(4 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 10/25/2016 | | | issue date = 10/25/2016 |
| | title = U.S. Nuclear Regulatory Commission Acknowledgement of Dispute of Non-Cited Violation 05000286/2016002-02 | | | title = U.S. Nuclear Regulatory Commission Acknowledgement of Dispute of Non-Cited Violation 05000286/2016002-02 |
| | author name = Schroeder D L | | | author name = Schroeder D |
| | author affiliation = NRC/RGN-I/DRP/PB4 | | | author affiliation = NRC/RGN-I/DRP/PB4 |
| | addressee name = Vitale A J | | | addressee name = Vitale A |
| | addressee affiliation = Entergy Nuclear Operations, Inc | | | addressee affiliation = Entergy Nuclear Operations, Inc |
| | docket = 05000286 | | | docket = 05000286 |
| | license number = DPR-064 | | | license number = DPR-064 |
| | contact person = Schroeder D L | | | contact person = Schroeder D |
| | case reference number = EA-16-223 | | | case reference number = EA-16-223 |
| | document report number = IR 2016002 | | | document report number = IR 2016002 |
Line 15: |
Line 15: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| See also: [[followed by::IR 05000286/2016002]] | | See also: [[see also::IR 05000286/2016002]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713 October 25, 2016 EA-16-223 | | {{#Wiki_filter:UNITED STATES |
| Mr. Anthony J. Vitale | | NUCLEAR REGULATORY COMMISSION |
| Site Vice President | | REGION I |
| Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB | | 2100 RENAISSANCE BLVD. |
| P.O. Box 249 | | KING OF PRUSSIA, PA 19406-2713 |
| Buchanan, NY 10511-0249 | | October 25, 2016 |
| SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF DISPUTE OF NON-CITED VIOLATION 05000286/2016002-02
| | EA-16-223 |
| Dear Mr. Vitale: | | Mr. Anthony J. Vitale |
|
| | Site Vice President |
| I am writing to acknowledge receipt of your letter, dated September 29, 2016, written in response to the U.S. Nuclear Regulatory Commission (NRC) Integrated Inspection Report 05000247/2016002-02 and 05000286/2016002-02, issued on August 30, 2016. | | Entergy Nuclear Operations, Inc. |
|
| | Indian Point Energy Center |
| Your letter requests withdrawal of the 10 CFR 50, Appendix B, Criterion V, "Instructions, | | 450 Broadway, GSB |
| Procedures, and Drawings," Green non-cited violation concerning the failure to follow the operability process as prescribed in Entergy procedure EN-OP-104, "Operability Determination Process." You stated that Entergy was in full compliance with procedure EN-OP-104 when | | P.O. Box 249 |
| evaluating the baffle former bolt condition discovered at Unit 2 as it applied to Unit 3. The NRC will review your response and provide you a letter documenting the basis for any decision within 90 days. | | Buchanan, NY 10511-0249 |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the
| | SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF |
| A. Vitale -2- Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). Your letter has also been added to ADAMS for the information of the public, and may be found under ADAMS Accession Number ML16281A486.
| | DISPUTE OF NON-CITED VIOLATION 05000286/2016002-02 |
|
| | Dear Mr. Vitale: |
| Should you have any questions concerning this letter, please contact me at (610) 337-5262.
| | I am writing to acknowledge receipt of your letter, dated September 29, 2016, written in |
| Sincerely,
| | response to the U.S. Nuclear Regulatory Commission (NRC) Integrated Inspection Report |
|
| | 05000247/2016002-02 and 05000286/2016002-02, issued on August 30, 2016. |
| /RA/
| | Your letter requests withdrawal of the 10 CFR 50, Appendix B, Criterion V, Instructions, |
| Daniel L. Schroeder, Chief
| | Procedures, and Drawings, Green non-cited violation concerning the failure to follow the |
| Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-286
| | operability process as prescribed in Entergy procedure EN-OP-104, Operability Determination |
| License No. DPR-64 cc: Distribution via ListServ
| | Process. You stated that Entergy was in full compliance with procedure EN-OP-104 when |
|
| | evaluating the baffle former bolt condition discovered at Unit 2 as it applied to Unit 3. The NRC |
| | will review your response and provide you a letter documenting the basis for any decision within |
| | 90 days. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be |
| | available electronically for public inspection in the NRCs Public Document Room or from the |
|
| |
|
| ML16299A110 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME NEmbert/NE GDentel/GTD DSchroeder/DLS DATE 10/20/16 10/20/16 10/20/16
| | A. Vitale -2- |
| | Publicly Available Records component of the NRCs Agencywide Documents Access and |
| | Management System (ADAMS). Your letter has also been added to ADAMS for the information |
| | of the public, and may be found under ADAMS Accession Number ML16281A486. |
| | Should you have any questions concerning this letter, please contact me at (610) 337-5262. |
| | Sincerely, |
| | /RA/ |
| | Daniel L. Schroeder, Chief |
| | Reactor Projects Branch 4 |
| | Division of Reactor Projects |
| | Docket No. 50-286 |
| | License No. DPR-64 |
| | cc: Distribution via ListServ |
|
| |
|
| | |
| | ML16299A110 |
| | Non-Sensitive Publicly Available |
| | SUNSI Review |
| | Sensitive Non-Publicly Available |
| | OFFICE RI/DRP RI/DRP RI/DRP |
| | NAME NEmbert/NE GDentel/GTD DSchroeder/DLS |
| | DATE 10/20/16 10/20/16 10/20/16 |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 07200051/20244022024-11-20020 November 2024 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200051/2024402 (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks 2024-09-18
[Table view] |
See also: IR 05000286/2016002
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713
October 25, 2016
EA-16-223
Mr. Anthony J. Vitale
Site Vice President
Entergy Nuclear Operations, Inc.
Indian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 10511-0249
SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF
DISPUTE OF NON-CITED VIOLATION 05000286/2016002-02
Dear Mr. Vitale:
I am writing to acknowledge receipt of your letter, dated September 29, 2016, written in
response to the U.S. Nuclear Regulatory Commission (NRC) Integrated Inspection Report
05000247/2016002-02 and 05000286/2016002-02, issued on August 30, 2016.
Your letter requests withdrawal of the 10 CFR 50, Appendix B, Criterion V, Instructions,
Procedures, and Drawings, Green non-cited violation concerning the failure to follow the
operability process as prescribed in Entergy procedure EN-OP-104, Operability Determination
Process. You stated that Entergy was in full compliance with procedure EN-OP-104 when
evaluating the baffle former bolt condition discovered at Unit 2 as it applied to Unit 3. The NRC
will review your response and provide you a letter documenting the basis for any decision within
90 days.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
A. Vitale -2-
Publicly Available Records component of the NRCs Agencywide Documents Access and
Management System (ADAMS). Your letter has also been added to ADAMS for the information
of the public, and may be found under ADAMS Accession Number ML16281A486.
Should you have any questions concerning this letter, please contact me at (610) 337-5262.
Sincerely,
/RA/
Daniel L. Schroeder, Chief
Reactor Projects Branch 4
Division of Reactor Projects
Docket No. 50-286
License No. DPR-64
cc: Distribution via ListServ
ML16299A110
Non-Sensitive Publicly Available
SUNSI Review
Sensitive Non-Publicly Available
OFFICE RI/DRP RI/DRP RI/DRP
NAME NEmbert/NE GDentel/GTD DSchroeder/DLS
DATE 10/20/16 10/20/16 10/20/16