| | number = ML16236A096 | | | number = ML16236A096 |
| | issue date = 08/26/2016 | | | issue date = 08/26/2016 |
| | title = R. E. Ginna - Correction Letter to License Amendment No. 122 Licence Amendment Request to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program - Adoption of TSTF-425, Revision 3 (CAC No. MF6358) | | | title = R. E. Ginna - Correction Letter to License Amendment No. 122 Licence Amendment Request to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program - Adoption of TSTF-425, Revision 3 |
| | author name = Render D L | | | author name = Render D |
| | author affiliation = NRC/NRR/DORL/LPLI-1 | | | author affiliation = NRC/NRR/DORL/LPLI-1 |
| | addressee name = Hanson B C | | | addressee name = Hanson B |
| | addressee affiliation = Exelon Nuclear, Nine Mile Point Nuclear Station, LLC | | | addressee affiliation = Exelon Nuclear, Nine Mile Point Nuclear Station, LLC |
| | docket = 05000244 | | | docket = 05000244 |
| | license number = DPR-018 | | | license number = DPR-018 |
| | contact person = Render D L, NRR/DORL/LPL1-1, 415-3629 | | | contact person = Render D, NRR/DORL/LPL1-1, 415-3629 |
| | case reference number = CAC MF6358 | | | case reference number = CAC MF6358 |
| | document type = Letter, Technical Specifications | | | document type = Letter, Technical Specifications |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Nine Mile Point Nuclear Station, LLC 4300 Winfield Road Warrenville, IL 60555 August 26, 2016 SUBJECT: R. E. GINNA NUCLEAR POWER PLANT -CORRECTION LETTER TO LICENSE AMENDMENT NO. 122 RE: LICENSE AMENDMENT REQUEST TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE CONTROLLED PROGRAM -ADOPTION OF TSTF-425, REVISION 3 (CAC NO. MF6358) Dear Mr. Hanson: On June 28, 2016 (Agencywide Documents Access and Management System Accession No. ML 16125A485), the Nuclear Regulatory Commission (NRC) issued Amendment No. 122 to Renewed Facility Operating License No. DPR-18 for Exelon Generation Company, LLC, the licensee for R.E. Ginna Nuclear Power Plant (Ginna). This amendment revised the technical specifications (TSs) tor Ginna by relocating specific TS surveillance frequencies to a licensee-controlled program with the adoption of Technical Specification Task Force -425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control -Risk Informed Technical Specification Task Force Initiative Sb". Additionally, the change added a new program, the Surveillance Frequency Control Program, to TS Section 5, Administrative Controls. In reviewing the above information, the NRC staff noted that there was an administrative typographical error on TS page 3.4.(3-2 for Amendment No. 122. In particular, Surveillance Requirement 3.4.6.4 includes a note that states, "Not required to performed until 12 yours after entering MODE 4", but it should state, "Not required to be performed until 12 hours after entering MODE 4". The correction to TS page 3.4.6-2 is provided and should be replaced with the enclosed TS page 3.4.6.2. These administrative typographical errors do not affect the staff's overall conclusions associated with approval of Amendment No. 122. The changes are within the scope of the application as originally noticed in the Federal Registeron October 13, 2015 (80 FR 61482). We regret any inconvenience the error may have caused. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 26, 2016 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Nine Mile Point Nuclear Station, LLC 4300 Winfield Road Warrenville, IL 60555 |
| B. Hanson -2 -If there are any questions regarding this matter, please contact me at 301-415-3629. Docket No. 50-244 Enclosure: As stated cc w/encl: Distribution via Listserv Diane Render, Project Manager Plant Licensing Branch 1-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation CONDITION REQUIRED ACTION B. One RHR loop ------------------inoperable. -NOTE -Required Action B.1 is not AND applicable if all RCS and RHR loops are inoperable Two RCS loops and Condition C is entered. ------------------inoperable. B.1 Be in MODE 5. C. All RCS and RHR loops C.1 Suspend operations that inoperable. would cause introduction of coolant into the RCS with OR boron concentration less than required to meet the No RCS or RHR loop in SDM of LCO 3.1.1. operation. AND C.2 Initiate action to restore one loop to OPERABLE status and operation. SURVEILLANCE REQUIREMENTS SR 