IR 05000440-12-403; 09/10/2012 - 09/14/2012; Perry Nuclear Power Plant; Routine Security Baseline Inspection - Cover Letter Only
ML12271A408
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/27/2012
From: Richard Skokowski
Plant Support Branch II
To: Kaminskas V
FirstEnergy Nuclear Operating Co
References
IR-12-403
Download: ML12271A408 (3)


Text

UNITED STATES ber 27, 2012

SUBJECT:

PERRY NUCLEAR POWER PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000440/2012403

Dear Mr. Kaminskas:

On September 14, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on September 14, 2012, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No NRC-Identified or self-revealed findings were identified during this inspection. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a Non-Cited Violation (NCV)

consistent with Section 2.3.2 of the Enforcement Policy. If you contest the subject or severity of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with a copy to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Perry Nuclear Power Plant.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/ By Don E. Funk Acting For/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Nonpublic Enclosure: Inspection Report 05000440/2012403 w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Hay, RIV M. Bear, Radiological Branch Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ'