Letter Sequence RAI |
---|
|
|
MONTHYEARML0809805432008-04-0707 April 2008 Surry, North Anna, Millstone and Kewaunee Power Stations - Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems - Schedule Extension for Three Month Response Project stage: Request ML0813002822008-05-0808 May 2008 Surry, North Anna, Millstone and Kewaunee - Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Project stage: Request ML0816804742008-07-0808 July 2008 GL-08-001, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Response to Extension Request Project stage: Other ML0819806402008-07-23023 July 2008 Millstone, Units 2/3, North Anna Power, Units 1/2, & Surry Power Station, Units 1/2, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling (TAC Nos. MD7838, MD7845, MD7846, MD7850, MD7851, MD7884, & MD7885) Project stage: Other ML0929605602009-11-0606 November 2009 Request for Additional Information Regarding Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (Tac Nos. MD7845 and MD7846) Project stage: RAI ML1027203952010-09-24024 September 2010 Generic Letter 2008-01 RAI Response Project stage: Request ML1105403932011-03-0202 March 2011 Closeout of Generic Letter 2008-01,Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray System Project stage: Other ML1109001892011-03-23023 March 2011 Responses to Request for Additional Information on Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. Project stage: Response to RAI ML11131A0002011-05-12012 May 2011 Close Out of Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Project stage: Other 2009-11-06
[Table View] |
|
---|
Category:Letter
MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23073A1802023-03-14014 March 2023 Notification of Commercial Grade Dedication Inspection (05000336/2023010 and 05000423/2023010) and Request for Information ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21182A2902021-07-0101 July 2021 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements ML21112A3082021-04-22022 April 2021 Request for Additional Information (E-mail Dated 4/22/2021) License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML21105A1152021-04-15015 April 2021 Request for Additional Information (e-mail Dated 4/15/2021) Proposed LAR for Addition of Analytical Methodology to the Core Operating Limits Report for a LBLOCA ML21078A0332021-03-18018 March 2021 NRR E-mail Capture - Millstone Power Station, Unit 2 - Request for Additional Information - Proposed LAR to Revise TSs for Steam Generator Inspection Frequency ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21077A1652021-02-26026 February 2021 (02/26/2021 E-mail) Draft Request for Additional Information LAR to Revise Technical Specifications for Steam Generator Inspection Frequency ML21034A5762021-02-0303 February 2021 Request for Additional Information (e-mail Dated 1/3/2021) Alternative Request RR-05-06 Inservice Inspection Interval Extension for Steam Generator Weld Inspections ML20246G5612020-09-0202 September 2020 Request for Additional Information (E-mail Dated 9/2/2020) License Amendment Request for a One-Time Deferral of the Steam Generator Inspections ML20244A2902020-08-31031 August 2020 Request for Additional Information (E-mail Dated 8/31/2020) License Amendment Request to Revise Battery Surveillance Requirements ML20231A7172020-08-18018 August 2020 Request for Additional Information (e-mail Dated 8/18/2020) License Amendment Request to Revise TS Table 3.3-11 Accident Monitoring Instrumentation ML20184A0052020-07-0202 July 2020 Request for Additional Information (E-mail Dated 7/2/2020) Relief Request IR-3-33 for Limited Coverage Examiniations ML20075A0322020-03-15015 March 2020 Request for Additional Information (E-mail Dated 3/15/2020) Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity ML20050F9212020-02-19019 February 2020 Request for Additional Information (E-mail Dated 2/19/2020) Proposed LAR to Revise TS 3.8.1.1, AC Sources Operating ML20023D0372020-01-23023 January 2020 Request for Additional Information (E-mail Dated 1/23/2020) Proposed LAR to Revise TS 3.8.1.1, AC Sources Operating ML19361A0382019-12-23023 December 2019 12/23/19 E-mail from R.Guzman to S. Sinha - Draft Request for Additional Information Planned Audit of LAR to Revise TS 3.8.1.1 ML19277B9082019-10-0707 October 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML19248D7552019-09-0505 September 2019 Request for Additional Information Via E-mail from R.Guzman to S. Sinha Proposed License Amendment Request to Adopt 10 CFR 50.69 ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19162A0052019-06-10010 June 2019 NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change