IR 05000528/2015006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/02/2016
| issue date = 03/02/2016
| title = Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (05000528/2015006, 05000529/2015006, and 05000530/2015006)
| title = Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (05000528/2015006, 05000529/2015006, and 05000530/2015006)
| author name = Sowa J R
| author name = Sowa J
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number = NPF-041, NPF-051, NPF-074
| license number = NPF-041, NPF-051, NPF-074
| contact person = Miller G B
| contact person = Miller G
| document report number = IR 2015006
| document report number = IR 2015006
| document type = Inspection Plan, Letter
| document type = Inspection Plan, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES rch 2, 2016
[[Issue date::March 2, 2016]]


Randall Executive Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (05000528/2015006, 05000529/2015006, AND 05000530/2015006)


SUBJECT: ANNUAL ASSESSMENT LETTER FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (05000528/2015006, 05000529/2015006, AND 05000530/2015006)
==Dear Mr. Edington:==
On February 17, 2016, the NRC completed its end-of-cycle performance review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Palo Verde Nuclear Generating Station Units 1, 2, and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Palo Verde Nuclear Generating Station Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.


==Dear Mr. Edington:==
Routine inspections performed by resident inspectors are not included in the inspection plan.
On February 17, 2016, the NRC completed its end-of-cycle performance review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Palo Verde Nuclear Generating Station Units 1, 2, and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Palo Verde Nuclear Generating Station Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.


The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Palo Verde Nuclear Generating Station Units 1, 2, and 3, and the information gathered will aid staff in development of the Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191:
Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.


In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Palo Verde Nuclear Generating Station Units 1, 2, and 3, and the information gathered will aid staff in development of the Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191: "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 225-635-3193 with any questions you have regarding this letter.
Please contact me at 225-635-3193 with any questions you have regarding this letter.


Sincerely,/RA/ Jeffrey R. Sowa, Acting Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74  
Sincerely,
/RA/
Jeffrey R. Sowa, Acting Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74 Enclosure:
Palo Verde Plant Inspection/Activity Plan
 
ML16061A371 SUNSI Review ADAMS:  Sensitive Non-Publicly Available Keyword By: RCH Yes No Non-Sensitive Publicly Available NRC-002 OFFICE  RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME  JSowa  AVegel  TPruett SIGNATURE /RA/  /RA/  /RA/RLantz, for DATE  2/25/16 2/26/16 2/26/16
 
Letter to Randall from Jeffrey R. Sowa dated March 2, 2016 SUBJECT: ANNUAL ASSESSMENT LETTER FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (05000528/2015006, 05000529/2015006, AND 05000530/2015006)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov)
Resident Inspector (David.You@nrc.gov)
Resident Inspector (Dustin.Reinert@nrc.gov)
PV Administrative Assistant (Yvonne.Dubay@nrc.gov)
Acting Branch Chief, DRP/D (Jeffrey.Sowa@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Jim.Melfi@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Margaret.Watford@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)
Director, DIRS, NRR (Scott.Morris@nrc.gov)
Deputy Director, DIRS, NRR (Clay.Johnson@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, DPR (Lawrence.Kokajko@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov


===Enclosure:===
Page 1 of 2      Palo Verde 02/29/2016 15:46:06    Inspection / Activity Plan Report 22 04/01/2016 - 12/31/2017 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site EXAM - INITIAL EXAM    8 1 10/03/2016 10/07/2016 X02576 INITIAL EXAM PALO VERDE UNIT 1 (10/2016)
Palo Verde Plant Inspection/Activity Plan  
2 10/03/2016 10/07/2016 X02577 INITIAL EXAM PALO VERDE UNIT 2 (10/2016)
3 10/03/2016 10/07/2016 X02578 INITIAL EXAM PALO VERDE UNIT 3 (10/2016)
1 10/31/2016 11/10/2016 X02576 INITIAL EXAM PALO VERDE UNIT 1 (10/2016)
2 10/31/2016 11/10/2016 X02577 INITIAL EXAM PALO VERDE UNIT 2 (10/2016)
3 10/31/2016 11/10/2016 X02578 INITIAL EXAM PALO VERDE UNIT 3 (10/2016)
RS 13 PI - RADIATION SAFETY    2 1, 2, 3 04/18/2016 04/22/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 04/18/2016 04/22/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 04/18/2016 04/22/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 04/18/2016 04/22/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION    1 1 04/18/2016 04/29/2016 IP 7111108P Inservice Inspection Activities - PWR EP-1 - EP PERFORMANCE INDICATORS    1 1 05/02/2016 05/06/2016 IP 71151-EP01 Drill/Exercise Performance 1 05/02/2016 05/06/2016 IP 71151-EP02 ERO Readiness 1 05/02/2016 05/06/2016 IP 71151-EP03 Alert & Notification System Reliability EP-2 - BIENNIAL EP PROGRAM INSPECTION    1 1, 2, 3 05/02/2016 05/06/2016 IP 7111402 Alert and Notification System Testing 1, 2, 3 05/02/2016 05/06/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2, 3 05/02/2016 05/06/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 05/02/2016 05/06/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EB1-21T - PV COMPONENT DESIGN BASIS INSPECTION    6 1, 2, 3 08/01/2016 09/02/2016 IP 7111121 Component Design Bases Inspection 71111.08 - INSERVICE INSPECTION    1 3 10/17/2016 10/28/2016 IP 7111108P Inservice Inspection Activities - PWR INSP - BIENNIAL REQUAL INSPECTION    3 1, 2, 3 12/12/2016 12/16/2016 IP 7111111B Licensed Operator Requalification Program RS 5678 - RS TEAM      5 1, 2, 3 01/23/2017 01/27/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 01/23/2017 01/27/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2, 3 01/23/2017 01/27/2017 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.


SUNSI Review By: RCH ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME JSowa AVegel TPruett SIGNATURE /RA/ /RA/ /RA/RLantz, for DATE 2/25/16 2/26/16 2/26/16 Letter to Randall from Jeffrey R. Sowa dated March 2, 2016
This report shows only on-site and announced inspection procedures.


SUBJECT: ANNUAL ASSESSMENT LETTER FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (05000528/2015006, 05000529/2015006, AND 05000530/2015006) DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Charles.Peabody@nrc.gov) Resident Inspector (David.You@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov) PV Administrative Assistant (Yvonne.Dubay@nrc.gov) Acting Branch Chief, DRP/D (Jeffrey.Sowa@nrc.gov) Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Jim.Melfi@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Margaret.Watford@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Raj.Iyengar@nrc.gov) Director, DIRS, NRR (Scott.Morris@nrc.gov) Deputy Director, DIRS, NRR (Clay.Johnson@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, DPR (Lawrence.Kokajko@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) DRP Branch Chiefs (R4DRPBC@nrc.gov) DRS Branch Chiefs (R4DRSBC@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov Page 1 of 202/29/201615:46:06Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SitePalo VerdeInspection / Activity Plan04/01/2016-12/31/2017EXAM-INITIAL EXAM81 INITIAL EXAM PALO VERDE UNIT 1 (10/2016)X0257610/03/201610/07/2016 2 INITIAL EXAM PALO VERDE UNIT 2 (10/2016)X0257710/03/201610/07/2016 3 INITIAL EXAM PALO VERDE UNIT 3 (10/2016)X0257810/03/201610/07/20161 INITIAL EXAM PALO VERDE UNIT 1 (10/2016)X0257610/31/201611/10/2016 2 INITIAL EXAM PALO VERDE UNIT 2 (10/2016)X0257710/31/201611/10/2016 3 INITIAL EXAM PALO VERDE UNIT 3 (10/2016)X0257810/31/201611/10/2016RS 13 PI-RADIATION SAFETY21,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0104/18/201604/22/20161,2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/18/201604/22/20161,2,3 IPOccupational Exposure Control Effectiveness71151-OR0104/18/201604/22/20161,2,3 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0104/18/201604/22/201671111.08-INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/18/201604/29/2016EP-1-EP PERFORMANCE INDICATORS11 IPDrill/Exercise Performance71151-EP0105/02/201605/06/20161 IPERO Readiness71151-EP0205/02/201605/06/20161 IPAlert & Notification System Reliability71151-EP0305/02/201605/06/2016EP-2-BIENNIAL EP PROGRAM INSPECTION11,2,3 IPAlert and Notification System Testing711140205/02/201605/06/20161,2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/02/201605/06/20161,2,3 IPEmergency Action Level and Emergency Plan Changes711140405/02/201605/06/20161,2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/02/201605/06/2016EB1-21T-PV COMPONENT DESIGN BASIS INSPECTION61,2,3 IPComponent Design Bases Inspection711112108/01/201609/02/201671111.08-INSERVICE INSPECTION1 3 IPInservice Inspection Activities - PWR7111108P10/17/201610/28/2016INSP-BIENNIAL REQUAL INSPECTION31,2,3 IPLicensed Operator Requalification Program7111111B12/12/201612/16/2016RS 5678-RS TEAM51,2,3 IPRadiation Monitoring Instrumentation71124.0501/23/201701/27/20171,2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0601/23/201701/27/20171,2,3 IPRadiological Environmental Monitoring Program71124.0701/23/201701/27/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2      Palo Verde 02/29/2016 15:46:06    Inspection / Activity Plan Report 22 04/01/2016 - 12/31/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site RS 5678 - RS TEAM        5 1, 2, 3 01/23/2017 01/27/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1-17T - PV PERMANENT PLANT MODS & 50.59      3 1, 2, 3 02/27/2017 03/17/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP-3 - EP PERFORMANCE INDICATOR VERIFICATION      1 1, 2, 3 03/06/2017 03/10/2017 IP 71151-EP01 Drill/Exercise Performance 1, 2, 3 03/06/2017 03/10/2017 IP 71151-EP02 ERO Readiness 1, 2, 3 03/06/2017 03/10/2017 IP 71151-EP03 Alert & Notification System Reliability EP2 - BIENNIAL EP EXERCISE INSPECTION      4 1, 2, 3 03/06/2017 03/10/2017 IP 7111401 Exercise Evaluation 1, 2, 3 03/06/2017 03/10/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH)      1 1, 2, 3 04/01/2017 04/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71111.08 - INSERVICE INSPECTION UNIT 2      1 2 04/17/2017 04/28/2017 IP 7111108P Inservice Inspection Activities - PWR RS 12 PI - RADIATION SAFETY      2 1, 2, 3 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 10/16/2017 10/20/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 10/16/2017 10/20/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 10/16/2017 10/20/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION UNIT 1      1 1 10/16/2017 10/27/2017 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.


Page 2 of 202/29/201615:46:06Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SitePalo VerdeInspection / Activity Plan04/01/2016-12/31/2017RS 5678-RS TEAM51,2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0801/23/201701/27/2017EB1-17T-PV PERMANENT PLANT MODS & 50.5931,2,3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T02/27/201703/17/2017EP-3-EP PERFORMANCE INDICATOR VERIFICATION11,2,3 IPDrill/Exercise Performance71151-EP0103/06/201703/10/20171,2,3 IPERO Readiness71151-EP0203/06/201703/10/20171,2,3 IPAlert & Notification System Reliability71151-EP0303/06/201703/10/2017EP2-BIENNIAL EP EXERCISE INSPECTION41,2,3 IPExercise Evaluation711140103/06/201703/10/20171,2,3 IPEmergency Action Level and Emergency Plan Changes711140403/06/201703/10/2017ISFSI-LOADING INSPECTION (ONE WEEK IN MONTH)11,2,3 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.104/01/201704/30/201771111.08-INSERVICE INSPECTION UNIT 21 2 IPInservice Inspection Activities - PWR7111108P04/17/201704/28/2017RS 12 PI-RADIATION SAFETY21,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/16/201710/20/20171,2,3 IPOccupational ALARA Planning and Controls71124.0210/16/201710/20/20171,2,3 IPOccupational Exposure Control Effectiveness71151-OR0110/16/201710/20/20171,2,3 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/16/201710/20/201771111.08-INSERVICE INSPECTION UNIT 111 IPInservice Inspection Activities - PWR7111108P10/16/201710/27/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 23:20, 30 October 2019

Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (05000528/2015006, 05000529/2015006, and 05000530/2015006)
ML16061A371
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/02/2016
From: Sowa J
NRC/RGN-IV/DRP/RPB-D
To: Edington R
Arizona Public Service Co
Miller G
References
IR 2015006
Download: ML16061A371 (6)


Text

UNITED STATES rch 2, 2016

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (05000528/2015006, 05000529/2015006, AND 05000530/2015006)

Dear Mr. Edington:

On February 17, 2016, the NRC completed its end-of-cycle performance review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Palo Verde Nuclear Generating Station Units 1, 2, and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Palo Verde Nuclear Generating Station Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2017.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Palo Verde Nuclear Generating Station Units 1, 2, and 3, and the information gathered will aid staff in development of the Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191:

Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 225-635-3193 with any questions you have regarding this letter.

Sincerely,

/RA/

Jeffrey R. Sowa, Acting Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74 Enclosure:

Palo Verde Plant Inspection/Activity Plan

ML16061A371 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: RCH Yes No Non-Sensitive Publicly Available NRC-002 OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME JSowa AVegel TPruett SIGNATURE /RA/ /RA/ /RA/RLantz, for DATE 2/25/16 2/26/16 2/26/16

Letter to Randall from Jeffrey R. Sowa dated March 2, 2016 SUBJECT: ANNUAL ASSESSMENT LETTER FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (05000528/2015006, 05000529/2015006, AND 05000530/2015006)

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Charles.Peabody@nrc.gov)

Resident Inspector (David.You@nrc.gov)

Resident Inspector (Dustin.Reinert@nrc.gov)

PV Administrative Assistant (Yvonne.Dubay@nrc.gov)

Acting Branch Chief, DRP/D (Jeffrey.Sowa@nrc.gov)

Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Jim.Melfi@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Margaret.Watford@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)

Director, DIRS, NRR (Scott.Morris@nrc.gov)

Deputy Director, DIRS, NRR (Clay.Johnson@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, DPR (Lawrence.Kokajko@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov

Page 1 of 2 Palo Verde 02/29/2016 15:46:06 Inspection / Activity Plan Report 22 04/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXAM - INITIAL EXAM 8 1 10/03/2016 10/07/2016 X02576 INITIAL EXAM PALO VERDE UNIT 1 (10/2016)

2 10/03/2016 10/07/2016 X02577 INITIAL EXAM PALO VERDE UNIT 2 (10/2016)

3 10/03/2016 10/07/2016 X02578 INITIAL EXAM PALO VERDE UNIT 3 (10/2016)

1 10/31/2016 11/10/2016 X02576 INITIAL EXAM PALO VERDE UNIT 1 (10/2016)

2 10/31/2016 11/10/2016 X02577 INITIAL EXAM PALO VERDE UNIT 2 (10/2016)

3 10/31/2016 11/10/2016 X02578 INITIAL EXAM PALO VERDE UNIT 3 (10/2016)

RS 13 PI - RADIATION SAFETY 2 1, 2, 3 04/18/2016 04/22/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 04/18/2016 04/22/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 04/18/2016 04/22/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 04/18/2016 04/22/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION 1 1 04/18/2016 04/29/2016 IP 7111108P Inservice Inspection Activities - PWR EP-1 - EP PERFORMANCE INDICATORS 1 1 05/02/2016 05/06/2016 IP 71151-EP01 Drill/Exercise Performance 1 05/02/2016 05/06/2016 IP 71151-EP02 ERO Readiness 1 05/02/2016 05/06/2016 IP 71151-EP03 Alert & Notification System Reliability EP-2 - BIENNIAL EP PROGRAM INSPECTION 1 1, 2, 3 05/02/2016 05/06/2016 IP 7111402 Alert and Notification System Testing 1, 2, 3 05/02/2016 05/06/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2, 3 05/02/2016 05/06/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 05/02/2016 05/06/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EB1-21T - PV COMPONENT DESIGN BASIS INSPECTION 6 1, 2, 3 08/01/2016 09/02/2016 IP 7111121 Component Design Bases Inspection 71111.08 - INSERVICE INSPECTION 1 3 10/17/2016 10/28/2016 IP 7111108P Inservice Inspection Activities - PWR INSP - BIENNIAL REQUAL INSPECTION 3 1, 2, 3 12/12/2016 12/16/2016 IP 7111111B Licensed Operator Requalification Program RS 5678 - RS TEAM 5 1, 2, 3 01/23/2017 01/27/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 01/23/2017 01/27/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2, 3 01/23/2017 01/27/2017 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Palo Verde 02/29/2016 15:46:06 Inspection / Activity Plan Report 22 04/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RS TEAM 5 1, 2, 3 01/23/2017 01/27/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1-17T - PV PERMANENT PLANT MODS & 50.59 3 1, 2, 3 02/27/2017 03/17/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1 1, 2, 3 03/06/2017 03/10/2017 IP 71151-EP01 Drill/Exercise Performance 1, 2, 3 03/06/2017 03/10/2017 IP 71151-EP02 ERO Readiness 1, 2, 3 03/06/2017 03/10/2017 IP 71151-EP03 Alert & Notification System Reliability EP2 - BIENNIAL EP EXERCISE INSPECTION 4 1, 2, 3 03/06/2017 03/10/2017 IP 7111401 Exercise Evaluation 1, 2, 3 03/06/2017 03/10/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1 1, 2, 3 04/01/2017 04/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71111.08 - INSERVICE INSPECTION UNIT 2 1 2 04/17/2017 04/28/2017 IP 7111108P Inservice Inspection Activities - PWR RS 12 PI - RADIATION SAFETY 2 1, 2, 3 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 10/16/2017 10/20/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 10/16/2017 10/20/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 10/16/2017 10/20/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION UNIT 1 1 1 10/16/2017 10/27/2017 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.