ML17055A856
| ML17055A856 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/27/1985 |
| From: | NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17055A857 | List: |
| References | |
| PROC-851127, NUDOCS 8512050005 | |
| Download: ML17055A856 (6) | |
Text
PRESERVICE INSPECTI N PLAN NINEMILEPOINT NUCLEARSTATIONUNIT 2 U
o kWIK I
-~~/ p~z/iiy 8512050005 851127 PDR
.ADOCK 05000410 9
l
NINE MILE POINT NUCLEAR STATION UNIT 2 NIAGARA MOHAWK POWER CORPORATION PRESERVICE INSPECTION PIAN RECEIPT ACKNOWLEDGEMENT I acknowledge receipt of:
'1.
Preservice Inspection Plan for Nuclear Piping Systems and the Reactor Pressure Vessel 2.
Inservice Testing Plan for Pumps and Valves My copy has been
- updated, and superseded pages have been removed and destroyed.
Set Reassi nment and/or Set Holder Chan e of Address (if necessary)
Please reassign this manual to, and/or change my address as follows:
Please furnish all requested information and return to:
A. L. Monahan Stone 8 Webster Engineering Corporation 3 Executive Campus P.O.
Box 5200 Cherry Hill, NJ 08034 Name of set holder Set No.
Company Signature Date
Nine Mile Point Unit 2 INSERTION INSTRUCTIONS The following instructions are for the insertion of material in the Nine Mile Point Unit 2 Preservice Inspection Plan.
Remove existing covers/spines and title pages for Volumes 1 and 2 of the Preservice and Inservice Inspection Plan and insert new covers/spines and title pages entitled Preservice Inspection Plan for Nuclear Piping Sys-tems and the Reactor Pressure
- Vessel, Volumes 1 and 2.
Remove existing cover/spine for Volume 3 of the Preservice and Inservice Inspection Plan and insert new cover/spine and title page entitled Inser-vice Testing Plan for Pumps and Valves into previously issued empty bind-er.
(Note:
This new material has no volume number.)
Insert all new material for Sections 1 through 3 and Appendixes A through D.
4
~