| issue date = 05/17/2013 | | issue date = 05/17/2013 | ||
| title = NRC Material Control and Accounting Program Inspection Report 05000482-10-405 | | title = NRC Material Control and Accounting Program Inspection Report 05000482-10-405 | ||
| author name = Drake J | | author name = Drake J | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-2 | | author affiliation = NRC/RGN-IV/DRS/PSB-2 | ||
| addressee name = Sunseri M | | addressee name = Sunseri M | ||
| addressee affiliation = Wolf Creek Nuclear Operating Corp | | addressee affiliation = Wolf Creek Nuclear Operating Corp | ||
| docket = 05000482 | | docket = 05000482 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: May 17, 2013 | {{#Wiki_filter: UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON May 17, 2013 | ||
==SUBJECT:== | |||
WOLF CREEK GENERATING STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000482/2010405 | |||
SUBJECT: WOLF CREEK GENERATING STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000482/2010405 | |||
==Dear Mr. Sunseri:== | ==Dear Mr. Sunseri:== | ||
Line 29: | Line 28: | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one for cases where a response is not required, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy or proprietary, information so that it can be made available to the Public without redaction. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one for cases where a response is not required, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy or proprietary, information so that it can be made available to the Public without redaction. | ||
Sincerely,/RA/ | Sincerely, | ||
James F. Drake, Chief Plant Support Branch 2 Division of Reactor Safety | /RA/ | ||
James F. Drake, Chief Plant Support Branch 2 Division of Reactor Safety Docket: 50-482 License: NPF-42 Enclosure: | |||
Docket: 50-482 License: NPF-42 | NRC Inspection Report 05000482/2013405-Cover Letter UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON rch 8, 2013 | ||
NRC Inspection Report 05000482/2013405-Cover Letter | |||
==SUBJECT:== | |||
WOLF CREEK GENERATING STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000482/2013405 | |||
SUBJECT: WOLF CREEK GENERATING STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000482/2013405 | |||
==Dear Mr. Sunseri:== | ==Dear Mr. Sunseri:== | ||
On February 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of a security baseline inspection at your Wolf Creek Generating Station. The inspection covered a key attribute of the Security Cornerstone of the | On February 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of a security baseline inspection at your Wolf Creek Generating Station. The inspection covered a key attribute of the Security Cornerstone of the NRCs Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material (MC&A-SNM). The enclosed inspection report documents the inspection results which were discussed on February 7, 2013, with you and members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Line 54: | Line 47: | ||
The deficiency was promptly corrected in the plant in order to restore compliance with applicable MC&A-SNM requirements before the inspectors left the site, and this matter was entered into the corrective action program to revise MC&A-SNM procedures to comply with NRC requirements. | The deficiency was promptly corrected in the plant in order to restore compliance with applicable MC&A-SNM requirements before the inspectors left the site, and this matter was entered into the corrective action program to revise MC&A-SNM procedures to comply with NRC requirements. | ||
In addition, this violation had a cross-cutting aspect in the area Human Performance associated with decision making and conservative assumptions. Wolf Creek Generating Station, Unit 1, did not verify the validity of the underlying assumptions when they implemented procedures that were contrary to NRC requirements without obtaining a written exception to NRC regulations (H.1.b). However, because this violation was of very low safety significance and was entered | In addition, this violation had a cross-cutting aspect in the area Human Performance associated with decision making and conservative assumptions. Wolf Creek Generating Station, Unit 1, did not verify the validity of the underlying assumptions when they implemented procedures that were contrary to NRC requirements without obtaining a written exception to NRC regulations (H.1.b). However, because this violation was of very low safety significance and was entered | ||
}} | }} |
Latest revision as of 18:59, 4 November 2019
ML13137A433 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 05/17/2013 |
From: | James Drake NRC/RGN-IV/DRS/PSB-2 |
To: | Matthew Sunseri Wolf Creek |
References | |
IR-10-405 | |
Download: ML13137A433 (2) | |
Text
UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON May 17, 2013
SUBJECT:
WOLF CREEK GENERATING STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000482/2010405
Dear Mr. Sunseri:
Please remove the cover page from the Wolf Creek Generating Station - NRC Material Control and Accounting Program Inspection Report 05000482/2010405 (ML13067A336) and replace it with the page enclosed with this letter. The purpose of this change is to correct the report number on the cover page.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one for cases where a response is not required, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy or proprietary, information so that it can be made available to the Public without redaction.
Sincerely,
/RA/
James F. Drake, Chief Plant Support Branch 2 Division of Reactor Safety Docket: 50-482 License: NPF-42 Enclosure:
NRC Inspection Report 05000482/2013405-Cover Letter UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON rch 8, 2013
SUBJECT:
WOLF CREEK GENERATING STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000482/2013405
Dear Mr. Sunseri:
On February 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of a security baseline inspection at your Wolf Creek Generating Station. The inspection covered a key attribute of the Security Cornerstone of the NRCs Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material (MC&A-SNM). The enclosed inspection report documents the inspection results which were discussed on February 7, 2013, with you and members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This inspection report documents one NRC-identified violation of very low safety significance (i.e., Green as determined by the Physical Protection Significance Determination Process).
The deficiency was promptly corrected in the plant in order to restore compliance with applicable MC&A-SNM requirements before the inspectors left the site, and this matter was entered into the corrective action program to revise MC&A-SNM procedures to comply with NRC requirements.
In addition, this violation had a cross-cutting aspect in the area Human Performance associated with decision making and conservative assumptions. Wolf Creek Generating Station, Unit 1, did not verify the validity of the underlying assumptions when they implemented procedures that were contrary to NRC requirements without obtaining a written exception to NRC regulations (H.1.b). However, because this violation was of very low safety significance and was entered