IR 05000269/2014403
| ML14069A458 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/10/2014 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | Batson S Duke Energy Corp |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR-14-403 | |
| Download: ML14069A458 (4) | |
Text
March 10, 2014
SUBJECT:
OCONEE NUCLEAR STATION - NRC PHYSICAL SECURITY INSPECTION REPORT 05000269/2014403, 05000270/2014403, AND 05000287/2014403
Dear Mr. Batson:
On February 6, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Oconee Nuclear Station, Units 1, 2 and 3. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
One licensee-identified finding of very low security significance (i.e., Green, as determined by the Physical Protection Significance Determination Process) was identified during this inspection. The deficiency was corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site.
The NRC is treating this violation as non-cited violation (NCV) consistent with Section 2.3.2, of the NRC Enforcement Policy because of the very low safety significance of the violation, and because it was entered into your corrective action program. If you contest this NCV you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Oconee Nuclear Station.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholdings, of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos. 50-269, 50-270, and 50-287 License Nos. DPR-38, DPR-47, and DPR-55
Enclosure:
Inspection Report 05000269/2014403, 05000270/2014403, 05000287/2014403 w/Attachment: Supplementary Info (OUO)
cc: (See page 3)
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR1 RII:DRS/PSB2 RII:DRS/PSB2
SIGNATURE JHW2 JCS3 GJM1 AXR2 BBD
NAME J. Wallo J. Shehee G. McCoy A. Richardson B. Desai
DATE 2/ 28 /2014 2/ 28 /2014 3/ 7 /2014 2/ 28 /2014 3/ 3 /2014
E-MAIL COPY YES NO YES NO YES NO YES NO YES NO cc:
Robert H. Guy Organizational Effectiveness Manager Oconee Nuclear Station Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672
Terry L. Patterson Safety Assurance Manager Duke Energy Corporation Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672
Kent Alter Regulatory Compliance Manager Oconee Nuclear Station Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672
Mark Mcneely Security Manager Oconee Nuclear Station Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672
Timothy J. Wadsworth Security Specialist General Office Duke Energy Corporation P. O. Box 1006 526 S. Church St., EC05P Charlotte, NC 28201-1006
Lara S. Nichols Deputy General Counsel General Office Duke Energy Corporation 550 S. Tyron Street (DEC45A)
Charlotte, NC 28202
Terry King Manager, Nuclear Security General Office Duke Energy Corporation 526 S. Church St., EC05P Charlotte, NC 28201-1006
Mark Mcneely Security Manager Oconee Nuclear Plant 7800 Rochester Highway Seneca, SC 29672-0752 Daniel C. Durham Security Safeguards Administrator Oconee Nuclear Station Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672