ML15106A928: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15106A928
| number = ML15106A928
| issue date = 04/24/2015
| issue date = 04/24/2015
| title = Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, :Primary Coolant Sources Outside Containment (TAC No. MF5291)
| title = Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, :Primary Coolant Sources Outside Containment
| author name = Purnell B A
| author name = Purnell B
| author affiliation = NRC/NRR/DORL/LPLIII-2
| author affiliation = NRC/NRR/DORL/LPLIII-2
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000461
| docket = 05000461
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 lpril 2015
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 lpril    2L~,  2015 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
CLINTON POWER STATION, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" (TAC NO. MF5291)  
CLINTON POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" (TAC NO. MF5291)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that additional information is needed to complete its review. A response to the enclosed request should be provided by June 19, 2015. This request was discussed with Mr. Tim Byam of your staff on April 22, 2015.
 
B. Hanson Should you have any questions, please contact me at 301-415-1380 or by email at blake.purnell@nrc.gov.
By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that additional information is needed to complete its review.
Docket No. 50-461  
A response to the enclosed request should be provided by June 19, 2015. This request was discussed with Mr. Tim Byam of your staff on April 22, 2015.
 
B. Hanson                                   Should you have any questions, please contact me at 301-415-1380 or by email at blake.purnell@nrc.gov.
Sincerely, Blake Purnell, Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461


==Enclosure:==
==Enclosure:==


Request for Additional Information cc w/encl: Listserv Sincerely, Blake Purnell, Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" CLINTON POWER STATION, UNIT 1 DOCKET NO. 50-461 By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that the additional information below is needed to complete its review. RAl-1 Provide the integrated leak test data for each system under TS 5.5.2 for the last two outages, including the test acceptance criterion, test pressure, as-found and as-left test leakage rate, and failed components.
Request for Additional Information cc w/encl: Listserv
RAl-2 Provide justification why the proposed "Refueling Only Outage" will not significantly impact the leakage pathways and associated leakage rates for each system under TS 5.5.2. Enclosure B. Hanson Should you have any questions, please contact me at 301-415-1380 or by email at blake.purnell@nrc.gov.
Docket No. 50-461


==Enclosure:==
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" CLINTON POWER STATION, UNIT 1 DOCKET NO. 50-461 By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that the additional information below is needed to complete its review.
RAl-1 Provide the integrated leak test data for each system under TS 5.5.2 for the last two outages, including the test acceptance criterion, test pressure, as-found and as-left test leakage rate, and failed components.
RAl-2 Provide justification why the proposed "Refueling Only Outage" will not significantly impact the leakage pathways and associated leakage rates for each system under TS 5.5.2.
Enclosure


Request for Additional Information cc w/encl: Listserv DISTRIBUTION:
ML15106A928                                *via memo OFFICE     LPL3-2/PM     LPL3-2/LA   SCVB/BC*       LPL3-2/BC         LPL3-2/PM NAME         BPurnell     SRohrer     RDennig           TTate           BPurnell DATE         4/23/15       4/20/15     3/30/15         4/24/15         4/24/15}}
Sincerely, /RAJ Blake Purnell, Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation PUBLIC RidsNrrPMClinton RidsN rrDssScvb LPL3-2 R/F RidsAcrsAcnwMailCenter RidsNrrDorllpl3-2 BPurnell RidsRgn3MailCenter RidsNrrLASRohrer RidsNrrDssStsb SPeng KWest ADAMS Accession No.:ML 15106A928
*via memo OFFICE LPL3-2/PM LPL3-2/LA SCVB/BC* LPL3-2/BC LPL3-2/PM NAME BPurnell SRohrer RDennig TTate BPurnell DATE 4/23/15 4/20/15 3/30/15 4/24/15 4/24/15 OFFICIAL RECORD COPY}}

Latest revision as of 13:56, 31 October 2019

Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, :Primary Coolant Sources Outside Containment
ML15106A928
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/24/2015
From: Blake Purnell
Plant Licensing Branch III
To: Bryan Hanson
Exelon Generation Co
Blake Purnell, NRR/DORL
References
TAC MF5291
Download: ML15106A928 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 lpril 2L~, 2015 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CLINTON POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" (TAC NO. MF5291)

Dear Mr. Hanson:

By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that additional information is needed to complete its review.

A response to the enclosed request should be provided by June 19, 2015. This request was discussed with Mr. Tim Byam of your staff on April 22, 2015.

B. Hanson Should you have any questions, please contact me at 301-415-1380 or by email at blake.purnell@nrc.gov.

Sincerely, Blake Purnell, Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosure:

Request for Additional Information cc w/encl: Listserv

REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" CLINTON POWER STATION, UNIT 1 DOCKET NO. 50-461 By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that the additional information below is needed to complete its review.

RAl-1 Provide the integrated leak test data for each system under TS 5.5.2 for the last two outages, including the test acceptance criterion, test pressure, as-found and as-left test leakage rate, and failed components.

RAl-2 Provide justification why the proposed "Refueling Only Outage" will not significantly impact the leakage pathways and associated leakage rates for each system under TS 5.5.2.

Enclosure

ML15106A928 *via memo OFFICE LPL3-2/PM LPL3-2/LA SCVB/BC* LPL3-2/BC LPL3-2/PM NAME BPurnell SRohrer RDennig TTate BPurnell DATE 4/23/15 4/20/15 3/30/15 4/24/15 4/24/15