R. E. Ginna Nuclear Power Plant, Technical Specifications, Eliminating Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process
ML051260181
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/05/2005
From: Skay D
NRC/NRR/DLPM/LPD1
To: Korsnick M
Ginna
References
TAC MC4196
Download: ML051260181 (4)


Text

PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3I The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.

APPLICABILITY: MODES 1,2, and 3.

ACTIONS

-NOTE-Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. A.1 Restore required channel to 30 days

--. OPERABLE status.

- NOTE -

Not applicable to Functions 3 and 4.

One or more Functions with one required channel inoperable.

B. Required Action and B.1 Initiate action to prepare Immediately associated Completion and submit a special report.

Time of Condition A not met.

C. C.1 Restore required channel to 7 days

--. OPERABLE status.

-NOTE-Only applicable to Functions 3 and 4.

One or more Functions with required channel inoperable.

R.E. Ginna Nuclear Power Plant 3.3.3-1 Amendment No- 90°

PAM Instrumentation 3.3.3 CONDITION l REQUIRED ACTION COMPLETION TIME D. One or more Functions D.1 Restore one channel to 7 days with two required OPERABLE status.

channels inoperable.

E. Required Action and E.1 Enter the Condition Immediately associated Completion referenced in Table 3.3.3-1 Time of Condition C or D for the channel.

not met.

F. As required by Required F.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action E.I and referenced in Table 3.3.3-1. AND F.2 Be In MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> G As required by Required G.1 Initiate action to prepare Immediately Action E.1 and referenced and submit a special report.

in Table 3.3.3-1.

SURVEILLANCE REQUIREMENTS

-NOTE-SR 3.3.3.1 and SR 3.3.3.2 apply to each PAM instrumentation Function in Table 3.3.3-1.

SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform CHANNEL CHECK for each requIred 31 days instrumentation channel that Is normally energized.

SR 3.3.3.2 Perform CHANNEL CALIBRATION. 24 months R.E. Ginna Nuclear Power Plant 3.3.3-2 Amendment TJo .. 9 0

4 e PAM Instrumentation 3.3.3 Table 3.3.3-1 Csost Accident Monitoring Instrumentation FUNCTION REQUIRED CONDITION CHANNELS

1. Pressurizer Pressure 2 F
2. Pressurizer Level 2 F 3- Reactor Coolant System (RCS) Hot Leg Temperature 1 per loop F
4. RCS Cold Leg Temperature 1 per loop F
5. RCS Pressure (Wide Range) 2 F
6. RCS Subcooling Monitor 2 F
7. Reactor Vessel Water Level 2 G
8. Containment Sump B Water Level 2 F
9. Containment Pressure (Wide Range) 2 F
10. ContainmentArea Radiatbn (High Range) 2 G
11. Condensate Storage Tank Level 2 F
12. Refueling Water Storage Tank Level 2 F
13. Residual Heat Removal Flow 2 F
14. Core Exit Temperature-Quadrant 1 2(a) F
15. Core ExitTemperature-Quadrant 2 2(a) F
16. Core Exit Temperature-Quadrant 3 2(a) F
17. Core Exit Temperature-Quadrant 4 2(a) F
18. Auxiliary Feedwater (AFW) Flow to Steam Generator (SG) A 2 F
19. AFW Fowto SG B 2 F
20. SG A Water Level (Narrow Range) 2 F
21. SG B Water Level (Narrow Range) 2 F
22. SG A Water Level (Wide Range) 2 F R.E. Ginna Nuclear Power Plant 3.3.3-3 Amendment No . 9 0

i I I PAM Instrumentation 3.3.3 Table 3.3.3-1 -

Post Accident Monitoring Instrumentation FUNCTION REQUIRED CONDITION CHANNELS

23. SG B Water Level (Wide Range) 2 F I
24. SG A Pressure 2 F
25. SG B Pressure 2 F (a) A channel consists of two core exit thermocouples (CETs).

R.E. Ginna Nuclear Power Plant 3.3.34 Amendment No . . 90