| issue date = 01/07/2016
| issue date = 01/07/2016
| title = E-Mail: Duane Arnold, MOD/50.59 Inspection Request for Information (Jsp)
| title = E-Mail: Duane Arnold, MOD/50.59 Inspection Request for Information (Jsp)
| author name = Park J S
| author name = Park J
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Weaver T
| addressee name = Weaver T
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:From:Park, JoonTo:Lopez, Crystal
{{#Wiki_filter:From:             Park, Joon To:               Lopez, Crystal


==Subject:==
==Subject:==
FW: Additional Documents Request for Mod/50.59 InspectionDate:Friday, January 08, 2016 9:16:03 AMFrom: Park, Joon Sent: Thursday, January 07, 2016 2:56 PMTo: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>
FW: Additional Documents Request for Mod/50.59 Inspection Date:             Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>
Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>


==Subject:==
==Subject:==
Additional Documents Request for Mod/50.59 InspectionHello Tracy,I have the following additional documents to request as part of the Mod/50.59 inspection:-       Design Document BECH-M190-GBD-       DGC-M100 (Design Guide for Seismic Cat. I Piping System)-       B31.1 Piping Code-       Evaluation 462706 & WO 40297129-       Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)-       Procedures and work instructions used to perform heavy load lift/movement in the Pump House-       ACI 318       Engineering Change 278809If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.Thank you,Joon S. ParkReactor InspectorNRC/Region IIIJoon.Park@nrc.govOffice: 630-829-9715 From:Park, JoonTo:Lopez, Crystal
Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:
        -   Design Document BECH-M190-GBD
        -   DGC-M100 (Design Guide for Seismic Cat. I Piping System)
        -   B31.1 Piping Code
        -   Evaluation 462706 & WO 40297129
        -   Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)
        -   Procedures and work instructions used to perform heavy load lift/movement in the Pump House
        -   ACI 318-63
        -  Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.
Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696
 
From:             Park, Joon To:               Lopez, Crystal


==Subject:==
==Subject:==
FW: Additional Documents Request for Mod/50.59 InspectionDate:Friday, January 08, 2016 9:16:03 AMFrom: Park, Joon Sent: Thursday, January 07, 2016 2:56 PMTo: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>
FW: Additional Documents Request for Mod/50.59 Inspection Date:             Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>
Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>


==Subject:==
==Subject:==
Additional Documents Request for Mod/50.59 InspectionHello Tracy,I have the following additional documents to request as part of the Mod/50.59 inspection:-       Design Document BECH-M190-GBD-       DGC-M100 (Design Guide for Seismic Cat. I Piping System)-       B31.1 Piping Code-       Evaluation 462706 & WO 40297129-       Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)-       Procedures and work instructions used to perform heavy load lift/movement in the Pump House-       ACI 318       Engineering Change 278809If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.Thank you,Joon S. ParkReactor InspectorNRC/Region IIIJoon.Park@nrc.govOffice: 630-829-9715}}
Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:
        -   Design Document BECH-M190-GBD
        -   DGC-M100 (Design Guide for Seismic Cat. I Piping System)
        -   B31.1 Piping Code
        -   Evaluation 462706 & WO 40297129
        -   Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)
        -   Procedures and work instructions used to perform heavy load lift/movement in the Pump House
        -   ACI 318-63
        -  Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.
Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696}}

Latest revision as of 02:14, 31 October 2019

E-Mail: Duane Arnold, MOD/50.59 Inspection Request for Information (Jsp)
ML16014A696
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/07/2016
From: James Park
NRC/RGN-III/DRS/EB1
To: Thomas Weaver
Nextera Energy
References
Download: ML16014A696 (1)


Text

From: Park, Joon To: Lopez, Crystal

Subject:

FW: Additional Documents Request for Mod/50.59 Inspection Date: Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>

Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>

Subject:

Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:

- Design Document BECH-M190-GBD

- DGC-M100 (Design Guide for Seismic Cat. I Piping System)

- B31.1 Piping Code

- Evaluation 462706 & WO 40297129

- Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)

- Procedures and work instructions used to perform heavy load lift/movement in the Pump House

- ACI 318-63

- Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.

Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696

From: Park, Joon To: Lopez, Crystal

Subject:

FW: Additional Documents Request for Mod/50.59 Inspection Date: Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>

Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>

Subject:

Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:

- Design Document BECH-M190-GBD

- DGC-M100 (Design Guide for Seismic Cat. I Piping System)

- B31.1 Piping Code

- Evaluation 462706 & WO 40297129

- Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)

- Procedures and work instructions used to perform heavy load lift/movement in the Pump House

- ACI 318-63

- Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.

Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696