ML15034A416: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15034A416
| number = ML15034A416
| issue date = 02/11/2015
| issue date = 02/11/2015
| title = Crystal River, Unit 3 Nuclear Generating Plant - Redacted - Request for Additional Information Regarding Revision to the Managing Fatigue and Working Hour Limits Manual (TAC No. MF5085)
| title = Nuclear Generating Plant - Redacted - Request for Additional Information Regarding Revision to the Managing Fatigue and Working Hour Limits Manual
| author name = Orenak M D
| author name = Orenak M
| author affiliation = NRC/NRR/DORL/LPLIV-2
| author affiliation = NRC/NRR/DORL/LPLIV-2
| addressee name = Hobbs T D
| addressee name = Hobbs T
| addressee affiliation = Duke Energy Florida, Inc
| addressee affiliation = Duke Energy Florida, Inc
| docket = 05000302
| docket = 05000302
| license number = DPR-072
| license number = DPR-072
| contact person = Orenak M D
| contact person = Orenak M
| case reference number = TAC MF5085
| case reference number = TAC MF5085
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Terry D. Hobbs General Manager, Decommissioning Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 February 11, 2015 SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT-REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISION TO THE MANAGING FATIGUE AND WORKING HOUR LIMITS MANUAL (TAC NO. MF5085) Dear Mr. Hobbs: By letter dated September 16, 2014, Duke Energy Florida, Inc. notified the U.S. Nuclear Regulatory Commission (NRC) staff about changes to the Crystal River Unit 3 Nuclear Generating Plant (CR-3) security plan per the requirements of Title 1 0 of the Code of Federal Regulations (1 0 CFR) Section 50.54(p). Contained within the submittal was a change to the fatigue management program for the CR-3 security force. The NRC staff is reviewing the changes to CR-3's fatigue management policies and procedures to determine how the reduction of the fatigue management requirements, identified in CR-3's ADM-206, Revision 2, will not affect their security officers alertness and ability to perform the critical job duties required by 10 CFR 73.55, "Requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage." Based on the NRC general authority under the Atomic Energy Act of 1954, as amended, to regulate the safe operation of facilities that possess special nuclear material, and to determine whether there is reasonable assurance of adequate protection at CR-3, the NRC staff had determined that additional information is needed to complete its review of CR-3's current work hours control program. Please provide the additional information requested in the enclosure within 30 days of receipt of this letter. NOTICE: The Enclosure to this letter contains Security-Related information. When separated from the enclosure, this transmittal letter is DECONTROLLED. OFFICIAL USE ONLY SECURITY RELATED INFORMATION OFFICIAL YSE ONLY SECl:IRITY RELATED INFORMATION T. Hobbs -2-If you have any questions, please contact me at 301-415-3229 or via e-mail at Michael. Orenak@nrc.gov. Docket No. 50-302 Enclosure: Request for Additional Information (Security-Related) cc w/o encl: Distribution via Listserv Sincerely, Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICIAL l:ISE ONLY SECURITY RELATED INFORMATION OFFICIAL USE ONLY SECURITY RELATED INFORMATION T. Hobbs -2-If you have any questions, please contact me at 301-415-3229 or via e-mail at Michael. Orenak@nrc.gov. Docket No. 50-302 Enclosure: Request for Additional Information (Security-Related) cc w/o encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-2 R/F RidsAcrsAcnw _MaiiCTR Resource RidsNrrDorllpl4-2 Resource KMartin, NRR ADAMS Accession No.: Letter ML 15034A416 (Public OFFICE DORULPL4-2/PM DORULPL4-2/LA NAME MOrenak PBiechman DATE 2/3/15 2/3/15 Sincerely, IRA/ Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrLAPBiechman Resource RidsNrrPMCrystaiRiver Resource RidsRgn2MaiiCenter Resource RidsNrrDraApla Resource ML 15033A481 (Non Public) DRAIAPLAIBC DORULPL4-2/BC SWeerakkody* DBroaddus 01/26/15 2/5/15 *via memo DORULPL4-2/PM MOrenak 2/11/15 OFFICIAL RECORD COPY OFFICIAL USE ONLY SECURITY RliLATiiD INFORMATION 
{{#Wiki_filter:OFFICIAL USE ONLY         SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 11, 2015 Mr. Terry D. Hobbs General Manager, Decommissioning Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708
}}
 
==SUBJECT:==
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT- REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISION TO THE MANAGING FATIGUE AND WORKING HOUR LIMITS MANUAL (TAC NO. MF5085)
 
==Dear Mr. Hobbs:==
 
By letter dated September 16, 2014, Duke Energy Florida, Inc. notified the U.S. Nuclear Regulatory Commission (NRC) staff about changes to the Crystal River Unit 3 Nuclear Generating Plant (CR-3) security plan per the requirements of Title 10 of the Code of Federal Regulations (1 0 CFR) Section 50.54(p). Contained within the submittal was a change to the fatigue management program for the CR-3 security force.
The NRC staff is reviewing the changes to CR-3's fatigue management policies and procedures to determine how the reduction of the fatigue management requirements, identified in CR-3's ADM-206, Revision 2, will not affect their security officers alertness and ability to perform the critical job duties required by 10 CFR 73.55, "Requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage." Based on the NRC general authority under the Atomic Energy Act of 1954, as amended, to regulate the safe operation of facilities that possess special nuclear material, and to determine whether there is reasonable assurance of adequate protection at CR-3, the NRC staff had determined that additional information is needed to complete its review of CR-3's current work hours control program.
Please provide the additional information requested in the enclosure within 30 days of receipt of this letter.
NOTICE: The Enclosure to this letter contains Security-Related information. When separated from the enclosure, this transmittal letter is DECONTROLLED.
OFFICIAL USE ONLY       SECURITY RELATED INFORMATION
 
OFFICIAL YSE ONLY       SECl:IRITY RELATED INFORMATION T. Hobbs                                     If you have any questions, please contact me at 301-415-3229 or via e-mail at Michael. Orenak@nrc.gov.
Sincerely, Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302
 
==Enclosure:==
 
Request for Additional Information (Security-Related) cc w/o encl: Distribution via Listserv OFFICIAL l:ISE ONLY    SECURITY RELATED INFORMATION
 
Letter ML15034A416 (Public        ML15033A481 (Non Public)    *via memo OFFICE   DORULPL4-2/PM     DORULPL4-2/LA       DRAIAPLAIBC        DORULPL4-2/BC    DORULPL4-2/PM NAME     MOrenak           PBiechman           SWeerakkody*      DBroaddus        MOrenak DATE     2/3/15             2/3/15             01/26/15           2/5/15         2/11/15}}

Latest revision as of 17:16, 31 October 2019

Nuclear Generating Plant - Redacted - Request for Additional Information Regarding Revision to the Managing Fatigue and Working Hour Limits Manual
ML15034A416
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/11/2015
From: Michael Orenak
Plant Licensing Branch IV
To: Hobbs T
Duke Energy Florida
Orenak M
References
TAC MF5085
Download: ML15034A416 (3)


Text

OFFICIAL USE ONLY SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 11, 2015 Mr. Terry D. Hobbs General Manager, Decommissioning Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT- REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISION TO THE MANAGING FATIGUE AND WORKING HOUR LIMITS MANUAL (TAC NO. MF5085)

Dear Mr. Hobbs:

By letter dated September 16, 2014, Duke Energy Florida, Inc. notified the U.S. Nuclear Regulatory Commission (NRC) staff about changes to the Crystal River Unit 3 Nuclear Generating Plant (CR-3) security plan per the requirements of Title 10 of the Code of Federal Regulations (1 0 CFR) Section 50.54(p). Contained within the submittal was a change to the fatigue management program for the CR-3 security force.

The NRC staff is reviewing the changes to CR-3's fatigue management policies and procedures to determine how the reduction of the fatigue management requirements, identified in CR-3's ADM-206, Revision 2, will not affect their security officers alertness and ability to perform the critical job duties required by 10 CFR 73.55, "Requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage." Based on the NRC general authority under the Atomic Energy Act of 1954, as amended, to regulate the safe operation of facilities that possess special nuclear material, and to determine whether there is reasonable assurance of adequate protection at CR-3, the NRC staff had determined that additional information is needed to complete its review of CR-3's current work hours control program.

Please provide the additional information requested in the enclosure within 30 days of receipt of this letter.

NOTICE: The Enclosure to this letter contains Security-Related information. When separated from the enclosure, this transmittal letter is DECONTROLLED.

OFFICIAL USE ONLY SECURITY RELATED INFORMATION

OFFICIAL YSE ONLY SECl:IRITY RELATED INFORMATION T. Hobbs If you have any questions, please contact me at 301-415-3229 or via e-mail at Michael. Orenak@nrc.gov.

Sincerely, Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302

Enclosure:

Request for Additional Information (Security-Related) cc w/o encl: Distribution via Listserv OFFICIAL l:ISE ONLY SECURITY RELATED INFORMATION

Letter ML15034A416 (Public ML15033A481 (Non Public) *via memo OFFICE DORULPL4-2/PM DORULPL4-2/LA DRAIAPLAIBC DORULPL4-2/BC DORULPL4-2/PM NAME MOrenak PBiechman SWeerakkody* DBroaddus MOrenak DATE 2/3/15 2/3/15 01/26/15 2/5/15 2/11/15