ML17286A655: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED D>TRIBUTION DEMONS TION SYSTEM'" REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)ACCESSION NBR:9103190437 DOC.DATE: 91/03/12 NOTARIZED:
{{#Wiki_filter:ACCELERATED D> TRIBUTION DEMONS                                   TION SYSTEM         '"
YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORSENSEN,G.C.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)'R  
ACCESSION NBR:9103190437             DOC.DATE: 91/03/12     NOTARIZED: YES         DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public Powe             05000397 AUTH. NAME           AUTHOR AFFILIATION SORSENSEN,G.C.       Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)                     'R


==SUBJECT:==
==SUBJECT:==
Responds to 901025 Generic Ltr 89-10 Suppl 3 re consideration of results of NRC sponsored tests of motor operated valves.RWCU valve not tested&,no deficiencies identified in RCXC valves.DISTRIBUTION CODE: A064D COPIES RECEIVED:LTR J ENCL I SIZE: TITLE: Response to Generic Ltr 89-10,"Safety-Related MOV Testing 6 NOTES D S Surveill/RECXPIENT ID CODE/NAME PD5 LA ENG, P.L.INTERNAL: ACRS NRR/DET~7E EG-PTE&EXTERNAL: NRC PDR COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD BAER, B RES NRR/LPEB/BC RES/DSIR/EIB/B NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:, PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10'D D WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 96B~3000 George Washington Way~Richland, Washington 99352 March 12, 1991 G02-91"050 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Responds to 901025 Generic Ltr 89-10 Suppl 3 re consideration of results of NRC sponsored tests of motor operated valves.RWCU valve not tested &,no deficiencies                             D identified in       RCXC   valves.
DISTRIBUTION CODE: A064D TITLE: Response COPIES RECEIVED:LTR to Generic Ltr 89-10, J ENCL "Safety-Related I
MOV SIZE:
Testing 6 Surveill S
                                                                                                /
NOTES RECXPIENT               COPIES            RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL            D PD5 LA                       1      0    PD5 PD                1    1 ENG, P. L.                   1      1                                                D INTERNAL: ACRS                         1      1    BAER, B RES            1    1 NRR/DET~         7E         1     1     NRR/LPEB/BC           1    1 EG- PTE&                    1      1    RES/DSIR/EIB/B         1     1 EXTERNAL: NRC PDR                                    NSIC D
                                                                                                'D D
NOTE TO ALL "RIDS" RECIPIENTS:,
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               11   ENCL   10
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96B ~ 3000 George Washington Way ~ Richland, Washington 99352 March 12, 1991 G02-91"050 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, D.C.       20555 Gentlemen:


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2, OPERATING LICENSE NPF-21 RESPONSE TO GENERIC LETlER 89-10, SUPPLEMENT 3 (TAC NOS.75738 AND 77801)
NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 RESPONSE TO GENERIC LETlER 89-10, SUPPLEMENT 3 (TAC NOS. 75738 AND 77801)


==Reference:==
==Reference:==
: 1. NRC  Generic Letter 89-10, Supplement 3, "Consideration of the Results of NRC Sponsored Tests of Motor-Operated Valves", dated October 25, 1990
: 2. EPRI Report NP-7065,          "Review of NRC/INEL Gate            Valve Test Program", Prepublication Copy date January, 1991
: 3. Letter, G02-90-204, GC Sorensen          (SS)  to  NRC, same    subject, dated December 12, 1990 Generic Letter 89-10, Supplement 3 requires that BWR licensees provide a written response to Reporting Requirement number two within 120 days of their receipt of the letter. The Supply System received the reference letter November 12, 1990.
The purpose of this letter is to provide such response.
The 120 day    reporting requirement requested:
a.) Criteria, reflecting operating experience and the latest test data, that were applied in determining whether deficiencies exist in the specified HPCI, RWCU and RCIC motor-operated valves and in any MOV's considered to be more safety significant; b.)  The    identification of      any MOV's found      to have deficiencies;        and c.)  A  schedule    for  any necessary    corrective action.
The 30 day response previously submitted (Reference 3)                  indicated that no MOV's have been identified with greater safety significance                    than those previously identified in IE Bulletin 85-03.              Containment isolation valves in the steam supply lines of the High Pressure Coolant Injection (HPCI) system are not applicable to WNP-2 since we do not have a HPCI turbine. Following is the response for the RWCU and RCIC valves.
9 f 03 1 9    7 9/0312 PDR    FIOOCK  0 5000397 PDR p


