PVNGS Units 1, 2, and 3 - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000528/2022401; 05000529/2022401; 05000530/2022401
ML22252A035
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/12/2022
From: Sam Graves
NRC/RGN-IV/DORS/EB2
To: Marjorie Mclaughlin
Arizona Public Service Co
Graves S
References
IR 2022401
Download: ML22252A035 (11)


See also: IR 05000528/2022401

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 EAST LAMAR BOULEVARD

ARLINGTON, TEXAS 76011-4511

September 12, 2022

Mr. Mike McLaughlin

Site Vice President

Arizona Public Service Company

P.O. Box 52034, MS 7602

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

INFORMATION REQUEST FOR THE CYBERSECURITY BASELINE

INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000528/2022401;

05000529/2022401; 05000530/2022401

Dear Mr. McLaughlin:

On December 5, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cybersecurity, at your Palo

Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection objectives are to provide

assurance that the digital computer and communication systems and networks associated with

safety, security, or emergency preparedness (SSEP) functions are adequately protected against

cyberattacks in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 73.54

and your approved cybersecurity plan (CSP), and to verify that any CSP changes and reports

have been made in accordance with 10 CFR 50.54(p).

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and licensee staff. To minimize the inspection impact on the site and to ensure

a productive inspection for both parties, we have enclosed a request for documents needed for

the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should

be made available via digital media (CD/DVD) or an online document repository and

delivered/available to the regional office no later than October 10, 2022. The inspection team

will review this information and, by October 31, 2022, will request the specific items that should

be provided for review.

The second group of requested documents will assist the inspection team in the evaluation of

the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas

of your cyber security program selected for review. This information will be requested for review

in the regional office prior to the inspection by November 14, 2022, as identified above.

M. McLaughlin 2

The third group of requested documents consists of additional items that the inspection team

will review, or need access to, during the inspection. Please have this information available by

the first day of the onsite inspection, December 5, 2022.

The fourth group of information aids the inspection team in tracking issues identified during the

inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all requested documents are

up to date and complete to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Sam Graves. We understand that our regulatory contact

for this inspection is Sarah Kane of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 817-200-1102 or via

e-mail at samuel.graves@nrc.gov

Paperwork Reduction Act Statement

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections under approval number 3150-0011. The burden to the

public for these information collections is estimated to average 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />(s) per response. Send

comments regarding this information collection to the FOIA, Library and Information Collection

Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and

to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011)

OMB, Washington, DC 20503.

Public Protection Notification

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Signed by Graves, Samuel

on 09/12/22

Sam Graves, Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket Nos. 05000528, 05000529, 05000530

License Nos. NPF-41, NPF-51, NPF-74

Enclosure: Palo Verde Nuclear Generating Station, Units 1, 2, And 3

ML22252A035

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: Yes No Publicly Available Sensitive NRC-002

OFFICE RIV:SRI/DORS/EB2

NAME S. Graves

SIGNATURE /RA/

DATE 9/12/2022

PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION

DOCUMENT REQUEST

Inspection Report: 05000528/2022401; 05000529/2022401; 05000530/2022401

Inspection Dates: Week of December 5, 2022

Inspection Procedure: IP 71130.10, CYBERSECURITY

Reference: ML21330A088, Guidance Document for Development of the

Request for Information (RFI) and Notification Letter for IP

71130.10 Cyber Security Inspection, Revision 2

NRC Inspectors: Sam Graves, Lead Shiattin Makor

817-200-1102 817-200-1507

samuel.graves@nrc.gov shiattin.Makor@nrc.gov

NRC Contractors: Al Konkal Trace Coleman

561-989-0210 301-415-7000

alan.konkal@nrc.gov trace.coleman@nrc.gov

I. Information Requested for In-Office Preparation

This initial request for information (i.e., Table RFI #1) concentrates on providing the inspection

team with information necessary to select appropriate components and cyber security program

elements to develop a site-specific inspection plan. The first RFI is used to identify the critical

digital assets or systems to be chosen as the sample set required to be inspected by the

cyber-security IP. The first RFIs requested information is specified below in Table RFI #1.

Please provide the information requested in Table RFI #1 to the regional office by

October 10, 2022, or sooner, to facilitate the selection of the specific items for review.

The inspection team will examine the documentation from the first RFI and select specific

systems and equipment to provide a more focused follow-up request to develop the second RFI.

The inspection team will submit the specific systems and equipment list to your staff by

October 31, 2022, which will be utilized to evaluate the equipment, defensive architecture, and

the areas of the licensees cyber security program for review.

Please provide the information requested by the second RFI to the regional office by

Enclosure

PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION

DOCUMENT REQUEST

November 14, 2022. All requests for information shall follow the guidance document referenced

above. For information requests that have more than ten (10) documents, please provide a

compressed (i.e., Zip) file of the documents.

2

PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION

DOCUMENT REQUEST

The required Table RFI #1 information shall be provided on digital media (CD/DVD)) or an online

document repository to the lead inspector by October 10, 2022. Please provide four copies of

each media submitted (i.e., one for each inspector/contactor). The preferred file format for all lists

is a searchable Excel spreadsheet file. The media (CDs/DVDs) should be indexed and hyper-

linked to facilitate ease of use. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

Table RFI #1

Section 3,

Paragraph Number/Title: IP Ref. Items

1 A list of all Identified Critical Systems and Critical Digital Assets, - Overall

highlight/note any additions, deletions, reclassifications due to new guidance

from white papers, changes to NEI 10-04, 13-10, etc. since the last cyber

security inspection.

2 A list of EP and Security onsite and offsite digital communication systems Overall

3 Network Topology Diagrams to include information and data flow for critical Overall

systems in levels 2, 3 and 4 (If available)

4 Ongoing Monitoring and Assessment program documentation 03.01(a)

5 The most recent Effectiveness Analysis of the Cyber Security Program 03.01(b)

6 Vulnerability screening/assessment and scan program documentation 03.01(c)

7 Cyber Security Incident response documentation, including incident 03.02(a) and

detection, response, and recovery documentation as well as contingency 03.04(b)

plan development, implementation and including any program documentation

that requires testing of security boundary device functionality

8 Device Access and Key Control documentation 03.02(d)

9 Password/Authenticator documentation 03.02(d)

10 User Account/Credential documentation 03.02(d)

11 Portable Media and Mobile Device control documentation, including kiosk 03.02(e)

security control assessment/documentation

12 Design change/modification program documentation and a list of all cyber- 03.03(a)

related design changes completed since the last cyber security inspection,

including either a summary describing the design change or the 50.59

documentation for the change.

3

PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION

DOCUMENT REQUEST

13 Supply Chain Management documentation including any security impact 03.03(a), (b)

analysis for new acquisitions and (c)

14 Configuration Management documentation including any security impact 03.03(a) and

analysis performed due to configuration changes since the last inspection (b)

15 Cyber Security Plan and any 50.54(p) analysis to support changes to the 03.04(a)

plan since the last inspection

16 Cyber Security Metrics tracked (if applicable) 03.06 (b)

17 Provide documentation describing any cyber security changes to the access Overall

authorization program since the last cyber security inspection.

18 Provide a list of all procedures and policies provided to the NRC with their Overall

descriptive name and associated number (if available)

19 Performance testing report (if applicable) 03.06 (a)

4

In addition to the above information please provide the following:

(1) Electronic copy of the UFSAR and technical specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

(4) Implementing and program procedures in a single folder.

Based on this information, the inspection team will identify and select specific systems and

equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of

specific systems and equipment to your staff by October 31, 2022, for the second RFI (i.e., RFI

  1. 2).

II. Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned documentation

requested from Table RFI #1 and submit the list of specific systems and equipment to your staff

by October 31, 2022, for the second RFI (i.e., RFI #2). The second RFI will request additional

information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the

licensees CSP selected for the cybersecurity inspection. The additional information requested

for the specific systems and equipment is identified in Table RFI #2. All requested information

shall follow the guidance document referenced above.

The Table RFI #2 information shall be provided on digital media (CD/DVD) or an online

document repository to the lead inspector by November 14, 2022. Please provide four copies of

each media (CD/DVD) submitted (i.e., one for each inspector/contactor). The preferred file

format for all lists is a searchable Excel spreadsheet file. The digital media (CDs/DVDs) should

be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

Table RFI #2

Section 3, IP Ref.

Paragraph Number/Title: Items

For the system(s) chosen for inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the system(s) 03.01(a)

2 All Security Control Assessments for the selected system(s) 03.01(a)

All vulnerability screenings/assessments associated with, or scans

3 03.01(c)

performed on the selected system(s) since the last cyber security inspection

5

PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION

DOCUMENT REQUEST

Table RFI #2

Section 3, IP Ref.

Paragraph Number/Title: Items

Documentation (including configuration files and rules sets) for Network-

based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based

4 03.02(b)

Intrusion Detection Systems (HIDS), and Security Information and Event

Management (SIEM) systems for system(s) chosen for inspection

Documentation (including configuration files and rule sets) for intra-security

5 03.02(c)

level firewalls and boundary devices used to protect the selected system(s)

Copies of all periodic reviews of the access authorization list for the selected

6 03.02(d)

systems since the last inspection

7 Baseline configuration data sheets for the selected CDAs 03.03(a)

Documentation on any changes, including Security Impact Analyses,

8 03.03(b)

performed on the selected system(s) since the last inspection

Copies of the purchase order documentation for any new equipment

9 03.03(c)

purchased for the selected systems since the last inspection

Copies of any reports/assessment for cyber security drills performed since 03.02(a)

10

the last inspection. 03.04(b)

Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a)

11

documentation of the results the last time the backups were executed. 03.04(b)

Corrective actions taken as a result of cyber security incidents/issues to

12 include previous NRC violations and Licensee Identified Violations since the 03.04(d)

last cyber security inspection

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the following RFI

(i.e., Table Onsite Week) on digital media (CD/DVD) or an online document repository by

December 5, 2022, the first day of the inspection. All requested information shall follow the

guidance document referenced above.

Please provide four copies of each passive digital media (CD/DVD) submitted (i.e., one for each

inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file.

The digital media (CDs/DVDs) should be indexed and hyper-linked to facilitate ease of use. If

you have any questions regarding this information, please call the inspection team leader as

soon as possible.

6

Table Onsite Week

Section 3,

Paragraph Number/Title: Items

Any cyber security event reports submitted in accordance with

1 03.04(a)

10 CFR 73.77 since the last cyber security inspection

Updated Copies of corrective actions taken as a result of cyber

security incidents/issues, to include previous NRC violations and

2 03.04(d)

Licensee Identified Violations since the last cyber security

inspection, as well as vulnerability-related corrective actions

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them:

a. Updated Final Safety Analysis Report, if not previously provided;

b. Original FSAR Volumes;

c. Original SER and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications, if not previously provided;

g. Latest IPE/PRA Report; and

(2) Vendor Manuals, Assessments and Corrective Actions:

a. The most recent Cyber-Security Quality Assurance (QA) audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of corrective

actions) generate as a result of the most recent Cyber-Security Quality Assurance

(QA) audit and/or self-assessment.

IV. Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection.

6

PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION

DOCUMENT REQUEST

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

7