IR 05000321/2017404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17276A038
| number = ML17276A038
| issue date = 09/27/2017
| issue date = 09/27/2017
| title = Edwin I. Hatch Nuclear Plant - U.S. Nuclear Regulatory Commission Security Inspection Report 05000321/2017404, 05000366/2017404 OUO Removed
| title = U.S. Nuclear Regulatory Commission Security Inspection Report 05000321/2017404, 05000366/2017404 OUO Removed
| author name = Desai B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = McGavin S P
| addressee name = Mcgavin S
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000321, 05000366
| docket = 05000321, 05000366
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES tember 27, 2017
[[Issue date::September 27, 2017]]


Mr. Stephen Fleet Security Director Southern Nuclear Operating Co., Inc. Edwin I. Hatch Nuclear Plant 40 Inverness Center Parkway (Bin B042) Birmingham, AL 35242
==SUBJECT:==
 
EDWIN I. HATCH NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000321/2017404, 05000366/2017404
SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000321/2017404, 05000366/2017404


==Dear Mr. McGavin:==
==Dear Mr. McGavin:==
On September 20, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Edwin I. Hatch Nuclear Plant and discussed the results of this inspection with Mr. D. Vineyard and other members of your staff. The results of this inspection are documented in the enclosed report.
On September 20, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Edwin I. Hatch Nuclear Plant and discussed the results of this inspection with Mr. D. Vineyard and other members of your staff. The results of this inspection are documented in the enclosed report.


No NRC-identified or self-revealing findings were identified during the inspection. This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html. and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
No NRC-identified or self-revealing findings were identified during the inspection.
 
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html. and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-321, 50-366 License No. DPR-57, NPF-5 Enclosure:
IR 05000321/2017404, 05000366/2017404 w/Attachment: Supplemental Information (OUO) cc:
Michael P. Long Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.


Sincerely,/RA/ Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-321, 50-366 License No. DPR-57, NPF-5
40 Inverness Center Parkway (Bin B042)
Birmingham, AL 35242 Lisa B. Hogg Fleet Security Project Manager Southern Nuclear Operating Co., Inc.


===Enclosure:===
40 Inverness Center Parkway (Bin B042)
IR 05000321/2017404, 05000366/2017404
Birmingham, AL 35242 Steven M. Shipman Fleet Security Project Manager Southern Nuclear Operating Co., Inc.


===w/Attachment:===
40 Inverness Center Parkway (Bin B042)
Supplemental Information (OUO)
Birmingham, AL 35242 _________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/DRS/PSB2 RII/ DRS/PSB@ RII/DRP RII/ DRS/ PSB@
SIGNATURE  ICH BBD SRS5 BBD NAME  I. Hall B. Desai S. Sandal B. Desai DATE  9/ 26/ 2017 9/ 27/2017 9/ 27/2017 9/ 27/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO
}}
}}

Latest revision as of 16:31, 29 October 2019

U.S. Nuclear Regulatory Commission Security Inspection Report 05000321/2017404, 05000366/2017404 OUO Removed
ML17276A038
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/27/2017
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Mcgavin S
Southern Nuclear Operating Co
References
IR 2017404
Download: ML17276A038 (4)


Text

UNITED STATES tember 27, 2017

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000321/2017404, 05000366/2017404

Dear Mr. McGavin:

On September 20, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Edwin I. Hatch Nuclear Plant and discussed the results of this inspection with Mr. D. Vineyard and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-identified or self-revealing findings were identified during the inspection.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html. and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-321, 50-366 License No. DPR-57, NPF-5 Enclosure:

IR 05000321/2017404, 05000366/2017404 w/Attachment: Supplemental Information (OUO) cc:

Michael P. Long Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242 Lisa B. Hogg Fleet Security Project Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242 Steven M. Shipman Fleet Security Project Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242 _________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/DRS/PSB2 RII/ DRS/PSB@ RII/DRP RII/ DRS/ PSB@

SIGNATURE ICH BBD SRS5 BBD NAME I. Hall B. Desai S. Sandal B. Desai DATE 9/ 26/ 2017 9/ 27/2017 9/ 27/2017 9/ 27/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO