ML17097A445: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17097A445
| number = ML17097A445
| issue date = 04/05/2017
| issue date = 04/05/2017
| title = Virgil C. Summer - Notification of Licensed Operator Initial Examination 05000395/2017301
| title = Notification of Licensed Operator Initial Examination 05000395/2017301
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS/EB2
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Lippard G
| addressee name = Lippard G
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000395/2017301]]
See also: [[see also::IR 05000395/2017301]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 5, 2017 Mr. George Lippard III, Vice President Nuclear Operations  
{{#Wiki_filter:UNITED STATES
South Carolina Electric & Gas Company  
                                  NUCLEAR REGULATORY COMMISSION
Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF LICENSED   OPERATOR INITIAL EXAMINATION 05000395/2017301
                                                REGION II
Dear Mr. Lippard: During a meeting on March 16, 2017, between Mr. Robert Johnston, Lead Developer, and
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration  
                                      ATLANTA, GEORGIA 30303-1257
of licensing examinations at the Virgil C. Summer (Unit 1) Nuclear Station. The operating test is  
                                            April 5, 2017
scheduled to be administered during the week of September 18, 2017. The written examination  
Mr. George Lippard III, Vice President
is scheduled to be administered the week of September 25, 2017. The on-site preparatory week is scheduled for the week of August 28, 2017.
Nuclear Operations
As agreed during the meeting, your staff will prepare both the operating test and written  
South Carolina Electric & Gas Company
examination based on the guidelines in Revision 11, of NUREG-1021, "Operator Licensing  
Virgil C. Summer Nuclear Station
Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  
Post Office Box 88, Mail Code 800
Jenkinsville, SC 29065
Your staff provided the NRC regional office with the operating test outlines on December 15, 2016. Mr. Mark Bates provided the written examination outline to your staff on September 29, 2016. The operating test, written examination, and the supporting reference materials identified  
SUBJECT:       VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF LICENSED
in Attachment 3 to ES-201 will be due by July 12, 2017. Pursuant to Title 10, Section  
                OPERATOR INITIAL EXAMINATION 05000395/2017301
55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
Dear Mr. Lippard:
representative of the facility licensee shall approve the examinations before they are submitted  
During a meeting on March 16, 2017, between Mr. Robert Johnston, Lead Developer, and
to the NRC for review and approval. All materials shall be complete and ready-to-use.   We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in  
Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration
receiving the required examination and reference materials, or the submittal of inadequate or  
of licensing examinations at the Virgil C. Summer (Unit 1) Nuclear Station. The operating test is
incomplete materials, may cause the examinations to be rescheduled.
scheduled to be administered during the week of September 18, 2017. The written examination
G. Lippard 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
is scheduled to be administered the week of September 25, 2017. The on-site preparatory
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
week is scheduled for the week of August 28, 2017.
As agreed during the meeting, your staff will prepare both the operating test and written
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver
examination based on the guidelines in Revision 11, of NUREG-1021, "Operator Licensing
requests (if any) at least 60 days before the first examination date.  If the applications are not
Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC)
received at least 60 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
regional office will discuss with your staff any changes that might be necessary before the
examinations are administered. Your staff has also agreed to make copies of all examination
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018.  The public reporting burden for this collection of information is estimated to average 2500 hours per response,
materials that are necessary for administering the examination.
including the time for reviewing instructions, gathering and maintaining the data needed, writing
Your staff provided the NRC regional office with the operating test outlines on December 15,
the examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to
2016. Mr. Mark Bates provided the written examination outline to your staff on September 29,
the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. 
2016. The operating test, written examination, and the supporting reference materials identified
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. 
in Attachment 3 to ES-201 will be due by July 12, 2017. Pursuant to Title 10, Section
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). 
representative of the facility licensee shall approve the examinations before they are submitted
G. Lippard 3  Thank you for your cooperation in this matter.  Mr. Johnston has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at (404) 997-4518, (Internet E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).  Sincerely,
to the NRC for review and approval. All materials shall be complete and ready-to-use.
/RA/  Eugene F. Guthrie, Chief      Operations Branch 2
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
      Division of Reactor Safety
your response be contained in a separate enclosure and appropriately marked. Any delay in
Docket No.: 50-395 License No.: NPF-12
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
cc:  Distribution via Listserv


