb Resource RidsNrrLAMOBrien Resource (hard copy)

RidsNrrPMOconee Resource (hard copy)

RidsOgcRp Resource RidsRgn2MailCenter Resource ADAMS A ccesslon No. ML11131AOOO *BIY memo d ated 4/29/11 OFFICE NRR/LPL2-1/PM NRRlLPL2-1/LA NRRlSRXB/BC NRRlLPL2-1/BC NRRlLPL2-1/PM MO'Brien NAME JStang (SLittle for) AUlses* GKulesa JStang DATE 5/12/11 5/11111 04/29/2011 5112111 5/12/11 OFFICIAL RECORD COpy