3.4.6.1 SR 3.4.6.2 SR 3.4.6.3 SR 3.4.6.4 SURVEILLANCE Verify one RHR or RCS loop is in operation. Verify SG secondary side water level is 16% for each required RCS loop. Verify correct breaker alignment and indicated power are available to the required pump that is not in operation. -----------------NOTE------------------Not required to be performed until 12 hours after entering MODE 4. Verify required RHR loop locations susceptible to gas accumulation are sufficiently filled with water. R.E. Ginna Nuclear Power Plant 3.4.6-2 RCS Loops -MODE 4 3.4.6 COMPLETION TIME 24 hours Immediately Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No. 122 B. Hanson -2 -If there are any questions regarding this matter, please contact me at 301-415-3629. Docket No. 50-244 Enclosure: As stated Sincerely, IRA! Diane Render, Project Manager Plant Licensing Branch 1-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC RidsNrrDorlLPL 1-1 RidsRgn1 MailCenter RidsOGCMailCenter RidsNrrLAKGoldstein ADAMS Accession No.: ML 16236A096 OFFICE LPL 1-1/PM LPL 1-1/LA RPB1/BC NAME DRender KGoldstein TTate DATE 08/18/2016 08/23/16 08/25/2016 OFFICIAL RECORD COPY LPL 1-1 R/F RidsNrrPMGinna LPL1-1/PM DRender 08/26/2016 | | |
| }} | | ==SUBJECT:== |
| | R. E. GINNA NUCLEAR POWER PLANT - CORRECTION LETTER TO LICENSE AMENDMENT NO. 122 RE: LICENSE AMENDMENT REQUEST TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE CONTROLLED PROGRAM - ADOPTION OF TSTF-425, REVISION 3 (CAC NO. MF6358) |
| | |
| | ==Dear Mr. Hanson:== |
| | |
| | On June 28, 2016 (Agencywide Documents Access and Management System Accession No. ML16125A485), the Nuclear Regulatory Commission (NRC) issued Amendment No. 122 to Renewed Facility Operating License No. DPR-18 for Exelon Generation Company, LLC, the licensee for R.E. Ginna Nuclear Power Plant (Ginna). This amendment revised the technical specifications (TSs) tor Ginna by relocating specific TS surveillance frequencies to a licensee-controlled program with the adoption of Technical Specification Task Force - 425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative Sb". Additionally, the change added a new program, the Surveillance Frequency Control Program, to TS Section 5, Administrative Controls. |
| | In reviewing the above information, the NRC staff noted that there was an administrative typographical error on TS page 3.4.(3-2 for Amendment No. 122. In particular, Surveillance Requirement 3.4.6.4 includes a note that states, "Not required to performed until 12 yours after entering MODE 4", but it should state, "Not required to be performed until 12 hours after entering MODE 4". The correction to TS page 3.4.6-2 is provided and should be replaced with the enclosed TS page 3.4.6.2. |
| | These administrative typographical errors do not affect the staff's overall conclusions associated with approval of Amendment No. 122. The changes are within the scope of the application as originally noticed in the Federal Registeron October 13, 2015 (80 FR 61482). We regret any inconvenience the error may have caused. |
| | |
| | B. Hanson If there are any questions regarding this matter, please contact me at 301-415-3629. |
| | Diane Render, Project Manager Plant Licensing Branch 1-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244 |
| | |
| | ==Enclosure:== |
| | |
| | As stated cc w/encl: Distribution via Listserv |
| | |
| | RCS Loops - MODE 4 3.4.6 CONDITION REQUIRED ACTION COMPLETION TIME B. One RHR loop ------------------ |
| | - NOTE - |
| | inoperable. |
| | Required Action B.1 is not applicable if all RCS and AND RHR loops are inoperable and Condition C is entered. |
| | Two RCS loops -- - - - - - - - - - - - - - - - - |
| | inoperable. |
| | B.1 Be in MODE 5. 24 hours C. All RCS and RHR loops C.1 Suspend operations that Immediately inoperable. would cause introduction of coolant into the RCS with OR boron concentration less than required to meet the No RCS or RHR loop in SDM of LCO 3.1.1. |
| | operation. |
| | AND C.2 Initiate action to restore one Immediately loop to OPERABLE status and operation. |
| | SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY In accordance with SR 3.4.6.1 Verify one RHR or RCS loop is in operation. |
| | the Surveillance Frequency Control Program In accordance with SR 3.4.6.2 Verify SG secondary side water level is ~ 16% for the Surveillance each required RCS loop. |
| | Frequency Control Program In accordance with SR 3.4.6.3 Verify correct breaker alignment and indicated power the Surveillance are available to the required pump that is not in Frequency Control operation. |
| | Program In accordance with SR 3.4.6.4 -----------------NOTE------------------ |
| | the Surveillance Not required to be performed until 12 hours after Frequency Control entering MODE 4. Program Verify required RHR loop locations susceptible to gas accumulation are sufficiently filled with water. |
| | R.E. Ginna Nuclear Power Plant 3.4.6-2 Amendment No. 122 |
| | |
| | ML16236A096 OFFICE LPL 1-1/PM LPL 1-1/LA RPB1/BC LPL1-1/PM NAME DRender KGoldstein TTate DRender DATE 08/18/2016 08/23/16 08/25/2016 08/26/2016}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML15166A0752015-06-0404 June 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) Project stage: Request ML15344A3532016-01-0707 January 2016 Request for Additional Information Regarding Risk-Informed Technical Specifications Initiative 5B CAC No. MF6358) Project stage: RAI ML16034A1392016-02-0303 February 2016 Response to Request for Additional Information - Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program.. Project stage: Response to RAI ML16168A2612016-06-16016 June 2016 Supplement No. 2 to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Rev. 3).... Project stage: Supplement ML16176A2352016-06-23023 June 2016 R. E. Ginna Nuclear Power Plant: Non-Concurrence Process Form for 2016-011 Project stage: Other ML16125A4852016-06-28028 June 2016 R. E. Ginna Nuclear Power Plant - Issuance of Amendment Request to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program - Adoption of TSTF-425, Revision 3 Project stage: Approval ML16236A0962016-08-26026 August 2016 R. E. Ginna - Correction Letter to License Amendment No. 122 Licence Amendment Request to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program - Adoption of TSTF-425, Revision 3 Project stage: Other 2016-06-16
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] Category:Technical Specifications
MONTHYEARML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML22234A1692022-08-22022 August 2022 R. E. Ginna Nuclear Power Plant, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Va ML22052A0132022-02-21021 February 2022 Application to Revise R. E. Ginna Technical Specification 3.1.8, Physics Tests Exception - Mode 2 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML20353A1262021-03-11011 March 2021 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 144 Implementation of WCAP-14333 and WCAP-15376, TSTF-411-A, and TSTF-418-A to Revise Reactor Trip and Engineered Safety Feature Actuation System Instrumentation ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20057E0912020-04-0303 April 2020 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 139 Add a One-Time Note for Use of Alternative Residual Heat Removal Method ML18213A3692018-11-13013 November 2018 Issuance of Amendment No. 132 Revise Technical Specifications 3.3.1, Reactor Trip System Instrumentation, and 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML16358A4242017-02-0909 February 2017 R. E. Ginna Nuclear Power Plant - Issuance of Amendment to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML16236A0962016-08-26026 August 2016 R. E. Ginna - Correction Letter to License Amendment No. 122 Licence Amendment Request to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program - Adoption of TSTF-425, Revision 3 ML16125A4852016-06-28028 June 2016 R. E. Ginna Nuclear Power Plant - Issuance of Amendment Request to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program - Adoption of TSTF-425, Revision 3 ML15352A1642016-03-17017 March 2016 Calvert Cliffs, Units 1 & 2 and Independent Spent Fuel Storage Installation; Nine Mile, Units 1 & 2 and R. E. Ginna - Issuance of Amendments Regarding the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel ML15271A1012015-11-23023 November 2015 Issuance of Amendment Regarding Transition to a Risk Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) ML15275A2762015-10-0202 October 2015 R.E. Ginna - Supplemental Information Regarding TSTF-425 License Amendment Request ML15223B2502015-08-14014 August 2015 and Nine Mile Point Nuclear Station, Unit No. 2- Copy of License Amendment Nos. 313, 291, 118, and 150 ML15161A3802015-07-30030 July 2015 R. E. Ginna and Nine