_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS     SIGNATURE DXB2 GXG     NAME BACON GUTHRIE     DATE 4/5/2017 4/5/2017 8/   /2017 8/   /2017 8/   /2017 8/   /2017 8/   /2017 E-MAIL COPY?     YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO
G. Lippard                                    2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 60 days before the first examination date. If the applications are not
received at least 60 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018. The public reporting
burden for this collection of information is estimated to average 2500 hours per response,
including the time for reviewing instructions, gathering and maintaining the data needed, writing
the examinations, and completing and reviewing the collection of information. Send comments
on any aspect of this collection of information, including suggestions for reducing the burden, to
the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail at
infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory
Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the
Public Electronic Reading Room).
 
G. Lippard                                    3
Thank you for your cooperation in this matter. Mr. Johnston has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Daniel Bacon at (404) 997-4518,
(Internet E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
                                                Sincerely,
                                                /RA/
                                                Eugene F. Guthrie, Chief
                                                Operations Branch 2
                                                Division of Reactor Safety
Docket No.: 50-395
License No.: NPF-12
cc: Distribution via Listserv
 
 
_________________________     SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
OFFICE           RII:DRS       RII:DRS
SIGNATURE         DXB2         GXG
NAME             BACON         GUTHRIE
DATE                 4/5/2017     4/5/2017     8/ /2017   8/ /2017     8/ /2017     8/ /2017       8/ /2017
E-MAIL COPY?         YES   NO   YES     NO   YES   NO   YES   NO     YES     NO   YES   NO     YES   NO
}}
}}

Latest revision as of 05:49, 30 October 2019

Notification of Licensed Operator Initial Examination 05000395/2017301
ML17097A445
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/05/2017
From: Eugene Guthrie
NRC/RGN-II/DRS/EB2
To: Lippard G
South Carolina Electric & Gas Co
References
50-395/17-301
Download: ML17097A445 (4)


See also: IR 05000395/2017301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

April 5, 2017

Mr. George Lippard III, Vice President

Nuclear Operations

South Carolina Electric & Gas Company

Virgil C. Summer Nuclear Station

Post Office Box 88, Mail Code 800

Jenkinsville, SC 29065

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000395/2017301

Dear Mr. Lippard:

During a meeting on March 16, 2017, between Mr. Robert Johnston, Lead Developer, and

Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration

of licensing examinations at the Virgil C. Summer (Unit 1) Nuclear Station. The operating test is

scheduled to be administered during the week of September 18, 2017. The written examination

is scheduled to be administered the week of September 25, 2017. The on-site preparatory

week is scheduled for the week of August 28, 2017.

As agreed during the meeting, your staff will prepare both the operating test and written

examination based on the guidelines in Revision 11, of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC)

regional office will discuss with your staff any changes that might be necessary before the

examinations are administered. Your staff has also agreed to make copies of all examination

materials that are necessary for administering the examination.

Your staff provided the NRC regional office with the operating test outlines on December 15,

2016. Mr. Mark Bates provided the written examination outline to your staff on September 29,

2016. The operating test, written examination, and the supporting reference materials identified

in Attachment 3 to ES-201 will be due by July 12, 2017. Pursuant to Title 10, Section

55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examinations before they are submitted

to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

G. Lippard 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 60 days before the first examination date. If the applications are not

received at least 60 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018. The public reporting

burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response,

including the time for reviewing instructions, gathering and maintaining the data needed, writing

the examinations, and completing and reviewing the collection of information. Send comments

on any aspect of this collection of information, including suggestions for reducing the burden, to

the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail at

infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory

Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the

Public Electronic Reading Room).

G. Lippard 3

Thank you for your cooperation in this matter. Mr. Johnston has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Daniel Bacon at (404) 997-4518,

(Internet E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket No.: 50-395

License No.: NPF-12

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE DXB2 GXG

NAME BACON GUTHRIE

DATE 4/5/2017 4/5/2017 8/ /2017 8/ /2017 8/ /2017 8/ /2017 8/ /2017

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO