| number = ML17156A161
| number = ML17156A161
| issue date = 06/02/2017
| issue date = 06/02/2017
| title = Browns Ferry Nuclear Plant - Notification of Inspection and Request for Information
| title = Notification of Inspection and Request for Information
| author name = Walker S A
| author name = Walker S
| author affiliation = NRC/RGN-II/DRS/EB
| author affiliation = NRC/RGN-II/DRS/EB
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000259, 05000260, 05000296
| docket = 05000259, 05000260, 05000296
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257     June 2, 2017
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 2, 2017 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
 
Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801  


==SUBJECT:==
==SUBJECT:==
BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION


==Dear Mr. Shea:==
==Dear Mr. Shea:==


The NRC will perform the baseline heat sink (HS) inspection at the Browns Ferry Nuclear Plant from July 24 - 28, 2017. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
The NRC will perform the baseline heat sink (HS) inspection at the Browns Ferry Nuclear Plant from July 24 - 28, 2017. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Justin Garner of your organization. Our inspection dates are subject to change based on your updated schedule of activities. If there are any questions about this inspection or the material requested, please contact the lead inspector, Paula Cooper, at (404) 997-4468 (Paula.Cooper@nrc.gov).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document


We discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Justin Garner of your organization. Our inspection dates are subject to change based on your updated schedule of activities. If there are any questions about this inspection or the material requested, please contact the lead inspector, Paula Cooper, at (404) 997-4468 (Paula.Cooper@nrc.gov). In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document 
2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                          /RA/
Shakur A. Walker, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68


2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).        Sincerely,
==Enclosure:==
 
      /RA/
Shakur A. Walker, Chief      Engineering Branch 3      Division of Reactor Safety
 
Docket Nos. 50-259, 50-260, 50-296  License Nos.:  DPR-33, DPR-52, DPR-68 


==Enclosure:==
Pre-Inspection Document Request cc: Distribution via Listserv


Pre-Inspection Document Request cc:  Distribution via Listserv 3  
3


==SUBJECT:==
==SUBJECT:==
BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION DATED: June 2, 2017 Distribution: A. Blamey, RII, DRP C. Rapp, RII, SR PE J. Seat, RII, PE D. Dumbacher, RII, SRI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerryResource
BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION DATED: June 2, 2017 Distribution:
* See previous page for concurrence   X PUBLICLY AVAILABLE      NON-PUBLICLY AVAILABLE       SENSITIVE     X NON-SENSITIVE       ADAMS: X Yes ACCESSION NUMBER: ____     x SUNSI REVIEW COMPLETE         X FORM 665 ATTACHED OFFICE RII/DRS RII/DRS     SIGNATURE pec SAW4     NAME P. Cooper S. Walker     DATE 06/1/2017 06/2/2017     E-MAIL COPY    YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO     OFFICIAL RECORD COPY******* DOCUMENT NAME: S:\DRS NEW\ENG BRANCH 3\INSPECTIONS\WORKING DOCUMENTS\RFIS\HEAT SINK REQUEST FOR INFORMATION LETTERS\2017\BROWNS FERRY HS 2017003 - PC.DOCX
A. Blamey, RII, DRP C. Rapp, RII, SR PE J. Seat, RII, PE D. Dumbacher, RII, SRI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerryResource
* See previous page for concurrence X PUBLICLY AVAILABLE      NON-PUBLICLY AVAILABLE     SENSITIVE X NON-SENSITIVE   ADAMS: X Yes ACCESSION NUMBER: ____ x SUNSI REVIEW COMPLETE           X FORM 665 ATTACHED OFFICE             RII/DRS         RII/DRS SIGNATURE                 pec           SAW4 NAME                   P. Cooper       S. Walker DATE                   06/1/2017       06/2/2017 E-MAIL COPY           YES     NO     YES     NO     YES   NO     YES     NO     YES NO     YES   NO YES NO OFFICIAL       RECORD     COPY*******   DOCUMENT   NAME:     S:\DRS NEW\ENG     BRANCH 3\INSPECTIONS\WORKING         DOCUMENTS\RFIS\HEAT   SINK   REQUEST   FOR   INFORMATION LETTERS\2017\BROWNS FERRY HS 2017003 - PC.DOCX


Enclosure HEAT SINK PERFORMANCE DOCUMENT REQUEST Inspection Dates: July 24 - July 28, 2017 Inspection Procedures: IP 71111.17, "Heat Sink Performance"
HEAT SINK PERFORMANCE DOCUMENT REQUEST Inspection Dates:               July 24 - July 28, 2017 Inspection Procedures:           IP 71111.17, Heat Sink Performance Inspectors:                     P. Cooper, Reactor Inspector (Lead Inspector)
 
A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (preferred), in care of Paula Cooper by July 14, 2017, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.
Inspectors:   P. Cooper, Reactor Inspector (Lead Inspector)  
A.1   Heat Exchangers and Service Water Equipment a) List of heat exchangers (HXs) or equipment cooled by service water (SW) directly or indirectly
 
A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (preferred), in care of Paula Cooper by July 14, 2017, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.
A.1 Heat Exchangers and Service Water Equipment a) List of heat exchangers (HXs) or equipment cooled by service water (SW) directly or indirectly
* Include the risk ranking from the site specific risk assessment for each listed HX
* Include the risk ranking from the site specific risk assessment for each listed HX
* Detail whether any cleaning or inspection activities are planned during the proposed onsite inspection period for any of the listed HXs
* Detail whether any cleaning or inspection activities are planned during the proposed onsite inspection period for any of the listed HXs
* For HXs directly cooled by SW, provide the testing, inspection, maintenance, and monitoring of biotic fouling and macrofouling program documents b) Detail the HX performance inspection methods and results for HXs that are inspected/cleaned c) Response to Generic Letter 89-13 including any regulatory commitments made d) Design Basis documents associated with the SW system e) Design Basis documents associated with the Ultimate Heat Sink (UHS)  
* For HXs directly cooled by SW, provide the testing, inspection, maintenance, and monitoring of biotic fouling and macrofouling program documents b) Detail the HX performance inspection methods and results for HXs that are inspected/cleaned c) Response to Generic Letter 89-13 including any regulatory commitments made d) Design Basis documents associated with the SW system e) Design Basis documents associated with the Ultimate Heat Sink (UHS) f)  SW system flow diagrams g) Recent Health Reports and self-assessments associated with the SW System and systems that are cooled by SW h) List of SW system related corrective action documents (with a brief description)
Enclosure


f) SW system flow diagrams g) Recent Health Reports and self-assessments associated with the SW System and systems that are cooled by SW h) List of SW system related corrective action documents (with a brief description) 2 which have received a Root Cause Analysis or an elevated severity level in the last two years i) Recent Operating Experience Events (2014-2017) j) List of applicable Codes and Industry Guidelines  
2 which have received a Root Cause Analysis or an elevated severity level in the last two years i) Recent Operating Experience Events (2014-2017) j) List of applicable Codes and Industry Guidelines k) List of findings in the heat sink/heat exchanger performance area for the last 3 years l)  List of redundant or infrequently used HXs m) Chemistry Program for safety-related HXs.
n) Detail whether the UHS is above ground encapsulated by embankments, weirs or excavated side slopes, underwater weir or excavation, or forced draft cooling tower or spray pond o) Provide a list of buried or inaccessible piping and the piping test program, inspection or monitoring program p) List of safety-related and non-safety related valve interface q) Most recent self-assessment reports performed on the UHS and SW systems B. Information to be provided on-site to the inspector at the entrance meeting (July 24, 2017):
B.1 Heat Exchangers and Service Water Equipment The inspector will select two to four heat exchangers and/or heat sink samples as required by the inspection procedure during in-office preparation. The following items will be requested when the selections are made.
a) Updated list of System Engineers b) List of any thru-wall leaks including completed or planned corrective actions and structural evaluations c) Provide a copy of the corrective actions and supporting documentation d) For the HXs that have Visual and/or Eddy Current Testing performed, provide a copy of the examination records, examiner qualification records, and associated corrective action documents e) Heat transfer calculations f)  Evaluations for the potential of water hammer g) Documentation for controls and operational limits for excessive flow induced vibrations


k) List of findings in the heat sink/heat exchanger performance area for the last 3 years  l) List of redundant or infrequently used HXs
3 h) Periodic flow test results at/or near maximum design flow i) For an UHS that is encapsulated by embankments, weirs of excavated side slopes provide: (1) third party dam inspection results, and (2) documentation showing that there is sufficient reservoir capacity j) For an UHS that is an underwater weir or excavation provide documentation showing:
 
