ML16299A110: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713  
{{#Wiki_filter:UNITED STATES
  October 25, 2016  
                        NUCLEAR REGULATORY COMMISSION
  EA-16-223  
                                            REGION I
                                    2100 RENAISSANCE BLVD.
Mr. Anthony J. Vitale  
                                KING OF PRUSSIA, PA 19406-2713
Site Vice President  
                                      October 25, 2016
Entergy Nuclear Operations, Inc. Indian Point Energy Center  
EA-16-223
450 Broadway, GSB  
Mr. Anthony J. Vitale
P.O. Box 249  
Site Vice President
Entergy Nuclear Operations, Inc.
Indian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 10511-0249
SUBJECT:        U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF
                DISPUTE OF NON-CITED VIOLATION 05000286/2016002-02
Dear Mr. Vitale:
I am writing to acknowledge receipt of your letter, dated September 29, 2016, written in
response to the U.S. Nuclear Regulatory Commission (NRC) Integrated Inspection Report
05000247/2016002-02 and 05000286/2016002-02, issued on August 30, 2016.
Your letter requests withdrawal of the 10 CFR 50, Appendix B, Criterion V, Instructions,
Procedures, and Drawings, Green non-cited violation concerning the failure to follow the
operability process as prescribed in Entergy procedure EN-OP-104, Operability Determination
Process. You stated that Entergy was in full compliance with procedure EN-OP-104 when
evaluating the baffle former bolt condition discovered at Unit 2 as it applied to Unit 3. The NRC
will review your response and provide you a letter documenting the basis for any decision within
90 days.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the


Buchanan, NY  10511-0249
A. Vitale                                    -2-
Publicly Available Records component of the NRCs Agencywide Documents Access and
Management System (ADAMS). Your letter has also been added to ADAMS for the information
of the public, and may be found under ADAMS Accession Number ML16281A486.
Should you have any questions concerning this letter, please contact me at (610) 337-5262.
                                          Sincerely,
                                            /RA/
                                          Daniel L. Schroeder, Chief
                                          Reactor Projects Branch 4
                                          Division of Reactor Projects
Docket No.      50-286
License No.    DPR-64
cc: Distribution via ListServ


SUBJECT:  U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF DISPUTE OF NON-CITED VIOLATION 05000286/2016002-02
Dear Mr. Vitale:


   
  ML16299A110
I am writing to acknowledge receipt of your letter, dated September 29, 2016, written in response to the U.S. Nuclear Regulatory Commission (NRC) Integrated Inspection Report 05000247/2016002-02 and 05000286/2016002-02, issued on August 30, 2016.
                                            Non-Sensitive                              Publicly Available
 
      SUNSI Review
                                            Sensitive                                   Non-Publicly Available
Your letter requests withdrawal of the 10 CFR 50, Appendix B, Criterion V, "Instructions,
OFFICE         RI/DRP               RI/DRP                 RI/DRP
Procedures, and Drawings," Green non-cited violation concerning the failure to follow the operability process as prescribed in Entergy procedure EN-OP-104, "Operability Determination Process."  You stated that Entergy was in full compliance with procedure EN-OP-104 when
NAME           NEmbert/NE           GDentel/GTD             DSchroeder/DLS
evaluating the baffle former bolt condition discovered at
DATE           10/20/16             10/20/16               10/20/16
Unit 2 as it applied to Unit 3.  The NRC
will review your response and provide you a le
tter documenting the basis for any decision within
90 days.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC's Public Document Room or from the 
A. Vitale -2-
  Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS).  Your letter has also been added to ADAMS for the information of the public, and may be found under ADAMS Accession Number ML16281A486.
 
Should you have any questions concerning this letter, please contact me at (610) 337-5262.
 
Sincerely, 
        /RA/
 
Daniel L. Schroeder, Chief
Reactor Projects Branch 4
Division of Reactor Projects
Docket No. 50-286
License No. DPR-64
cc:  Distribution via ListServ
 
 
 
  ML16299A110
  SUNSI Review  
  Non-Sensitive  Sensitive  
Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP   NAME NEmbert/NE GDentel/GTD DSchroeder/DLS   DATE 10/20/16 10/20/16 10/20/16
}}
}}

Latest revision as of 12:51, 30 October 2019

U.S. Nuclear Regulatory Commission Acknowledgement of Dispute of Non-Cited Violation 05000286/2016002-02
ML16299A110
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/25/2016
From: Daniel Schroeder
Reactor Projects Region 1 Branch 4
To: Vitale A
Entergy Nuclear Operations
Schroeder D
References
EA-16-223 IR 2016002
Download: ML16299A110 (3)


See also: IR 05000286/2016002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713

October 25, 2016

EA-16-223

Mr. Anthony J. Vitale

Site Vice President

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF

DISPUTE OF NON-CITED VIOLATION 05000286/2016002-02

Dear Mr. Vitale:

I am writing to acknowledge receipt of your letter, dated September 29, 2016, written in

response to the U.S. Nuclear Regulatory Commission (NRC) Integrated Inspection Report

05000247/2016002-02 and 05000286/2016002-02, issued on August 30, 2016.

Your letter requests withdrawal of the 10 CFR 50, Appendix B, Criterion V, Instructions,

Procedures, and Drawings, Green non-cited violation concerning the failure to follow the

operability process as prescribed in Entergy procedure EN-OP-104, Operability Determination

Process. You stated that Entergy was in full compliance with procedure EN-OP-104 when

evaluating the baffle former bolt condition discovered at Unit 2 as it applied to Unit 3. The NRC

will review your response and provide you a letter documenting the basis for any decision within

90 days.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

A. Vitale -2-

Publicly Available Records component of the NRCs Agencywide Documents Access and

Management System (ADAMS). Your letter has also been added to ADAMS for the information

of the public, and may be found under ADAMS Accession Number ML16281A486.

Should you have any questions concerning this letter, please contact me at (610) 337-5262.

Sincerely,

/RA/

Daniel L. Schroeder, Chief

Reactor Projects Branch 4

Division of Reactor Projects

Docket No. 50-286

License No. DPR-64

cc: Distribution via ListServ

ML16299A110

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

OFFICE RI/DRP RI/DRP RI/DRP

NAME NEmbert/NE GDentel/GTD DSchroeder/DLS

DATE 10/20/16 10/20/16 10/20/16