| issue date = 10/25/2012
| issue date = 10/25/2012
| title = IR 05000440-12-407; 09/10/2012 - 09/14/2012, Perry Nuclear Power Plant; Supplemental Inspection - Inspection Procedure 95001 - Cover Letter Only
| title = IR 05000440-12-407; 09/10/2012 - 09/14/2012, Perry Nuclear Power Plant; Supplemental Inspection - Inspection Procedure 95001 - Cover Letter Only
| author name = Reynolds S A
| author name = Reynolds S
| author affiliation = NRC/RGN-III/DRS
| author affiliation = NRC/RGN-III/DRS
| addressee name = Kaminskas V
| addressee name = Kaminskas V
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 25, 2012  
{{#Wiki_filter:tober 25, 2012


EA-12-074
==SUBJECT:==
PERRY NUCLEAR POWER PLANT NRC SUPPLEMENTAL INSPECTION REPORT 05000440/2012407


Mr. Vito Kaminskas Site Vice President, Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
==Dear Mr. Kaminskas:==
On September 14, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff completed a supplemental inspection at your Perry Nuclear Power Plant. The enclosed inspection report documents the inspection results, which were discussed at the exit meeting on [[Exit meeting date::September 14, 2012]], with you and other members of your staff. During this meeting, R. Skokowski, the Acting Region III DRS Deputy Director, discussed the associated performance deficiencies and corrective actions with your staff, which fulfills NRC policy for a regulatory performance meeting.


SUBJECT: PERRY NUCLEAR POWER PLANT NRC SUPPLEMENTAL INSPECTION REPORT 05000440/2012407
In accordance with the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed to follow-up on a performance issue that occurred in the first quarter of 2012. The issue was previously documented and assessed in NRC Inspection Report 050000440/2012405. The NRC was informed of your readiness for the inspection on August 3, 2012.
 
==Dear Mr. Kaminskas:==
On September 14, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff completed a supplemental inspection at your Perry Nuclear Power Plant. The enclosed inspection report documents the inspection results, which were discussed at the exit meeting on September 14, 2012, with you and other members of your staff. During this meeting, R. Skokowski, the Acting Region III DRS Deputy Director, discussed the associated performance deficiencies and corrective actions with your staff, which fulfills NRC policy for a regulatory performance meeting.


In accordance with the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed to follow-up on a performance issue that occurred in the first quarter of 2012. The issue was previously documented and assessed in NRC Inspection Report 050000440/2012405. The NRC was informed of your readiness for the inspection on August 3, 2012. The objectives of this supplemental inspection were to determine whether or not: (1) the root causes and contributing causes for the significant issues were understood; (2) the extent of condition and the extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes.
The objectives of this supplemental inspection were to determine whether or not: (1) the root causes and contributing causes for the significant issues were understood; (2) the extent of condition and the extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes.


All inspection objectives described in Inspection Procedure 95001 were completed during the inspection. As a result, Violation 05000440/2012405-01 is closed.
All inspection objectives described in Inspection Procedure 95001 were completed during the inspection. As a result, Violation 05000440/2012405-01 is closed.
Line 38: Line 37:
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related  
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Line 46: Line 43:
Sincerely,
Sincerely,
/RA/ By Kenneth G. O'Brien Acting For/
/RA/ By Kenneth G. O'Brien Acting For/
Steven A. Reynolds, Director  
Steven A. Reynolds, Director Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Nonpublic Enclosure: Inspection Report 05000440/2012407; w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV M. Kunowski, RIII J. Jandovitz, RIII J. Lara, RIII M. Bear, Radiological Branch Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ'
 
Division of Reactor Safety Docket No. 50-440 License No. NPF-58  
 
Nonpublic Enclosure: Inspection Report 05000440/2012407; w/Attachment: Supplemental Information  
 
cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR  
 
T. Dimitriadis, RI  
 
B. Desai, RII M. Haire, RIV M. Kunowski, RIII J. Jandovitz, RIII  
 
J. Lara, RIII M. Bear, Radiological Branch Ohio Emergency Management Agency  
 
cc w/o encl: Distribution via ListServŽ
}}
}}

Latest revision as of 21:55, 11 November 2019

IR 05000440-12-407; 09/10/2012 - 09/14/2012, Perry Nuclear Power Plant; Supplemental Inspection - Inspection Procedure 95001 - Cover Letter Only
ML12300A061
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/25/2012
From: Reynolds S
Division of Reactor Safety III
To: Kaminskas V
FirstEnergy Nuclear Operating Co
References
EA-12-074 EA-12-074, IR-12-407
Download: ML12300A061 (4)


Text

tober 25, 2012

SUBJECT:

PERRY NUCLEAR POWER PLANT NRC SUPPLEMENTAL INSPECTION REPORT 05000440/2012407

Dear Mr. Kaminskas:

On September 14, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff completed a supplemental inspection at your Perry Nuclear Power Plant. The enclosed inspection report documents the inspection results, which were discussed at the exit meeting on September 14, 2012, with you and other members of your staff. During this meeting, R. Skokowski, the Acting Region III DRS Deputy Director, discussed the associated performance deficiencies and corrective actions with your staff, which fulfills NRC policy for a regulatory performance meeting.

In accordance with the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed to follow-up on a performance issue that occurred in the first quarter of 2012. The issue was previously documented and assessed in NRC Inspection Report 050000440/2012405. The NRC was informed of your readiness for the inspection on August 3, 2012.

The objectives of this supplemental inspection were to determine whether or not: (1) the root causes and contributing causes for the significant issues were understood; (2) the extent of condition and the extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes.

All inspection objectives described in Inspection Procedure 95001 were completed during the inspection. As a result, Violation 05000440/2012405-01 is closed.

No findings were identified during this inspection.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/ By Kenneth G. O'Brien Acting For/

Steven A. Reynolds, Director Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Nonpublic Enclosure: Inspection Report 05000440/2012407; w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV M. Kunowski, RIII J. Jandovitz, RIII J. Lara, RIII M. Bear, Radiological Branch Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ'