{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:                 Boyd, Desiree L [dlboyd@tva.gov]
Sent: Monday, September 12, 2011 9:38 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Rober t H Jr; Smith, James D; Crouch, William D
Sent:                 Monday, September 12, 2011 9:38 AM To:                   Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:                   Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D


==Subject:==
==Subject:==
NRC PM Open Items List 9-13-11.docx Attachments:
NRC PM Open Items List 9-13-11.docx Attachments:           NRC PM Open Items List 9-13-11.docx For next phone call.
NRC PM Open Items List 9-13-11.docx For next phone call.  
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1


Thank You,    ~*~*~*~*~*~*~*~*~*~*~*~
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           522 Mail Envelope Properties       (7AB41F650F76BD44B5BCAB7C0CCABFAF22E7E58D)
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764
 
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 522   Mail Envelope Properties   (7AB41F650F76BD44B5BCAB7C0CCABFAF22E7E58D)


==Subject:==
==Subject:==
NRC PM Open Items List 9-13-11.docx Sent Date:   9/12/2011 9:38:18 AM Received Date: 9/12/2011 9:38:24 AM From:   Boyd, Desiree L Created By:   dlboyd@tva.gov Recipients:     "Arent, Gordon" <garent@tva.gov>
NRC PM Open Items List 9-13-11.docx Sent Date:               9/12/2011 9:38:18 AM Received Date:           9/12/2011 9:38:24 AM From:                   Boyd, Desiree L Created By:             dlboyd@tva.gov Recipients:
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None Post Office:   TVANUCXVS2.main.tva.gov
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                            Size                  Date & Time MESSAGE                          244                    9/12/2011 9:38:24 AM NRC PM Open Items List 9-13-11.docx                  31574 Options Priority:                        Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Files    Size      Date & Time MESSAGE    244      9/12/2011 9:38:24 AM  NRC PM Open Items List 9-13-11.docx    31574 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Page 1 of 3 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#
Page 1 of 3     NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#
No.               Description                   Status                   Additional Comments                       Resp Org/Person
No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot  
: 1. Cyber Security Plan/Controls and         NRC TI issued NRC Inspection in 2011                              Heinrich/Snyder Implementation                            TBD                                                               (Bryan)
 
To be discussed at the next ACRS meeting (October NRC Table     5th - closed portion).
Oct 2011 Procedures complete 9/30/11 Pre-inspection TBD  
Top/Pilot Oct 2011       Set up follow-up meeting 9/20 or 9/21 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011
 
: 2. Instrumentation RAI List (Knuettel)      1. 9/23/11    RAI Responses                                      Eng/Hilmes
Inspection
: 1. Item 3 for GA-ESI RM-1000 RAD          2. Various -
 
* Item 1 GA/ESI is preparing a report to document (Smith)
Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October
Monitors.                                see status    the conformance of their CGD program to NRC
: 2. GA proprietary, non-proprietary and    3. 9/26/11        requirements based on NRC telecom on 8/30/11.
affidavits for withholding submittals 4. 10/1/11
* Item 2 - 04038903-1SP - Prop due 9/30/11
(~12 documents.)                      5. 11/30/11        04038903-2SP - Prop due 10/6/11
: 3. NRC comments on procedures to                            04038903-4SP - Prop due 10/21/11 GA-ESI                                                  04038903-QSR - Prop due 9/30/11
: 4. RM1000 EMI/RFI questions
* Item 3 OP-7.3-240 - Prop due 9/26/11
: 5. Submit non-prop/affidavits
* Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11
: 3. Verify MACCs values for SAMA Cost        1. 9/8/11A    1. Non-conservatisms in some values identified. ENG/Koontz Benefit Evaluation                        2. 9/13/11        Discuss updated results with NRC
: 3. 9/20/11    2. Submitted revised tables
: 3. Submit revised RAI responses