1.NRC Generic Letter 89-10, Supplement 3,"Consideration of the Results of NRC Sponsored Tests of Motor-Operated Valves", dated October 25, 1990 2.EPRI Report NP-7065,"Review of NRC/INEL Gate Valve Test Program", Prepublication Copy date January, 1991 3.Letter, G02-90-204, GC Sorensen (SS)to NRC, same subject, dated December 12, 1990 Generic Letter 89-10, Supplement 3 requires that BWR licensees provide a written response to Reporting Requirement number two within 120 days of their receipt of the letter.The Supply System received the reference letter November 12, 1990.The purpose of this letter is to provide such response.The 120 day reporting requirement requested:
I ci     C r>
a.)Criteria, reflecting operating experience and the latest test data, that were applied in determining whether deficiencies exist in the specified HPCI, RWCU and RCIC motor-operated valves and in any MOV's considered to be more safety significant; b.)The identification of any MOV's found to have deficiencies; and c.)A schedule for any necessary corrective action.The 30 day response previously submitted (Reference 3)indicated that no MOV's have been identified with greater safety significance than those previously identified in IE Bulletin 85-03.Containment isolation valves in the steam supply lines of the High Pressure Coolant Injection (HPCI)system are not applicable to WNP-2 since we do not have a HPCI turbine.Following is the response for the RWCU and RCIC valves.9 f 03 1 9 5000397 7 9/0312 PDR FIOOCK 0 PDR p ci I C r>t t'V l k.~
t t'
Page Two)ESPONSE TO GENERIC LETTER 89-10, SUPPLEMENT 3 The Supply System is participating in the EPRI HOV Performance Prediction Program and other industry groups.Further review of these specific RWCU and RCIC valves will be completed as industry data becomes available.
V l
RWCU Valves A detailed comparison of the RWCU isolation valves to the INEL test valves has been made in Table 1.The RWCU isolation valves at WNP-2 are deemed to be very similar to INEL valves"B" and"2" with the exception of motor size and stem thread lead.The motors are rated at 40 foot pounds starting torque versus 25 foot pounds for the INEL operators providing 60%to 90%higher motor pullout torque capability.
k
The larger stem thread lead for the WNP-2 valves results in a higher speed valve with less thrust for a given motor size.However, the thrust is compensated for by the larger motor size for the WNP-2 valves.A review of the first blowdown isolation test for the two INEL valves indicates a maximum apparent disk factor of 0.35 for flow isolation.
    . ~
This valve disk factor will be used to determine the thrust setpoints for the WNP-2 RWCU valves using the standard industry equations.
 
