(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 10/31/2012 | | | issue date = 10/31/2012 |
| | title = October 25, 2012, Summary of Meeting Regarding Palisades Nuclear Plant Control Rod Mechanism (CRDM) 25 | | | title = October 25, 2012, Summary of Meeting Regarding Palisades Nuclear Plant Control Rod Mechanism (CRDM) 25 |
| | author name = Giessner J B | | | author name = Giessner J |
| | author affiliation = NRC/RGN-III/DRP/B4 | | | author affiliation = NRC/RGN-III/DRP/B4 |
| | addressee name = | | | addressee name = |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 31, 2012 LICENSEE: Entergy Nuclear Operations, Inc. |
| -4352 October 31, 2012 LICENSEE: | | FACILITY: Palisades Nuclear Plant |
| Entergy Nuclear Operations, Inc. | |
| FACILITY: | |
| Palisades Nuclear Plant | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE OCTOBER 25, 2012, MEETING REGARDING PALISADES NUCLEAR PLANT CONTROL ROD DRIVE MECHANISM (CRDM) 25 On October 25, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a Conference Call Meeting with members of the Palisades management team at the NRC's request. The discussion was related to the possible indication emanating from the internal diameter (ID) of the CRDM 25 housing that was detected by Pacific Northwest National Laboratory (PNNL) and discussed with the licensee on October 12, 2012 | | OF THE OCTOBER 25, 2012, MEETING REGARDING PALISADES NUCLEAR PLANT CONTROL ROD DRIVE MECHANISM (CRDM) 25 On October 25, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a Conference Call Meeting with members of the Palisades management team at the NRCs request. The discussion was related to the possible indication emanating from the internal diameter (ID) of the CRDM 25 housing that was detected by Pacific Northwest National Laboratory (PNNL) and discussed with the licensee on October 12, 2012, and October 18, 2012. The conference call was held after the licensee provided a plan to include more information to confirm the indications on CRDM-25 were indeed surface scratches versus an actual crack. This included comparing non-destructive examination (NDE) results related to two CRDMs installed at Palisades and a spare CRDM that is stored at the licensees warehouse. This also included the licensee conducting a boroscope exam to look at indications on a spare CRDM. The ultrasonic test (UT) information had not yet been reviewed by PNNL, and the boroscope exam had not been done. |
| , and October 18, 2012. | | The NRC stated that, while the proposed assessment methodology for reviewing the surface scratch as determined by the licensee (possible crack emanating from the internal diameter on the CRDM 25 housing as determined by PNNL) provided some information; it would not provide enough information related to the depth of the respective scratch/flaw on CRDM-25. A boroscope exam may reveal surface scratches on the spare housing which have a UT signature, but this method may not be successful in differentiating between a scratch and a potential shallow crack on the CRDM housing. The NRC asked the licensee to provide any additional information that would support the licensees claim that the indication from the UT was indeed a scratch rather than a crack. In addition, the NRC suggested that any UT image of a crack of a similar size from other applications would be helpful in differentiating the proposed scratch from a crack. |
| The conference call was held after the licensee provided a plan to include more information to confirm the indications on CRDM | | The licensee stated that the NDE data related to the spare CRDMs had a higher response compared to the data gathered on the CRDM 25 housing. The licensee agreed to examine the spare CRDMs in the warehouse using a boroscope within the next 2 weeks. In addition, if the UT data observed from the CRDM 25 housing was similar to the data observed from a spare CRDM, the scratches on the CRDM 25 housing could be further characterized. If dissimilar, another methodology will have to be adopted to enable characterization of the scratches on the CRDM 25 housing. |
| -25 were indeed surface scratches versus an actual crack. | |
| This included comparing non-destructive examination (NDE) results related to two CRDMs installed at Palisades and a spare CRDM that is stored at the licensee's warehouse. | |
| This also included the licensee conducting a boroscope exam to look at indications on a spare CRDM. | |
| The ultrasonic test (UT) information had not yet been reviewed by PNNL | |
| , and the boroscope exam had not been done. | |
| The NRC stated that, while the proposed assessment methodology for reviewing the surface scratch as determined by the licensee (possible crack emanating from the internal diameter on the CRDM 25 housing as determined by PNNL) provided some information; it would not provide enough information related to the depth of the respective scratch/flaw on CRDM-25. A boroscope exam may reveal surface scratches on the spare housing which have a UT signature, but this method may not be successful in differentiating between a scratch and a potential shallow crack on the CRDM housing. The NRC asked the licensee to provide any additional information that would support the licensee's claim that the indication from the UT was indeed a scratch rather than a crack. In addition, the NRC suggested that any UT image of a crack of a similar size from other applications would be helpful in differentiating the proposed scratch from a crack. | |
| The licensee stated that the NDE data related to the spare CRDMs had a higher response compared to the data gathered on the CRDM 25 housing. The licensee agreed to examine the spare CRDMs in the warehouse using a boroscope within the next 2 weeks. In addition, if the UT data observed from the CRDM 25 housing was similar to the data observed from a spare CRDM, the scratches on the CRDM 25 housing could be further characterized | |
| . If dissimilar , another methodology will have to be adopted to enable characterization of the scratches on the CRDM 25 housing. | |
| Entergy Nuclear Operations, Inc.
| |
| The NRC concluded the meeting by stating that there continued to be no immediate safety concern as the NRC was seeking to understand the assessments completed.
| |
| The NRC also stated it would reconvene with the licensee after PNNL reviewed the data related to the two installed CRDM housings and the spare warehouse CRDM housings within the next 2 weeks while the licensee inspected the spare CRDM housings using a boroscope.
| |
| The call lasted about an hour. Enclosure 1 is a list of attendees for the meeting.
| |
|
| |
|
| Sincerely, | | Entergy Nuclear Operations, Inc. The NRC concluded the meeting by stating that there continued to be no immediate safety concern as the NRC was seeking to understand the assessments completed. The NRC also stated it would reconvene with the licensee after PNNL reviewed the data related to the two installed CRDM housings and the spare warehouse CRDM housings within the next 2 weeks while the licensee inspected the spare CRDM housings using a boroscope. |
| /RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72
| | The call lasted about an hour. Enclosure 1 is a list of attendees for the meeting. |
| -007 License No. DPR | | Sincerely, |
| -20 | | /RA/ |
| | John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| List of Meeting Attendees for the October 25, 2012, Conference Meeting cc w/encl: Distribution via List Serv | | List of Meeting Attendees for the October 25, 2012, Conference Meeting cc w/encl: Distribution via List Serv |
|
| |
|
| LIST OF MEETING ATTENDEES FOR THE OCTOBER 25, 2012 CONFERENCE MEETING NRC Attendees John Giessner, Chief, Division of Reactor Projects, Branch 4 Thomas Taylor, Palisades Senior Resident Inspector David Alley, Senior Materials Engineer, Nuclear Reactor Regulation, Piping and NDE Branch Jay Lennartz, Project Engineer, Division of Reactor Projects, Branch 4 Robert Orlikowski, Project Engineer, Division of Reactor Projects, Branch 1 Swetha Shah, Reactor Engineer, Division of Reactor Projects, Branch 4 Diana Betancourt, Reactor Engineer, Division of Reactor Projects, Branch 4 Elba Sanchez Santiago, Division of Reactor Safety, Engineering Branch 1 Michael Anderson, Pacific Northwest National Laboratory Susan Crawford, Pacific Northwest National Laboratory | | LIST OF MEETING ATTENDEES FOR THE OCTOBER 25, 2012 CONFERENCE MEETING NRC Attendees John Giessner, Chief, Division of Reactor Projects, Branch 4 Thomas Taylor, Palisades Senior Resident Inspector David Alley, Senior Materials Engineer, Nuclear Reactor Regulation, Piping and NDE Branch Jay Lennartz, Project Engineer, Division of Reactor Projects, Branch 4 Robert Orlikowski, Project Engineer, Division of Reactor Projects, Branch 1 Swetha Shah, Reactor Engineer, Division of Reactor Projects, Branch 4 Diana Betancourt, Reactor Engineer, Division of Reactor Projects, Branch 4 Elba Sanchez Santiago, Division of Reactor Safety, Engineering Branch 1 Michael Anderson, Pacific Northwest National Laboratory Susan Crawford, Pacific Northwest National Laboratory Licensee Attendees Barry Davis, Entergy Nuclear General Manager Engineering Otto Gustafson, Palisades Licensing Manager Jake Milliken, Palisades Programs and Codes Supervisor Jack Lareau, Wesdyne |
|
| |
|
| Licensee Attendees Barry Davis, Entergy Nuclear General Manager Engineering Otto Gustafson, Palisades Licensing Manager Jake Milliken, Palisades Programs and Codes Supervisor Jack Lareau, Wesdyne
| | Entergy Nuclear Operations, Inc. The NRC concluded the meeting by stating that there continued to be no immediate safety concern as the NRC was seeking to understand the assessments completed. The NRC also stated it would reconvene with the licensee after PNNL reviewed the data related to the two installed CRDM housings and the spare warehouse CRDM housings within the next 2 weeks while the licensee inspected the spare CRDM housings using a boroscope. |
| | | The call lasted about an hour. Enclosure 1 is a list of attendees for the meeting. |
| Entergy Nuclear Operations, Inc. | | Sincerely, |
| The NRC concluded the meeting by stating that there continued to be no immediate safety concern as the NRC was seeking to understand the assessments completed. The NRC also stated it would reconvene with the licensee after PNNL reviewed the data related to the two installed CRDM housings and the spare warehouse CRDM housings within the next 2 weeks while the licensee inspected the spare CRDM housings using a boroscope. | | /RA/ |
| The call lasted about an hour. Enclosure 1 is a list of attendees for the meeting. | | John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20 |
| | |
| Sincerely, | |
| /RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50
| |
| -255 and 72 | |
| -007 License No. DPR | |
| -20 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| List of Meeting Attendees for the October 25, 2012, Conference Meeting cc w/encl: Distribution via List Serv | | List of Meeting Attendees for the October 25, 2012, Conference Meeting cc w/encl: Distribution via List Serv DOCUMENT NAME: G:\DRPIII\PALI\Palisades meeting summary - 2012 October 25th.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SShah:dtp*JBG for JGiessner DATE 10/31/12 10/31/12 OFFICIAL RECORD COPY |
| | |
| DOCUMENT NAME: | |
| G:\DRPIII\PALI\Palisades meeting summary | |
| - 2012 October 25th.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SShah:dtp*JBG for JGiessner DATE 10/31/12 10/31/12 OFFICIAL RECORD COPY | |
|
| |
|
| Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated October 31, 2012. | | Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated October 31, 2012. |
Line 74: |
Line 50: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE OCTOBER 25, 2012, MEETING REGARDING PALISADES NUCLEAR PLANT CONTROL ROD DRIVE MECHANISM (CRDM) 25 DISTRIBUTION | | OF THE OCTOBER 25, 2012, MEETING REGARDING PALISADES NUCLEAR PLANT CONTROL ROD DRIVE MECHANISM (CRDM) 25 DISTRIBUTION: |
| : Cayetano Santos RidsNrrPMPalisades Resource RidsNrrDorlLpl3
| | Cayetano Santos RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPreports.Resource@nrc.gov}} |
| -1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPreports.Resource@nrc.gov}} | |
|
---|
Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Meeting Summary
MONTHYEARML24016A0052024-01-23023 January 2024 Summary of Meeting with Holtec Decommissioning International, LLC, Regarding Power Operations Technical Specifications ML23303A2132023-11-0101 November 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a License Transfer Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23263A0012023-09-27027 September 2023 Summary of August 29, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit an Exemption Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclea ML23171B1222023-06-22022 June 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23107A1212023-04-20020 April 2023 Summary of Meeting with Holtec Decommissioning International, Llc Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML22292A2612022-10-31031 October 2022 PSDAR Meeting Summary ML22132A0892022-05-12012 May 2022 Summary of the April 26, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21200A2262021-07-19019 July 2021 Summary of the July 1, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21145A0482021-06-0202 June 2021 Summary of May 12, 2021, Teleconference with Entergy Nuclear Operations, Inc. to Discuss Potential License Amendment Request Related to Permanently Defueled Technical Specifications for Palisades Nuclear Plant ML21012A0382021-01-14014 January 2021 December 8, 2020, Summary of Public Teleconference with Entergy Nuclear Operations Inc. Regarding Pre-submittal of a License Transfer Application to Holtec International for Palisades Nuclear Plant ML20309A2372020-11-0606 November 2020 Summary of Public Teleconference with Entergy Nuclear Operations, Inc. to Discuss Future Request for One-Time Exemption from Certain Requirements of 10 CFR 50, Appendix E, Section Iv.F. at Palisades Nuclear Plant (EPID L-2020-LRM-0091 ML20304A1442020-11-0202 November 2020 Summary of September 21, 2020, Public Teleconference with Entergy Nuclear Operations Inc. Regarding a Proposed Alternative for Repair of Reactor Vessel Head Penetrations for Palisades Nuclear Plant ML20280A6972020-10-13013 October 2020 20200910 NRC Mid Outage Q and a for Phone Call for Palisades 1R27-Entergy Responses ML20280A6962020-10-13013 October 2020 20200912 NRC Mid Outage Q and a for Phone Call for Palisades 1R27 (Revised) ML20280A6952020-10-13013 October 2020 Letter - Palisades Nuclear Plant- Summary of September 11, 2020, Conference Call with Entergy Nuclear Operations Inc. Regarding the Fall 2020 Steam Generator Tube Inspections at Palisades Nuclear Plant EPID L-2020-LRO-0051 ML20231A2202020-08-17017 August 2020 Summary of Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML19296D0632019-11-0101 November 2019 August 2019 Palisades NEIMA 108 Public Meeting Summary ML19136A2552019-05-16016 May 2019 Summary of the Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML18351A2382018-12-18018 December 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations. Inc., Regarding Emergent Alternative Request for Repair of Central Rod Drive Nozzles at Palisades Nuclear Plant ML18340A0072018-12-0606 December 2018 Summary of Call with Entergy Nuclear Operations, Inc. - Verbal Authorization of Request for Alternative for the Repair of Reactor Vessel Closure Head Penetrations ML18268A2802018-09-26026 September 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Relocate Surveillance Frequencies to Licensee Control ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18113A6592018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18008A2302018-01-10010 January 2018 Summary of Public Teleconference Meeting with Entergy Nuclear Operations, Inc., Regarding Request to Extend Enforcement Discretion for Tornado-Generated Missile Non-Conformances at Palisades Nuclear Plant ML17338B0502017-12-0505 December 2017 Summary of November 28, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding a Potential Request Associated with an Alternative to the Reexamination Frequency for a Relevant Condition ML17335A0262017-12-0505 December 2017 Summary of November 27, 2017 Public Meeting with Entergy Nuclear Operations, Inc. Regarding Request to Extend Enforcement Discretion for Tornado Missle Non-Confomances ML17227A2742017-08-14014 August 2017 Summary of the July 26, 2017, Public Meeting Regarding Palisades Nuclear Plant ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17164A3112017-06-27027 June 2017 Summary of 06/12/2017, Pre-Submittal Meeting with Entergy Nuclear Operations, Inc. to Discuss Palisades Nuclear Plant Post Shutdown Emergency Plan and Administrative Technical Specification License Amendment Request ML17160A1812017-06-14014 June 2017 Summary of Conference Call with Palisades Nuclear Plant Regarding the Spring 2017 Steam Generator Inspections ML17080A1492017-03-23023 March 2017 Summary of March 20, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Cyber Security Plan Implementation Schedule ML16344A0862016-12-20020 December 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding National Fire Protection Association Standard 805 ML16277A6772016-10-11011 October 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Proposed Closure Plant for Generic Safety Issue 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance ML16182A5142016-06-30030 June 2016 Summary of the June 23, 2016, Public Meeting Regarding Palisades Nuclear Plant ML16127A1722016-05-0505 May 2016 6/23/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Palisades Nuclear Plant Performance for the 2015 Calendar Year ML16035A4252016-03-0101 March 2016 Summary of January 25, 2016, Pre-Application Teleconference Meeting with Entergy Nuclear Operations to Discuss a Forthcoming License Amendment Request Regarding Steam Generator Cold Leg Alternate Repair Criteria at Palisades Nuclear Plant ( ML15294A2972015-10-27027 October 2015 Steam Generator Tube Inspection Discussion During Palisades 2015 (RF24) Outage (Preliminary Information) ML15294A2922015-10-27027 October 2015 Summary of Conference Call with Palisades Nuclear Plant Regarding the Fall 2015 Steam Generator Inspections ML15272A0652015-09-30030 September 2015 Summary of Telephone Conference on September 28, 2015, Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15261A0392015-09-21021 September 2015 September 17, 2015, Summary of Telephone Conference Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15119A0442015-05-0606 May 2015 Summary of April 14, 2015, Meeting with Entergy Nuclear Operations, Inc. on Plans for Volumetric Examinations of Primary Coolant System Alloy 600 Welds ML15118A0352015-04-27027 April 2015 Meeting Summary with Public to Discuss the 2014 Annual Assessment Results for Palisades Nuclear Plant ML15026A5202015-01-29029 January 2015 Summary of Palisades Nuclear Plant, June 24 - 28, 2013, Audit Associated with License Amendment Request to Transition to National Fire Protection Association 805 Standards (Tac No. MF0382) ML14192B3842014-07-11011 July 2014 Summary of Public Meeting Regarding Palisades Nuclear Plant to Discuss 2013 Annual Assessment ML14093A2432014-04-30030 April 2014 Summary of Conference Call with Palisades Nuclear Plant Regarding the Fall 2014 Steam Generator Inspections ML13347B2862013-12-13013 December 2013 Summary of Public Meeting Webinar Regarding Independent Spent Fuel Storage Installation (ISFSI) Basics ML13296A5402013-10-28028 October 2013 Summary of Pre-Application Teleconference Meeting with Entergy Nuclear Operations, Inc., to Discuss a Forthcoming Palisades Equivalent Margin Analysis Submittal ML13221A5962013-08-0909 August 2013 7/16/2013 - Summary of Public Internet Event Briefing Regarding Palisades Safety Injection Refueling Water Tank (SIRWT) Leak ML13165A2422013-06-13013 June 2013 Summary of Public Meeting Webinar to Discuss Nrc'S Perspectives on Palisades Nuclear Power Plant Effluents 2024-01-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 31, 2012 LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Palisades Nuclear Plant
SUBJECT:
SUMMARY
OF THE OCTOBER 25, 2012, MEETING REGARDING PALISADES NUCLEAR PLANT CONTROL ROD DRIVE MECHANISM (CRDM) 25 On October 25, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a Conference Call Meeting with members of the Palisades management team at the NRCs request. The discussion was related to the possible indication emanating from the internal diameter (ID) of the CRDM 25 housing that was detected by Pacific Northwest National Laboratory (PNNL) and discussed with the licensee on October 12, 2012, and October 18, 2012. The conference call was held after the licensee provided a plan to include more information to confirm the indications on CRDM-25 were indeed surface scratches versus an actual crack. This included comparing non-destructive examination (NDE) results related to two CRDMs installed at Palisades and a spare CRDM that is stored at the licensees warehouse. This also included the licensee conducting a boroscope exam to look at indications on a spare CRDM. The ultrasonic test (UT) information had not yet been reviewed by PNNL, and the boroscope exam had not been done.
The NRC stated that, while the proposed assessment methodology for reviewing the surface scratch as determined by the licensee (possible crack emanating from the internal diameter on the CRDM 25 housing as determined by PNNL) provided some information; it would not provide enough information related to the depth of the respective scratch/flaw on CRDM-25. A boroscope exam may reveal surface scratches on the spare housing which have a UT signature, but this method may not be successful in differentiating between a scratch and a potential shallow crack on the CRDM housing. The NRC asked the licensee to provide any additional information that would support the licensees claim that the indication from the UT was indeed a scratch rather than a crack. In addition, the NRC suggested that any UT image of a crack of a similar size from other applications would be helpful in differentiating the proposed scratch from a crack.
The licensee stated that the NDE data related to the spare CRDMs had a higher response compared to the data gathered on the CRDM 25 housing. The licensee agreed to examine the spare CRDMs in the warehouse using a boroscope within the next 2 weeks. In addition, if the UT data observed from the CRDM 25 housing was similar to the data observed from a spare CRDM, the scratches on the CRDM 25 housing could be further characterized. If dissimilar, another methodology will have to be adopted to enable characterization of the scratches on the CRDM 25 housing.
Entergy Nuclear Operations, Inc. The NRC concluded the meeting by stating that there continued to be no immediate safety concern as the NRC was seeking to understand the assessments completed. The NRC also stated it would reconvene with the licensee after PNNL reviewed the data related to the two installed CRDM housings and the spare warehouse CRDM housings within the next 2 weeks while the licensee inspected the spare CRDM housings using a boroscope.
The call lasted about an hour. Enclosure 1 is a list of attendees for the meeting.
Sincerely,
/RA/
John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20
Enclosure:
List of Meeting Attendees for the October 25, 2012, Conference Meeting cc w/encl: Distribution via List Serv
LIST OF MEETING ATTENDEES FOR THE OCTOBER 25, 2012 CONFERENCE MEETING NRC Attendees John Giessner, Chief, Division of Reactor Projects, Branch 4 Thomas Taylor, Palisades Senior Resident Inspector David Alley, Senior Materials Engineer, Nuclear Reactor Regulation, Piping and NDE Branch Jay Lennartz, Project Engineer, Division of Reactor Projects, Branch 4 Robert Orlikowski, Project Engineer, Division of Reactor Projects, Branch 1 Swetha Shah, Reactor Engineer, Division of Reactor Projects, Branch 4 Diana Betancourt, Reactor Engineer, Division of Reactor Projects, Branch 4 Elba Sanchez Santiago, Division of Reactor Safety, Engineering Branch 1 Michael Anderson, Pacific Northwest National Laboratory Susan Crawford, Pacific Northwest National Laboratory Licensee Attendees Barry Davis, Entergy Nuclear General Manager Engineering Otto Gustafson, Palisades Licensing Manager Jake Milliken, Palisades Programs and Codes Supervisor Jack Lareau, Wesdyne
Entergy Nuclear Operations, Inc. The NRC concluded the meeting by stating that there continued to be no immediate safety concern as the NRC was seeking to understand the assessments completed. The NRC also stated it would reconvene with the licensee after PNNL reviewed the data related to the two installed CRDM housings and the spare warehouse CRDM housings within the next 2 weeks while the licensee inspected the spare CRDM housings using a boroscope.
The call lasted about an hour. Enclosure 1 is a list of attendees for the meeting.
Sincerely,
/RA/
John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20
Enclosure:
List of Meeting Attendees for the October 25, 2012, Conference Meeting cc w/encl: Distribution via List Serv DOCUMENT NAME: G:\DRPIII\PALI\Palisades meeting summary - 2012 October 25th.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SShah:dtp*JBG for JGiessner DATE 10/31/12 10/31/12 OFFICIAL RECORD COPY
Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated October 31, 2012.
SUBJECT:
SUMMARY
OF THE OCTOBER 25, 2012, MEETING REGARDING PALISADES NUCLEAR PLANT CONTROL ROD DRIVE MECHANISM (CRDM) 25 DISTRIBUTION:
Cayetano Santos RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPreports.Resource@nrc.gov