: a. Periodic monitoring and trending of sediment build-up
m) Chemistry Program for safety-related HXs.
: b. Sufficient reservoir capacity
n) Detail whether the UHS is above ground encapsulated by embankments, weirs or excavated side slopes, underwater weir or excavation, or forced draft cooling tower or spray pond o) Provide a list of buried or inaccessible piping and the piping test program, inspection or monitoring program p) List of safety-related and non-safety related valve interface 
: c. Considerations for adjacent non-seismic and/or non-safety related structures of possible degradation or blocking of safety-related flow paths due to severe weather or seismic events
 
: d. Performance monitoring of heat transfer capabilities
q) Most recent self-assessment reports performed on the UHS and SW systems B. Information to be provided on-site to the inspector at the entrance meeting (July 24, 2017):  B.1 Heat Exchangers and Service Water Equipment The inspector will select two to four heat exchangers and/or heat sink samples as required by the inspection procedure during in-office preparation. The following items will be requested when the selections are made. a) Updated list of System Engineers  b) List of any thru-wall leaks including completed or planned corrective actions and structural evaluations  c) Provide a copy of the corrective actions and supporting documentation  d) For the HXs that have Visual and/or Eddy Current Testing performed, provide a copy of the examination records, examiner qualification records, and associated corrective action documents  e) Heat transfer calculations  f) Evaluations for the potential of water hammer  g) Documentation for controls and operational limits for excessive flow induced vibrations 3 h) Periodic flow test results at/or near maximum design flow i) For an UHS that is encapsulated by embankments, weirs of excavated side slopes provide: (1) third party dam inspection results, and (2) documentation showing that there is sufficient reservoir capacity j) For an UHS that is an underwater weir or excavation provide documentation showing: a. Periodic monitoring and trending of sediment build-up b. Sufficient reservoir capacity  
: e. Performance monitoring of UHS structural integrity k) SW flow balance test results Inspector Contact Information:
: c. Considerations for adjacent non-seismic and/or non-safety related structures of possible degradation or blocking of safety-related flow paths due to severe weather or seismic events d. Performance monitoring of heat transfer capabilities e. Performance monitoring of UHS structural integrity k) SW flow balance test results Inspector Contact Information: Paula Cooper Reactor Inspector 404-997-4468 Paula.Cooper@nrc.gov   Mailing Address: US NRC Region 2     Attn: Paula Cooper Marquis One Tower 245 Peachtree Center Avenue, NE   Suite 1200       Atlanta, GA 30303    
Paula Cooper Reactor Inspector 404-997-4468 Paula.Cooper@nrc.gov Mailing Address:
 
US NRC Region 2 Attn: Paula Cooper Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303}}
}}

Latest revision as of 03:30, 30 October 2019

Notification of Inspection and Request for Information
ML17156A161
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/02/2017
From: Sandra Walker
NRC/RGN-II/DRS/EB
To: James Shea
Tennessee Valley Authority
References
Download: ML17156A161 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 2, 2017 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Shea:

The NRC will perform the baseline heat sink (HS) inspection at the Browns Ferry Nuclear Plant from July 24 - 28, 2017. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Justin Garner of your organization. Our inspection dates are subject to change based on your updated schedule of activities. If there are any questions about this inspection or the material requested, please contact the lead inspector, Paula Cooper, at (404) 997-4468 (Paula.Cooper@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document

2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Shakur A. Walker, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68

Enclosure:

Pre-Inspection Document Request cc: Distribution via Listserv

3

SUBJECT:

BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION DATED: June 2, 2017 Distribution:

A. Blamey, RII, DRP C. Rapp, RII, SR PE J. Seat, RII, PE D. Dumbacher, RII, SRI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerryResource

  • See previous page for concurrence X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ____ x SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII/DRS RII/DRS SIGNATURE pec SAW4 NAME P. Cooper S. Walker DATE 06/1/2017 06/2/2017 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY******* DOCUMENT NAME: S:\DRS NEW\ENG BRANCH 3\INSPECTIONS\WORKING DOCUMENTS\RFIS\HEAT SINK REQUEST FOR INFORMATION LETTERS\2017\BROWNS FERRY HS 2017003 - PC.DOCX

HEAT SINK PERFORMANCE DOCUMENT REQUEST Inspection Dates: July 24 - July 28, 2017 Inspection Procedures: IP 71111.17, Heat Sink Performance Inspectors: P. Cooper, Reactor Inspector (Lead Inspector)

A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (preferred), in care of Paula Cooper by July 14, 2017, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.

A.1 Heat Exchangers and Service Water Equipment a) List of heat exchangers (HXs) or equipment cooled by service water (SW) directly or indirectly

  • Include the risk ranking from the site specific risk assessment for each listed HX
  • Detail whether any cleaning or inspection activities are planned during the proposed onsite inspection period for any of the listed HXs
  • For HXs directly cooled by SW, provide the testing, inspection, maintenance, and monitoring of biotic fouling and macrofouling program documents b) Detail the HX performance inspection methods and results for HXs that are inspected/cleaned c) Response to Generic Letter 89-13 including any regulatory commitments made d) Design Basis documents associated with the SW system e) Design Basis documents associated with the Ultimate Heat Sink (UHS) f) SW system flow diagrams g) Recent Health Reports and self-assessments associated with the SW System and systems that are cooled by SW h) List of SW system related corrective action documents (with a brief description)

Enclosure

2 which have received a Root Cause Analysis or an elevated severity level in the last two years i) Recent Operating Experience Events (2014-2017) j) List of applicable Codes and Industry Guidelines k) List of findings in the heat sink/heat exchanger performance area for the last 3 years l) List of redundant or infrequently used HXs m) Chemistry Program for safety-related HXs.

n) Detail whether the UHS is above ground encapsulated by embankments, weirs or excavated side slopes, underwater weir or excavation, or forced draft cooling tower or spray pond o) Provide a list of buried or inaccessible piping and the piping test program, inspection or monitoring program p) List of safety-related and non-safety related valve interface q) Most recent self-assessment reports performed on the UHS and SW systems B. Information to be provided on-site to the inspector at the entrance meeting (July 24, 2017):

B.1 Heat Exchangers and Service Water Equipment The inspector will select two to four heat exchangers and/or heat sink samples as required by the inspection procedure during in-office preparation. The following items will be requested when the selections are made.

a) Updated list of System Engineers b) List of any thru-wall leaks including completed or planned corrective actions and structural evaluations c) Provide a copy of the corrective actions and supporting documentation d) For the HXs that have Visual and/or Eddy Current Testing performed, provide a copy of the examination records, examiner qualification records, and associated corrective action documents e) Heat transfer calculations f) Evaluations for the potential of water hammer g) Documentation for controls and operational limits for excessive flow induced vibrations

3 h) Periodic flow test results at/or near maximum design flow i) For an UHS that is encapsulated by embankments, weirs of excavated side slopes provide: (1) third party dam inspection results, and (2) documentation showing that there is sufficient reservoir capacity j) For an UHS that is an underwater weir or excavation provide documentation showing:

a. Periodic monitoring and trending of sediment build-up
b. Sufficient reservoir capacity
c. Considerations for adjacent non-seismic and/or non-safety related structures of possible degradation or blocking of safety-related flow paths due to severe weather or seismic events
d. Performance monitoring of heat transfer capabilities
e. Performance monitoring of UHS structural integrity k) SW flow balance test results Inspector Contact Information:

Paula Cooper Reactor Inspector 404-997-4468 Paula.Cooper@nrc.gov Mailing Address:

US NRC Region 2 Attn: Paula Cooper Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303