It is also noted that the thrust capability of the RWCU operators with the torque switch bypassed exceeds the required closing thrust provided in Information Notice 90-40.The RWCU valves have not yet been diagnostically tested due to inaccessibility during plant operation.
Page Two
The valves are currently scheduled to be tested during the 1991 Spring Refueling Outage.The identification of any deficiencies and a schedule for any potential corrective actions will be reported within 30 days following the completion of that outage if any deficiencies are identified.
)ESPONSE TO GENERIC LETTER   89-10, SUPPLEMENT 3 The Supply System is participating in the EPRI HOV Performance Prediction Program and other industry groups. Further review of these specific RWCU and RCIC valves will be completed as industry data becomes available.
RCIC Valves A detailed comparison of the RCIC inboard isolation valve at WNP-2, RCIC-V-63, to the INEL test valves has been made in Table 2.This valve is deemed to be similar to INEL valve"6" with the exception of operator size, unit ratio, stem thread lead, and motor speed.After review of Reference 2, it appears all blowdown closure strokes for the test valve were performed with pre-existing damage to the body guide rails and the direct applicability of the apparent disk factor to the valve at WNP-2 is questionable.
RWCU Valves A detailed comparison of the RWCU isolation valves to the INEL test valves has been made   in Table 1. The RWCU isolation valves at WNP-2 are deemed to be very similar to INEL valves "B" and "2" with the exception of motor size and stem thread lead. The motors are rated at 40 foot pounds starting torque versus 25 foot pounds for the INEL operators providing 60% to 90% higher motor pullout torque capability. The larger stem thread lead for the WNP-2 valves results in a higher speed valve with less thrust for a given motor size.         However, the thrust is compensated for by the larger motor size for the WNP-2 valves.
RCIC-V-63 has been diagnostically tested as part of IE Bulletin 85-03.The torque switch has been verified to be bypassed for approximately 98%of valve stroke in the close direction.
A review of the first blowdown isolation test for the two INEL valves indicates a maximum   apparent disk factor of 0.35 for flow isolation. This valve disk factor will be used to determine the thrust setpoints for the WNP-2 RWCU valves using the standard industry equations.       It is also noted that the thrust capability of the RWCU operators with the torque switch bypassed exceeds the required closing thrust provided in Information Notice 90-40.
The thrust capability of the operator with the torque switch bypassed has been evaluated in response to Information Notice 90-40.The thrust capability greatly exceeds the required thrust reported in Table 1 of Information Notice 90-40 thus providing a high degree of assurance of valve isolation.
The RWCU valves have not yet been diagnostically tested due to inaccessibility during plant operation. The valves are currently scheduled to be tested during the 1991 Spring Refueling Outage. The identification of any deficiencies and a schedule for any potential corrective actions will be reported within 30 days following the completion of that outage   if any deficiencies are identified.
The outboard isolation valve at WNP-2, RCIC-V-8, is a 4 inch Velan flexible wedge gate valve., No valves of this size were tested in the blowdown test research program, therefore a comparison of this valve to any test valve data is not made.
RCIC Valves A detailed comparison of the RCIC inboard isolation valve at WNP-2, RCIC-V-63, to the INEL test valves has been made in Table 2. This valve is deemed to be similar to INEL valve "6" with the exception of operator size, unit ratio, stem thread lead, and motor speed.
e Page Three RESPONSE TO GENERIC LETTER 89-10, SUPPLEMENT 3 RCIC-V-8 has been diagnostically tested as part of IE Bulletin 85-03.The thrust setpoint for RCIC-V-8 has been established using the standard industry equations with a valve factor of 0.3.The motor operator was set up and verified to meet the required thrust setpoint during diagnostic testing.In addition, the torque switch has been verified to be bypassed for approximately 98%of valve stroke in the close direction.
After review of Reference 2, it appears all blowdown closure strokes for the test valve were performed with pre-existing damage to the body guide rails and the direct applicability of the apparent disk factor to the valve at WNP-2 is questionable.
This will allow full actuator stall torque capability during the bypass period thus maximizing the probability of valve isolation.
RCIC-V-63 has   been diagnostically tested as part of IE Bulletin 85-03.       The torque switch has been verified to be bypassed for approximately 98% of valve stroke in the close direction. The thrust capability of the operator with the torque switch bypassed has been evaluated in response to Information Notice 90-
No deficiencies were identified for RCIC-V-63 or RCIC-V-8, and therefore no corrective actions are necessary.
: 40. The thrust capability greatly exceeds the required thrust reported in Table 1 of Information Notice 90-40 thus providing a high degree of assurance   of valve isolation.
As discussed above, we will inform the NRC of any deficiencies identified during diagnostic testing of the RWCU valves.This completes the Supply System's response to Generic Letter 89-10, Supplement 3.Very truly yours, G.C.Sorensen, Manager Regulatory Programs HLA/MRG/bk Attachments cc: JB Hartin-NRC RV NS Reynolds-Winston&Strawn PL Eng-NRC DL Williams-BPA/399 NRC Site Inspector-901A STATE OF WASHINGTON)
The outboard   isolation valve at WNP-2, RCIC-V-8, is a 4 inch Velan flexible wedge gate valve.,   No valves of this size were tested in the blowdown test research program, therefore a comparison of this valve to any test valve data is not made.
)COUNTY OF BENTON
 
Page Three e
RESPONSE   TO GENERIC LETTER 89-10, SUPPLEMENT 3 RCIC-V-8 has been diagnostically tested as part of IE Bulletin 85-03. The thrust setpoint for RCIC-V-8 has been established using the standard industry equations with a valve factor of 0.3. The motor operator was set up and verified to meet the required thrust setpoint during diagnostic testing. In addition, the torque switch has been verified to be bypassed for approximately 98% of valve stroke in the close direction. This will allow full actuator stall torque capability during the bypass period thus maximizing the probability of valve isolation.
No deficiencies were identified for     RCIC-V-63 or RCIC-V-8, and therefore no corrective actions are necessary.
As discussed above, we will inform the NRC of any deficiencies identified during diagnostic testing of the RWCU valves. This completes the Supply System's response to Generic Letter 89-10, Supplement 3.
Very   truly yours, G. C. Sorensen, Manager Regulatory Programs HLA/MRG/bk Attachments cc:     JB Hartin - NRC RV NS Reynolds - Winston & Strawn PL Eng - NRC DL Williams - BPA/399 NRC Site Inspector - 901A
 
STATE OF WASHINGTON)                          


