ML17265A591: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:0 Battery Cell Parameters
{{#Wiki_filter:0                               Battery Cell Parameters 3.8.6 SURVEILLANCE REgUIRB1ENTS SURVEILLANCE                                    FRE(UENCY SR  3.8.6. I  Verify electrolyte level of each connected              31 days battery cell is above the top of the plates and not  overflowing.
SR  3.8.6.2    Verify the float voltage of      each connected        31 days battery cell is > 2.07 V.
SR  3.8.6.3    Verify specific gravity of the desi n ted              31 days pilot cell in each battery is          .188 for A, 1.<              a  ery  A an                  atter  8 ~
SR  3.8.6.4    Verify average electrolyte temperature of              31 days the designated pilot cell in each battery is > 55 F.
SR  3.8.6.5    Verify average electrolyte temperature of              92 days every fifth cell of each battery is ) 55'F.
SR  3.8.6.6    Verify specific gravity of      each connected          92 days battery cell is:
: a.  .Not more than 0.020 below average of all connected cells, and
: b.  , Avera e 'of all  connected  cells's 1.188  or  a    ery  an  ~ 1.192 for B.                              'ttery
                                        ~ /, le5; 9903i00125 99030f PDR  ADQCK 05000244 P                PDR R.E. Ginna Nuclear Power Plant          3.8-19<                        Amendment No. 61,


====3.8.6 SURVEILLANCE====
l Attachment IV R.E. Ginna Nuclear Power Plant Proposed Ginna Station Technical Specifications Included pages:
REgUIRB1ENTS SURVEILLANCE FRE(UENCY SR 3.8.6.I Verify electrolyte level of each connected battery cell is above the top of the plates and not overflowing.
3.&-19
31 days SR 3.8.6.2 Verify the float voltage of each connected battery cell is>2.07 V.31 days SR 3.8.6.3 A, 1.<Verify specific gravity of the desi n ted pilot cell in each battery is.188 for a ery A an atter 8~31 days SR 3.8.6.4 Verify average electrolyte temperature of the designated pilot cell in each battery is>55 F.31 days SR 3.8.6.5 Verify average electrolyte temperature of every fifth cell of each battery is)55'F.92 days SR 3.8.6.6 Verify specific gravity of each connected battery cell is: a..Not more than 0.020 below average of all connected cells, and b., Avera e'of all connected cells's 1.188 or a ery an~1.192 for'ttery B.~/, le5;92 days 9903i00125 99030f PDR ADQCK 05000244 P PDR R.E.Ginna Nuclear Power Plant 3.8-19<Amendment No.61, l
Attachment IV R.E.Ginna Nuclear Power Plant Proposed Ginna Station Technical Specifications Included pages: 3.&-19 attery Cell Parameters


====3.8.6 SURVEILLANCE====
attery Cell Parameters 3.8.6 SURVEILLANCE REgUIREPIENTS SURVEILLANCE                               FREQUENCY SR 3.8.6. 1   Verify electrolyte level of each connected         31 days battery cell is above the top of the plates and not overflowing.
REgUIREPIENTS SURVEILLANCE FREQUENCY SR 3.8.6.1 Verify electrolyte level of each connected battery cell is above the top of the plates and not overflowing.
SR 3.8.6.2   Verify the float voltage of   each connected     31 days battery cell is > 2.07 V.
31 days SR 3.8.6.2 Verify the float voltage of each connected battery cell is>2.07 V.31 days SR 3.8.6.3 Verify specific gravity of the designated I pilot cell in each battery is~1.195.31 days SR 3.8.6.4 Verify average electrolyte temperature of the designated pilot cell in each battery is z 55'F.31 days SR 3.8.6.5 Verify average electrolyte temperature of every fifth cell of each battery is z 55'F.92 days SR 3.8.6.6 Verify specific gravity of each connected battery cell is: a.Not more than 0.020 below average of all connected cells, and b.Average of all connected cells is z 1.195.92 days R.E.Ginna Nuclear Power Plant 3.8-19 Amendment No.Pg  
SR 3.8.6.3   Verify specific gravity of the designated         31 days I                 pilot cell in each battery is ~ 1.195.
~~,h}}
SR 3.8.6.4   Verify average electrolyte temperature of         31 days the designated pilot cell in each battery is z 55'F.
SR 3.8.6.5   Verify average electrolyte temperature of         92 days every fifth cell of each battery is z 55'F.
SR 3.8.6.6   Verify specific gravity of   each connected       92 days battery cell is:
: a. Not more than 0.020 below average   of all connected cells, and
: b. Average of all connected cells is z 1.195.
R.E. Ginna Nuclear Power Plant       3.8-19                       Amendment No. Pg
 
  ~ ~
,h}}

Latest revision as of 17:47, 29 October 2019

Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6)
ML17265A591
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/01/1999
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17265A568 List:
References
NUDOCS 9903100125
Download: ML17265A591 (5)


Text

0 Battery Cell Parameters 3.8.6 SURVEILLANCE REgUIRB1ENTS SURVEILLANCE FRE(UENCY SR 3.8.6. I Verify electrolyte level of each connected 31 days battery cell is above the top of the plates and not overflowing.

SR 3.8.6.2 Verify the float voltage of each connected 31 days battery cell is > 2.07 V.

SR 3.8.6.3 Verify specific gravity of the desi n ted 31 days pilot cell in each battery is .188 for A, 1.< a ery A an atter 8 ~

SR 3.8.6.4 Verify average electrolyte temperature of 31 days the designated pilot cell in each battery is > 55 F.

SR 3.8.6.5 Verify average electrolyte temperature of 92 days every fifth cell of each battery is ) 55'F.

SR 3.8.6.6 Verify specific gravity of each connected 92 days battery cell is:

a. .Not more than 0.020 below average of all connected cells, and
b. , Avera e 'of all connected cells's 1.188 or a ery an ~ 1.192 for B. 'ttery

~ /, le5; 9903i00125 99030f PDR ADQCK 05000244 P PDR R.E. Ginna Nuclear Power Plant 3.8-19< Amendment No. 61,

l Attachment IV R.E. Ginna Nuclear Power Plant Proposed Ginna Station Technical Specifications Included pages:

3.&-19

attery Cell Parameters 3.8.6 SURVEILLANCE REgUIREPIENTS SURVEILLANCE FREQUENCY SR 3.8.6. 1 Verify electrolyte level of each connected 31 days battery cell is above the top of the plates and not overflowing.

SR 3.8.6.2 Verify the float voltage of each connected 31 days battery cell is > 2.07 V.

SR 3.8.6.3 Verify specific gravity of the designated 31 days I pilot cell in each battery is ~ 1.195.

SR 3.8.6.4 Verify average electrolyte temperature of 31 days the designated pilot cell in each battery is z 55'F.

SR 3.8.6.5 Verify average electrolyte temperature of 92 days every fifth cell of each battery is z 55'F.

SR 3.8.6.6 Verify specific gravity of each connected 92 days battery cell is:

a. Not more than 0.020 below average of all connected cells, and
b. Average of all connected cells is z 1.195.

R.E. Ginna Nuclear Power Plant 3.8-19 Amendment No. Pg

~ ~

,h