ML19042A1822019-02-11011 February 2019 Request for Additional Information LAR for TS Changes to Spent Fuel Storage and New Fuel Storage, 02/11/2019 E-mail from R. Guzman to S. Sinha ML18291B3262018-10-18018 October 2018 Request for Additional Information LAR Regarding Proposed Technical Specification Changes for Spent Fuel Pool Storage and New Fuel Storage, E-mail from R.Guzman to S.Sinha ML18277A1762018-10-0404 October 2018 Request for Additional Information LAR to Revise TS Action Statement for Loss of Control Building Inlet Ventilation Rad Monitor Instrumentation Channels (e-mail from R.Guzman to M.Whitlock, EPID: L-2018-LLA-0099) ML18213A1152018-08-0101 August 2018 Request for Additional Information Alternative Request P-06 'C' Charging Pump (08/01/2018 E-mail from R. Guzman to M. Whitlock) ML18171A1532018-06-20020 June 2018 Request for Additional Information Via E-mail from R.Guzman to W.Craft Alternative Requests for Inservice Testing Program (E-mail from R.Guzman to W.Craft) (EPID: L-2018-LLR-0012-LLR-0022) ML18137A3132018-05-17017 May 2018 Request for Additional Information Via E-mail from R.Guzman to W.Craft Proposed License Amendment Request to Revise ILRT Type a and Type C Test Intervals ML17297A8472017-10-27027 October 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools (CAC No. MF9430; EPID L-2016-LRC-0001) ML17033B6142017-02-0202 February 2017 Request for Additional Information, 2017/02/02 E-mail from R.Guzman to W.Craft Proposed Alternative RR-04-24 and IR-3-30 for the Elimination of Reactor Pressure Vessel Threads in Flange Examination (CAC Nos. MF8468/MF8469) ML17005A3282017-01-0505 January 2017 MPS2 EOC-23 and MPS3 EOC-17 Steam Generator Tube Inspection Reports - Requests for Additional Information ML16260A0062016-09-16016 September 2016 2016/09/16 E-mail from R. Guzman to W. Craft Request for Additional Information - License Amendment Request Realistic Large Break Loss of Coolant Accident Analysis (MF7761) ML16267A0022016-09-12012 September 2016 2016/09/12 E-mail from R.Guzman to W.Craft Request for Additional Information - LAR to Revise ECCS TS and FSAR Ch. 14 to Remove Charging (MF7297) ML16133A3562016-05-12012 May 2016 E-mail from R. Guzman to C. Sly Request for Additional Information Supporting License Amendment Request to Remove Charging Credit ML16068A4142016-03-0808 March 2016 Request for Additional Information - Relief Request RR-04-19 Examination Cat R-A, Risk-Informed Piping Examinations (MF6569) ML16055A5302016-02-24024 February 2016 2016/02/24 E-mail from R.Guzman to W.Craft Request for Additional Information - LAR to Adopt Dominion Core Design and Safety Analysis Methods (MF6251) ML16047A1712016-02-16016 February 2016 2016/02/16 E-mail from R.Guzman to M. Whitlock Request for Additional Information - Small Break Loss of Coolant Accident Re-Analysis (MF6700) ML16043A5232016-02-12012 February 2016 Request for Additional Information 2016/02/12 E-mail from R. Guzman to M.Whitlock Relief Requests IR-3-22 and IR-3-23 (CAC Nos. MF6573 and MF6574) ML16013A4772016-01-13013 January 2016 NRR E-mail Capture - Millstone Power Station, Units 2 and 3 - Request for Additional Information License Amendment Request for Removal of Severe Line Outage Detection (Slod) from the Offsite Power System - (MF6430, MF6431) ML16011A5172016-01-11011 January 2016 NRR E-mail Capture - Millstone Power Station, Unit 3, Reactor Vessel Surveillance Capsule Withdrawal Schedule - Request for Additional Information ML15349A8312016-01-0808 January 2016 Request for Additional Information License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods ML15337A1512015-12-0303 December 2015 NRR Email Capture - Millstone Unit 2 Request for Additional Information ML15279A1092015-10-0606 October 2015 NRR e-mail Capture - Millstone Power Station, Unit 3, NRC Staff Request for Additional Information - Relief Request Nos. IR-3-19,3-20,3-21 ML15275A1432015-10-0202 October 2015 2015/10/02 E-mail from R.Guzman to W.Craft - Follow-up Request for Additional Information TSTF-523, Revision 2, GL 2008-01, Managing Gas Accumulation 2023-07-18
[Table view] |
Text
~p..f\ REG U v"- ('1
~~ '>-0 UNITED STATES
~' '1l
.L I<j
/-. C'l NUCLEAR REGULATORY COMMISSION oct' 0
~ :: WASHINGTON, D.C. 20555-0001 l/l ~
~ ~
"/. ~
1-~ ~O November 6, 2009
Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NOS. 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NOS. MD7845 AND MD7846)
Dear Mr. Heacock:
By letter dated October 14, 2008, as supplemented by letter dated January 15, 2009 (Agencywide Document Access and Management System (ADAMS) Accession Nos.
