ML17055A856: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 15: Line 15:
| page count = 6
| page count = 6
}}
}}
=Text=
{{#Wiki_filter:PRESERVICE INSPECTI N PLAN NINE MILEPOINT NUCLEAR STATION UNIT 2 U  o kWIK I
    -~~/ p~z/iiy 8512050005 851127 PDR .ADOCK 05000410 9              PDR
l NINE MILE POINT NUCLEAR STATION UNIT 2 NIAGARA MOHAWK POWER CORPORATION PRESERVICE INSPECTION PIAN RECEIPT ACKNOWLEDGEMENT I acknowledge    receipt of:
      '1. Preservice Inspection Plan      for Nuclear Piping    Systems  and the Reactor Pressure Vessel
: 2. Inservice Testing Plan for      Pumps  and Valves My copy      has  been  updated,  and  superseded    pages  have been    removed  and destroyed.
Set Reassi nment and/or Set Holder Chan          e  of Address (if  necessary)
Please    reassign    this  manual  to, and/or    change  my  address  as  follows:
Please    furnish  all  requested information and return to:
A. L. Monahan Stone 8 Webster Engineering Corporation 3  Executive  Campus P.O. Box 5200 Cherry    Hill, NJ  08034 Name    of set holder                                    Set No.
Company Signature                                                  Date
Nine Mile Point Unit 2 INSERTION INSTRUCTIONS The  following instructions are for the insertion of material in the Nine Mile Point Unit  2 Preservice Inspection Plan.
Remove  existing covers/spines and title pages for Volumes 1 and 2 of the Preservice and Inservice Inspection Plan and insert new covers/spines and title pages entitled Preservice Inspection Plan for Nuclear Piping Sys-tems and the Reactor Pressure Vessel, Volumes 1 and 2.
Remove  existing cover/spine for Volume 3 of the Preservice and Inservice Inspection Plan and insert new cover/spine and title page entitled Inser-vice Testing Plan for Pumps and Valves into previously issued empty bind-er. (Note: This new material has no volume number.) Insert all new material for Sections 1 through 3 and Appendixes A through D.
4 ~}}

Latest revision as of 06:49, 30 October 2019

Preservice Insp Plan,Nine Mile Point Nuclear Station - Unit 2, Inservice Testing Plan for Pumps & Valves
ML17055A856
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/27/1985
From:
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17055A857 List:
References
PROC-851127, NUDOCS 8512050005
Download: ML17055A856 (6)


Text

PRESERVICE INSPECTI N PLAN NINE MILEPOINT NUCLEAR STATION UNIT 2 U o kWIK I

-~~/ p~z/iiy 8512050005 851127 PDR .ADOCK 05000410 9 PDR

l NINE MILE POINT NUCLEAR STATION UNIT 2 NIAGARA MOHAWK POWER CORPORATION PRESERVICE INSPECTION PIAN RECEIPT ACKNOWLEDGEMENT I acknowledge receipt of:

'1. Preservice Inspection Plan for Nuclear Piping Systems and the Reactor Pressure Vessel

2. Inservice Testing Plan for Pumps and Valves My copy has been updated, and superseded pages have been removed and destroyed.

Set Reassi nment and/or Set Holder Chan e of Address (if necessary)

Please reassign this manual to, and/or change my address as follows:

Please furnish all requested information and return to:

A. L. Monahan Stone 8 Webster Engineering Corporation 3 Executive Campus P.O. Box 5200 Cherry Hill, NJ 08034 Name of set holder Set No.

Company Signature Date

Nine Mile Point Unit 2 INSERTION INSTRUCTIONS The following instructions are for the insertion of material in the Nine Mile Point Unit 2 Preservice Inspection Plan.

Remove existing covers/spines and title pages for Volumes 1 and 2 of the Preservice and Inservice Inspection Plan and insert new covers/spines and title pages entitled Preservice Inspection Plan for Nuclear Piping Sys-tems and the Reactor Pressure Vessel, Volumes 1 and 2.

Remove existing cover/spine for Volume 3 of the Preservice and Inservice Inspection Plan and insert new cover/spine and title page entitled Inser-vice Testing Plan for Pumps and Valves into previously issued empty bind-er. (Note: This new material has no volume number.) Insert all new material for Sections 1 through 3 and Appendixes A through D.

4 ~