(b) Pursuant to the Act and 10 CFR Part 70, to possess and use four (4) mixed oxide fuel assemblies in accordance with the RG&E's application dated December 14, 1979 (transmitted by letter dated December 20, 1979), as supplemented February 20, 1980 and March 5, 1980; (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Part 20, Section-30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
(1) Maximum Power Level Ginna LLC is authorized to operate the facility at steady-state power levels up to a maximum of 1775 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.100. are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Fire Protection (a) The licensee shall implement and maintain in effect all fire protection features described in the licensee's submittals referenced in and as approved or modified by the NRC's Fire Protection Safety Evaluation (SE) dated February 14, 1979 and Amendment No. IM
Definitions 1.1 1.0 USE AND APPLICATION 1.1 Definitions
- NOTE -
The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.
Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.
ACTUATION An ACTUATION LOGIC TEST shall be the application of various LOGIC TEST simulated or actual input combinations in conjunction with each possible interlock logic state and the verification of the required logic output. The ACTUATION LOGIC TEST, as a minimum, shall include a continuity check of output devices.
AXIAL FLUX AFD shall be the difference in normalized flux signals between the top DIFFERENCE and bottom halves of a two section excore neutron detector.
(AFD)
CHANNEL A CHANNEL CALIBRATION shall be the adjustment, as necessary, of CALIBRATION the channel so that it responds within the required range and accuracy to known input. The CHANNEL CALIBRATION shall encompass the entire channel, including the required sensor, alarm, interlock, display, and trip functions. Calibration of instrument channels with resistance temperature detector (RTD) or thermocouple sensors may consist of an inplace qualitative assessment of sensor behavior and normal calibration of the remaining adjustable devices in the channel.
The CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping calibrations or total channel steps so that the entire channel is calibrated.
CHANNELCHECK A CHANNEL CHECK shall be the qualitative assessment, by observation, of channel behavior during operation. This determination shall include, where possible, comparison of the channel indication and status to other indications or status derived from independent instrument channels measuring the same parameter.
R.E. Ginna Nuclear Power Plant 1 .1-1 Amendment 100
Definitions 1.1 CHANNEL A COT shall be the injection of a simulated or actual signal into the OPERATIONAL channel as close to the sensor as practicable to verify the OPERABILITY TEST of required alarm, interlock, display, and trip functions. The COT shall (COT) include adjustments, as necessary, of the required alarm, interlock, and trip setpoints so that the setpoints are within the required range and accuracy.
CORE CORE ALTERATIONS shall be the movement of any fuel, sources, or ALTERATIONS reactivity control components, within the reactor vessel with the vessel head removed and fuel in the vessel. Suspension of CORE ALTERATIONS shall not preclude completion of movement of a component to a safe position.
CORE OPERATING The COLR is the plant specific document that provides cycle specific LIMITS REPORT parameter limits for the current reload cycle. These cycle specific (COLR) parameter limits shall be determined for each reload cycle in accordance with Specification 5.6.5. Plant operation within these limits is addressed in individual Specifications.
DOSE DOSE EQUIVALENT 1-131 shall be that concentration of 1-131 EQUIVALENT 1-131 (microcuries/gram) that alone would produce the same thyroid dose as the quantity and isotopic mixture of 1-131, 1-132, 1-133, 1-134, and 1-135 actually present. The thyroid dose conversion factors used for this calculation shall be those listed in ICRP 30, Supplement to Part 1, pages 192-212, table entitled, "Committed Dose Equivalent in Target Organs or Tissues per Intake of Unit Activity."
E - AVERAGE E shall be the average (weighted in proportion to the concentration of DISI NTEGRATION each radionuclide in the reactor coolant at the time of sampling) of the ENERGY sum of the average beta and gamma energies (in MeV) per disintegration for non-iodine isotopes, with half lives > 15 minutes, making up at least 95% of the total non-iodine activity in the coolant.
R.E. Ginna Nuclear Power Plant 1ý11-2 Amendment IM
Definitions 1.1 LEAKAGE LEAKAGE from the RCS shall be:
- a. Identified LEAKAGE
- 1. LEAKAGE, such as that from pump seals or valve packing (except reactor coolant pump (RCP) seal water injection or return), that is captured and conducted to collection systems or a sump or collecting tank;
- 2. LEAKAGE into the containment atmosphere from sources that are both specifically located and known either not to interfere with the operation of leakage detection systems or not to be pressure boundary LEAKAGE; or
- 3. Reactor Coolant System (RCS) LEAKAGE through a steam generator to the Secondary System (primary to secondary I LEAKAGE);
- b. Unidentified LEAKAGE All LEAKAGE (except RCP seal water injection or return) that is not identified LEAKAGE;
- c. Pressure Boundary LEAKAGE I LEAKAGE (except primary to secondary LEAKAGE) through a nonisolable fault in an RCS component body, pipe wall, or vessel wall.
MODE A MODE shall correspond to any one inclusive combination of core
- MODES reactivity condition, power level, average reactor coolant temperature, and reactor vessel head closure bolt tensioning specified, in Table 1.1-1 with fuel in the reactor vessel.
OPERABLE A system, subsystem, train, component, or device shall be OPERABLE
- OPERABILITY or have OPERABILITY when it is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its specified safety function(s) are also capable of performing their related support function(s).
R.E. Ginna Nuclear Power Plant 1.1-3 Amendment IM
Definitions 1.1 PHYSICS TESTS PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation. These tests are:
- a. Described in Chapter 14, Initial Test Program of the UFSAR;
- b. Authorized under the provisions of 10 CFR 50.59; or
- c. Otherwise approved by the Nuclear Regulatory Commission (NRC).
PRESSURE AND The PTLR is the plant specific document that provides the reactor vessel TEMPERATURE pressure and temperature limits, including heatup and cooldown rates, LIMITS REPORT and the power operated relief valve lift settings and enable temperature (PTLR) associated with the Low Temperature Overpressurization Protection System for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluence period in accordance with Specification 5.6.6. Plant operation within these limits is addressed in individual specifications.
QUADRANT QPTR shall be the ratio of the highest average nuclear power in any POWER TILT quadrant to the average nuclear power in the four quadrants.
RATIO (QPTR)
RATED THERMAL RTP shall be a total reactor core heat transfer rate to the reactor coolant POWER of 1775 MWt.
(RTP)
SHUTDOWN SDM shall be the instantaneous amount of reactivity by which the reactor MARGIN is subcritical or would be subcritical from its present condition assuming:
(SDM)
- a. All rod cluster control assemblies (RCCAs) are fully inserted except for the single RCCA of highest reactivity worth, which is assumed to be fully withdrawn. With any RCCAs not capable of being fully inserted, the reactivity worth of the RCCAs must be accounted for in the determination of SDM; and
- b. In MODES 1 and 2, the fuel and moderator temperatures are changed to the nominal hot zero power temperature.
STAGGERED TEST A STAGGERED TEST BASIS shall consist of the testing of one of the BASIS systems, subsystems, channels, or other designated components during the interval specified by the Surveillance Frequency, so that all systems, subsystems, channels, or other designated components are tested during n Surveillance Frequency intervals, where n is the total number of systems, subsystems, channels, or other designated components in the associated function.
R.E. Ginna Nuclear Power Plant 1.1-4 Amendment 100
Definitions 1.1 THERMAL POWER THERMAL POWER shall be the total reactor core heat transfer rate to the reactor coolant.
TRIP ACTUATING A TADOT shall consist of operating the trip actuating device and verifying DEVICE the OPERABILITY of required alarm, interlock, display, and trip functions.
OPERATIONAL The TADOT shall include adjustment, as necessary, of the trip actuating TEST device so that it actuates at the required setpoint within the required (TADOT) accuracy.
R.E. Ginna Nuclear Power Plant 1. 1-rd Amendment 100
Definitions 1.1 Table 1.1-1 MODES MODE TITLE REACTIVITY % RATED AVERAGE REACTOR CONDITION (keff) THERMAL COOLANT TEMPERATURE POWER(a) ('F) 1 Power Operation > 0.99 >5 NA 2 Startup > 0.99 5 NA 3 Hot Shutdown < 0.99 NA > 350 4 Hot Standby(b) < 0.99 NA 350 > Tavg > 200 5 Cold Shutdown(b) < 0.99 NA < 200 6 Refueling(c) NA NA NA (a) Excluding decay heat.
(b) All reactor vessel head closure bolts fully tensioned.
(c) One or more reactor vessel head closure bolts less than fully tensioned.
R.E. Ginna Nuclear Power Plant 1.1-6 Amendment 100
RCS Operational LEAKAGE 3.4.13 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 RCS Operational LEAKAGE LCO 3.4.13 RCS operational LEAKAGE shall be limited to:
- a. No pressure boundary LEAKAGE;
- b. 1 gpm unidentified LEAKAGE;
- c. 10 gpm identified LEAKAGE; and
- d. 150 gallons per day primary to secondary LEAKAGE through any I one steam generator (SG).
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS operational A.1 Reduce LEAKAGE to within 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> LEAKAGE not within limits.
limits for reasons other than pressure boundary LEAKAGE or primary to secondary LEAKAGE.
B. Required Action and B.1 Be in MODE 3. 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time not met. AND OR B.2 Be in MODE 5. 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> RCS pressure boundary LEAKAGE exists.
OR Primary to secondary LEAKAGE not within limit.
R.E. Ginna Nuclear Power Plant 3. 4.13 -"I Amendment 10D
RCS Operational LEAKAGE 3.4.13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.13.1 -NOTE-
- 1. Not required to be performed until 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> after establishment of steady state operation.
- 2. Not applicable to primary to secondary LEAKAGE.
Verify RCS operational LEAKAGE is within limits by 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> performance of RCS water inventory balance.
- NOTE -
SR 3.4.13.2 Not required to be performed until 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> after establishment of steady state operation.
Verify primary to secondary LEAKAGE is *< 150 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> gallons per day through any one SG.
R.E. Ginna Nuclear Power Plant 3.4.13-2 .Amendment IM-
SG Tube Integrity 3.4.17 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.17 Steam Generator (SG) Tube integrity LCO 3.4.17 SG tube integrity shall be maintained.
AND All SG tubes satisfying the tube repair criteria shall be plugged in accordance with the Steam Generator Program.
I APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS
- NOTE -
Separate Condition entry is allowed for each SG tube.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SG tubes A. 1 Verify tube integrity of the 7 days satisfying the tube repair affected tube(s) is criteria and not plugged in maintained until the next accordance with the refueling outage or SG tube Steam Generator inspection.
Program.
AND A.2 Plug the affected tube(s) in Prior to entering accordance with the Steam MODE 4 following Generator Program. the next refueling outage or SG tube inspection B. Required Action and B.1 Be in MODE3 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time of Condition A not AND met.
B.2 Be in MODE 5 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> OR SG tube integrity not maintained.
R-E Ginna Nuclear Power Plant 3.4.17-1 A Im --ndr-1 1e nt IQ)
SG Tube Integrity 3.4.17 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.17.1 Verify SG tube integrity in accordance with the Steam In accordance with Generator Program. the Steam Generator Program Verify that each inspected SG tube that satisfies the Prior to entering I
SR 3.4.17.2 tube repair criteria is plugged in accordance with the MODE 4 following a Steam Generator Program. SG tube inspection R.E. Ginna Nuclear Power Plant 3.4.17-2 Arne.n,4me,+
. IIL11ý-"
Programs and Manuals 5.5 5.0 ADMINISTRATIVE CONTROLS 5.5 Programs and Manuals The following programs and manuals shall be established, implemented, and maintained.
5.5.1 Offsite Dose Calculation Manual (ODCM)
The ODCM shall contain:
- a. The methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm and trip setpoints, and in the conduct of the radiological environmental monitoring program; and
- b. The radioactive effluent controls and radiological environmental monitoring activities and descriptions of the information that should be included in the Annual Radiological Environmental Operating and Radioactive Effluent Release Reports.
Licensee initiated changes to the ODCM:
- a. Shall be documented and records of reviews performed shall be retained. This documentation shall contain:
- 1. sufficient information to support the change(s) together with the appropriate analyses or evaluations justifying the change(s),
- 2. a determination that the change(s) maintain the levels of radioactive effluent control required by 10 CFR 20.1302, 40 CFR 190, 10 CFR 50.36a, and 10 CFR 50, Appendix I, and does not adversely impact the accuracy or reliability of effluent, dose, or setpoint calculations;
- b. Shall become effective after review and acceptance by the onsite review function and the approval of the plant manager; and
- c. Shall be submitted to the NRC in the form of a complete, legible copy of the entire ODCM as a part of or concurrent with the Radioactive Effluent Release Report for the period of the report in which any change in the ODCM was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (i.e., month and year) the change was implemented.
R.E. Ginna Nuclear Power Plant 5.5-1 Amenrimant PTJ
Programs and Manuals 5.5 5.5.2 Primary Coolant Sources Outside Containment Program This program provides controls to minimize leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident. The systems include Containment Spray, Safety Injection, and Residual Heat Removal in the recirculation configuration. The program shall include the following:
- a. Preventive maintenance and periodic visual inspection requirements; and
- b. Integrated leak test requirements for each system at refueling cycle intervals or less.
5.5.3 Deleted 5.5.4 Radioactive Effluent Controls Program This program conforms to 10 CFR 50.36a for the control of radioactive effluents and for maintaining the doses to members of the public from radioactive effluents as low as reasonably achievable. The program shall be contained in the ODCM, shall be implemented by procedures, and shall include remedial actions to be taken whenever the program limits are exceeded. The program shall include the following elements:
- a. Limitations on the functional capability of radioactive liquid and gaseous monitoring instrumentation including surveillance tests and setpoint determination in accordance with the methodology in the ODCM;
- b. Limitations on the concentrations of radioactive material released in liquid effluents to unrestricted areas, conforming to ten times the concentration values in 10 CFR 20, Appendix B, Table 2, Column 2;
- c. Monitoring, sampling, and analysis of radioactive liquid and gaseous effluents in accordance with 10 CFR 20.1302 and with the methodology and parameters in the ODCM;
- d. Limitations on the annual and quarterly doses or dose commitment to a member of the public from radioactive materials in liquid effluents released from the plant to unrestricted areas, conforming to 10 CFR 50, Appendix I and 40 CFR 141;
- e. Determination of cumulative and projected dose contributions from radioactive effluents for the current calendar quarter and current calendar year in accordance with the methodology and parameters in the ODCM at least every 31 days; R.E. Ginna Nuclear Power Plant 5-9-2 Amendment IOD
Programs and Manuals 5.5
- f. Limitations on the functional capability and use of the liquid and gaseous effluent treatment systems to ensure that appropriate portions of these systems are used to reduce releases of radioactivity when the projected doses in a period of 31 days would exceed 2% of the guidelines for the annual dose or dose commitment, conforming to 10 CFR 50, Appendix I;
- g. Limitations on the dose rate resulting from radioactive material released in gaseous effluents to areas beyond the site boundary conforming to the dose associated with 10 CFR 20, Appendix B, Table 2, Column 1;
- h. Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from the plant to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; Limitations on the annual and quarterly doses to a member of the public from iodine-131, iodine-133, tritium, and all radionuclides in particulate form with half lives > 8 days in gaseous effluents released from the plant to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and
- j. Limitations on the annual dose or dose commitment to any member of the public due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.
5.5.5 Component Cyclic or Transient Limit Program This program provides controls to track the reactor coolant system cyclic and transient occurrences specified in UFSAR Table 5.1-4 to ensure that components are maintained within the design limits.
5.5.6 Pre-Stressed Concrete Containment Tendon Surveillance Program This program provides controls for monitoring any tendon degradation in pre-stressed concrete containments, including effectiveness of its corrosion protection medium, to ensure containment structural integrity.
The Tendon Surveillance Program, inspection frequencies, and acceptance criteria shall be in accordance with Regulatory Guide 1.35, Revision 2.
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Tendon Surveillance Program inspection frequencies.
R.E_ Ginna Nuclear Power Plant -5.5- 31 Amendment 1YO,
Programs and Manuals 5.5 5.5.7 Inservice Testina Proaram This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components including applicable supports. The program shall include the following:
- a. Testing frequencies specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as follows:
ASME Boiler and Pressure Vessel Code and Required Frequencies for applicable Addenda terminology for inservice performing inservice testing testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days
- b. The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing activities;
- c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and
- d. Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any Technical Specification.
5.5.8 Steam Generator (SG) Program A Steam Generator Program shall be established and implemented to ensure that SG tube integrity is maintained. In addition, the Steam Generator Program shall include the following provisions:
- a. Provisions for condition monitoring assessments. Condition monitoring assessment means an evaluation of the "as found" condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during an SG inspection outage, as determined from the inservice inspection R.E. Ginna Nuclear Power Plant 5.5;-A Amendment 1-m--
Programs and Manuals 5.5 results or by other means, prior to the plugging of tubes. Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected or plugged, to confirm that the performance criteria are being met.
- b. Performance criteria for SG tube integrity. Steam generator tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational LEAKAGE.
- 1. Structural integrity performance criterion: All in-service steam generator tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down and all anticipated transients included in the design specification) and design basis accidents. This includes retaining a safety factor of 3.0 against burst under normal steady-state full power operation primary to secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials.
Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse.
In the assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.
- 2. Accident induced leakage performance criterion: The primary to secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for each SG. Leakage is not to exceed 1 gpm per SG.
- 3. The operational LEAKAGE performance criterion is specified in LCO 3.4.13, "RCS Operational LEAKAGE."
- c. Provisions for SG tube repair criteria. Tubes found by inservice inspection to contain flaws with a depth equal to or exceeding 40%
of the nominal tube wall thickness shall be plugged.
- d. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial, and circumferential cracks) that may be present along the length of R.E. Ginna Nuclear Power Plant 5.5;-51 1 Amendment100
Programs and Manuals 5.5 the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria. The tube-to-tubesheet weld is not part of the tube. In addition to meeting the requirements of d.1, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. An assessment of degradation shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.
- 2. Inspect 100% of the tubes at sequential periods of 144, 108, 72, and, thereafter, 60 effective full power months. The first sequential period shall be considered to begin afte&the first inservice inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outage nearest the midpoint of the period and the remaining 50% by the refueling outage nearest the end of the period. No SG shall operate for more than 72 effective full power months or three refueling outages (whichever is less) without being inspected.
- 3. If crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.
- e. Provisions for monitoring operational primary to secondary LEAKAGE.
5.5.9 Secondary Water Chemistry Program This program provides controls for monitoring secondary water chemistry to inhibit SG tube degradation. This program shall include:
- a. Identification of a sampling schedule for the critical variables and control points for these variables;
- b. Identification of the procedures used to measure the values of the critical variables; R.E. Ginna Nuclear Power Plant 5.5-6 Amendment 1,00
Programs and Manuals 5.5
- c. Identification of process sampling points;
- d. Procedures for the recording and management of data;
- e. Procedures defining corrective actions for all off control point chemistry conditions; and
- f. A procedure identifying the authority responsible for the interpretation of the data and the sequence and timing of administrative events, which is required to initiate corrective action.
5.5.10 Ventilation Filter Testing Program (VFTP)
A program shall be established to implement the following required testing of Engineered Safety Feature filter ventilation systems and the Spent Fuel Pool (SFP) Charcoal Adsorber System. The test frequencies will be in accordance with Regulatory Guide 1.52, Revision 2, except that in lieu of 18 month test intervals, a 24 month interval will be implemented.
The test methods will be in accordance with Regulatory Guide 1.52, Revision 2, except as modified below.
- a. Containment Recirculation Fan Cooler System
- 1. Demonstrate the pressure drop across the high efficiency particulate air (HEPA) filter bank is < 3 inches of water at a design flow rate (+/- 10%).
- 2. Demonstrate that an in-place dioctylphthalate (DOP) test of the HEPA filter bank shows a penetration and system bypass
< 1.0%.
- b. Control Room Emergency Air Treatment System (CREATS)
- 1. Demonstrate the pressure drop across the combined HEPA filters, the prefilters, the charcoal adsorbers and the post-filters is < 11 inches of water at a design flow rate (+/- 10%).
- 2. Demonstrate that an in-place DOP test of the HEPA filter bank shows a penetration and system bypass < 0.05%.
- 3. Demonstrate that an in-place Freon test of the charcoal adsorber bank shows a penetration and system bypass
< 0.05%, when tested under ambient conditions.
R.E. Ginna Nuclear Power Plant 5.5-7 Amendment 100
Programs and Manuals 5.5
- 4. Demonstrate that a laboratory test of a sample of the charcoal adsorber, when obtained as described in Regulatory Guide 1.52, Revision 2, shows a methyl iodide penetration of less than 1.5% when tested in accordance with ASTM D3803-1989 at a test temperature of 30 0 C (86 0 F), a relative humidity of 95%, and a face velocity of 61 ft/min.
