ML16251A134: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/07/2016 | | issue date = 09/07/2016 | ||
| title = Notification of Inspection (NRC Integrated Inspection Report 05000397/2016004) and Request for Information | | title = Notification of Inspection (NRC Integrated Inspection Report 05000397/2016004) and Request for Information | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = Reddemann M | | addressee name = Reddemann M | ||
| addressee affiliation = Energy Northwest | | addressee affiliation = Energy Northwest | ||
| docket = 05000397 | | docket = 05000397 | ||
Line 14: | Line 14: | ||
| page count = 9 | | page count = 9 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000397/2016004]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:September 7, 2016 | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
Mr. Mark E. Reddemann | 1600 E. LAMAR BLVD. | ||
ARLINGTON, TX 76011-4511 | |||
Chief Executive Officer Energy Northwest | September 7, 2016 | ||
76 North Power Plant Loop | Mr. Mark E. Reddemann | ||
P.O. Box 968 - Mail Drop 1023 | Chief Executive Officer | ||
Richland, WA | Energy Northwest | ||
76 North Power Plant Loop | |||
P.O. Box 968 - Mail Drop 1023 | |||
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF INSPECTION | Richland, WA 99352-0968 | ||
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF INSPECTION | |||
Dear Mr. Reddemann: | (NRC INTEGRATED INSPECTION REPORT 05000397/2016004) AND REQUEST | ||
FOR INFORMATION | |||
Dear Mr. Reddemann: | |||
Generating Station, using NRC | From December 5-9, 2016, inspectors from the Nuclear Regulatory Commissions (NRC) | ||
Region IV office will perform the baseline biennial requalification inspection at Columbia | |||
inspection both for the NRC inspectors and your | Generating Station, using NRC Inspection Procedure 71111.11B, Licensed Operator | ||
Requalification Program. Experience has shown that this inspection is a resource intensive | |||
inspection to ensure that the inspectors are adequately prepared. | inspection both for the NRC inspectors and your staff. In order to minimize the impact to your | ||
of the enclosure) identifies the information the inspectors will need upon arrival at the site. | on-site resources and to ensure a productive inspection, we have enclosed a request for | ||
third group (Section C of the enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site. | documents needed for this inspection. These documents have been divided into three groups. | ||
additional documents requested during the preparation and/or the onsite portions of the | The first group (Section A of the enclosure) identifies information to be provided prior to the | ||
inspection. | inspection to ensure that the inspectors are adequately prepared. The second group (Section B | ||
of the enclosure) identifies the information the inspectors will need upon arrival at the site. The | |||
third group (Section C of the enclosure) identifies the items which are necessary to close out the | |||
Our inspection dates are subject to change based on your updated schedule of examination activities. | inspection and are usually sent a few weeks after the team has left the site. It is important that | ||
Sean.Hedger@nrc.gov. | all of these documents are up to date and complete in order to minimize the number of | ||
collection requirements were approved by the Office of Management and Budget, control | additional documents requested during the preparation and/or the onsite portions of the | ||
number 3150-0018. | inspection. | ||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be Ms. T. Parmellee, Regulatory Affairs. | |||
Our inspection dates are subject to change based on your updated schedule of examination | |||
activities. If there are any questions about this inspection or the material requested, please | |||
contact Sean Hedger, lead inspector, at 817-200-1556 or Sean.Hedger@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to | |||
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to | |||
M. Reddemann -2- | |||
Enclosure: Biennial Requalification Inspection | respond to, a request for information or an information collection requirement unless the | ||
Document Request | requesting document displays a currently valid Office of Management and Budget control | ||
number. | |||
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice and Procedure," a copy of | |||
this letter and its enclosure will be available electronically for public inspection in the NRC Public | |||
Document Room or from the Publicly Available Records (PARS) component of the NRC's | |||
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible | |||
from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic | |||
Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket No. 50-397 | |||
License No. NPF-21 | |||
Enclosure: | |||
Biennial Requalification Inspection | |||
Document Request | |||
cc: Electronic Distribution | |||
ML16251A134 | |||
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: | |||
By: VGG Yes No Non-Publicly Available Sensitive NRC-002 | |||
OFFICE OE:OB C:OB | |||
NAME SHedger VGaddy | |||
SIGNATURE /RA/ /RA/ | |||
DATE 9/7/16 9/7/16 | |||
/RA/ /RA/ | |||
Letter to Mark E. Reddemann from Vincent G. Gaddy, dated September 7, 2016 | |||
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF INSPECTION | |||
(NRC INTEGRATED INSPECTION REPORT 05000397/2016004) AND REQUEST | |||
FOR INFORMATION | |||
Electronic distribution by RIV: | |||
Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
Deputy Regional Administrator (Scott.Morris@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Gregory.Kolcum@nrc.gov) | |||
Resident Inspector (Dan.Bradley@nrc.gov) | |||
Administrative Assistant (Vacant) | |||
Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) | |||
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) | |||
Project Engineer (Thomas.Sullivan@nrc.gov) | |||
Project Engineer (Matthew.Kirk@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (John.Klos@nrc.gov) | |||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | |||
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | |||
RIV RSLO (Bill.Maier@nrc.gov) | |||
BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST | |||
TO: Gerald Wyatt | |||
Simulator and Exam Group Supervisor | |||
509-377-4368 | |||
FROM: Sean Hedger | |||
Operations Engineer, NRC RIV | |||
817-200-1556 | |||
SUBJECT: INFORMATION REQUEST TO SUPPORT DECEMBER 5 TO 9, 2016, | |||
LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION | |||
(IP 71111.11B) | |||
A. The following information is requested in order to support inspection preparation | |||
activities. These items are listed by section as they appear in the inspection module | |||
(i.e., 2.02, 2.04, etc.). Requested materials should be sent either electronically or | |||
hardcopy in order to arrive at the Region IV office no later than November 14, 2016. | |||
Electronically to: Sean.Hedger@nrc.gov (lead inspector); | |||
cc: Clyde.Osterholtz@nrc.gov; Chris.Steely@nrc.gov (inspectors) | |||
Note: Making documents available in IMS Certrec is acceptable as well | |||
Items sent on hardcopy or CD go to: U.S. Nuclear Regulatory Commission | |||
Region IV | |||
ATTN: Sean Hedger | |||
1600 E. Lamar Blvd | |||
Arlington, TX 76011 | |||
General Requests: | |||
* Index of the materials provided in response to this request | |||
* List of licensed operators (LO) [senior reactor operators (SRO) and reactor operators | |||
(RO)] by crew (operating and staff) | |||
* Training and operations department organization charts [with qualified licensed | |||
operator requalification (LOR) evaluators identified] | |||
* Procedures that identify process for revising and maintaining LO continuing training | |||
program up to date | |||
* List of outstanding LOR program changes | |||
* List of plant events and industry operating experience incorporated into LOR | |||
program since last BRQ (biennial requalification) | |||
* Audits and/or self-assessment reports addressing the licensed operator | |||
requalification training program | |||
* Last two years of Simulator Review Committee (or equivalent) meeting minutes | |||
* Last two years of Curriculum Review Committee (or equivalent) meeting minutes | |||
Enclosure | |||
02.03: Biennial Requalification Written Examination Quality | |||
* Current and approved biennial written examination schedule | |||
* Current requalification cycle written examination results for both SRO and RO that | |||
have already been administered up to the week prior to the inspection team arrival | |||
onsite, if any | |||
* All written examinations that have been approved for administration up to and | |||
including the week before the inspection team is onsite, if any (these documents will | |||
need to have adequate password protection if e-mailed or double envelope | |||
protection if mailed via regular mail per NUREG-1021). | |||
* Current requalification cycle examination methodology (sample plan) | |||
02.04: Annual Requalification Operating Test Quality | |||
* Schedule for the operating tests [job performance measures (JPMs) and scenarios] | |||
to be given the week of December 5, 2016 | |||
* Operating tests (JPMs and scenarios) (password protected and provide separately | |||
via telephone at later date) to be given the week of December 5, 2016 | |||
* Current requalification cycle operating tests (SRO and RO) and results up to the | |||
week prior to the inspection team arrival on-site | |||
* All of the previous years NRC required annual operating tests | |||
* Current requalification cycle operating test methodology (sample plan) | |||
* All portions of the updated final safety analysis report that identify operator response | |||
times for time critical operator actions | |||
02.05: Licensee Admin of Requalification Exams | |||
* All procedures used to administer the annual operating test | |||
* All procedures used to assess operator performance | |||
* All procedures that describe conduct of simulator training | |||
* All procedures used to test, operate, and maintain the simulator | |||
* Index for referencing the above procedures | |||
02.06: Requalification Examination Security | |||
* Submit any tracking tools that you use as a means to prevent excessive overlap on | |||
the written examinations and also meet the intent of sampling all required topics on a | |||
periodic basis | |||
* Submit any tracking tools that you use as a means to prevent excessive overlap on | |||
the operating tests and also meet the intent of sampling all required malfunctions | |||
(including major events, instrument/component malfunctions, technical support calls, | |||
etc.) on a periodic basis | |||
* All procedures that describe examination security, including procedures used to | |||
develop the examinations that include guidelines on overlap between examinations | |||
in current examination cycle tests and prior year examinations | |||
* List of all condition reports since the last biennial requalification inspection related to | |||
examination security and overlap | |||
-2- | |||
02.07: Licensee Remedial Training Program | |||
* List of remedial training conducted or planned since last requalification examinations | |||
(includes training provided to operators to enable passing requalification | |||
examinations and training provided to correct generic or individual weaknesses | |||
observed during previous requalification examination cycle) | |||
* Remediation plans (lesson plans, reference materials, and attendance | |||
documentation) | |||
02.08: Conformance with Operator License Conditions | |||
* All procedures and program documentation for maintaining active operator licenses, | |||
tracking training attendance, and ensuring medical fitness of licensed operators | |||
* All procedures and associated documentation that supports reactivation of any | |||
SRO/RO license (operating or staff crew) since the last biennial inspection | |||
* List of licensed operators whose licenses were reactivated since the last BRQ | |||
inspection | |||
02.09: Simulator Performance | |||
* For the following cases, send the most recent transient test packages, which may be | |||
electronic or in paper single test packages and shall be complete with test | |||
procedures for each test, the acceptance criteria, and results. For each transient test, | |||
the reference chart should be included or an equivalent subject matter expert review | |||
versus the simulator results with a write-up for any differences beyond the ANSI 3.5 | |||
standard requirements. | |||
o Transient test 2, simultaneous trip of all feedwater pumps | |||
o Transient test 6, main turbine trip from maximum power level which does not | |||
result in immediate reactor scram. | |||
o Transient test 10, simultaneous closure of all main steam isolation valves | |||
combined with single stuck open safety or relief valve (inhibit activation of | |||
high pressure emergency core cooling systems) | |||
o Steady State tests for low power test | |||
* All simulator management and configuration procedures if not already provided for | |||
Section 02.05 above. | |||
* Simulator Discrepancy Report (DR) summary list for all open DRs. For closed DRs, | |||
summary list for those items closed between December 2014 and November 2016. | |||
* Malfunction tests for loss of condenser vacuum, misaligned rods, and failure of | |||
reactor pressure control. If these are included in an SBT package then the review of | |||
that package would be acceptable. If these are in a scenario-based training | |||
package, then the review of that package would be acceptable. | |||
* Primary parameters tested in order to verify core physics parameters. The | |||
applicable reference graphs from the Plant physics data book (electronic or other | |||
means as available) should also be included as well as the test procedures used and | |||
the acceptance criteria with results. | |||
-3- | |||
02.10: Problem Identification and Resolution | |||
* Summary report of all condition reports related to operator actions/errors in the | |||
control room | |||
* Any revised requalification training that was based on licensed operator performance | |||
issues | |||
* Action Requests AR-2015-00325641, AR-2015-00326763, AR-2015-00327006, | |||
AR-2015-00325643, AR-2015-00329948; and any causal analysis documentation | |||
associated with issues identified during the 2015 initial licensing examination | |||
* Action Request 346945 and any causal analysis documentation associated with the | |||
March 28, 2016 loss of reactor closed cooling (RCC) event | |||
* Action Requests 324146 and 327593 | |||
B. The following information is requested in order to support the onsite inspection | |||
activities. Requested materials should be available to the inspection team, either | |||
electronically or hardcopy, upon site arrival on December 5, 2016. | |||
02.02: Exam Results/ 02.03 and 02.04: Written Exam and Op Test Quality | |||
* All approved Operating Tests (JPMs and scenarios) not previously submitted | |||
* All results up to the day the team leaves the site | |||
02.08: Conformance with Operator License Conditions | |||
* Access to licensed operators records (operating and staff crews) | |||
* Access to licensed operators training attendance records | |||
* Access to licensed operators medical records | |||
02.09: Simulator Performance | |||
* Simulator discrepancies (DRs) from December 1, 2014, to December 5, 2016. This | |||
should include all open DR examinations and DRs that have been closed, including | |||
the documentation/justification for closure | |||
* Acceptance test documentation, including hardware and software model revisions at | |||
the time of acceptance (as available) | |||
* Documentation that validates current models, including the thermal-hydraulics and | |||
neutronics models, to the actual plant | |||
* All current model deficiencies, including FSAR vs. Design differences in the simulator | |||
(any documentation on this) | |||
* Summary list of modifications from December 1, 2014, to December 5, 2016 | |||
* Plant modifications (both hardware and software) completed on the simulator by due | |||
date from July 1, 2014, to July 11, 2016 | |||
* Simulator differences lesson plan used in training (current to December 5, 2016) | |||
* The complete book of all simulator annual performance test packages (usually in a | |||
single book, but may be electronic or in single test packages), complete with all | |||
transient tests, steady state tests, scenario-based tests, post-event simulator tests, | |||
and malfunction tests (This should also include the test procedures for each test, the | |||
acceptance criteria, and results. For each transient test, the reference chart should | |||
be included or an equivalent subject matter expert review versus the simulator | |||
results with a write-up for any differences beyond the ANSI 3.5 standard | |||
requirements.) | |||
-4- | |||
* All test packages used to verify core physics parameters. The applicable reference | |||
graphs from the plant physics data book (electronic or other means as available) | |||
should also be included as well as the test procedures used and the acceptance | |||
criteria with results. | |||
* All simulator test, configuration management, and related documents available in the | |||
room for inspectors to review (this includes training needs analysis packages, | |||
simulator review committee meeting minutes, etc.) | |||
* Current copy of ANSI 3.5 Standard you are committed to for simulator testing | |||
02.10: Problem Identification and Resolution | |||
* All condition reports related to operator actions/errors in the control room | |||
C. Columbia Generating Station is required to send the final results summary and any | |||
remaining examinations and operating tests that have not been reviewed to the NRC | |||
regional office lead inspectors for final review and comparison against the | |||
Significance Determination Tools in order to communicate the exit results for the | |||
inspection. | |||
-5- | |||
* | |||
criteria with results. | |||
* All simulator test, configuration management, and related documents available in the room for inspectors to review (this includes training needs analysis packages, simulator review committee meeting minutes, etc.) | |||
* Current copy of ANSI 3.5 Standard you are committed to for simulator testing | |||
* All condition reports related to operator actions/errors in the control room | |||
regional office lead inspectors for final review and comparison against the Significance Determination Tools in order to communicate the exit results for the | |||
inspection. | |||
}} | }} |
Latest revision as of 14:27, 30 October 2019
ML16251A134 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 09/07/2016 |
From: | Vincent Gaddy Operations Branch IV |
To: | Reddemann M Energy Northwest |
References | |
IR 2016004 | |
Download: ML16251A134 (9) | |
See also: IR 05000397/2016004
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
September 7, 2016
Mr. Mark E. Reddemann
Chief Executive Officer
Energy Northwest
76 North Power Plant Loop
P.O. Box 968 - Mail Drop 1023
Richland, WA 99352-0968
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF INSPECTION
(NRC INTEGRATED INSPECTION REPORT 05000397/2016004) AND REQUEST
FOR INFORMATION
Dear Mr. Reddemann:
From December 5-9, 2016, inspectors from the Nuclear Regulatory Commissions (NRC)
Region IV office will perform the baseline biennial requalification inspection at Columbia
Generating Station, using NRC Inspection Procedure 71111.11B, Licensed Operator
Requalification Program. Experience has shown that this inspection is a resource intensive
inspection both for the NRC inspectors and your staff. In order to minimize the impact to your
on-site resources and to ensure a productive inspection, we have enclosed a request for
documents needed for this inspection. These documents have been divided into three groups.
The first group (Section A of the enclosure) identifies information to be provided prior to the
inspection to ensure that the inspectors are adequately prepared. The second group (Section B
of the enclosure) identifies the information the inspectors will need upon arrival at the site. The
third group (Section C of the enclosure) identifies the items which are necessary to close out the
inspection and are usually sent a few weeks after the team has left the site. It is important that
all of these documents are up to date and complete in order to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Ms. T. Parmellee, Regulatory Affairs.