ML082890266 and ML090150378, respectively), Dominion Nuclear Connecticut, Inc. (DNC or the licensee) provided a response to Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," for Millstone Power Station, Unit Nos. 2 and 3 (MPS2 and MPS3, respectively).
Specifically, DNC's response discusses the emergency core cooling, decay heat removal, and containment spray systems with regards to compliance with the current licensing and design bases and applicable regulatory requirements, and suitable design, operational, and testing control measures are in place for maintaining compliance. To complete its review, the Nuclear Regulatory Commission staff requests responses to the enclosed additional information.
The draft questions were sent to Mr. William Bartron, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. On October 29, 2009, Mr. Bartron agreed that you would provide a response by January 14, 2010.
If you have any questions regarding this matter, please contact me at 301-415-1603.
Sej Carleen J. a Plant Lice si Division of erating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423
Enclosure:
As stated cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION (RAI)
RESPONSE TO GENERIC LETTER 2008-01 "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" MILLSTONE POWER STATION, UNIT NOS. 2 AND 3 DOCKET NOS. 50-336 AND 50-423 By letter dated October 14, 2008, as supplemented by letter dated January 15, 2009 (Agencywide Document Access and Management System (ADAMS) Accession Nos.
ML082890266 and ML090150378, respectively), Dominion Nuclear Connecticut, Inc. (DNC or the licensee) provided a response to Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," for Millstone Power Station, Unit Nos. 2 and 3 (MPS2 and MPS3, respectively).
Specifically, DNC's response discusses the emergency core cooling, decay heat removal, and containment spray systems with regards to compliance with the current licensing and design bases and applicable regulatory requirements, and suitable design, operational, and testing control measures are in place for maintaining compliance. To complete its review, the Nuclear Regulatory Commission (NRC) staff requests responses to the following request for additional information.
Guidance on NRC staff expectations is provided in Reference 1. Nuclear Energy Institute (NEI) guidance is provided in Reference 2. The NRC staff recommends that DNC consult Reference 1 when responding to the following questions:
- 1. In Reference 4, Dominion Nuclear Connecticut, Inc. noted that "a corrective action is in place to monitor the status of the TSTF [Technical Specification Task Force] traveler described above." The TSTF traveler described above is being developed for making changes to TSs related to the potential for unacceptable gas accumulation.
Clarify the schedule for evaluating the TSTF traveler and submitting a license amendment, if necessary.
- 2. The licensee states in Reference 4 that MPS2 has several locations of possible gas accumulation that require further confirmation. "UT [ultrasonic testing] measurements of these potential voids will be performed to validate void size."
The licensee also states that, "MPS2 has utilized this methodology [Joint Owners group methodology using plant specific information for piping restraints and relief valve set points to determine the acceptable gas volume accumulation such that a relief valve does not lift] in technical evaluation (M2-EV-08-0027) for evaluation of any gas accumulation found in discharge piping of susceptible GL2008-01 in scope systems
[Emergency Core Cooling, Decay Heat Removal, and Containment Spray System]."
Enclosure
-2 Clarify how voids are being detected in the pump discharge piping. If gas accumulation is detected, how are these potential voids going to be monitored and trended?
