ML17033A313: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17033A313
| number = ML17033A313
| issue date = 01/31/2017
| issue date = 01/31/2017
| title = Watts Bar Nuclear Plant, Unit 1 and 2 - Emergency Plan Implementing Procedure Revision
| title = Emergency Plan Implementing Procedure Revision
| author name = Simmons P
| author name = Simmons P
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 31, 2A17 10 cFR 50.4 10 CFR 50, Appendix E, Section V 10 CFR 50.54(qX5) 10 cFR 72.4 10 cFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1& Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391
 
==Subject:==
Emergency PIan Implementing Procedure Revision ln accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.54(qX5), and 10 CFR72.44(f), the following Emergency Plan lmplementing Procedures (EPIP) have been revised to correct phone numbers and access code for the plant announcement system. ln addition, EPIP 12, changes to the inventory of dosimeters from Appendix A to Appendix L, updated the Appendix A inventory and Appendix H inventory to include AA batteries:
EPIP          Revision                            Title                    Effective Date 2              0038              Notification of Unusual Event              01t10t17 10              0030            Medical Emergency Response                  01/05 t17 12              0040        Emergency Equipment and Supplies                01/05 t17 The above referenced revisions continue to comply with regulations and there is no reduction in effectiveness of the plans.
 
U.S. Regulatory Commission January 31,2017 Page2 There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232.
Respectfully, Paul Simmons Site Vice President Watts Bar Nuclear Plant cc:
NRC Regional Administrator - Region ll NRC Senior Resident lnspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant}}

Latest revision as of 08:56, 30 October 2019

Emergency Plan Implementing Procedure Revision
ML17033A313
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 01/31/2017
From: Simmons P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17033A313 (2)


Text

Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 31, 2A17 10 cFR 50.4 10 CFR 50, Appendix E, Section V 10 CFR 50.54(qX5) 10 cFR 72.4 10 cFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1& Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391

Subject:

Emergency PIan Implementing Procedure Revision ln accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.54(qX5), and 10 CFR72.44(f), the following Emergency Plan lmplementing Procedures (EPIP) have been revised to correct phone numbers and access code for the plant announcement system. ln addition, EPIP 12, changes to the inventory of dosimeters from Appendix A to Appendix L, updated the Appendix A inventory and Appendix H inventory to include AA batteries:

EPIP Revision Title Effective Date 2 0038 Notification of Unusual Event 01t10t17 10 0030 Medical Emergency Response 01/05 t17 12 0040 Emergency Equipment and Supplies 01/05 t17 The above referenced revisions continue to comply with regulations and there is no reduction in effectiveness of the plans.

U.S. Regulatory Commission January 31,2017 Page2 There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232.

Respectfully, Paul Simmons Site Vice President Watts Bar Nuclear Plant cc:

NRC Regional Administrator - Region ll NRC Senior Resident lnspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant