|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 6, 2017 Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc. |
| -4352 June 6, 2017 Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc. | | Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 |
| Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 | |
| -9530 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PALISADES NUCLEAR PLANT - CONFIRMATION OF INITIAL LICENSE REEXAMINATION FOR AUGUST 2017 | | PALISADES NUCLEAR PLANT - CONFIRMATION OF INITIAL LICENSE REEXAMINATION FOR AUGUST 2017 |
|
| |
|
| ==Dear Mr. Arnone:== | | ==Dear Mr. Arnone:== |
| In a telephone conversation on May 30 , 2017, between Mr. Frank Korfias
| |
| , Operations Training Superintendent
| |
| , and Mr. Michael Bielby
| |
| , Senior Operations Engineer, arrangements were made for the administration of an operator licensing reexamination
| |
| , at the Palisades Nuclear Plant , during the week of August 7 , 2017. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility during that same week, August 7 , 2017. As agreed during the telephone conversation, your staff will prepare the reexamination based on the guidelines in Revision 10 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."
| |
| T he NRC's regional office will discuss with your staff any changes that might be necessary before the reexamination is administered.
| |
| To meet the above schedule, your staff will provide the final reexamination outlines, as well as the proposed operating test and supporting reference materials identified in Attachment 3 to ES-20 , by July 10, 2017. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 55.40(b)(3) (10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the reexamination test before submittal to the Commission for review and approval. All materials shall be complete and ready-to-use. W e request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required reexamination and reference materials, or the submittal of inadequate or incomplete materials, may cause the reexamination to be rescheduled.
| |
| To conduct the requested operating test, it will be necessary for your staff to provide adequate space and accommodations and to make the simulation facility available on the dates noted above. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating test is being administered.
| |
|
| |
|
| C. Arnone To permit timely NRC review and evaluation, your staff should submit the preliminary senior reactor operator license application (Office of Management and Budget (OMB) approval number 3150 | | In a telephone conversation on May 30, 2017, between Mr. Frank Korfias, Operations Training Superintendent, and Mr. Michael Bielby, Senior Operations Engineer, arrangements were made for the administration of an operator licensing reexamination, at the Palisades Nuclear Plant, during the week of August 7, 2017. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility during that same week, August 7, 2017. |
| -0090), medical certification (OMB approval number 3150 | | As agreed during the telephone conversation, your staff will prepare the reexamination based on the guidelines in Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the reexamination is administered. |
| -0024), and waiver requests (OMB approval number 3150 | | To meet the above schedule, your staff will provide the final reexamination outlines, as well as the proposed operating test and supporting reference materials identified in to ES-20, by July 10, 2017. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 55.40(b)(3) (10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the reexamination test before submittal to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required reexamination and reference materials, or the submittal of inadequate or incomplete materials, may cause the reexamination to be rescheduled. |
| -0090), at least 30 days before the first reexamination date. I f the application is not received at least 30 days before the reexamination date, a postponement may be necessary. | | To conduct the requested operating test, it will be necessary for your staff to provide adequate space and accommodations and to make the simulation facility available on the dates noted above. |
| A signed application certifying that all required training has been completed should be submitted at least 14 days before the first reexamination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150 | | Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating test is being administered. |
| -0018. T he public reporting burden for this collection of information is estimated to average 120 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. | | |
| Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov | | C. Arnone To permit timely NRC review and evaluation, your staff should submit the preliminary senior reactor operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090), at least 30 days before the first reexamination date. If the application is not received at least 30 days before the reexamination date, a postponement may be necessary. A signed application certifying that all required training has been completed should be submitted at least 14 days before the first reexamination date. |
| ; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading | | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 120 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. |
| -rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. |
| Thank you for your cooperation in this matter. M r. Frank Korfias has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Michael Bielby at 630-829-97 62 , or me at 630-829-9834. Sincerely, /RA/ Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50 | | This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. |
| -255 License No. DPR | | Thank you for your cooperation in this matter. Mr. Frank Korfias has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. Michael Bielby at 630-829-9762, or me at 630-829-9834. |
| -20 cc: Distribution via LISTSERV C. Arnone Letter to Charles Arnone from Robert J. Orlikowski dated June 6 2017 | | Sincerely, |
| | /RA/ |
| | Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via LISTSERV |
| | |
| | C. Arnone Letter to Charles Arnone from Robert J. Orlikowski dated June 6 2017 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PALISADES NUCLEAR PLANT - CONFIRMATION OF INITIAL LICENSE REEXAMINATION FOR AUGUST 2017 DISTRIBUTION | | PALISADES NUCLEAR PLANT - CONFIRMATION OF INITIAL LICENSE REEXAMINATION FOR AUGUST 2017 DISTRIBUTION: |
| : Jeremy Bowen RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt
| | Jeremy Bowen RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML17157B230 OFFICE RIII RIII RIII RIII NAME RKWalson for MBielby:jw ROrlikowski DATE 06/05/17 06/06/17 OFFICIAL RECORD COPY}} |
| | |
| ADAMS Accession Number: ML17157B230 OFFICE RIII RIII RIII RIII NAME RKWalson for MBielby:jw ROrlikowski DATE 06/05/17 06/06/17 OFFICIAL RECORD COPY}} | |
|
---|
Category:Letter
MONTHYEARML24320A1232024-11-18018 November 2024 Confirmation of Initial License Examination IR 05000255/20240122024-11-12012 November 2024 Restart Inspection Report 05000255/2024012 ML24312A2262024-11-0606 November 2024 Letter from C. Nelson, Michigan SHPO Regarding Palisades Nuclear Plant Architectural Survey ML24310A0142024-11-0505 November 2024 Ape Notification to Mackinac Bands of Chippewa Palisades ML24292A1572024-11-0505 November 2024 Ape Notification to Burt Lake Band Palisades ML24310A0132024-11-0505 November 2024 Ape Notification to Grand River Bands of Ottawa Indians Palisades ML24309A2032024-11-0404 November 2024 Ape Notification to Ottawa Tribe of Oklahoma Palisades ML24309A2072024-11-0404 November 2024 Ape Notification to Quechan Tribe of the Fort Yuma Indian Reservation Palisades ML24309A1832024-11-0404 November 2024 Ape Notification to Bois Forte Band of the Minnesota Chippewa Tribe Palisades ML24309A2122024-11-0404 November 2024 Ape Notification to Sault Ste. Marie Tribe of Chippewa Indians Palisades ML24309A2042024-11-0404 November 2024 Ape Notification to Pokagon Band of Potawatomi Indians Palisades ML24292A0492024-11-0404 November 2024 Ape Notification to Bad River Band of the Lake Superior Tribe of Chippewa Indians Palisades ML24309A1932024-11-0404 November 2024 Ape Notification to Leech Lake Band of Ojibwe Palisades ML24309A2012024-11-0404 November 2024 Ape Notification to Mille Lacs Band of Ojibwe Palisades ML24309A1902024-11-0404 November 2024 Ape Notification to Lac Courte Oreilles Band of Lake Superior Chippewa Palisades ML24309A1892024-11-0404 November 2024 Ape Notification to Hannahville Indian Community Palisades ML24309A2022024-11-0404 November 2024 Ape Notification to Nottawaseppi Huron Band of the Potawatomi Palisades ML24309A1852024-11-0404 November 2024 Ape Notification to Citizen Potawatomi Nation Palisades ML24309A1922024-11-0404 November 2024 Ape Notification to Lac Vieux Desert Band of Lk Superior Chippewa Indians Palisades ML24309A2112024-11-0404 November 2024 Ape Notification to Saint Croix Chippewa Indians of Wisconsin Palisades ML24309A2002024-11-0404 November 2024 Ape Notification to Miami Tribe of Oklahoma Palisades ML24309A1952024-11-0404 November 2024 Ape Notification to Little River Band of Ottawa Indians Palisades ML24309A2102024-11-0404 November 2024 Ape Notification to Saginaw Chippewa Indian Tribe of Michigan Palisades ML24309A1912024-11-0404 November 2024 Ape Notification to Lac Du Flambeau Band of Lake Superior Chippewa Indians Palisades ML24309A1842024-11-0404 November 2024 Ape Notification to Chippewa Cree Indians of the Rocky Boys Reservation of Montana Palisades ML24309A1882024-11-0404 November 2024 Ape Notification to Grand Traverse Band of Ottawa and Chippewa Indians Palisades ML24309A2082024-11-0404 November 2024 Ape Notification to Red Cliff Band of Lake Superior Chippewa Indians Palisades ML24309A2092024-11-0404 November 2024 Ape Notification to Red Lake Band of Chippewa Indians Palisades ML24309A1862024-11-0404 November 2024 Ape Notification to Forest County Potawatomi Community Palisades ML24309A1822024-11-0404 November 2024 Ape Notification to Bay Mills Indian Community Palisades ML24309A2052024-11-0404 November 2024 Ape Notification to Prairie Band Potawatomi Nation Palisades ML24309A1872024-11-0404 November 2024 Ape Notification to Grand Portage Band of Lake Superior Chippewa Palisades ML24309A1992024-11-0404 November 2024 Ape Notification to Menominee Indian Tribe of Wisconsin Palisades ML24292A0072024-11-0404 November 2024 Ape Notification to Achp Palisades ML24309A1982024-11-0404 November 2024 Ape Notification to Match E Be Nash She Wish Band of Pottawatomi Indians Palisades ML24309A1972024-11-0404 November 2024 Ape Notification to Little Traverse Bay Bands of Odawa Indians Palisades ML24309A2132024-11-0404 November 2024 Ape Notification to Turtle Mountain Band of Chippewa Indians Palisades ML24309A2062024-11-0404 November 2024 Ape Notification to Prairie Island Indian Community Palisades ML24309A2142024-11-0404 November 2024 Ape Notification to White Earth Band of Minnesota Chippewa Tribe Palisades PNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations 2024-09-06
[Table view] Category:License-Operator
MONTHYEARML24320A1232024-11-18018 November 2024 Confirmation of Initial License Examination IR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 ML20267A3432020-07-0606 July 2020 2020 Palisades Ile Form ES-401-6 ML20268A0732020-07-0606 July 2020 2020 Palisades Ile Form ES-401-4 ML20267A3442020-07-0606 July 2020 2020 Palisades Ile Proposed RO Admin JPMs ML20268A0842020-07-0606 July 2020 2020 Palisades Ile Op Test Outline Review Comments ML20267A3492020-07-0606 July 2020 2020 Palisades Ile Proposed Scenarios ML20267A3592020-07-0606 July 2020 2020 Palisades Ile Proposed Written Exam with Answer Key - Redacted ML20268A1312020-07-0606 July 2020 2020 Palisades Ile Administered Walkthrough JPMs ML20268A1502020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam with Answer Key - Redacted ML20267A5822020-07-0606 July 2020 2020 Palisades Ile Form ES-201-1 ML20267A5882020-07-0606 July 2020 2020 Palisades Ile Form ES-403-1 ML20267A3322020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 0 ML20267A3212020-07-0606 July 2020 2020 Palisades Ile Form ES-301-4 ML20267A3102020-07-0606 July 2020 2020 Palisades Ile Form ES-301-3 PNP 2020-003, 2020 Palisades Ile Proposed Exam Submittal Letter2020-07-0606 July 2020 2020 Palisades Ile Proposed Exam Submittal Letter ML20268A0762020-07-0606 July 2020 2020 Palisades Ile Form ES-401-9 ML20268A1632020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam - Redacted ML20267A5922020-07-0606 July 2020 2020 Palisades Post-Examination Submittal Letter ML20267A3342020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 1 ML20268A0792020-07-0606 July 2020 2020 Palisades Ile Post-Exam Comments - Redacted ML20268A1092020-07-0606 July 2020 2020 Palisades Ile Administered Scenarios ML20267A5852020-07-0606 July 2020 2020 Palisades Ile Form ES-201-3 ML20267A3562020-07-0606 July 2020 2020 Palisades Ile Proposed Walkthrough JPMs ML20268A0712020-07-0606 July 2020 2020 Palisades Ile Form ES-301-7 ML20268A1012020-07-0606 July 2020 2020 Palisades Ile Administered RO Admin JPMs ML20268A1112020-07-0606 July 2020 2020 Palisades Ile Administered SRO Admin JPMs ML20267A3522020-07-0606 July 2020 2020 Palisades Ile Proposed SRO Admin JPMs ML20099D2832020-04-0808 April 2020 Operator Licensing Examination Approval ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2019-038, 2020 Palisades Ile Outline Submittal Letter2019-11-0707 November 2019 2020 Palisades Ile Outline Submittal Letter ML19234A0332019-08-22022 August 2019 Confirmation of Initial License Examination (Bab) ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML18284A1822018-09-27027 September 2018 Gfes Results, September 2018 PNP 2018-030, Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-06-0606 June 2018 Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML17361A0302017-12-26026 December 2017 GFE Annual Registration Letter - 2018 Examinations - Region III ML22145A5952017-08-14014 August 2017 2017 Palisades Retake ES-201-1 ML22145A5972017-08-14014 August 2017 2017 Palisades Retake Outline and Operating Test Comments (ES-301-7) ML22145A5962017-08-14014 August 2017 2017 Palisades Retake ES-201-3 PNP 2017-051, 2017 Palisades Retake Post Exam Submittal Letter2017-08-0909 August 2017 2017 Palisades Retake Post Exam Submittal Letter ML22146A0232017-08-0808 August 2017 JPM 2 ML22146A0172017-08-0808 August 2017 JPM 1a ML22146A0192017-08-0808 August 2017 JPM 1b ML22146A0242017-08-0808 August 2017 JPM 3 ML22146A0262017-08-0808 August 2017 JPM 4 ML17222A1812017-08-0707 August 2017 Operator Licensing Reexamination Approval ML22146A0542017-08-0101 August 2017 2017 Palisades Retake ES-301-1 ML22146A0502017-08-0101 August 2017 2017 Palisades Retake ES-201-2 ML22146A0322017-07-24024 July 2017 2017 Palisades Retake Proposed Admin JPMs 2024-11-18
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24320A1232024-11-18018 November 2024 Confirmation of Initial License Examination IR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 ML20268A1632020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam - Redacted ML20268A0762020-07-0606 July 2020 2020 Palisades Ile Form ES-401-9 ML20268A0842020-07-0606 July 2020 2020 Palisades Ile Op Test Outline Review Comments ML20268A1012020-07-0606 July 2020 2020 Palisades Ile Administered RO Admin JPMs ML20268A1312020-07-0606 July 2020 2020 Palisades Ile Administered Walkthrough JPMs ML20267A3342020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 1 ML20267A3592020-07-0606 July 2020 2020 Palisades Ile Proposed Written Exam with Answer Key - Redacted ML20267A3102020-07-0606 July 2020 2020 Palisades Ile Form ES-301-3 ML20267A5852020-07-0606 July 2020 2020 Palisades Ile Form ES-201-3 ML20268A0712020-07-0606 July 2020 2020 Palisades Ile Form ES-301-7 ML20268A1112020-07-0606 July 2020 2020 Palisades Ile Administered SRO Admin JPMs ML20268A1502020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam with Answer Key - Redacted ML20267A5822020-07-0606 July 2020 2020 Palisades Ile Form ES-201-1 ML20267A5882020-07-0606 July 2020 2020 Palisades Ile Form ES-403-1 ML20267A3442020-07-0606 July 2020 2020 Palisades Ile Proposed RO Admin JPMs ML20267A3322020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 0 ML20268A0792020-07-0606 July 2020 2020 Palisades Ile Post-Exam Comments - Redacted ML20268A1092020-07-0606 July 2020 2020 Palisades Ile Administered Scenarios ML20268A0732020-07-0606 July 2020 2020 Palisades Ile Form ES-401-4 ML20267A3522020-07-0606 July 2020 2020 Palisades Ile Proposed SRO Admin JPMs ML20267A3492020-07-0606 July 2020 2020 Palisades Ile Proposed Scenarios ML20267A5922020-07-0606 July 2020 2020 Palisades Post-Examination Submittal Letter ML20267A3212020-07-0606 July 2020 2020 Palisades Ile Form ES-301-4 ML20267A3432020-07-0606 July 2020 2020 Palisades Ile Form ES-401-6 PNP 2020-003, 2020 Palisades Ile Proposed Exam Submittal Letter2020-07-0606 July 2020 2020 Palisades Ile Proposed Exam Submittal Letter ML20267A3562020-07-0606 July 2020 2020 Palisades Ile Proposed Walkthrough JPMs ML20099D2832020-04-0808 April 2020 Operator Licensing Examination Approval ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2019-038, 2020 Palisades Ile Outline Submittal Letter2019-11-0707 November 2019 2020 Palisades Ile Outline Submittal Letter ML19234A0332019-08-22022 August 2019 Confirmation of Initial License Examination (Bab) ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18284A1822018-09-27027 September 2018 Gfes Results, September 2018 PNP 2018-030, Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-06-0606 June 2018 Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML22145A5952017-08-14014 August 2017 2017 Palisades Retake ES-201-1 ML22145A5972017-08-14014 August 2017 2017 Palisades Retake Outline and Operating Test Comments (ES-301-7) ML22145A5962017-08-14014 August 2017 2017 Palisades Retake ES-201-3 PNP 2017-051, 2017 Palisades Retake Post Exam Submittal Letter2017-08-0909 August 2017 2017 Palisades Retake Post Exam Submittal Letter ML22146A0262017-08-0808 August 2017 JPM 4 ML22146A0172017-08-0808 August 2017 JPM 1a ML22146A0232017-08-0808 August 2017 JPM 2 ML22146A0192017-08-0808 August 2017 JPM 1b ML22146A0242017-08-0808 August 2017 JPM 3 ML17222A1812017-08-0707 August 2017 Operator Licensing Reexamination Approval ML22146A0502017-08-0101 August 2017 2017 Palisades Retake ES-201-2 ML22146A0542017-08-0101 August 2017 2017 Palisades Retake ES-301-1 ML22146A0322017-07-24024 July 2017 2017 Palisades Retake Proposed Admin JPMs ML22146A0292017-07-24024 July 2017 2017 Palisades Retake ES-301-3 ML22146A0402017-07-10010 July 2017 Ltr Pal 2017 Retake Exam - Outline and Proposed Exam Submittal 2024-11-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 6, 2017 Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT - CONFIRMATION OF INITIAL LICENSE REEXAMINATION FOR AUGUST 2017
Dear Mr. Arnone:
In a telephone conversation on May 30, 2017, between Mr. Frank Korfias, Operations Training Superintendent, and Mr. Michael Bielby, Senior Operations Engineer, arrangements were made for the administration of an operator licensing reexamination, at the Palisades Nuclear Plant, during the week of August 7, 2017. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility during that same week, August 7, 2017.
As agreed during the telephone conversation, your staff will prepare the reexamination based on the guidelines in Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the reexamination is administered.
To meet the above schedule, your staff will provide the final reexamination outlines, as well as the proposed operating test and supporting reference materials identified in to ES-20, by July 10, 2017. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 55.40(b)(3) (10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the reexamination test before submittal to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required reexamination and reference materials, or the submittal of inadequate or incomplete materials, may cause the reexamination to be rescheduled.
To conduct the requested operating test, it will be necessary for your staff to provide adequate space and accommodations and to make the simulation facility available on the dates noted above.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating test is being administered.
C. Arnone To permit timely NRC review and evaluation, your staff should submit the preliminary senior reactor operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090), at least 30 days before the first reexamination date. If the application is not received at least 30 days before the reexamination date, a postponement may be necessary. A signed application certifying that all required training has been completed should be submitted at least 14 days before the first reexamination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Thank you for your cooperation in this matter. Mr. Frank Korfias has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. Michael Bielby at 630-829-9762, or me at 630-829-9834.
Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via LISTSERV
C. Arnone Letter to Charles Arnone from Robert J. Orlikowski dated June 6 2017
SUBJECT:
PALISADES NUCLEAR PLANT - CONFIRMATION OF INITIAL LICENSE REEXAMINATION FOR AUGUST 2017 DISTRIBUTION:
Jeremy Bowen RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML17157B230 OFFICE RIII RIII RIII RIII NAME RKWalson for MBielby:jw ROrlikowski DATE 06/05/17 06/06/17 OFFICIAL RECORD COPY