5 th - closed portion).  
Page 2 of 3 No.              Description              Status                    Additional Comments                        Resp Org/Person
: 4. Exemption to 10CFR50.49 for some        9/23/11                                                          Hilmes Category II cables                                                                                      (Stockton)
: 5. Complete Implementation (Hemmer)    Pump          Additional clarification to Phase I actions will be  Hemmer Relocation    needed. Fleet wide issue.                            (Smith) 5/30/12        Substantial building to complete and equipment in May.
Bldg Plan      Provide document of mitigating equipment and 9/23/11        location for unit 2.
Inspection -
June 2012 Phase I commitments 10/1/11
: 6. Chapter 15.5 RAIs                  9/21/11        Includes FHA calc. X/Q discussion for each accident,  Wastrack corrections to previously submitted dose calcs, and a (Bryan) complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up.
: 7. Fire Protection Report Questions    1. 10/24-28/11 1. Audit                                              ENG/Hilmes regarding OMA                      2.9/30/11      2. Group 7 RAI response                              (Crouch) 3.10/1/11      3. Receive Group 8 RAIs
: 4. 11/4/11    4. Response to Group 8
: 5. 11/30/11    5. Submit As-designed U1/U2 FPR
: 8. Tech Spec Revisions from latest T/S 1. Oct, 2011  1. CSST A & B - discretionary                        Licensing/Elton markup and NRC Review comments      2. Sept, 2011  2. I-131 DEI                                          (Bryan)
: 3. Oct, 2011  3. Diesel Generator Frequency
: 4. TBD        4. Unit 1 AST FHA
: 9. ACRS Topics                        10/5/11        Cyber, Chapter 15 except dose, Chapter 4 (Fuels),    Gordon WINCISE, Hydrology, process for FSAR drawing documentation update,
: 10. SSER 22/23/24 Open Items Response  9/16/11        9/16 is the target date for the next SSER update. The Licensing expanded HH list and status is covered periodically.
: 11. Transient Analysis issues          9/16/11        Question on RG revision and modes 3, 4, & 5. TVA to  ENG/Koontz provide write up explaining NRC acceptance (CLB) of  WEC/Morgan Boron dilution RAI response                        unit1 for modes 3, 4, & 5.


Set up follow-up meeting 9/20 or 9/21 Heinrich/Snyder (Bryan) 2. Instrumentation RAI List (Knuettel)
Page 3 of 3 No.               Description                 Status                     Additional Comments                           Resp Org/Person
: 1. Item 3 for GA-ESI RM-1000 RAD Monitors.
: 12. FSAR A106                               9/16/11       Target date. Correction - change note 17 of Table       Lic/Stockton 7.1.1 to Reg Guide 1.152 R 3 instead of R 2
: 2. GA proprietary, non-proprietary and affidavits for withholding submittals
: 13. Develop list of planned License             1. 11/1/11      1. Review Unit 1 SER for exemptions. Sand         NRR/TVA Conditions, Exemptions and Relief          2. TBD            baskets, cyber security, physical security, PAD (Bryan)
(~12 documents.)
Requests (Crouch)                                              4.0
: 3. NRC comments on procedures to GA-ESI 4. RM1000 EMI/RFI questions
: 2. NRR to review current exemptions
: 5. Submit non-prop/affidavits
: 14. Verify Tech Spec Setpoints match calcs 1. 10/4/11     1. 6 SSDs remaining to be issued. Possible submittal   Eng/Hilmes if any number changes.                                 (Bryan)
: 1. 9/23/11 2. Various - see status
TS certification                        2. TBD        2. TS certification
: 3. 9/26/11 4. 10/1/11 5. 11/30/11 RAI Responses
: 15. Issue two Unit Offsite Dose Calculation 3/1/12         Determine actual need date                             Chemistry/
* Item 1 GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
Manual (Beach) Review TS Chapter 5                                                                            Woods programs also                                                                                                  (Bryan)
* Item 2 - 04038903-1SP - Prop due 9/30/11 04038903-2SP - Prop due 10/6/11 04038903-4SP - Prop due 10/21/11 04038903-QSR - Prop due 9/30/11
: 16. Issue Unit 2 Completion Letter (Crouch) 8/1/12                                                                 Licensing
* Item 3 OP-7.3-240 - Prop due 9/26/11
: 17. Submit final as-constructed FSAR       7/1/12                                                                 Licensing/
* Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11 Eng/Hilmes (Smith) 3. Verify MACCs values for SAMA Cost Benefit Evaluation 1. 9/8/11A 2. 9/13/11 3. 9/20/11 1. Non-conservatisms in some values identified. Discuss updated results with NRC 2. Submitted revised tables 3. Submit revised RAI responses ENG/Koontz Page 2 of 3    No. Description Status Additional Comments Resp Org/Person 4. Exemption to 10CFR50.49 for some Category II cables 9/23/11  Hilmes (Stockton) 5. Complete Implementation (Hemmer)
figures                                                                                                        Stockton
Pump Relocation 5/30/12  Bldg Plan 9/23/11  Inspection - June 2012 Phase I commitments 10/1/11 Additional clarification to Phase I actions will be needed. Fleet wide issue. Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 6. Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, corrections to previously submitted dose calcs, and a complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up. Wastrack (Bryan) 7. Fire Protection Report Questions regarding OMA 1. 10/24-28/11 2.9/30/11 3.10/1/11 4. 11/4/11 5. 11/30/11
: 18. TMI action items                       7/1/12         TVA to provide letter when TMI actions are field       Licensing complete.                                               (Gordon)
: 1. Audit 2. Group 7 RAI response 3. Receive Group 8 RAIs
: 19. ASME N-801 & N-802 code cases           March 2012`   NRC response to relief request submitted 9/1/11.       NRR
: 4. Response to Group 8 5. Submit As-designed U1/U2 FPR ENG/Hilmes (Crouch) 8. Tech Spec Revisions from latest T/S markup and NRC Review comments
: 0. Discretionary Actions
: 1. Oct, 2011
: 1. Letter to terminate Part 30/40 License 4/1/12                                                                Licensing after receipt of Part 50 License                                                                               (Crouch)
: 2. Sept, 2011
: 2. Combined U1/U2 FSAR (Stockton)         3/1/13                                                                 Licensing
: 3. Oct, 2011
: 3. Status of GSI 199 Eastern Seismicity   Fall 2011     No action pending upcoming Generic Letter               TVA/NRR (Crouch)                                              Related information on GSI 194 may need input
: 4. TBD 1. CSST A & B - discretionary
: 4. Letter to notify NRC when Vital Area   12/1/11       Security Plan Update - Boundary to be restored by       Lic/Crouch Boundary returned to original location                9/30/11
: 2. I-131 DEI
: 5. IEB 88-02 SG Tube Cracking             TBD           Tubes are assumed locked in the WEC analysis.           Corp SG/
: 3. Diesel Generator Frequency
Waiting for NRC concurrence.                           Webber ISI/Tinley}}
: 4. Unit 1 AST FHA Licensing/Elton (Bryan) 9. ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels), WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon 10. SSER 22/23/24 Open Items Response 9/16/11 9/16 is the target date for the next SSER update. The expanded HH list and status is covered periodically. Licensing 11. Transient Analysis issues Boron dilution RAI response 9/16/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write up explaining NRC acceptance (CLB) of unit1 for modes 3, 4, & 5. ENG/Koontz WEC/Morgan Page 3 of 3    No. Description Status Additional Comments Resp Org/Person 12. FSAR A106 9/16/11 Target date. Correction - change note 17 of Table 7.1.1 to Reg Guide 1.152 R 3 instead of R 2 Lic/Stockton 13. Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch) 1. 11/1/112. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions NRR/TVA (Bryan) 14. Verify Tech Spec Setpoints match calcs TS certification 1. 10/4/11
: 2. TBD 1. 6 SSDs remaining to be issued. Possible submittal if any number changes.
: 2. TS certification Eng/Hilmes (Bryan) 15. Issue two Unit Offsite Dose Calculation Manual (Beach)  Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan) 16. Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing 17. Submit final as-constructed FSAR figures 7/1/12 Licensing/ Stockton 18. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon) 19. ASME N-801 & N-802 code cases March 2012` NRC response to relief request submitted 9/1/11. NRR 0. Discretionary Actions
: 1. Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12  Licensing (Crouch) 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing 3. Status of GSI 199 Eastern Seismicity (Crouch) Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR 4. Letter to notify NRC when Vital Area Boundary returned to original location 12/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch 5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Waiting for NRC concurrence.
Corp SG/ Webber ISI/Tinley}}

Revision as of 13:31, 12 November 2019

2011/09/12 Watts Bar 2 OL - NRC PM Open Items List 9-13-11.docx
ML11285A477
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/12/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11285A477 (5)


Text

WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Monday, September 12, 2011 9:38 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D

Subject:

NRC PM Open Items List 9-13-11.docx Attachments: NRC PM Open Items List 9-13-11.docx For next phone call.

Thank You,

~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 522 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF22E7E58D)

Subject:

NRC PM Open Items List 9-13-11.docx Sent Date: 9/12/2011 9:38:18 AM Received Date: 9/12/2011 9:38:24 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 244 9/12/2011 9:38:24 AM NRC PM Open Items List 9-13-11.docx 31574 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 3 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#

No. Description Status Additional Comments Resp Org/Person

1. Cyber Security Plan/Controls and NRC TI issued NRC Inspection in 2011 Heinrich/Snyder Implementation TBD (Bryan)

To be discussed at the next ACRS meeting (October NRC Table 5th - closed portion).

Top/Pilot Oct 2011 Set up follow-up meeting 9/20 or 9/21 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011

2. Instrumentation RAI List (Knuettel) 1. 9/23/11 RAI Responses Eng/Hilmes
1. Item 3 for GA-ESI RM-1000 RAD 2. Various -
  • Item 1 GA/ESI is preparing a report to document (Smith)

Monitors. see status the conformance of their CGD program to NRC

2. GA proprietary, non-proprietary and 3. 9/26/11 requirements based on NRC telecom on 8/30/11.

affidavits for withholding submittals 4. 10/1/11

  • Item 2 - 04038903-1SP - Prop due 9/30/11

(~12 documents.) 5. 11/30/11 04038903-2SP - Prop due 10/6/11

3. NRC comments on procedures to 04038903-4SP - Prop due 10/21/11 GA-ESI 04038903-QSR - Prop due 9/30/11
4. RM1000 EMI/RFI questions
  • Item 3 OP-7.3-240 - Prop due 9/26/11
5. Submit non-prop/affidavits
  • Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11
3. Verify MACCs values for SAMA Cost 1. 9/8/11A 1. Non-conservatisms in some values identified. ENG/Koontz Benefit Evaluation 2. 9/13/11 Discuss updated results with NRC
3. 9/20/11 2. Submitted revised tables
3. Submit revised RAI responses

Page 2 of 3 No. Description Status Additional Comments Resp Org/Person

4. Exemption to 10CFR50.49 for some 9/23/11 Hilmes Category II cables (Stockton)
5. Complete Implementation (Hemmer) Pump Additional clarification to Phase I actions will be Hemmer Relocation needed. Fleet wide issue. (Smith) 5/30/12 Substantial building to complete and equipment in May.

Bldg Plan Provide document of mitigating equipment and 9/23/11 location for unit 2.

Inspection -

June 2012 Phase I commitments 10/1/11

6. Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, Wastrack corrections to previously submitted dose calcs, and a (Bryan) complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up.
7. Fire Protection Report Questions 1. 10/24-28/11 1. Audit ENG/Hilmes regarding OMA 2.9/30/11 2. Group 7 RAI response (Crouch) 3.10/1/11 3. Receive Group 8 RAIs
4. 11/4/11 4. Response to Group 8
5. 11/30/11 5. Submit As-designed U1/U2 FPR
8. Tech Spec Revisions from latest T/S 1. Oct, 2011 1. CSST A & B - discretionary Licensing/Elton markup and NRC Review comments 2. Sept, 2011 2. I-131 DEI (Bryan)
3. Oct, 2011 3. Diesel Generator Frequency
4. TBD 4. Unit 1 AST FHA
9. ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels), Gordon WINCISE, Hydrology, process for FSAR drawing documentation update,
10. SSER 22/23/24 Open Items Response 9/16/11 9/16 is the target date for the next SSER update. The Licensing expanded HH list and status is covered periodically.
11. Transient Analysis issues 9/16/11 Question on RG revision and modes 3, 4, & 5. TVA to ENG/Koontz provide write up explaining NRC acceptance (CLB) of WEC/Morgan Boron dilution RAI response unit1 for modes 3, 4, & 5.

Page 3 of 3 No. Description Status Additional Comments Resp Org/Person

12. FSAR A106 9/16/11 Target date. Correction - change note 17 of Table Lic/Stockton 7.1.1 to Reg Guide 1.152 R 3 instead of R 2
13. Develop list of planned License 1. 11/1/11 1. Review Unit 1 SER for exemptions. Sand NRR/TVA Conditions, Exemptions and Relief 2. TBD baskets, cyber security, physical security, PAD (Bryan)

Requests (Crouch) 4.0

2. NRR to review current exemptions
14. Verify Tech Spec Setpoints match calcs 1. 10/4/11 1. 6 SSDs remaining to be issued. Possible submittal Eng/Hilmes if any number changes. (Bryan)

TS certification 2. TBD 2. TS certification

15. Issue two Unit Offsite Dose Calculation 3/1/12 Determine actual need date Chemistry/

Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan)

16. Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing
17. Submit final as-constructed FSAR 7/1/12 Licensing/

figures Stockton

18. TMI action items 7/1/12 TVA to provide letter when TMI actions are field Licensing complete. (Gordon)
19. ASME N-801 & N-802 code cases March 2012` NRC response to relief request submitted 9/1/11. NRR
0. Discretionary Actions
1. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Crouch)
2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
3. Status of GSI 199 Eastern Seismicity Fall 2011 No action pending upcoming Generic Letter TVA/NRR (Crouch) Related information on GSI 194 may need input
4. Letter to notify NRC when Vital Area 12/1/11 Security Plan Update - Boundary to be restored by Lic/Crouch Boundary returned to original location 9/30/11
5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Corp SG/

Waiting for NRC concurrence. Webber ISI/Tinley