R. E. Ginna - Tech Spec Pages for Amendment 105 Control Room Envelope Habitability
ML082320161
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/27/2008
From:
Plant Licensing Branch 1
To:
Pickett D
References
TAC MD6679
Download: ML082320161 (20)


Text

(b) Pursuant to the Act and 10 CFR Part 70, to possess and use four (4) mixed oxide fuel assemblies in accordance with the RG&E's application dated December 14,1979 (transmitted by letter dated December 20, 1979), as supplemented February 20, 1980, and March 5, 1980; (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1) Maximum Power Level Ginna LLC is authorized to operate the facility at steady-state power levels up to a maximum of 1775 megawatts (thermal).

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 105, are hereby incorporated in the renewed license.

The licensee shall operate the facility in accordance with the Technical Specifications.

(3) Fire Protection (a) The licensee shall implement and maintain in effect all fire protection features described in the licensee's submittals referenced in and as approved or modified by the NRC's Fire Protection Safety Evaluation (SE) dated February 14, 1979, and Amendment No. 105

3. Designated staging areas for equipment and materials
4. Command and control .
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders (9) Control Room Envelope Habitability Upon implementation of Amendment No. 105 adopting TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by SR 3.7.9.4, in accordance with TS 5.5.16.c.i and the assessment of CRE habitability as required by 5.5.16.c.ii, shall be considered met. Following implementation:

(a) The first performance of SR 3.7.9.4 in accordance with Specification 5.5.16.c.i shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2, as measured from February 8, 2005, the date of the most recent successful tracer gas test, as-stated iKthe-April-6,2007 lettefi'--p~se-to--..

Generic Letter 2003-01, or within the next 18 months if the time period since the most recent tracer gas test is greater than 6 years.

(b) The first performance of the periodic assessment of CRE habitability, Specification 5.5.16.c.ii, shall be within 3 years, plus the 9-month allowance of SR 3.0.2 as measured from February 8, 2005, the date of the most recent successful tracer gas test, as stated in-the April- 6,2007-1efter-response -to-Generic-Letter----

20n03-.n1 , or w^Aithin the naet 9 mnnthe if the timen nprinol since the most recent successful tracer gas test is greater than 3 years.

D. The facility requires an exemption from certain requirements of 10 CFR 50.46(a)(1). This includes an exemption from 50.46(a)(1), that emergency core cooling system (ECCS) performance be calculated in Amendment No. 105

accordance with an acceptable calculational model which conforms to the provisions in Appendix K (SER dated April 18,1978). The exemption will expire upon receipt and approval of revised ECCS calculations. The aforementioned exemption is authorized by law and will not endanger life property or the common defense and security and is otherwise in the public interest. Therefore, the exemption is hereby granted pursuant to 10 CFR 50.12.

E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27827 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "R. E. Ginna Nuclear Power Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan," submitted by letter dated October 11, 2004.

F. The Updated Final Safety Analysis Report supplement, submitted pursuant to 10 CFR 54.21 (d), describes certain future activities to be completed prior to the period of extended operation. Ginna LLC shall complete these activities no later than September 18, 2009, and shall notify the Commission in writing when implementation of these activities is complete and can be verified by NRC inspection.

The Updated Final Safety Analysis Report supplement, as revised, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4) following issuance of this renewed license. Until that update is complete, Ginna LLC may make changes to the programs and activities described in the supplement without prior Commission approval, provided that Ginna LLC evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

G. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of ASTM E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. Any capsules placed in storage must be maintained for future insertion, unless approved by the NRC.

Amendment No. 105

and shall expire at H. This renewed license is effective as of the date of issuance midnight on September 18, 2029.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By J. E. Dyer, Director Office of Nuclear Reactor Regulation

Attachment:

Appendix A - Technical Specifications Date of Issuance: May 19, 2004 Amendment No. 105

CREATS 3.7.9 3.7 PLANT SYSTEMS 3.7'9 Control- Room Emergency Air Treatment System (CREATS)

LCO 3.7.£ Two CREATS Trains shall be OPERABLE.

- NOTE -

The control room envelope (CRE) boundary may be opened intermittently I under administrative control. r APPLICABILITY:  ! MODES 1, 2, 3, and 4, During movement of irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CREATS train A.1 Restore CREATS train to 7 days inoperable for reasons OPERABLE status.

I other than Condition B.,

B. One or more CREATS B.1 Initiate action to implement Immediately trains inoperable due to mitigating actions.

inoperable CRE boundary in MODE 1, 2, 3, or 4., AND B.2 Verify mitigating actions 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.

AND B.3 Restore CRE boundary to 90 days OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or 4. C.2 Be in MODE 5. 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> R.E. Ginna Nuclear Power. Plant 3.7.9-1 Amendment 105

CREATS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME I D. Required Action and associated Completion Time of Condition A not D.1 Place OPERABLE CREATS train in emergency mode.

Immediately met during movement of irradiated fuel assemblies.

OR I D.2 Suspend movement of Immediately irradiated fuel assemblies.

E. Two CREATS trains E.1 Suspend movement of Immediately inoperable during' irradiated fuel assemblies.

movement of irradiated fuel assemblies.

OR One or more CREATS trains inoperable due to an inoperable CRE boundary during' movement of irradiated fuel assemblies.

F. Two CREATS trains F.1' Enter LCO 3.0.3.. Immediately inoperable in MODE 1, 2, 3, or 4 for reasons other than Condition B.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operate each CREATS filtration train _ 15 minutes. 31 days SR 3.7.9.2 Perform' required CREATS filter testing in accordance In accordance with with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.9.3 Verify each -CREATS -train actuates on an actual or 24 months simulated actuation signal.

R.E. Ginna Nuclear Power Plant 3.7.9-2 Amendment 105

'CREATS S3.7.9 SURVEILLANCE FREQUENCY SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing In accordance with in accordance with the Control Room Envelope the Control Room Habitability Program Envelope Habitability Program R.E. Ginna Nuclear Power Plant 3.7.9-3 Amendment 105

Programs and Manuals 5.5 5.0 ADMINISTRATIVE CONTROLS 5.5 Programs and Manuals The following programs and manuals shall be established, implemented, and maintained.

5.5.1 Offsite Dose Calculation Manual (ODCM)

The ODCM shall contain:

a. The methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm and trip setpoints, and in the conduct of the radiological environmental monitoring program; and
b. The radioactive effluent controls and radiological environmental monitoring activities and descriptions of the information that should be included in the Annual Radiological Environmental Operating and Radioactive Effluent Release Reports.

Licensee initiated changes to the ODCM:

a. Shall be documented and records of reviews performed shall be retained. This documentation shall contain:
1. sufficient information to support the change(s) together with the appropriate analyses or evaluations justifying, the change(s),
2. a determination that the change(s) maintain the levels of radioactive effluent control required by 10 CFR 20.1302, 40 CFR 190, 10 CFR 50.36a, and 10 CFR 50, Appendix I, and does not adversely impact the accuracy or reliability of effluent, dose, or setpoint calculations;
b. Shall become effective after review and acceptance by the onsite review function and the approval of the plant manager; and
c. Shall be submitted to the NRC in the form of a complete, legible copy of the entire ODCM as a part of or concurrent with the Radioactive Effluent Release Report for the period of the report in which any change in the ODCM was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (i.e., month and year) the change was implemented.

R.E. Ginna 'Nuclear Power Plant 5.5-1 Amendment105

Programs and Manuals

  • ' .5.5 5.5.2 Primary Coolant Sources Outside Containment Program This program provides controls to minimize leakage from those portions of systems- outside-containment--that-could contain-highly-radioactive fluids during a serious transient or accident. The systems include Containment Spray, Safety Injection, and Residual Heat Removal in the recirculation configuration. The program shall include the following:
a. Preventive maintenance and periodic visual inspection requirements; and
b. Integrated leak test requirements for each.system at refueling cycle intervals or less.

5.5.3 Deleted 5.5.4 Radioactive Effluent Controls Program This program conforms to 10 CFR 50.36a for the control of radioactive effluents and for maintaining the 'doses to members of the public from radioactive effluents as low as reasonably achievable. The program shall be contained in the ODCM, shall be implemented by procedures, and shall include remedial actions to be taken whenever the program limits are exceeded. The program shall include the following elements:

a. Limitations on the functional capability of radioactive liquid and gaseous monitoring instrumentation including surveillance tests and setpoint determination in accordance with the methodology in the ODCM;
b. Limitations on the concentrations of radioactive material released in liquid effluents to unrestricted areas, conforming to ten times the concentration values in 10 CFR 20, Appendix B, Table 2, Column 2;
c. Monitoring, sampling, and analysis of radioactive liquid and gaseous effluents in accordance with 10 CFR 20.1302 and with the methodology and parameters in the ODCM;
d. Limitations on the annual and quarterly doses or dose commitment to a member of the public from radioactive materials in liquid effluents released from the plant to unrestricted areas, conforming to 10 CFR 50, Appendix I and 40 CFR 141;
e. Determination of cumulative and projected dose contributions from radioactive effluents for the current calendar quarter and current calendar year in accordance with the methodology and parameters in the ODCM at least every 31 days; R.E. Ginna Nuclear Power Plant 5.5-2 Amendmentim

Programs and Manuals 5.5

f. Limitations on the functional capability and use of the liquid and gaseous effluent treatment systems to ensure that appropriate portions of these systems are used to reduce releases o.f radioactivity *hen the projected doses in a period of 31 days would exceed 2% of the guidelines for the annual dose or dose commitment, conforming to 10 CFR 50, Appendix I;
g. Limitations on the dose rate resulting from radioactive material released in gaseous effluents to areas beyond the site boundary conforming to the dose associated with 10 CFR 20, Appendix B, Table 2, Column 1;
h. Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from the plant to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;
i. Limitations on the annual and quarterly doses to a member of the public from iodine-1 31, iodine-1 33, tritium, and all radionuclides in particulate form with half lives > 8.days in gaseous effluents released from the plant to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and
j. Limitations on the annual dose or dose commitment to any member of the public due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.

5.5.5 Component Cyclic or Transient Limit Program This program provides controls to track the reactor coolant system cyclic and transient occurrences specified in UFSAR Table 5.1-4 to ensure that components are maintained within the design limits.

R.E. Ginna Nuclear Power Plant 5.5-3 ArnendmentIn9

Programs and Manuals 5.5 5.5.6 Pre-Stressed Concrete Containment Tendon Surveillance Proaram This program provides controls for monitoring any tendon degradation in pre-stressed concrete-containments,- including-effectiveness-of its corrosion protection medium, to ensure containment structural integrity.

The Tendon Surveillance Program, inspection frequencies, and acceptance criteria shall be in accordance with Regulatory Guide 1.35, Revision 2.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Tendon Surveillance Program inspection frequencies.

5.5.7 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components including applicable supports. The program shall include the following:

a. Testing frequencies specified in Section Xl of the ASME Boiler and Pressure Vessel Code and applicable Addenda as follows:

ASME Boiler and Pressure Vessel Code and Reauired Freauencies for aoolicable Addenda terminolgoy for inservice aerformino inservice testing testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

b. The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing activities;
c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and
d. Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any Technical Specification.

R.E. Ginna Nuclear Power Plant 5.5-4 Amendmenffý

Programs and Manuals 5.5 5.5.8 Steam Generator (SG) Program A Steam Generator Program shall be established and implemented to ensure that SG-tube integrity-is maintained. Inaddition, the-Steam Generator Program shall include the following provisions:

a. Provisions for condition monitoring assessments. Condition monitoring assessment means an evaluation of the "as found"'

condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during an SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging of tubes. Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected or plugged, to confirm that the performance criteria are being met.

b. Performance criteria for SG tube integrity. Steam generator tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational LEAKAGE.
1. Structural integrity performance criterion: All in-service steam generator tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down and all anticipated transients included in the design specification) and design basis accidents. This includes retaining a safety factor of 3.0 against burst under normal steady-state full power operation primary to secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials.

Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse.

In the assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.

2. Accident induced leakage performance criterion: The primary to secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for each SG. Leakage is not to exceed 1 gpm per SG.

R.E. Ginna Nuclear Power Plant 5.5-5 Amendment 105

Programs and Manuals 5.5

3. The operational LEAKAGE performance criterion is specified in LCO 3.4.13, "RCS Operational LEAKAGE."
c. Provisions for SG- tube repair aritria[ Tub-es found-by inservice inspection to contain flaws with a depth equal to or exceeding 40%

of the nominal tube wall thickness shall be plugged.

d. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial, and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria. The tube-to-tubesheet weld is not part of the tube. In addition to rmeeting the requirements of d.1, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained -until the next SG inspection. An assessment of degradation shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine Which inspection methods need to be employed and at what locations.
1. Inspect 100% of the tubes in each SG during the first refueling outage following SG replacement.
2. Inspect 100% of the tubes at sequential periods of 144, 108, 72, and, thereafter, 60 effective full power months. The first sequential period shall be considered to begin after the first inservice inspection of the SGs., In addition, inspect 50% of the tubes by the refueling outage nearest the midpoint of the period and the remaining 50% by the refueling outage nearest the end of the period. No SG shall operate for more than 72 effective full power months or three refueling outages (whichever is less) without being inspected.
3. If crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.
e. Provisions for monitoring operational primary to secondary LEAKAGE, R.E. Ginna Nuclear Power Plant 5.5-6 Amendmentln9-

Programs and Manuals, 5.5.

5.5.9 Secondary Water Chemistry Program This program provides controls for--monitoring secondary water chemistry-to inhibit SG tube degradation. This program shall include:

a. Identification of a sampling schedule for the critical variables and control points for these variables;
b. Identification of the procedures used to measure the values of the critical variables;
c. Identification of process sampling points;
d. Procedures for the recording and management of data; -
e. Procedures defining corrective actions for all off control point chemistry conditions; and
f. A procedure identifying the authority responsible for the.

interpretation of the data and the sequence and timing of administrative events, which is required to initiate corrective action.

R.E. Ginna Nuclear Power Plant 5.5-7 Amendmentim

Programs and Manuals,"

.5.5 5.5.10 Ventilation Filter Testing Program (VFTP)

A program shall be established to implement the following required testing of Engineered Safety Feature._filter ventilation -systemrs and the Spent Fuel Pool (SFP) Charcoal Adsorber System. The test frequencies will be in accordance with Regulatory Guide 1.52, Revision 2, except that in lieu of 18 month test intervals, a 24 month interval will be implemented.

The test methods will be in accordance with Regulatory Guide 1.52, Revision 2, except as modified below.

a. Containment Recirculation Fan Cooler System
1. Demonstrate the pressure drop across the high efficiency particulate air (HEPA) filter bank is < 3 inches of water at a design flow rate (+/- 10%).
2. Demonstrate that an in-place dioctylphthalate (DOP) test of the HEPA filter bank shows a penetration and system bypass

< 1.0%.

b. Control Room Emergency Air Treatment System (CREATS)
1. Demonstrate the pressure drop across the combined HEPA filters, the prefilters, the charcoal adsorbers and the post-filters is < 11 inches of water at a design flow rate (+ 10%).
2. Demonstrate that an in-place DOP test of the HEPA filter bank shows a penetration and system bypass < 0.05%.
3. Demonstrate that an in-place Freon test of the charcoal adsorber bank shows a penetration and system bypass

< 0.05%, when tested under ambient conditions.

4. Demonstrate that a laboratory test of a sample of the charcoal adsorber, when obtained as described in Regulatory Guide 1.52, Revision 2, shows a methyl iodide penetration of less than 1.5% when tested in accordance with ASTM D3803-1989 at a test temperature of 30 0C (86 0 F), a relative humidity of 95%, and a face velocity of 61 ft/min.
c. SFP Charcoal Adsorber System
1. Demonstrate that the total air flow rate from the charcoal adsorbers shows at least 75% of that measured with a complete set of new adsorbers.
2. Demonstrate that an in-placeFreon test of the charcoal

.adsorbers bank shows a penetration and system bypass

< 1.0%, when tested under ambient conditions.

