(6 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML16014A696 | | | number = ML16014A696 |
| | issue date = 01/07/2016 | | | issue date = 01/07/2016 |
| | title = E-Mail: Duane Arnold, Mod/50.59 Inspection Request for Information (JSP) | | | title = E-Mail: Duane Arnold, MOD/50.59 Inspection Request for Information (Jsp) |
| | author name = Park J S | | | author name = Park J |
| | author affiliation = NRC/RGN-III/DRS/EB1 | | | author affiliation = NRC/RGN-III/DRS/EB1 |
| | addressee name = Weaver T | | | addressee name = Weaver T |
Line 12: |
Line 12: |
| | document type = E-Mail, Inspection Report, Request for Additional Information (RAI) | | | document type = E-Mail, Inspection Report, Request for Additional Information (RAI) |
| | page count = 1 | | | page count = 1 |
| | revision = 0
| |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:From: Park, Joon To: Lopez, Crystal |
| | |
| | ==Subject:== |
| | FW: Additional Documents Request for Mod/50.59 Inspection Date: Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com> |
| | Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov> |
| | |
| | ==Subject:== |
| | Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection: |
| | - Design Document BECH-M190-GBD |
| | - DGC-M100 (Design Guide for Seismic Cat. I Piping System) |
| | - B31.1 Piping Code |
| | - Evaluation 462706 & WO 40297129 |
| | - Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0) |
| | - Procedures and work instructions used to perform heavy load lift/movement in the Pump House |
| | - ACI 318-63 |
| | - Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site. |
| | Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696 |
| | |
| | From: Park, Joon To: Lopez, Crystal |
| | |
| | ==Subject:== |
| | FW: Additional Documents Request for Mod/50.59 Inspection Date: Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com> |
| | Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov> |
| | |
| | ==Subject:== |
| | Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection: |
| | - Design Document BECH-M190-GBD |
| | - DGC-M100 (Design Guide for Seismic Cat. I Piping System) |
| | - B31.1 Piping Code |
| | - Evaluation 462706 & WO 40297129 |
| | - Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0) |
| | - Procedures and work instructions used to perform heavy load lift/movement in the Pump House |
| | - ACI 318-63 |
| | - Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site. |
| | Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696}} |
Latest revision as of 02:14, 31 October 2019
|
---|
Category:E-Mail
MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML22067A0922022-03-0303 March 2022 State Consultation - Duane Arnold ISFSI-Only EP License Amendment ML22040A1162022-02-0808 February 2022 Email to G. Van Noordennen Zion and La Crosse Review Schedule Changes ML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML22007A3102022-01-0505 January 2022 State Consultation - Draft No Significant Hazards Determination Regarding a LAR for NextEra Energy Duane Arnold, LLC, Duane Arnold Energy Center ISFSI in Palo, Iowa ML22005A1012022-01-0404 January 2022 Email from a Leek to a Snyder Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo Iowa ML22005A0992022-01-0404 January 2022 Email from a Snyder to a Leek Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo, Iowa ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML22004A0122022-01-0303 January 2022 E-mail from M. Davis, NextEra, to A. Snyder, NRC, - Duane Arnold Energy Center - Supplement Information to Technical Specification Amendment Application ML21354A6722021-12-17017 December 2021 Email to State of Iowa - Draft EA on Duane Arnold Exemption ML21214A0482021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Emergency Plan ML21214A0502021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Physical Security Plan ML21165A1212021-06-10010 June 2021 E-mail from M. Davis, Duane Arnold, to M. Doell and R. Edwards, NRC - Duane Arnold Defueled Emergency Plan Implementation Confirmation ML21117A2752021-04-26026 April 2021 Acceptance of Updated Spent Fuel Management Plan ML21089A2092021-03-19019 March 2021 Spent Fuel Pattern Procedure ML21068A3352021-03-0707 March 2021 Acceptance of License Amendment Request to Adopt ISFSI-Only Technical Specifications ML21056A2172021-02-17017 February 2021 Acceptance of License Amendment Request to Revise the Physical Security Plan Requirements ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan ML21006A4052021-01-0606 January 2021 NRR E-mail Capture - Final RAI - Duane Arnold - Post-Shutdown Decommissioning Activities Report ML20338A0032020-12-0101 December 2020 Letter from EPRI to Mr. Scott Wall, BWRVIP 2020-100, 288 Surveillance Capsule Test Results Report ML20316A0212020-11-10010 November 2020 NRR E-mail Capture - Final RAI - Duane Arnold - Duane Arnold Amendment for Proposed Defueled EP and EAL Scheme ML20289A3522020-10-14014 October 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Requested Licensing Action, One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic (EPID No. L-2020-LLE-01 ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) ML20154K6202020-05-27027 May 2020 COVID-19 Preparedness Assessments for FEMA Region VII Duane Arnold Energy Center (DAEC) and Quad Cities Generating Station (Qcgs) ML20141L8132020-05-19019 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Exemption Request for Security Training Requirements Due to COVID-19 Pandemic - EPID L-2020-LLE-0042 to 45, L-2020-LLE-0051 ML20129J8282020-05-0606 May 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from Portions of 10 CFR 50.47 and Appendix E - EPID L-2020-LLE-0023 ML20127H8662020-05-0505 May 2020 NRR E-mail Capture - Duane Arnold Energy Center (DAEC) - Request for Additional Information (RAI) - Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20122A1152020-04-30030 April 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Post-Shutdown Decommissioning Activities Report ML20087F2872020-03-26026 March 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20129J8322020-03-19019 March 2020 NRR E-mail Capture - (External_Sender) Teleconference with Nextra Energy - Duane Arnold Physical Security Plan LIC-109 Review Status ML20022A3602020-01-22022 January 2020 NRR E-mail Capture - Duane Arnold Energy Center - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML19352G6872019-12-11011 December 2019 12-11-19 Email to FEMA: Response to FEMA Questions on Proposed DAEC Emergency Plan ML19302G3212019-10-29029 October 2019 LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186) - Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19302G9732019-10-29029 October 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186): Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19280A0352019-10-0404 October 2019 NRR E-mail Capture - Final - RAI Related to License Amendment Request (TSCR-182) for Proposed Changes to the Emergency Plan for Permanently Defueled Conditions at Duane Arnold Energy Center (DAEC) - L-2019-LLA-0075 ML19206A2182019-07-25025 July 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130 ML19183A0172019-06-26026 June 2019 NRR E-mail Capture - LIC-109 Acceptance of Request for Change in the BWRVIP Integrated Surveillance Program Test Schedule to Accommodate Early Closure of the Duane Arnold Energy Center - EPID L-2019-LRO-0042 ML19122A4882019-04-29029 April 2019 NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request (TSCR-182) for Duane Arnold Energy Center (DAEC) - Proposed Changes to the Emergency Plan for Permanently Defueled Condition - EPID L-2019-LLA-0075 ML19086A3502019-03-27027 March 2019 NRR E-mail Capture - LIC-109 Acceptance of the Request for Exemption from 10 CFR 73.55(p)(1)(I) and 10 CFR 73.55(p)(1)(ii) for Duane Arnold Energy Center - EPID L-2019-LLE-0003 ML19064A2032019-03-0404 March 2019 NRR E-mail Capture - Results of LIC-109 Acceptance Review - Duane Arnold Energy Center - Request for Approval of Certified Fuel Handler Training Program, EPID L-2019-LLL-0003 ML18283B0522018-10-0909 October 2018 NRR E-mail Capture - Final Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18255A2922018-09-11011 September 2018 NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18166A2982018-06-15015 June 2018 NRR E-mail Capture - Draft Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18108A3102018-04-12012 April 2018 NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ ML18088A0102018-03-28028 March 2018 NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05) ML18037B0032018-02-0606 February 2018 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 ML18025A2362018-01-24024 January 2018 NRR E-mail Capture - Resent - LIC-109 Acceptance - Duane Arnold LAR (TSCR-166) - Adoption of Emergency Action Level (EAL) Scheme Pursuant to NEI 99-01, Revision 6, Development of EALs for Non-Passive Reactors ML18023A0752018-01-22022 January 2018 NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amendment Request (LAR) (TSCR-179) - Application to Add Technical Specification 3.2.3, Linear Heat Generation Rate - EPID: L-2017-LLA-0436 2024-09-04
[Table view] Category:Inspection Report
MONTHYEARIR 07200032/20224012023-03-0909 March 2023 Public DAEC ISFSI - Independent Spent Fuel Storage Installation Security Inspection Report 07200032/2022401 IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) IR 05000331/20210012022-01-25025 January 2022 NRC Inspection Report Nos. 05000331/2021001(DNMS); 07200032/2021001(DNMS); and 07200032/2021002(DNMS) - Duane Arnold Energy Center IR 05000331/20214022021-12-30030 December 2021 DAEC Decommissioning Reactor - Decommissioning Security Inspection Report 05000331/2021402 IR 05000331/20214012021-08-25025 August 2021 DAEC Decommissioning Reactor (Permanently Shut Down) and Independent Spent Fuel Storage Installation - Security Inspection Reports 05000331/2021401; and 07200032/2021401 IR 05000331/20200042021-02-12012 February 2021 Integrated Inspection Report 05000331/2020004 and 05000331/2020501 IR 05000331/20200102021-01-0707 January 2021 NRC Inspection Report No. 05000331/2020010(DNMS) - Duane Arnold Energy Center IR 05000331/20200032020-11-0606 November 2020 Integrated Inspection Report 05000331/2020003 and 07200032/2020001 IR 05000331/20200052020-09-0101 September 2020 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2020005) IR 05000331/20200022020-08-0404 August 2020 Integrated Inspection Report 05000331/2020002 IR 05000331/20204022020-07-14014 July 2020 Security Baseline Inspection Report 05000331/2020402 IR 05000331/20200012020-06-22022 June 2020 Reissue - Duane Arnold Energy Center - Integrated Inspection Report 05000331/2020001 IR 05000331/20204012020-06-10010 June 2020 Security Baseline Inspection Report 05000331/2020401 ML20132A2662020-05-11011 May 2020 Integrated Inspection Report 05000331/2020001 IR 05000331/20190062020-03-0303 March 2020 Annual Assessment Letter Duane Arnold Energy Center (Report 05000331/2019006) IR 05000331/20190042020-01-28028 January 2020 Integrated Inspection Report 05000331/2019004 IR 05000331/20190132019-12-11011 December 2019 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000331/2019013 IR 05000331/20190032019-11-12012 November 2019 Integrated Inspection Report 05000331/2019003 IR 05000331/20194112019-10-21021 October 2019 Dune Arnold Energy Center - NRC Baseline Inspection Report 05000331/2019411 IR 05000331/20190112019-10-0101 October 2019 NRC Inspection Report 05000331/2019011 IR 05000331/20190052019-08-28028 August 2019 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2019005) IR 05000331/20190022019-08-0101 August 2019 Integrated Inspection Report 05000331/2019002 IR 05000331/20193012019-06-18018 June 2019 NRC Initial License Examination Report 05000331/2019301 IR 05000331/20190012019-05-0303 May 2019 NRC Integrated Inspection Report 05000331/2019001 IR 07200032/20194012019-05-0202 May 2019 Independent Spent Fuel Storage Installation NRC Security Inspection Report 07200032/2019401 (DRS-G.Bonano) IR 05000331/20190102019-04-18018 April 2019 NRC Biennial Problem Identification and Resolution Inspection Report 05000331/2019010 IR 05000331/20194102019-04-16016 April 2019 NRC Security Baseline Inspection Report 05000331/2019410 (DRS-G.Bonano) IR 05000331/20180062019-03-0404 March 2019 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2018006) IR 05000331/20180042019-02-0707 February 2019 Errata - Duane Arnold Energy Center - NRC Integrated Inspection Report 05000331/2018004 ML19029A4432019-01-29029 January 2019 NRC Integrated Inspection Report 05000331/2018004 IR 05000331/20182012019-01-0808 January 2019 NRC Security Baseline Inspection Report 05000331/2018201 IR 05000331/20184142018-11-29029 November 2018 NRC Cyber Security Inspection Report 05000331/2018414 - Cover Letter (DRS-G.Hausman) IR 05000331/20180032018-10-24024 October 2018 NRC Integrated Inspection Report 05000331/2018003 IR 05000331/20184132018-10-11011 October 2018 NRC Security Baseline Inspection Report 05000331/2018413 (DRS-J.Kutlesa) IR 05000331/20180052018-08-28028 August 2018 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005) IR 05000331/20180022018-08-0303 August 2018 NRC Integrated Inspection Report 05000331/2018002 IR 05000331/20184122018-07-17017 July 2018 NRC Security Baseline Inspection Report 05000331/2018412 (DRS-G.Bonano) IR 05000331/20185032018-05-29029 May 2018 NRC Emergency Preparedness Inspection Report 05000331/2018503 (Gph) IR 05000331/20180012018-05-0404 May 2018 NRC Integrated Inspection Report 05000331/2018001 IR 05000331/20184112018-03-23023 March 2018 NRC Security Baseline Inspection Report 05000331/2018411 - (Cover Letter Only) IR 05000331/20180102018-03-16016 March 2018 NRC Triennial Fire Protection Inspection Report 05000331/2018010 (DRS-A.Dahbur) IR 05000331/20170062018-03-0202 March 2018 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2017006) IR 05000331/20184102018-02-26026 February 2018 NRC Material Control and Accounting Program Inspection Report 05000331/2018410 IR 05000331/20170042018-01-22022 January 2018 NRC Integrated Inspection Report 05000331/2017004; 07200032/2017001; and Emergency Preparedness Annual Inspection Report 05000331/2017501 ML18012A5482018-01-10010 January 2018 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000331/2018001 (DRS-A.Dunlop) IR 05000331/20174072017-12-14014 December 2017 NRC Security Baseline Inspection Report 05000331/2017407 - Cover Letter Only (DRS-M.Ziolkowski) IR 05000331/20170102017-11-21021 November 2017 Ltr 11/21/17 Duane Arnold Energy Center - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program; Inspection Report 05000331/2017010 (DRS-N.Feliz-Adorno) 2023-03-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML21335A0712021-12-0101 December 2021 Request for Additional Information - Duane Arnold Energy Center ISFSI Only Emergency Plan ML21335A0702021-12-0101 December 2021 Cover Letter to B. Coffey from K. Conway - Duane Arnold Energy Center RAI Re License Amendment Request for ISFSI Only Emergency Plan ML21250A3002021-09-0808 September 2021 Defueled Physical Security Plan RAI Cover Letter ML21006A4052021-01-0606 January 2021 NRR E-mail Capture - Final RAI - Duane Arnold - Post-Shutdown Decommissioning Activities Report ML20316A0212020-11-10010 November 2020 NRR E-mail Capture - Final RAI - Duane Arnold - Duane Arnold Amendment for Proposed Defueled EP and EAL Scheme ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) ML20141L8132020-05-19019 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Exemption Request for Security Training Requirements Due to COVID-19 Pandemic - EPID L-2020-LLE-0042 to 45, L-2020-LLE-0051 ML20133K0482020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8662020-05-0505 May 2020 NRR E-mail Capture - Duane Arnold Energy Center (DAEC) - Request for Additional Information (RAI) - Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML19280A0352019-10-0404 October 2019 NRR E-mail Capture - Final - RAI Related to License Amendment Request (TSCR-182) for Proposed Changes to the Emergency Plan for Permanently Defueled Conditions at Duane Arnold Energy Center (DAEC) - L-2019-LLA-0075 ML18283B0522018-10-0909 October 2018 NRR E-mail Capture - Final Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18255A2922018-09-11011 September 2018 NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18247A2002018-08-21021 August 2018 E-Mailed Request for Information for Duane Arnold, Dated 08/21/18 (DRS-M.Holmberg) ML18166A2982018-06-15015 June 2018 NRR E-mail Capture - Draft Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18088A0102018-03-28028 March 2018 NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05) ML18058A0522018-02-27027 February 2018 Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2) ML18037B0032018-02-0606 February 2018 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 ML17347A8752017-12-12012 December 2017 NRR E-mail Capture - Second Round of Request for Additional Information - Duane Arnold Energy Center (DAEC) - LAR to Adopt TST-542, Revision 2, Reactor Pressure Vessel Water Inventory Control - CAC No. MF9829 ML17277A3652017-10-0404 October 2017 NRR E-mail Capture - Final Request for Additional Information - Duane Arnold - Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control - CAC No. MF9829 ML17240A0082017-08-25025 August 2017 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Fifth Ten Year Service Inspection Interval - Relief Request No. RR-04, Rev. 0 - Proposed Alternative for Seal Weld Procedure Qualification - MF937 ML17220A3332017-08-0808 August 2017 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center - Relief Request No. RR-03 - Alternative Requirements for Nozzle Inner Radius and Nozzle-To-Shell Welds - CAC No. MF9374 ML17159A7962017-06-0707 June 2017 17 Duane Arnold Energy Center - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17068A0632017-03-0808 March 2017 NRR E-mail Capture - Final - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - Revision to Staff Augmentation Times in the Duane Arnold Energy Center (DAEC) Emergency Plan (Eplan) - MF8390 ML16333A4622016-11-28028 November 2016 NRR E-mail Capture - Final Request for Additional Information - Duane Arnold Energy Center - LAR - SFP Criticality - MF7486 ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16313A0742016-11-0808 November 2016 NextEra Audit Plan Nov 2016 (DAEC SFP Criticality LAR) ML16075A0032016-03-14014 March 2016 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center - LAR to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specifications 2.1.1, Reactor Core Safety Limits - MF6618 ML16074A3142016-03-14014 March 2016 NRR E-mail Capture - Second Round RAIs - Duane Arnold Energy Center - LAR (TSCR-143) to Extend Containment Leakage Test Frequency - MF6619 ML16022A0092016-01-21021 January 2016 NRR E-mail Capture - Request for Additional Information - LAR to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 ML16021A0122016-01-21021 January 2016 Request for Additional Information by the Containment & Ventilation Branch and PRA Licensing Branch License Amendment Request - Extension of the 10 CFR 50 Appendix J Containment Type a & Type C Test Intervals ML16014A6962016-01-0707 January 2016 E-Mail: Duane Arnold, MOD/50.59 Inspection Request for Information (Jsp) ML16005A6082015-12-24024 December 2015 E-Mail: Duane Arnold Request for Information; December 24, 2015 (AAS) ML15175A0652015-06-23023 June 2015 Ltr. 06/23/15 Duane Arnold Energy Center - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000331/2015003 (Axd) ML14057A7562014-02-25025 February 2014 14 Duane Arnold CDBI Request for Information ML14031A1462014-01-29029 January 2014 Update to NextEra Energy Duane Arnold, Llc'S Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendations ML13323B4432013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13255A1982013-09-16016 September 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13175A3932013-06-27027 June 2013 Request for Additional Information for Review Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML13154A5112013-06-0404 June 2013 Rai'S Following Ifib Analysis of NextEra Energy'S 2013 Decommissioning Funding Status Reports for Duane Arnold Energy Center and Point Beach Units 1 and 2 ML12107A0592012-04-11011 April 2012 NRR E-mail Capture - ME7246 - DAEC - Request for Additional Information (RAI) Relief Requests NDR-R003, R010, R011, R014, R015 ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML1201203182012-01-17017 January 2012 Request for Additional Information Amendment to Change Emergency Action Levels ML12011A0602012-01-0404 January 2012 NRR E-mail Capture - ME6508 - DAEC - Emergency Action Level (EAL) Changes ML1132105812011-11-28028 November 2011 Request for Additional Information Regarding 60-Day Response to Bulletin 2011-01, Mitigating Strategies. 2024-07-12
[Table view] |
Text
From: Park, Joon To: Lopez, Crystal
Subject:
FW: Additional Documents Request for Mod/50.59 Inspection Date: Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>
Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>
Subject:
Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:
- Design Document BECH-M190-GBD
- DGC-M100 (Design Guide for Seismic Cat. I Piping System)
- B31.1 Piping Code
- Evaluation 462706 & WO 40297129
- Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)
- Procedures and work instructions used to perform heavy load lift/movement in the Pump House
- ACI 318-63
- Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.
Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696
From: Park, Joon To: Lopez, Crystal
Subject:
FW: Additional Documents Request for Mod/50.59 Inspection Date: Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>
Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>
Subject:
Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:
- Design Document BECH-M190-GBD
- DGC-M100 (Design Guide for Seismic Cat. I Piping System)
- B31.1 Piping Code
- Evaluation 462706 & WO 40297129
- Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)
- Procedures and work instructions used to perform heavy load lift/movement in the Pump House
- ACI 318-63
- Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.
Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696