ML15274A599: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/01/2015
| issue date = 10/01/2015
| title = 10-01-15 Public Phone Call
| title = 10-01-15 Public Phone Call
| author name = Regner L M
| author name = Regner L
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000498, 05000499
| docket = 05000498, 05000499
| license number =  
| license number =  
| contact person = Regner L M
| contact person = Regner L
| case reference number = GL-04-002, GSI-191
| case reference number = GL-04-002, GSI-191
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 12
| page count = 12
}}
}}
=Text=
{{#Wiki_filter:Description of Supplement 2 to STPNOC Risk-Informed Licensing Application to Address GSI-191 and Respond to GL-2004-02 Public Phone Call Meeting with NRC October 1, 2015
Introduction and Agenda
* Introduction of STP participants
* Desired Outcomes:
* NRC staff understand the STPNOC licensing application and the changes from the previous supplement
* Resolve NRC questions and establish follow-up to resolve questions that remain open
* Identify steps remaining for going forward with the application 2
Introduction and Agenda
* Agenda
* Overview of changes from November 13, 2013 letter (ML13323A183)
* Effect on reported results
* Conservatism and acceptability of revised approach
* RoverD In-Vessel Cooling Analysis
* Specific Focus Areas
* Debris Test Margin
* Follow-up and Going Forward Actions 3
Overview of Changes from November 13, 2013 Letter
* Changed methodology to explicitly incorporate certain deterministically-based elements Risk over Deterministic approach (RoverD) that was described in March 25, 2015 letter (ML15091A440)
* Added the plant-specific testing deterministic basis (Letter Attachment 1-2)
* Addressed all the NRC content guide questions and responded to earlier RAIs (Letter Attachment 1-5)
* Added the RoverD risk-informed description (Letter Attachment 1-3)
* Expanded Defense-in-Depth and Safety Margin discussion (Letter Attachment 1-4)
* Clarification on exemptions
* Changed exemption to 10CFR50.46 to be to other requirements (10CFR50.46(d))
* Clarified that a specific exemption to single failure is not being requested
* Added proposed Technical Specification change for debris-specific effects (Letter Attachment 3) 4
Overview of Changes from November 13, 2013 Letter
* What is no longer in the scope of the application and should not be part of the review, including RAI responses:
* CASA Grande calculation of conditional failure probabilities
* Use of correlations for head loss, including bump-up factors
* Uncertainty quantification of pipe break probability distributions; replaced with conservative estimates
* Time dependent debris transport
* Use of STP PRA for calculation of delta CDF; used only for delta LERF
* Applications of CASA Grande that are still used
* Debris generation
* Debris arrival to the containment pool (non-time dependent) 5
Results with Revised Methodology Remain in RG 1.174 Region III
* Conclusions are unchanged with revised methodology
* 2015 RoverD:            CDF: 1.23E-07/yr, LERF: 3.08E-10/yr
* 2013 CASA Grande/PRA:    CDF: 2.88E-08/yr, LERF: 1.40E-11/yr 6
Conservatism and Acceptability of Revised Approach 7
Conservatism and Acceptability of Revised Approach
* Deterministically tested debris
* Qualitative margin evaluation of July 2008 test determined that low density fiberglass is the only debris source term not bounded by the test
* Used weld/break characteristics from NUREG 1829
* Considers various break types and locations
* Conservatisms used in transport calculation 8
RoverD In-Vessel Cooling Analysis
* T-H and Debris Analyses Show Adequate Long-Term Cooling
* Analysis assuming total blockage of core and core bypass shows that there is sufficient cooling for all HLB and all SLOCA (CLB and HLB)
* FA tests show that there is insignificant pressure drop for bounding HLB conditions (DEGB, no credit for decay heat at time of recirculation) with 15 gm/FA including chemical effects
* STP strainer penetration testing shows that for all CLB, << 15gm/FA accumulates on the core
* Shows there is no CLB with potential for in-core debris effects, independent of T-H analysis
* Confirms that all risk-informed debris effects scope is due to blockage at the strainer 9
Specific Focus Items
* Breaks that have bounding debris transport fractions do not have direct spill paths to the containment floor
* Transport evaluation included 1, 2, and 3 trains operating
* Transport metrics from NUREG/CR 6772, NUREG/CR 6808, and Stokes Law were applied.
* Evaluation of transport of unqualified epoxy, particulate, and chips shows sufficient margin
* Erosion Methodology
* STP conditions are bounded by 30-day erosion testing showing factors below 10%
* Methodology shown in Table 10 of Att. 1-2 of 8/20/15 letter
* Early or late arrival is based on initial blow-down to pool or wash down by spray
* Small and large percentage are the eroded fractions from small and large debris
* Early and late arrival of fines based on initial blow-down to pool or wash down by spray
* Margin evaluation of July 2008 test shows that low density fiberglass is the only debris source term not bounded by the test 10
Debris Test Margin DEBRIS AMOUNTS FOR JULY 2008 TEST Debris Item                    Debris Amount                Comment
* LDFG fines accounted for in the risk-Test Surrogate Material informed portion LDFG Fibers Total Fines        79.91 ft3 / Nukon    Not bounding; was based on
* Microtherm and Epoxy offset by:
Total Smalls        158.48 ft3 / Nukon    7D ZOI
* Marinite Particulates Microtherm                      33 lbm / Microtherm powder  Not bounding; subsequently
* Zinc shown to be 29.3 lbm more Marinite Board                            182.7 lbm        Bounding;      subsequently Powdered Marinite board  removed from containment Latent particulate, dust, dirt        141.1 lbm / Dirt mix  Bounding Coatings Zinc                                1,368 lbm / Tin Powder  Bounding;      subsequently shown to be 637 lbm less Polyamide primer                    10 lbm / Powder (Acrylic Bounding coating)
Alkyds                            247 lbm / Powder (Acrylic Bounding coating)
Baked enamel                      268 lbm / Powder (Acrylic Bounding coating)
Epoxy (outside ZOI)                106 lbm / Chips (Acrylic Not bounding; subsequently 1/64 to 1/4)      shown to be 259 lbm more Epoxy (ZOI)                        57 lbm / Powder (Acrylic coating)
Total powder              1,950 lbm Total chips            106 lbm Chemical Precipitates Sodium Aluminum Silicate          1,432 lbm / WCAP AlOOH    Bounding Aluminum Oxyhydroxide              143 lbm / WCAP AlOOH    Bounding Calcium Phosphate                359 lbm / WCAP Ca3(PO4)2  Bounding 11
Follow-up and Going Forward Actions
* November public meeting to resolve outstanding questions 12}}

Latest revision as of 06:08, 31 October 2019

10-01-15 Public Phone Call
ML15274A599
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/01/2015
From: Lisa Regner
Plant Licensing Branch IV
To:
Regner L
References
GL-04-002, GSI-191
Download: ML15274A599 (12)


Text

Description of Supplement 2 to STPNOC Risk-Informed Licensing Application to Address GSI-191 and Respond to GL-2004-02 Public Phone Call Meeting with NRC October 1, 2015

Introduction and Agenda

  • Introduction of STP participants
  • Desired Outcomes:
  • NRC staff understand the STPNOC licensing application and the changes from the previous supplement
  • Resolve NRC questions and establish follow-up to resolve questions that remain open
  • Identify steps remaining for going forward with the application 2

Introduction and Agenda

  • Agenda
  • Overview of changes from November 13, 2013 letter (ML13323A183)
  • Effect on reported results
  • Conservatism and acceptability of revised approach
  • RoverD In-Vessel Cooling Analysis
  • Specific Focus Areas
  • Debris Test Margin
  • Follow-up and Going Forward Actions 3

Overview of Changes from November 13, 2013 Letter

  • Changed methodology to explicitly incorporate certain deterministically-based elements Risk over Deterministic approach (RoverD) that was described in March 25, 2015 letter (ML15091A440)
  • Added the plant-specific testing deterministic basis (Letter Attachment 1-2)
  • Addressed all the NRC content guide questions and responded to earlier RAIs (Letter Attachment 1-5)
  • Added the RoverD risk-informed description (Letter Attachment 1-3)
  • Expanded Defense-in-Depth and Safety Margin discussion (Letter Attachment 1-4)
  • Clarification on exemptions
  • Clarified that a specific exemption to single failure is not being requested
  • Added proposed Technical Specification change for debris-specific effects (Letter Attachment 3) 4

Overview of Changes from November 13, 2013 Letter

  • What is no longer in the scope of the application and should not be part of the review, including RAI responses:
  • CASA Grande calculation of conditional failure probabilities
  • Use of correlations for head loss, including bump-up factors
  • Uncertainty quantification of pipe break probability distributions; replaced with conservative estimates
  • Time dependent debris transport
  • Use of STP PRA for calculation of delta CDF; used only for delta LERF
  • Applications of CASA Grande that are still used
  • Debris generation
  • Debris arrival to the containment pool (non-time dependent) 5

Results with Revised Methodology Remain in RG 1.174 Region III

  • Conclusions are unchanged with revised methodology
  • 2015 RoverD: CDF: 1.23E-07/yr, LERF: 3.08E-10/yr
  • 2013 CASA Grande/PRA: CDF: 2.88E-08/yr, LERF: 1.40E-11/yr 6

Conservatism and Acceptability of Revised Approach 7

Conservatism and Acceptability of Revised Approach

  • Deterministically tested debris
  • Qualitative margin evaluation of July 2008 test determined that low density fiberglass is the only debris source term not bounded by the test
  • Considers various break types and locations
  • Conservatisms used in transport calculation 8

RoverD In-Vessel Cooling Analysis

  • T-H and Debris Analyses Show Adequate Long-Term Cooling
  • Analysis assuming total blockage of core and core bypass shows that there is sufficient cooling for all HLB and all SLOCA (CLB and HLB)
  • FA tests show that there is insignificant pressure drop for bounding HLB conditions (DEGB, no credit for decay heat at time of recirculation) with 15 gm/FA including chemical effects
  • STP strainer penetration testing shows that for all CLB, << 15gm/FA accumulates on the core
  • Shows there is no CLB with potential for in-core debris effects, independent of T-H analysis
  • Confirms that all risk-informed debris effects scope is due to blockage at the strainer 9

Specific Focus Items

  • Breaks that have bounding debris transport fractions do not have direct spill paths to the containment floor
  • Transport evaluation included 1, 2, and 3 trains operating
  • Evaluation of transport of unqualified epoxy, particulate, and chips shows sufficient margin
  • Erosion Methodology
  • STP conditions are bounded by 30-day erosion testing showing factors below 10%
  • Methodology shown in Table 10 of Att. 1-2 of 8/20/15 letter
  • Early or late arrival is based on initial blow-down to pool or wash down by spray
  • Small and large percentage are the eroded fractions from small and large debris
  • Early and late arrival of fines based on initial blow-down to pool or wash down by spray
  • Margin evaluation of July 2008 test shows that low density fiberglass is the only debris source term not bounded by the test 10

Debris Test Margin DEBRIS AMOUNTS FOR JULY 2008 TEST Debris Item Debris Amount Comment

  • LDFG fines accounted for in the risk-Test Surrogate Material informed portion LDFG Fibers Total Fines 79.91 ft3 / Nukon Not bounding; was based on
  • Microtherm and Epoxy offset by:

Total Smalls 158.48 ft3 / Nukon 7D ZOI

  • Marinite Particulates Microtherm 33 lbm / Microtherm powder Not bounding; subsequently
  • Zinc shown to be 29.3 lbm more Marinite Board 182.7 lbm Bounding; subsequently Powdered Marinite board removed from containment Latent particulate, dust, dirt 141.1 lbm / Dirt mix Bounding Coatings Zinc 1,368 lbm / Tin Powder Bounding; subsequently shown to be 637 lbm less Polyamide primer 10 lbm / Powder (Acrylic Bounding coating)

Alkyds 247 lbm / Powder (Acrylic Bounding coating)

Baked enamel 268 lbm / Powder (Acrylic Bounding coating)

Epoxy (outside ZOI) 106 lbm / Chips (Acrylic Not bounding; subsequently 1/64 to 1/4) shown to be 259 lbm more Epoxy (ZOI) 57 lbm / Powder (Acrylic coating)

Total powder 1,950 lbm Total chips 106 lbm Chemical Precipitates Sodium Aluminum Silicate 1,432 lbm / WCAP AlOOH Bounding Aluminum Oxyhydroxide 143 lbm / WCAP AlOOH Bounding Calcium Phosphate 359 lbm / WCAP Ca3(PO4)2 Bounding 11

Follow-up and Going Forward Actions

  • November public meeting to resolve outstanding questions 12