R.E. Ginna Nuclear Power Plant 5.5-8 Amendment 105

Programs and Manuals 5.5

3. Demonstrate that a laboratory test of a sample of the charcoal adsorber, when obtained as described in Regulatory Guide 1.52, Revision 2, shows a methyl iodide penetration of les-s-thar1- 145% when tested- in accordance-with -ASTM D3803-1989 at a test temperature of 30 0 C (86 0 F) and a relative humidity of 95%.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the VFTP frequencies.

5.5.11 Explosive Gas and Storage Tank Radioactivity Monitoring Program this program provides controls for potentially explosive gas mixtures contained in the waste gas decay tanks and the quantity of radioactivity contained in waste gas decay tanks. The gaseous radioactivity quantities shall be determined following the methodology in NUREG-0133.

The program shall include:

a. The limits for concentrations of hydrogen and oxygen in the waste gas decay tanks and a surveillance program to ensure the limits are maintained. Such limits shall be appropriate to the system's design criteria (i.e., whether or not the system is designed to withstand a hydrogen explosion); and
b. A surveillance program to ensure that the quantity of radioactivity contained in each waste gas decay tank is less than the amount that would result in a whole body exposure of Ž_0.5 rem to any individual in an unrestricted area, in the event of an uncontrolled release of the tanks' contents.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Explosive Gas and Storage Tank Radioactivity Monitoring Program surveillance frequencies.

5.5.12 Diesel Fuel Oil Testing Program A diesel fuel oil testing program to implement required testing of both new fuel oil and stored fuel oil shall be established. The program shall include sampling and testing requirements, and acceptance criteria, all in accordance with applicable ASTM Standards. The purpose of the program is to establish the following:

a. Acceptability of new fuel oil for use prior to addition to storage tanks by determining that the fuel oil has:
1. an API gravity or an absolute specific gravity within limits, R.E. Ginna Nuclear Power Plant 5.5-9 Amendment 1-05

,* Programs and Manuals 5.5

2. a flash point and kinematic viscosity within limits for ASTM 2D fuel oil, and

(

3. - a clear and bright appearance with proper color or a water and sediment content within limits; and
b. Within 31 days following addition of the new fuel to the storage tanks, verify that the properties of the new fuel oil, other than those addressed in a. above, are within limits for ASTM 2D fuel oil; and
c. Total particulate concentration of the fuel oil is < 10 mg/I when tested every 92 days.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Diesel Fuel Oil Testing Program test frequencies.

5.5.13 Technical Specifications (TS) Bases Control Program this program provides a means for processing changes to the Bases of these Technical Specifications.

a. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
b. Licensees may make changes to Bases without prior NRC approval provided the changes-do not require either of the following:
1. A change in the TS incorporated in the license; or
2. A change to the UFSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
c. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the UFSAR.
d. Proposed changes that meet'the criteria of Specification 5.5.13.b.1 or Specification 5.5.13.b.2 shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71e.

R.E. Ginna Nuclear Power Plant 5.5-10 Amendment in5

Programs and Manuals 5.5 5.5.14 Safety Function Determination Proaram (SFDP)

This program ensures loss of safety function is detected and appropriate actions-taken.--Upon-entry-into LCO 3.0.6,-an evaluation-shall.be-made-to determine if loss of safety function exists. Additionally, other appropriate actions may be taken as a result of the support system inoperability and corresponding exception to entering supported system Condition and Required Actions. This program implements the requirements of LCO 3.0.6. The SFDP shall contain the following:

a. Provisions for cross train checks to ensure a loss of the capability to perform the safety function assumed in the accident analysis does not go undetected;
b. Provisions for ensuring the plant is maintained in a safe condition if a loss of function condition exists; C. Provisions to ensure that an inoperable supported system's Completion Time is not inappropriately extended as a result of multiple support system inoperabilities; and
d. Other appropriate limitations' and remedial or compensatory actions.