- c. SFP Charcoal Adsorber System
- 1. Demonstrate that the total air flow rate from the charcoal adsorbers shows at least 75% of that measured with a complete set of new adsorbers.
- 2. Demonstrate that an in-place Freon test of the charcoal adsorbers bank shows a penetration and system bypass
< 1.0%, when tested under ambient conditions.
- 3. Demonstrate that a laboratory test of a sample of the charcoal adsorber, when obtained as described in Regulatory Guide 1.52, Revision 2, shows a methyl iodide penetration of less than 14.5% when tested in accordance with ASTM D3803-1989 at a test temperature of 300C (86 0 F) and a relative humidity of 95%.
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the VFTP frequencies.
5.5.11 Explosive Gas and Storage Tank Radioactivity Monitoring Program This program provides controls for potentially explosive gas mixtures contained in the waste gas decay tanks and the quantity of radioactivity contained in waste gas decay tanks. The gaseous radioactivity quantities shall be determined following the methodology in NUREG-0133.
The program shall include:
- a. The limits for concentrations of hydrogen and oxygen in the waste gas decay tanks and a surveillance program to ensure the limits are maintained. Such limits shall be appropriate to the system's design criteria (i.e., whether or not the system is designed to withstand a hydrogen explosion); and R... Ginna Nuclear Power Plant 5.5-8 Amendment 1-m--
Programs and Manuals
.5.5
- b. A surveillance program to ensure that the quantity of radioactivity contained in each waste gas decay tank is less than the amount that would result in a whole body exposure of > 0.5 rem to any individual in an unrestricted area, in the event of an uncontrolled release of the tanks' contents.
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Explosive Gas and Storage Tank Radioactivity Monitoring Program surveillance frequencies.
5.5.12 Diesel Fuel Oil Testing Program A diesel fuel oil testing program to implement required testing of both new fuel oil and stored fuel oil shall be established. The program shall include sampling and testing requirements, and acceptance criteria, all in accordance with applicable ASTM Standards. The purpose of the program is to establish the following:
- a. Acceptability of new fuel oil for use prior to addition to storage tanks by determining that the fuel oil has:
- 1. an API gravity or an absolute specific gravity within limits,
- 2. a flash point and kinematic viscosity within limits for ASTM 2D.
fuel oil, and
- 3. a clear and bright appearance with proper color or a water and sediment content within limits; and
- b. Within 31 days following addition of the new fuel to the storage tanks, verify that the properties of the new fuel oil, other than those addressed in a. above, are within limits for ASTM 2D fuel oil; and
- c. Total particulate concentration of the fuel oil is 10 mg/I when tested every 92 days.
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Diesel Fuel Oil Testing Program test frequencies.
5.5.13 Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.
- a. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
R.E. Ginna Nuclear Power Plant 5.5-9 Amendment Iffl--
Programs and Manuals 5.5
- b. Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
- 1. A change in the TS incorporated in the license; or
- 2. A change to the UFSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
- c. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the UFSAR.
- d. Proposed changes that meet the criteria of Specification 5.5.13.b.1 or Specification 5.5.13.b.2 shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71e.
5.5.14 Safety Function Determination Program (SFDP)
This program ensures loss of safety function is detected and appropriate actions taken. Upon entry into LCO 3.0.6, an evaluation shall be made to determine if loss of safety function exists. Additionally, other appropriate actions may be taken as a result of the support system inoperability and corresponding exception to entering supported system Condition and Required Actions. This program implements the requirements of LCO 3.0.6. The SFDP shall contain the following:
- a. Provisions for cross train checks to ensure a loss of the capability to perform the safety function assumed in the accident analysis does not go undetected;
- b. Provisions for ensuring the plant is maintained in a safe condition if a loss of function condition exists;
- c. Provisions to ensure that an inoperable supported system's Completion Time is not inappropriately extended as a result of multiple support system inoperabilities; and
- d. Other appropriate limitations and remedial or compensatory actions.
A loss of safety function exists when, assuming no concurrent single failure, a safety function assumed in the accident analysis cannot be performed. For the purpose of this program, a loss of safety function may exist when a support system is inoperable, and:
- a. A required system redundant to the supported system(s) is also inoperable; or R.E. Ginna Nuclear Power Plant 5.-10 Amendment 1m--
Programs and Manuals 5.5
- b. A required system redundant to the system(s) in turn supported by the inoperable supported system is also inoperable; or
- c. A required system redundant to the inoperable support system(s) for the supported systems (a) and (b) above is also inoperable.
The SFDP identifies where a loss of safety function exists. If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.
5.5.15 Containment Leakage Rate Testing Program A program shall be established to implement the leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, "Performance-Based Containment Leak-Test Program," dated September 1995, as modified by the following exception to NEI 94-01, Rev. 0, "Industry Guideline for Implementing Performance-Based Option of 10 CFR 50, Appendix J":
- a. Section 9.2.3: The first Type A test performed after the May 31, 1996 Type A test shall be performed by May 31, 2011.
The peak calculated containment internal pressure for the design basis loss of coolant accident, Pa, is 60 psig.
The maximum allowable primary containment leakage rate, La, at Pa, shall be 0.2% of containment air weight per day.
Leakage Rate acceptance criteria are:
- a. Containment leakage rate acceptance criterion is _<1.0 La. During the first plant startup following testing in accordance with this program, the leakage rate acceptance criteria are _<0.60 La for the Type B and Type C tests and _<0.75 La for Type A tests;
- b. Air lock testing acceptance criteria are:
- 1. For each air lock, overall leakage rate is _<0.05 La when tested at _ Pa, and
- 2. For each door, leakage rate is <_0.01 La when tested at >_Pa-R.E. Ginna Nuclear Power Plant 5.5-!! AmendmentlMT
Programs and Manuals 5.5
- c. Mini-purge valve acceptance criteria is < 0.05 La when tested at SPa The provisions of SR 3.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.
The provisions of SR 3.0.3 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.
R.E. Ginna Nuclear Power Plant 5-5-12 Amendment IM
Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.
5.6.1 Deleted 5.6.2 Annual Radiological Environmental Operating Report The Annual Radiological Environmental Operating Report covering the operation of the plant during the previous calendar year shall be submitted by May 15 of each year. The report shall include summaries, interpretations, and analyses of trends of the results of the radiological environmental monitoring activities for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (ODCM), and in 10 CFR 50, Appendix I, Sections IV.B.2, IV.B.3, and IV.C.
The Annual Radiological Environmental Operating Report shall include the results of analyses of all radiological environmental samples and of all enVironmental radiation measurements taken during the period pursuant to the locations specified in the table and figures in the ODCM, as well as summarized and tabulated results of these analyses and measurements in the format of the table in the Radiological Assessment Branch Technical Position, Revision 1, November 1979. In the event that some individual results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted in a supplementary report as soon as possible.
5.6.3 Radioactive Effluent Release Report The Radioactive Effluent Release Report covering the operation of the plant shall be submitted in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the plant. The material provided shall be consistent with the objectives outlined in the ODCM and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1.
5.6.4 Deleted R.E. Ginna Nuclear Power Plant 5.6-1 AmIen dment 100
Reporting Requirements 5.6 5.6.5 CORE OPERATING LIMITS REPORT (COLR)
The following administrative requirements apply to the COLR:
- a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
2.1, "Safety Limits (SLs)";
LCO 3.1.1, "SHUTDOWN MARGIN (SDM)";
LCO 3.1.3, "MODERATOR TEMPERATURE COEFFICIENT (MTC)";
LCO 3.1.5, "Shutdown Bank Insertion Limit";
LCO 3.1.6, "Control Bank Insertion Limits";
LCO 3.2.1, "Heat Flux Hot Channel Factor (FQ(Z))";
LCO 3.2.2, "Nuclear Enthalpy Rise Hot Channel Factor (FNAH)";
LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)";
LCO 3.3.1, "Reactor Protection System (RPS) Instrumentation";
LCO 3.4.1, "RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits"; and LCO 3.9.1, "Boron Concentration."
R.E. Ginna Nuclear Power Plant 5.63- 2 Amendment 100
Reporting Requirements 5.6
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
(Methodology for 2.1, LCO 3.1.1, LCO 3.1.3, LCO 3.1.5, LCO 3.1.6, LCO 3.2.1, LCO 3.2.2, LCO 3.2.3, and LCO 3.9.1.)
- 2. WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty (ASTRUM)," January 2005.
- 3. WCAP-1 0216-P-A, Rev. 1A, "Relaxation of Constant Axial Offset Control / FQ Surveillance Technical Specification,"
February 1994.
(Methodology for LCO 3.2.1 and LCO 3.2.3.)
- 4. WCAP-1 2610-P-A, "VANTAGE + Fuel Assembly Reference Core Report," April 1995.
(Methodology for LCO 3.2.1.)
- 5. WCAP 11397-P-A, "Revised Thermal Design Procedure,"
April 1989.
(Methodology for LCO 3.4.1 when using RTDP.)
- 6. WCAP-10054-P-A and WCAP-10081-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.
(Methodology for LCO 3.2.1.)
- 7. WCAP-10054-P-A, Addendum 2, Revision 1, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection Into the Broken Loop and COSI Condensation Model," July 1997.
(Methodology for LCO 3.2.1)
- 8. WCAP-11145-P-A, "Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study With the NOTRUMP Code,"
October 1986.
(Methodology for LCO 3.2.1)
- 9. WCAP-1 0079-P-A, "NOTRUMP - A Nodal Transient Small Break and General Network Code," August 1985.
(Methodology for LCO 3.2.1)
- 10. WCAP-8745, "Design Basis for the Thermal Overpower Delta T and Thermal Overtemperature Delta T Trip Functions,"
March 1977.
(Methodology for LCO 3.3.1 .).
R.E. Ginna Nuclear Power Plant 5.6-33 A Amendment 100
Reporting Requirements 5.6
- 11. WCAP-14710-P-A, "1-D Heat Conduction Model for Annular Fuel Pellets," May, 1998.
(Methodology for LCO 3.2.1)
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
5.6.6 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)
The following administrative requirements apply to the PTLR:
- a. RCS pressure and temperature limits for heatup, cooldown, criticality, and hydrostatic testing as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:
LCO 3.4:3, "RCS Pressure and Temperature (P/T) Limits"
- b. The power operated relief valve lift settings required to support the Low Temperature Overpressure Protection (LTOP) System, and the LTOP enable temperature shall be established and documented in the PTLR for the following:
LCO 3.4.6, "RCS Loops - MODE 4";
LCO 3.4.7, "RCS Loops - MODE 5, Loops Filled";
LCO 3.4.10, "Pressurizer Safety Valves", and LCO 3.4.12, "LTOP System."
- c. The analytical methods used to determine the RCS pressure and temperature and LTOP limits shall be those previously reviewed and approved by the NRC in NRC letter, "R.E. Ginna - Acceptance for Referencing of Pressure Temperature Limits Report, Revision 2 (TAC No. M96529)," dated November 28, 1997. Specifically, the methodology is described in the following documents:
- 1. Letter from R.C. Mecredy, Rochester Gas and Electric Corporation (RG&E), to Document Control Desk, NRC, R.E. Ginna Nuclear Power Plant 5.6-4 Amendmen' -r'
Reporting Requirements
5.6 Attention
Guy S. Vissing, "Application for Facility Operating License, Revision to Reactor Coolant System (RCS)
Pressure and Temperature Limits Report (PTLR)
Administrative Controls Requirements," Attachment VI, September 29, 1997, as supplemented by letter from R.C.
Mecredy, RG&E, to Guy S. Vissing, NRC, "Corrections to Proposed Low Temperature Overpressure Protection System Technical Specification," October 8, 1997.
- 2. WCAP-14040-NP-A, "Methodology used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves," Sections 1 and 2, January, 1996.
- d. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for revisions or supplement thereto.
5.6.7 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.8, Steam Generator (SG) Program. The report shall include:
- a. The scope of inspections performed on each SG,
- b. Active degradation mechanisms found,
- c. Nondestructive examination techniques utilized for each degradation mechanism,
- d. Location, orientation (if linear), and measured sizes (if available) of service induced indications,
- e. Number of tubes plugged during the inspection outage for each active degradation mechanism,
- f. Total number and percentage of tubes plugged to date, and
- g. The results of condition monitoring, including the results of tube pulls and in-situ testing.
R.E. Ginna Nuclear Power Plant 5.6-5 Amendment Irn_