==Subject:==
==Subject:==
GL 89-10, Sup lement 3 I.A.G.HOSLER, being duly sworn, subscribe to and say that I am the Manager, WNP-2 Licensing, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that I have the full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.DATE 1991 A.G.Hosier, Manager WNP-2 Licensing On this date personally appeared before me A.G.HOSLER, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mention.ed GIVEN under my hand and seal this~day of 1991.No ry Public in and for the STATE OF WASHINGTON Residing at My Commission Expires  
GL 89-10, Sup lement 3
~~/J/P>rag, 0 j',".'v p gs tlggtv~~"
                      )
Table 1: RWCU Valve Comparison Item Manufacturer Velan INEL Valve"B" and"2" WNP-2 Valve RWCU-V-1 (Inboard Isolation)
COUNTY OF BENTON I. A. G. HOSLER, being   duly sworn, subscribe to and say that I am the Manager, WNP-2   Licensing, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in   it are true.
Veian WNP-2 Valve RWCU-V4 (Outboard Isolation)
DATE                                 1991 A. G. Hosier, Manager WNP-2   Licensing On this date personally   appeared before me A. G. HOSLER, to me known to be the individual   who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mention.ed GIVEN under my hand and seal this ~day       of                           1991.
Veian Drawin Number Size in.ANSI Class (lbs.)Orifice Diameter fn.)Disk Base Material Disk Seat Material Disk Guide Material Body Guide Material Seat Ring Base Material Seat Rin Material Stroke Length (in.)Stem Diameter (in.)Thread T e Thread Pitch (in.)Thread Lead (in./rev.)
No   ry Public in and for the STATE OF WASHINGTON Residing at My Commission Expires
Operator Model Unit Ratio S rin PackNo.Motor Pullout Torque@Rated Voltage@De raded Volta e MotorS eed P2-70916-S01 900 5.18 A-105 Stellite 6 Stellite 6 (B), A-1 05 (2)A46 A-216 WCB Stellite 6 5.75 1.75 Acme 1/4 1/4 SMB4 34.9 0501-184 314 ft-Ibs 201 ft-Ibs 1800r m P2-3311-N4 900 5.19 SA-216 WCB Stellite 6 Stellite 6 or SA-105 SA46 SA-216 WCB or SA-105 Stellite 6 5.75 1.75 Acme 1/4 1/2 SMB4 34.96 604004017-1 503 ft-Ibs 322 ft-Ibs 1800r m P24311-N4 900 5.19 SA-105 Stellite 6 Stellite 6 or SA-105 SA46 SA-105 Stellite 6 5.75 1.75 Acme 1/4 1/2 SMB4 41.33 604004017-1 595 ft-Ibs 476 ft-Ibs 1900 r m Motor Voltage 460 VAC Motor Starting Torque 25 ft-Ibs 0 erator Rated Tor ue 500 ft-Ibs Valve Rated Thrust Not Available 0 erator Rated Thrust 24,000 Ibs 460 VAC 40 ft-Ibs 500 ft-Ibs 24,000 lbs 25,516 Ibs 240 VDC 40 ft-Ibs 500 ft-Ibs 24,000 Ibs 25,516 Ibs la I Table 2: RCIC Valve Comparison Item Manufacturer Velan INEL Valve"6" WNP-2 Valve RCIC-V-63 (Inboard Isolation)
 
Velan Drawin Number Size ln.ANSI Class (lbs.)Orifice Diameter (in.)Disk Base Material Disk Seat Material Disk Guide Material Body Guide Material Seat Ring Base Material Seat Rin Material Stroke Length (ln.)Stem Diameter (in.)Thread T e Thread Pitch (in.)Thread Lead (in./rev.)
                                  ~ ~
Operator Model Unit Ratio S rin PackNo.Motor Pullout Torque@Rated Voltage@De raded Volta e MotorS eed Motor Voltage Motor Starting Torque 0 eratorRatedTor ue 0 erator Rated Thrust Valve Rated Thrust P2-72916-S01 10 600 A-105 Stelllte 6 A-105 A46 A-105 Stelllte 6 8.75 2.5 Acme 1/3 2/3 SMB-1 56.6 0701-212 1222 ft-Ibs 782 ft-Ibs 1800r m 460 VAC 60 ft-Ibs 850 ft-Ibs 45,000 Ibs Not Available P2-3311-N-1 4 10 900 7.87 SA-105 Stellite 6 Stellite 6 or SA-105 SA46 SA-216 WCB or SA-105 Stellite 6 8.5 2.5 Acme 1/3 1 SMB-2 95.58 604004071-1 1806 ft-Ibs 1156 ft-Ibs 3600r m 460 VAC 60 ft-lbs 1250 ft-Ibs 70,000 1bs 57,782 Ibs v.C l t i}}
                                /
0     j',".
                        'v p
gs
/        J P
    >rag, tlggtv ~ ~ "
 