A loss of safety function exists when, assuming no concurrent single failure,,a safety function assumed in the accident analysis cannot be performed. For the purpose of this program, a loss of safety function may exist when a support system is inoperable, and:

a. A required system redundant to the supported system(s) is also inoperable; or
b. A required system redundant to the'system(s) in turn supported by the inoperable supported system is 'also inoperable; or
c. A required system redundant to the inoperable support system(s) for the supported systems (a) and (b) above is also inoperable.

The SFDP identifies where a loss of safety function exists. If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

5.5.15 Containment Leakage Rate Testing Program A program shall be established to implement the leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in R.E. Ginna Nuclear Power Plant 5.5-11 Amendment 105

S .. Programs and Manuals 5.5 Regulatory Guide 1.163, "Performance-Based Containment Leak-Test Program," dated September 1995, as modified by the following exception to NEI 94-01 ,.Rev. 0, "Industry Guideline for Implementing Performance-Based Option -f10-CFR- 50, Apefiidix J"

a. Section 9.2.3: The first Type A test performed after the May 31, 1996 Type A test shall be performed by May 31, 2011.

The peak calculated containment internal pressure for the design basis loss of coolant accident, Pa, is 60 Psig.

The maximum allowable primary containment leakage rate, La, at Pal shall be 0.2% of containment air weight per day.

Leakage Rate acceptance criteria are:

a. Containment leakage rate acceptance criterion is _ 1.0 La. During the first plant startup following testing in accordance with this program, the leakage rate acceptance criteria are _< 0.60 La for the Type B and Type C tests and _*0.75 La for Type A tests;
b. Air lock testing acceptance criteria are:
1. For each air lock, overall leakage rate is _ 0.05 La when tested at __Pa, and
2. For each door, leakage rate is < 0.01 La when tested at _ Pa-
c. Mini-purge valve acceptance criteria is < 0.05 La when tested at

>Pa The provisions of SR 3.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.

The provisions of SR 3.0.3 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.

5.5.16 Control Room Envelope Habitability Program A Control Room Envelope (CRE) Habitability Program shall be established and implemented to ensure that CRE habitability is maintained such that, with an OPERABLE Control Room Emergency Air Treatment System (CREATS), CRE occupants can control the reactor safely under normal conditions and maintain it in a safe condition following a radiological event, hazardous chemical release, or a smoke challenge. The program shall ensure that adequate radiation protection is provided to permit access and occupancy of the CRE under design basis ac-,-*.int inDBA) Conditions without-personnel receiving radiat.ion---

R.E. Ginna Nuclear Power Plant 5.5-12 Amendment 105

Programs and Manuals 5.5 exposures in excess of 5 rem total effective dose equivalent (TEDE) for the duration of the accident. The program shall include the following elements:

a. The definition of the CRE and the CRE boundary.
b. Requirements for maintaining the CRE boundary in its design condition including configuration control and preventive maintenance.
c. Requirements for (i) determining the unfiltered air inleakage past the CRE boundary into the CRE in accordance with the testing methods and at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors," Revision 0, May 2003, and (ii) assessing CRE habitability at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0.
d. Licensee controlled programs that will be used to verify the integrity of the CRE boundary. Conditions that generate relevant information from these programs will be entered into the corrective action process and shall be trended and used as part of the 36 month assessments of the CRE boundary.
e. The quantitative limits on unfiltered air inleakage into the CRE.

These limits shall be stated in a manner to allow direct comparison to the unfiltered air inleakage measured by the testing described in paragraph c. The unfiltered air inleakage limit for radiological challenges is the inleakage flow rate assumed in the licensing basis analyses of DBA consequences. Unfiltered air inleakage limits for hazardous chemicals must ensure that exposure of CRE occupants to these hazards will be within the assumptions in the licensing basis.

f. The provisions of SR 3.0.2 are applicable to the Frequencies for assessing CRE habitability and determining CRE unfiltered inleakage as required by paragraph c.

R.E. Ginna Nuclear Power Plant 5.5-13 AmendmentIO5