Mile Point, Unit 2 - Issuance of Amendments Regarding Implementation of Technical Specification Task Force Traveler 523, Generic Letter 2008-01, Managing Gas Accumulation (TAC Nos. MF4405 - MF4409) ML15120A2842015-04-30030 April 2015 Response to Request for Additional Information Regarding Proposed License Amendment to Revise Technical Specifications to Adopt TSTF-523 ML14232A3312014-08-21021 August 2014 Non-Proprietary, Correction to Amendment No. 116 Issued August 12, 2014, Revision to Technical Specification Section 3.6.5, 'Containment Air Temperature ML14232A1252014-08-12012 August 2014 R. E. Ginna Nuclear Power Plant - Redacted, Issuance of Amendment Revision to Technical Specification Section 3.6.5 Containment Air Temperature ML14091A3662014-04-0101 April 2014 Issuance of Amendment to Conform the Renewed Facility Operating License to Reflect the Direct Transfer of Operating Authority ML13197A3502013-07-18018 July 2013 Correction to Amendment Approving the Use of Alternate Control and Shutdown Rod Position Monitoring System ML11129A0132011-05-0303 May 2011 Update to License Amendment Request: Improvement to the Definition of Operations Involving Positive Reactivity Changes (TSTF-286) ML0920905382009-07-23023 July 2009 R. E. Ginna - License Amendment Request: Improvement to the Definition of Operations Involving Positive Reactivity Changes (TSTF-286) ML0900607412008-12-19019 December 2008 R. E. Ginna - Application to Revise Technical Specification Limiting Conditions of Operation (Lcos) 3.3.2, 3.3.4, and 3.8.1 ML0823201612008-08-27027 August 2008 R. E. Ginna - Tech Spec Pages for Amendment 105 Control Room Envelope Habitability ML0804605042008-02-0808 February 2008 License Amendment Request: Methodology for Determining Reactor Coolant System Pressure and Temperature and Low Temperature Over Pressure Limits ML0727707352007-10-0101 October 2007 R. E. Ginna, Technical Specifications, Amendment Spent Fuel Pool Storage Capacity ML0714103352007-05-16016 May 2007 Technical Specification (Ts), Revised TS 3.7.8, Service Water (SW) System ML0708903712007-03-28028 March 2007 R. E. Ginna - Tech Spec Pages for Amendment 101 Technical Specification 3.5.1 Regarding Emergency Core Cooling System Accumulators ML0706702082007-03-0101 March 2007 R. E. Ginna, Tech Spec Pages for Amendment 100 Regarding Steam Generator Tube Integrity Technical Specifications ML0627802212006-09-29029 September 2006 License Amendment Request: Change to Technical Specification 3.7.8, Service Water (SW) from an Electrical Train Based on a Pump Based Specification ML0621405252006-07-31031 July 2006 License Page 3, Technical Specifications Section 3.6.6 ML0620903672006-07-26026 July 2006 Technical Specifications, Revises TS 3.9.3, Containment Penetrations, to Allow an Emergency Egress Door, Access Door, or Roll Up Door, as Associated with the Equipment Hatch Penetration, to Be Open, But Capable of Being Closed ML0619205942006-07-11011 July 2006 R. E. Ginna, Tech Spec Pages for Amendment 97 Regarding 16.8 Percent Power Uprate ML0615300162006-05-31031 May 2006 Tech Spec Pages for Amendment 96 Regarding Revised Loss-of-Coolant Accident Analyses ML0612405632006-05-0404 May 2006 Corrected Tech Spec Page 5.6-3, to Amendment No. 94 Relaxed Axial Offset Control ML0612805492006-05-0101 May 2006 License Amendment Request: Technical Specification Improvement Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process ML0608202122006-03-16016 March 2006 R. E. Ginna - Tech Spec Pages for Amendment 95 Main Feedwater Isolation Valves ML0532901022005-11-18018 November 2005 Application for Amendment to Facility Operating License Regarding the Testing Requirement for the Containment Spray Nozzles ML0531902132005-11-0707 November 2005 Application for Amendment to Facility Operating License Revising Technical Specification, Section 3.9.3. to Allow Refueling Operations with the Containment Equipment Hatch Open ML0519202452005-07-0707 July 2005 Technical Specification Pages Revision to Diesel Fuel Oil Requirements ML0513901662005-05-18018 May 2005 Technical Specification Page Modification of the Control Room Emergency Air Treatment System ML0512601812005-05-0505 May 2005 R. E. Ginna Nuclear Power Plant, Technical Specifications, Eliminating Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0512602362005-04-29029 April 2005 R.E.Ginna - License Application Request Regarding Main Feedwater Isolation Valves ML0512602392005-04-29029 April 2005 License Amendment Request Regarding Revised Loss of Coolant Accident (LOCA) Analyses-Changes to Accumulator, Refueling Water Storage Rwst), and Administrative Control Technical Specifications ML0513003302005-04-29029 April 2005 License Amendment Request Regarding Adoption of Relaxed Axial Offset Control (RAOC) ML0510400672005-04-13013 April 2005 R. E. Ginna Tech Spec Pages for Amendment 89 Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports 2023-08-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 26, 2016 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Nine Mile Point Nuclear Station, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - CORRECTION LETTER TO LICENSE AMENDMENT NO. 122 RE: LICENSE AMENDMENT REQUEST TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE CONTROLLED PROGRAM - ADOPTION OF TSTF-425, REVISION 3 (CAC NO. MF6358)
Dear Mr. Hanson:
On June 28, 2016 (Agencywide Documents Access and Management System Accession No. ML16125A485), the Nuclear Regulatory Commission (NRC) issued Amendment No. 122 to Renewed Facility Operating License No. DPR-18 for Exelon Generation Company, LLC, the licensee for R.E. Ginna Nuclear Power Plant (Ginna). This amendment revised the technical specifications (TSs) tor Ginna by relocating specific TS surveillance frequencies to a licensee-controlled program with the adoption of Technical Specification Task Force - 425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative Sb". Additionally, the change added a new program, the Surveillance Frequency Control Program, to TS Section 5, Administrative Controls.
In reviewing the above information, the NRC staff noted that there was an administrative typographical error on TS page 3.4.(3-2 for Amendment No. 122. In particular, Surveillance Requirement 3.4.6.4 includes a note that states, "Not required to performed until 12 yours after entering MODE 4", but it should state, "Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 4". The correction to TS page 3.4.6-2 is provided and should be replaced with the enclosed TS page 3.4.6.2.
These administrative typographical errors do not affect the staff's overall conclusions associated with approval of Amendment No. 122. The changes are within the scope of the application as originally noticed in the Federal Registeron October 13, 2015 (80 FR 61482). We regret any inconvenience the error may have caused.
B. Hanson If there are any questions regarding this matter, please contact me at 301-415-3629.
Diane Render, Project Manager Plant Licensing Branch 1-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
As stated cc w/encl: Distribution via Listserv
RCS Loops - MODE 4 3.4.6 CONDITION REQUIRED ACTION COMPLETION TIME B. One RHR loop ------------------
- NOTE -
inoperable.
Required Action B.1 is not applicable if all RCS and AND RHR loops are inoperable and Condition C is entered.
Two RCS loops -- - - - - - - - - - - - - - - - -
inoperable.
B.1 Be in MODE 5. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C. All RCS and RHR loops C.1 Suspend operations that Immediately inoperable. would cause introduction of coolant into the RCS with OR boron concentration less than required to meet the No RCS or RHR loop in SDM of LCO 3.1.1.
operation.
AND C.2 Initiate action to restore one Immediately loop to OPERABLE status and operation.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY In accordance with SR 3.4.6.1 Verify one RHR or RCS loop is in operation.
the Surveillance Frequency Control Program In accordance with SR 3.4.6.2 Verify SG secondary side water level is ~ 16% for the Surveillance each required RCS loop.
Frequency Control Program In accordance with SR 3.4.6.3 Verify correct breaker alignment and indicated power the Surveillance are available to the required pump that is not in Frequency Control operation.
Program In accordance with SR 3.4.6.4 -----------------NOTE------------------
the Surveillance Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after Frequency Control entering MODE 4. Program Verify required RHR loop locations susceptible to gas accumulation are sufficiently filled with water.
R.E. Ginna Nuclear Power Plant 3.4.6-2 Amendment No. 122
ML16236A096 OFFICE LPL 1-1/PM LPL 1-1/LA RPB1/BC LPL1-1/PM NAME DRender KGoldstein TTate DRender DATE 08/18/2016 08/23/16 08/25/2016 08/26/2016