Our inspection dates are subject to change based on your updated schedule of examination
activities. If there are any questions about this inspection or the material requested, please
contact Sean Hedger, lead inspector, at 817-200-1556 or Sean.Hedger@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to
M. Reddemann -2-
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice and Procedure," a copy of
this letter and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-397
License No. NPF-21
Enclosure:
Biennial Requalification Inspection
Document Request
cc: Electronic Distribution
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: VGG Yes No Non-Publicly Available Sensitive NRC-002
OFFICE OE:OB C:OB
NAME SHedger VGaddy
SIGNATURE /RA/ /RA/
DATE 9/7/16 9/7/16
Letter to Mark E. Reddemann from Vincent G. Gaddy, dated September 7, 2016
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF INSPECTION
(NRC INTEGRATED INSPECTION REPORT 05000397/2016004) AND REQUEST
FOR INFORMATION
Electronic distribution by RIV:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Gregory.Kolcum@nrc.gov)
Resident Inspector (Dan.Bradley@nrc.gov)
Administrative Assistant (Vacant)
Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer (Thomas.Sullivan@nrc.gov)
Project Engineer (Matthew.Kirk@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
TO: Gerald Wyatt
Simulator and Exam Group Supervisor
509-377-4368
FROM: Sean Hedger
Operations Engineer, NRC RIV
817-200-1556
SUBJECT: INFORMATION REQUEST TO SUPPORT DECEMBER 5 TO 9, 2016,
LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION
A. The following information is requested in order to support inspection preparation
activities. These items are listed by section as they appear in the inspection module
(i.e., 2.02, 2.04, etc.). Requested materials should be sent either electronically or
hardcopy in order to arrive at the Region IV office no later than November 14, 2016.
Electronically to: Sean.Hedger@nrc.gov (lead inspector);
cc: Clyde.Osterholtz@nrc.gov; Chris.Steely@nrc.gov (inspectors)
Note: Making documents available in IMS Certrec is acceptable as well
Items sent on hardcopy or CD go to: U.S. Nuclear Regulatory Commission
Region IV
ATTN: Sean Hedger
1600 E. Lamar Blvd
Arlington, TX 76011
General Requests:
- Index of the materials provided in response to this request
(RO)] by crew (operating and staff)
- Training and operations department organization charts [with qualified licensed
operator requalification (LOR) evaluators identified]
- Procedures that identify process for revising and maintaining LO continuing training
program up to date
- List of outstanding LOR program changes
- List of plant events and industry operating experience incorporated into LOR
program since last BRQ (biennial requalification)
- Audits and/or self-assessment reports addressing the licensed operator
requalification training program
- Last two years of Simulator Review Committee (or equivalent) meeting minutes
- Last two years of Curriculum Review Committee (or equivalent) meeting minutes
Enclosure
02.03: Biennial Requalification Written Examination Quality
- Current and approved biennial written examination schedule
have already been administered up to the week prior to the inspection team arrival
onsite, if any
- All written examinations that have been approved for administration up to and
including the week before the inspection team is onsite, if any (these documents will
need to have adequate password protection if e-mailed or double envelope
protection if mailed via regular mail per NUREG-1021).
- Current requalification cycle examination methodology (sample plan)
02.04: Annual Requalification Operating Test Quality
- Schedule for the operating tests [job performance measures (JPMs) and scenarios]
to be given the week of December 5, 2016
- Operating tests (JPMs and scenarios) (password protected and provide separately
via telephone at later date) to be given the week of December 5, 2016
week prior to the inspection team arrival on-site
- All of the previous years NRC required annual operating tests
- Current requalification cycle operating test methodology (sample plan)
- All portions of the updated final safety analysis report that identify operator response
times for time critical operator actions
02.05: Licensee Admin of Requalification Exams
- All procedures used to administer the annual operating test
- All procedures used to assess operator performance
- All procedures that describe conduct of simulator training
- All procedures used to test, operate, and maintain the simulator
- Index for referencing the above procedures
02.06: Requalification Examination Security
- Submit any tracking tools that you use as a means to prevent excessive overlap on
the written examinations and also meet the intent of sampling all required topics on a
periodic basis
- Submit any tracking tools that you use as a means to prevent excessive overlap on
the operating tests and also meet the intent of sampling all required malfunctions
(including major events, instrument/component malfunctions, technical support calls,
etc.) on a periodic basis
- All procedures that describe examination security, including procedures used to
develop the examinations that include guidelines on overlap between examinations
in current examination cycle tests and prior year examinations
- List of all condition reports since the last biennial requalification inspection related to
examination security and overlap
-2-
02.07: Licensee Remedial Training Program
- List of remedial training conducted or planned since last requalification examinations
(includes training provided to operators to enable passing requalification
examinations and training provided to correct generic or individual weaknesses
observed during previous requalification examination cycle)
- Remediation plans (lesson plans, reference materials, and attendance
documentation)
02.08: Conformance with Operator License Conditions
- All procedures and program documentation for maintaining active operator licenses,
tracking training attendance, and ensuring medical fitness of licensed operators
- All procedures and associated documentation that supports reactivation of any
SRO/RO license (operating or staff crew) since the last biennial inspection
- List of licensed operators whose licenses were reactivated since the last BRQ
inspection
02.09: Simulator Performance
- For the following cases, send the most recent transient test packages, which may be
electronic or in paper single test packages and shall be complete with test
procedures for each test, the acceptance criteria, and results. For each transient test,
the reference chart should be included or an equivalent subject matter expert review
versus the simulator results with a write-up for any differences beyond the ANSI 3.5
standard requirements.
o Transient test 2, simultaneous trip of all feedwater pumps
o Transient test 6, main turbine trip from maximum power level which does not
result in immediate reactor scram.
o Transient test 10, simultaneous closure of all main steam isolation valves
combined with single stuck open safety or relief valve (inhibit activation of
high pressure emergency core cooling systems)
o Steady State tests for low power test
- All simulator management and configuration procedures if not already provided for
Section 02.05 above.
- Simulator Discrepancy Report (DR) summary list for all open DRs. For closed DRs,
summary list for those items closed between December 2014 and November 2016.
- Malfunction tests for loss of condenser vacuum, misaligned rods, and failure of
reactor pressure control. If these are included in an SBT package then the review of
that package would be acceptable. If these are in a scenario-based training
package, then the review of that package would be acceptable.
- Primary parameters tested in order to verify core physics parameters. The
applicable reference graphs from the Plant physics data book (electronic or other
means as available) should also be included as well as the test procedures used and
the acceptance criteria with results.
-3-
02.10: Problem Identification and Resolution
- Summary report of all condition reports related to operator actions/errors in the
control room
- Any revised requalification training that was based on licensed operator performance
issues
- Action Requests AR-2015-00325641, AR-2015-00326763, AR-2015-00327006,
AR-2015-00325643, AR-2015-00329948; and any causal analysis documentation
associated with issues identified during the 2015 initial licensing examination
- Action Request 346945 and any causal analysis documentation associated with the
March 28, 2016 loss of reactor closed cooling (RCC) event
- Action Requests 324146 and 327593
B. The following information is requested in order to support the onsite inspection
activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on December 5, 2016.
02.02: Exam Results/ 02.03 and 02.04: Written Exam and Op Test Quality
- All approved Operating Tests (JPMs and scenarios) not previously submitted
- All results up to the day the team leaves the site
02.08: Conformance with Operator License Conditions
- Access to licensed operators records (operating and staff crews)
- Access to licensed operators training attendance records
- Access to licensed operators medical records
02.09: Simulator Performance
- Simulator discrepancies (DRs) from December 1, 2014, to December 5, 2016. This
should include all open DR examinations and DRs that have been closed, including
the documentation/justification for closure
- Acceptance test documentation, including hardware and software model revisions at
the time of acceptance (as available)
- Documentation that validates current models, including the thermal-hydraulics and
neutronics models, to the actual plant
- All current model deficiencies, including FSAR vs. Design differences in the simulator
(any documentation on this)
- Summary list of modifications from December 1, 2014, to December 5, 2016
- Plant modifications (both hardware and software) completed on the simulator by due
date from July 1, 2014, to July 11, 2016
- Simulator differences lesson plan used in training (current to December 5, 2016)
- The complete book of all simulator annual performance test packages (usually in a
single book, but may be electronic or in single test packages), complete with all
transient tests, steady state tests, scenario-based tests, post-event simulator tests,
and malfunction tests (This should also include the test procedures for each test, the
acceptance criteria, and results. For each transient test, the reference chart should
be included or an equivalent subject matter expert review versus the simulator
results with a write-up for any differences beyond the ANSI 3.5 standard
requirements.)
-4-
- All test packages used to verify core physics parameters. The applicable reference
graphs from the plant physics data book (electronic or other means as available)
should also be included as well as the test procedures used and the acceptance
criteria with results.
- All simulator test, configuration management, and related documents available in the
room for inspectors to review (this includes training needs analysis packages,
simulator review committee meeting minutes, etc.)
- Current copy of ANSI 3.5 Standard you are committed to for simulator testing
02.10: Problem Identification and Resolution
- All condition reports related to operator actions/errors in the control room
C. Columbia Generating Station is required to send the final results summary and any
remaining examinations and operating tests that have not been reviewed to the NRC
regional office lead inspectors for final review and comparison against the
Significance Determination Tools in order to communicate the exit results for the
inspection.
-5-