- 3. In Reference 4, the licensee states that for MPS2 "with the exception of SIT [Safety Injection Tank] back leakage, there are no known gas intrusion mechanisms that impact these piping systems [emergency core cooling, decay heat removal, and containment spray systems] during the operating cycle." Discuss measures used to guard against gas intrusion due to inadvertent draining, system realignments, incorrect maintenance procedures, or other evolutions.
References 1 and 3 identify additional gas intrusion mechanisms, such as leakage from the reactor coolant system and issues related to the charging systems that may apply to MPS2. Please list the potential gas intrusion mechanisms identified in the references and justify why they are not a concern for MPS2.
- 4. In reference 4, the licensee states that if gas accumulation was discovered at MPS2 or MPS3, a condition report would be initiated and the shift manager would be notified.
Clarify how gas accumulation is determined, including the overall criteria. Also, discuss any follow-up actions that would be taken.
- 5. In Reference 4, the licensee states for MPS3 that "when gas voids were present in pump suction lines, the pumps were evaluated to ensure gas would not accumulate within the pumps due to low flow rates."
Were any follow-up actions taken in regard to this issue, if so what were they? Discuss in generic terms the source of the gas voids present.
- 6. Training was not identified in the GL but is considered to be a necessary part of applying procedures and other activities when addressing the issues identified in the GL. Provide a brief description of training.
REFERENCES 1 Ruland, William H., "Preliminary Assessment of Responses to Generic Letter 2008-01,
'Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems,' and Future NRC Staff Review Plans," NRC letter to James H. Riley, Nuclear Energy Institute, ML091390637, May 28, 2009.
2 Riley, James H., "Generic Letter (GL) 2008-01, 'Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Contain Spray Systems' Evaluation and 3 Month Response Template," Letter to Administrative Points of Contact from Director, Engineering, Nuclear Generation Division, Nuclear Energy Institute, Enclosure 2, "Generic Letter 2008-01 Response Guidance," March 20, 2008.
3 Case, Michael J., "NRC Generic Letter 2008-01: Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems,"
Letter from Director, Division of Policy and Rulemaking, Office of Nuclear Regulation, NRC, ML072910759, January 11, 2008.
4 Price, lan, "Dominion Nuclear Connecticut, Inc. Millstone Power Station Units 2 and 3, Docket No. 50-336, 50-423, Nine-Month Response to NRC Generic Letter 2008-01,"
Letter to Document Control Desk, NRC, from President, Nuclear Engineering, Dominion Nuclear Connecticut, Inc., ML082890266, October 14,2008.
5 Matthews, William R., "Dominion Nuclear Connecticut, Inc. Millstone Power Station Unit 3 Supplemental Response to Generic Letter 2008-01," Letter to Document Control Desk, NRC, from Senior Vice President, Nuclear Operations, Dominion Nuclear Connecticut, Inc., ML090150378, January 15, 2009.
6 "Revision 2 to NRC Staff Criteria for Gas Movement in Suction Lines and Pump Response to Gas," ML090900136, March 26, 2009.
November 6, 2009 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NOS. 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NOS. MD7845 AND MD7846)
Dear Mr. Heacock:
By letter dated October 14, 2008, as supplemented by letter dated January 15, 2009 (Agencywide Document Access and Management System (ADAMS) Accession Nos.
ML082890266 and ML090150378, respectively), Dominion Nuclear Connecticut, Inc. (DNC or the licensee) provided a response to Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," for Millstone Power Station, Unit Nos. 2 and 3 (MPS2 and MPS3, respectively).
Specifically, DNC's response discusses the emergency core cooling, decay heat removal, and containment spray systems with regards to compliance with the current licensing and design bases and applicable regulatory requirements, and suitable design, operational, and testing control measures are in place for maintaining compliance. To complete its review, the Nuclear Regulatory Commission staff requests responses to the enclosed additional information.
The draft questions were sent to Mr. William Bartron, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. On October 29,2009, Mr. Bartron agreed that you would provide a response by January 14, 2010.
If you have any questions regarding this matter, please contact me at 301-415-1603.
Sincerely,
/raJ Carleen J. Sanders, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423
Enclosure: