|
|
(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 08/14/2014 | | | issue date = 08/14/2014 |
| | title = Er 05000269-14-301, 05000270-14-301 and 05000287-14-301; Operating Test June 9 - 12, 2014 & Written Exam June 18, 2014; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations | | | title = Er 05000269-14-301, 05000270-14-301 and 05000287-14-301; Operating Test June 9 - 12, 2014 & Written Exam June 18, 2014; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations |
| | author name = Guthrie E F | | | author name = Guthrie E |
| | author affiliation = NRC/RGN-II/DRS | | | author affiliation = NRC/RGN-II/DRS |
| | addressee name = Batson S L | | | addressee name = Batson S |
| | addressee affiliation = Duke Energy Carolinas, LLC | | | addressee affiliation = Duke Energy Carolinas, LLC |
| | docket = 05000269, 05000270, 05000287 | | | docket = 05000269, 05000270, 05000287 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 14, 2014 Mr. Scott Site Vice President | | {{#Wiki_filter:UNITED STATES gust 14, 2014 |
|
| |
|
| Duke Energy Carolinas, LLC Oconee Nuclear Station
| | ==SUBJECT:== |
| | | OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2014301, 05000270/2014301 AND 05000287/2014301 |
| 7800 Rochester Highway Seneca, SC 29672 SUBJECT: OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2014301, 05000270/2014301 AND 05000287/2014301
| |
|
| |
|
| ==Dear Mr. Batson:== | | ==Dear Mr. Batson:== |
Line 31: |
Line 30: |
| Seven applicants were issued licenses commensurate with the level of examination administered. A Simulator Fidelity Report is included in this report as Enclosure 2. | | Seven applicants were issued licenses commensurate with the level of examination administered. A Simulator Fidelity Report is included in this report as Enclosure 2. |
|
| |
|
| The initial examination operating test submittal was within the range of acceptability expected for a proposed examination. All examinat ion changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1. | | The initial examination operating test submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662. |
| | |
| enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662. | |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
| | | Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 |
| Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety | |
| | |
| Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 Enclosures: | |
| 1. Report Details
| |
| | |
| 2. Simulator Fidelity Report
| |
| | |
| cc: Distribution via Listserv
| |
| | |
| __ML14227A249___________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE EFG FOR DRL2 VIA EMAIL EFG NAME RBALDWIN DLANYI EGUTHRIE DATE 8/14/2014 8/ 13 /2014 8/14/2014 E-MAIL COPY?
| |
| YES NO YES NO YES NO YES YES NO YES NO YES NO Letter to Scott from Eugene F. Guthrie dated August 14, 2014 SUBJECT: OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2014301, 05000270/2014301 AND 05000287/2014301 DISTRIBUTION
| |
| : S. Law, RII EICS L. Douglas, RII EICS RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource
| |
| | |
| Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION
| |
| | |
| ==REGION II==
| |
| Docket Nos.: 05000269, 05000270, 05000287
| |
| | |
| License Nos.: DPR-38, DPR-47 and DPR-55
| |
| | |
| Report No.: 05000269/2014301, 05000270/2014301 and 05000287/2014301
| |
| | |
| Licensee: Duke Energy Carolinas LLC.
| |
| | |
| Facility: Oconee Nuclear Station, Units 1, 2, and 3
| |
|
| |
|
| Location: Seneca, SC
| | ===Enclosures:=== |
| | 1. Report Details 2. Simulator Fidelity Report |
|
| |
|
| Dates: Operating Tests - June 9 - 12, 2014 Written Examination - June 18, 2014
| | REGION II== |
| | Docket Nos.: 05000269, 05000270, 05000287 License Nos.: DPR-38, DPR-47 and DPR-55 Report No.: 05000269/2014301, 05000270/2014301 and 05000287/2014301 Licensee: Duke Energy Carolinas LLC. |
|
| |
|
| Examiners: R. Baldwin, Chief, Senior Operations Examiner G. Laska, Senior Examiner D. Lanyi, Operations Engineer | | Facility: Oconee Nuclear Station, Units 1, 2, and 3 Location: Seneca, SC Dates: Operating Tests - June 9 - 12, 2014 Written Examination - June 18, 2014 Examiners: R. Baldwin, Chief, Senior Operations Examiner G. Laska, Senior Examiner D. Lanyi, Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch Division of Reactor Safety Enclosure 1 |
| | |
| Approved by: Eugene F. Guthrie, Chief Operations Branch Division of Reactor Safety | |
|
| |
|
| SUMMARY OF FINDINGS ER 05000269/2014301, 05000270/2014301 and 05000287/2014301; operating test June 9 - 12, 2014 & written exam June 18, 2014; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations. | | SUMMARY OF FINDINGS ER 05000269/2014301, 05000270/2014301 and 05000287/2014301; operating test June 9 - 12, 2014 & written exam June 18, 2014; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations. |
|
| |
|
| Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45 as applicable. | | Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45 as applicable. |
|
| |
|
| Members of the Oconee Nuclear Station staff developed the operating tests and the written examination. The NRC developed the written examination outlines. | | Members of the Oconee Nuclear Station staff developed the operating tests and the written examination. The NRC developed the written examination outlines. |
Line 82: |
Line 54: |
| The NRC administered the operating tests during the period of June 9 - 12, 2014. Members of the Oconee Nuclear Station training staff administered the written examination June 18, 2014. | | The NRC administered the operating tests during the period of June 9 - 12, 2014. Members of the Oconee Nuclear Station training staff administered the written examination June 18, 2014. |
|
| |
|
| Two Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants passed both the written examination and operating test. Seven applicants were issued licenses | | Two Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants passed both the written examination and operating test. Seven applicants were issued licenses commensurate with the level of examination administered. |
| | |
| commensurate with the level of examination administered. | |
|
| |
|
| There were no post-examination comments. | | There were no post-examination comments. |
Line 90: |
Line 60: |
| No findings were identified. | | No findings were identified. |
|
| |
|
| Report Details 4. OTHER ACTIVITIES | | Report Details 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope Members of the Oconee Nuclear Station staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021, and incorporated into the final version of the examination materials. |
| | |
| 4OA5 Operator Licensing Initial Examinations | |
|
| |
|
| a. Inspection Scope Members of the Oconee Nuclear Station staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021, and incorporated into the final version of the examination materials.
| | The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests. |
| | |
| The examiners reviewed the licensee's examination security measures while preparing and administering the examinations to ens ure examination security and integrity complied with 10 CFR 55.49, "Integrity of Examinations and Tests." | |
|
| |
|
| The NRC examiners evaluated two Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period of June 9 - 12, 2014. | | The NRC examiners evaluated two Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period of June 9 - 12, 2014. |
|
| |
|
| Members of the Oconee Nuclear Station training staff administered the written examination on June 18, 2014. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Oconee Nuclear Station, met the requirements specified in 10 CFR Part 55, | | Members of the Oconee Nuclear Station training staff administered the written examination on June 18, 2014. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Oconee Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses. |
| "Operators' Licenses."
| |
|
| |
|
| b. Findings No findings were identified. The NRC determined that, using NUREG-1021, the licensee's initial operating test examination submittal was within the range of acceptability expected for a proposed examination. | | b. Findings No findings were identified. The NRC determined that, using NUREG-1021, the licensees initial operating test examination submittal was within the range of acceptability expected for a proposed examination. |
|
| |
|
| Two RO and five SRO applicants passed both the operating test and written examination. Seven licenses were issued commensurate with the level of examination administered. | | Two RO and five SRO applicants passed both the operating test and written examination. Seven licenses were issued commensurate with the level of examination administered. |
Line 109: |
Line 74: |
| Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training. | | Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training. |
|
| |
|
| The licensee did not submit any post-examination comments. A copy of the final RO and SRO written examinations and answer key's may be accessed not earlier than June 18, 2016, in the ADAMS system (ADAMS Accession Number ML14174A885 and ML14174A904). | | The licensee did not submit any post-examination comments. A copy of the final RO and SRO written examinations and answer keys may be accessed not earlier than June 18, 2016, in the ADAMS system (ADAMS Accession Number ML14174A885 and ML14174A904). |
|
| |
|
| 4 4OA6 Meetings Exit Meeting Summary On June 12, 2014, the NRC examination team discussed generic issues associated with the operating test with Mr. Batson, Oconee Nuclear Station Vice President, and members of his staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
| | 4OA6 Meetings Exit Meeting Summary On June 12, 2014, the NRC examination team discussed generic issues associated with the operating test with Mr. Batson, Oconee Nuclear Station Vice President, and members of his staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified. |
|
| |
|
| PARTIAL LIST OF PERSONS CONTACTED | | PARTIAL LIST OF PERSONS CONTACTED Licensee personnel T. Doss, ILT Supervisor P. Fisk, Operations Manager L. Nowell, Supervisor Nuclear OPS Training T. Ray, Oconee Plant Manager C. Rop, Operations Training Manager J. Smith, Licensing Administrator J. Steely, Nuclear Training Manager G. Washburn, Nuclear Station Instructor - Operations K. Welchel, Simulator Supervisor C. Witherspoon, Sr. Operations Specialist NRC personnel N/A |
|
| |
|
| Licensee personnel T. Doss, ILT Supervisor P. Fisk, Operations Manager L. Nowell, Supervisor Nuclear OPS Training T. Ray, Oconee Plant Manager C. Rop, Operations Training Manager J. Smith, Licensing Administrator J. Steely, Nuclear Training Manager G. Washburn, Nuclear Station Instructor - Operations K. Welchel, Simulator Supervisor C. Witherspoon, Sr. Operations Specialist | | SIMULATOR FIDELITY REPORT Facility Licensee: Oconee Nuclear Station Facility Docket No.: 05000269, 05000270, AND 05000287 Operating Test Administered: June 9 - 12, 2013 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations. |
|
| |
|
| NRC personnel
| | No simulator fidelity or configuration issues were identified. |
| | |
| N/A
| |
| | |
| Enclosure 2 SIMULATOR FIDELITY REPORT Facility Licensee: Oconee Nuclear Station
| |
| | |
| Facility Docket No.: 05000269, 05000270, AND 05000287
| |
| | |
| Operating Test Administered: June 9 - 12, 2013
| |
|
| |
|
| This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
| | Enclosure 2 |
| | |
| No simulator fidelity or configuration issues were identified.
| |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 IR 05000269/20234012023-04-14014 April 2023 Security Baseline Inspection Report 05000269 2023401 and 05000270 2023401 and 05000287 2023401 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 IR 05000269/20224012022-08-26026 August 2022 Material Control and Accounting Program Inspection Report 05000269/2022401 and 05000270/2022401 and 05000287/2022401 (OUO Removed) IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 IR 05000270/20220022022-07-29029 July 2022 Integrated Inspection Report 05000269/ 2022002 and 05000270/2022002 and 05000287/2022002 IR 05000269/20220102022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010 IR 05000269/20224032022-05-0404 May 2022 Security Baseline Target Set Inspection Report 05000269/2022403 and 05000270/2022403 and 05000287/2022403 IR 05000269/20220012022-05-0404 May 2022 Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 IR 05000269/20224042022-04-27027 April 2022 Security Baseline Inspection Report 05000269/2022404 and 05000270/2022404 and 05000287/2022404 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) IR 05000269/20220122022-02-24024 February 2022 Safety Conscious Work Environment Issue of Concern Followup Report 05000269/2022012 and 05000270/2022012 and 05000287/2022012 IR 05000269/20224022022-02-16016 February 2022 Security Baseline Inspection Report 05000269/2022402 and 05000270/2022402 and 05000287/2022402 IR 05000269/20210042022-02-14014 February 2022 Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation IR 05000269/20210032021-10-28028 October 2021 Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003 IR 05000269/20210102021-09-17017 September 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000269/2021010 and 05000270/2021010 and 05000287/2021010 IR 05000269/20210052021-08-26026 August 2021 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2021005, 05000270/2021005, and 05000287/2021005) IR 07200004/20210012021-08-26026 August 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200004/2021001 IR 05000269/20210022021-08-0404 August 2021 Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002 IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 IR 05000269/20210112021-06-0202 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000269/2021011 and 05000270/2021011 and 05000287/2021011 IR 05000269/20210012021-04-23023 April 2021 Integrated Inspection Report 05000269/2021001 and 05000270/2021001 and 05000287/2021001 IR 05000269/20214012021-04-22022 April 2021 Security Baseline Inspection Report 05000269/2021401, 05000270/2021401 and 05000287/2021401 (U) IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 IR 05000269/20200042021-02-22022 February 2021 Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004 ML21036A0012021-02-0404 February 2021 Integrated Inspection Report 05000269/2020004 and 05000270/2020004 and 05000287/2020004 IR 05000269/20200102021-01-22022 January 2021 NRC Design Bases Assurance Inspection (Team) Report 05000269/2020010 and 05000270/2020010 and 05000287/2020010 and Notice of Violation IR 05000269/20204012020-11-13013 November 2020 Security Baseline Inspection Report 05000269/2020401 and 05000270/2020401 and 05000287/2020401 IR 05000269/20200032020-11-0404 November 2020 Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002 2024-09-23
[Table view] Category:Letter
MONTHYEARML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 2024-09-23
[Table view] |
Text
UNITED STATES gust 14, 2014
SUBJECT:
OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2014301, 05000270/2014301 AND 05000287/2014301
Dear Mr. Batson:
During the period June 9 - 12, 2014, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Oconee Nuclear Station. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on June 18, 2014.
Two Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. There were no post-administration comments.
Seven applicants were issued licenses commensurate with the level of examination administered. A Simulator Fidelity Report is included in this report as Enclosure 2.
The initial examination operating test submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662.
Sincerely,
/RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
Enclosures:
1. Report Details 2. Simulator Fidelity Report
REGION II==
Docket Nos.: 05000269, 05000270, 05000287 License Nos.: DPR-38, DPR-47 and DPR-55 Report No.: 05000269/2014301, 05000270/2014301 and 05000287/2014301 Licensee: Duke Energy Carolinas LLC.
Facility: Oconee Nuclear Station, Units 1, 2, and 3 Location: Seneca, SC Dates: Operating Tests - June 9 - 12, 2014 Written Examination - June 18, 2014 Examiners: R. Baldwin, Chief, Senior Operations Examiner G. Laska, Senior Examiner D. Lanyi, Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS ER 05000269/2014301, 05000270/2014301 and 05000287/2014301; operating test June 9 - 12, 2014 & written exam June 18, 2014; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45 as applicable.
Members of the Oconee Nuclear Station staff developed the operating tests and the written examination. The NRC developed the written examination outlines.
The NRC administered the operating tests during the period of June 9 - 12, 2014. Members of the Oconee Nuclear Station training staff administered the written examination June 18, 2014.
Two Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants passed both the written examination and operating test. Seven applicants were issued licenses commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
Report Details 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope Members of the Oconee Nuclear Station staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021, and incorporated into the final version of the examination materials.
The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests.
The NRC examiners evaluated two Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period of June 9 - 12, 2014.
Members of the Oconee Nuclear Station training staff administered the written examination on June 18, 2014. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Oconee Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.
b. Findings No findings were identified. The NRC determined that, using NUREG-1021, the licensees initial operating test examination submittal was within the range of acceptability expected for a proposed examination.
Two RO and five SRO applicants passed both the operating test and written examination. Seven licenses were issued commensurate with the level of examination administered.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee did not submit any post-examination comments. A copy of the final RO and SRO written examinations and answer keys may be accessed not earlier than June 18, 2016, in the ADAMS system (ADAMS Accession Number ML14174A885 and ML14174A904).
4OA6 Meetings Exit Meeting Summary On June 12, 2014, the NRC examination team discussed generic issues associated with the operating test with Mr. Batson, Oconee Nuclear Station Vice President, and members of his staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee personnel T. Doss, ILT Supervisor P. Fisk, Operations Manager L. Nowell, Supervisor Nuclear OPS Training T. Ray, Oconee Plant Manager C. Rop, Operations Training Manager J. Smith, Licensing Administrator J. Steely, Nuclear Training Manager G. Washburn, Nuclear Station Instructor - Operations K. Welchel, Simulator Supervisor C. Witherspoon, Sr. Operations Specialist NRC personnel N/A
SIMULATOR FIDELITY REPORT Facility Licensee: Oconee Nuclear Station Facility Docket No.: 05000269, 05000270, AND 05000287 Operating Test Administered: June 9 - 12, 2013 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
No simulator fidelity or configuration issues were identified.
Enclosure 2