Table 1: RWCU Valve Comparison INEL Valve                WNP-2 Valve            WNP-2 Valve "B" and "2"               RWCU-V-1               RWCU-V4 Item                                                  (Inboard Isolation)   (Outboard Isolation)
Manufacturer            Velan                      Veian                  Veian Drawin Number           P2-70916-S01              P2-3311-N4              P24311-N4 Size in.
ANSI Class (lbs.)       900                        900                    900 Orifice Diameter fn.)   5.18                      5.19                    5.19 Disk Base Material     A-105                      SA-216 WCB              SA-105 Disk Seat Material     Stellite 6                Stellite 6              Stellite 6 Disk Guide Material     Stellite 6 (B), A-1 05 (2) Stellite 6 or SA-105    Stellite 6 or SA-105 Body Guide Material     A46                        SA46                    SA46 Seat Ring Base Material A-216 WCB                  SA-216 WCB or SA-105    SA-105 Seat Rin Material       Stellite 6                Stellite 6              Stellite 6 Stroke Length (in.)     5.75                      5.75                    5.75 Stem Diameter (in.)     1.75                      1.75                    1.75 Thread T e             Acme                      Acme                    Acme Thread Pitch (in.)     1/4                        1/4                    1/4 Thread Lead (in./rev.) 1/4                        1/2                    1/2 Operator Model         SMB4                      SMB4                    SMB4 Unit Ratio             34.9                      34.96                  41.33 S rin PackNo.           0501-184                  604004017-1            604004017-1 Motor Pullout Torque
  @ Rated Voltage       314 ft-Ibs                 503 ft-Ibs             595 ft-Ibs
  @De raded Volta e    201 ft-Ibs                 322 ft-Ibs             476 ft-Ibs MotorS eed              1800r m                    1800r m                1900 r m Motor Voltage           460 VAC                    460 VAC                 240 VDC Motor Starting Torque   25 ft-Ibs                  40 ft-Ibs              40 ft-Ibs 0 erator Rated Tor ue   500 ft-Ibs                500 ft-Ibs              500 ft-Ibs 0 erator Rated Thrust   24,000 Ibs                 24,000 lbs             24,000 Ibs Valve Rated Thrust      Not Available              25,516 Ibs             25,516 Ibs
 
la I
 
Table 2: RCIC Valve Comparison INEL Valve             WNP-2 Valve "6"                  RCIC-V-63 Item                                                    (Inboard Isolation)
Manufacturer                Velan                  Velan Drawin Number               P2-72916-S01            P2-3311-N-1 4 Size ln.                   10                      10 ANSI Class (lbs.)           600                    900 Orifice Diameter (in.)                             7.87 Disk Base Material         A-105                  SA-105 Disk Seat Material         Stelllte 6              Stellite 6 Disk Guide Material         A-105                    Stellite 6 or SA-105 Body Guide Material         A46                      SA46 Seat Ring Base Material     A-105                    SA-216 WCB or SA-105 Seat Rin Material           Stelllte 6              Stellite 6 Stroke Length (ln.)         8.75                    8.5 Stem Diameter (in.)         2.5                    2.5 Thread T e                 Acme                    Acme Thread Pitch (in.)         1/3                      1/3 Thread Lead (in./rev.)     2/3                      1 Operator Model             SMB-1                    SMB-2 Unit Ratio                 56.6                    95.58 S rin PackNo.               0701-212                604004071-1 Motor Pullout Torque
  @ Rated Voltage           1222 ft-Ibs              1806 ft-Ibs
  @De raded Volta e         782 ft-Ibs               1156 ft-Ibs MotorS eed                  1800r m                 3600r m Motor Voltage              460 VAC                460 VAC Motor Starting Torque      60 ft-Ibs               60 ft-lbs 0 eratorRatedTor ue        850 ft-Ibs               1250 ft-Ibs 0 erator Rated Thrust      45,000 Ibs             70,000 1bs Valve Rated Thrust          Not Available          57,782 Ibs
 
v lt
  .C i}}

Latest revision as of 14:15, 29 October 2019

Responds to 901025 Generic Ltr 89-10 Suppl 3 Re Consideration of Results of NRC Sponsored Tests of Motor Operated Valves.Rwcu Valve Not Tested & No Deficiencies Identified in RCIC Valves
ML17286A655
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/12/1991
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-10, GO2-91-050, GO2-91-50, TAC-75738, TAC-77801, NUDOCS 9103190437
Download: ML17286A655 (11)


Text

ACCELERATED D> TRIBUTION DEMONS TION SYSTEM '"

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)

ACCESSION NBR:9103190437 DOC.DATE: 91/03/12 NOTARIZED: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORSENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) 'R

SUBJECT:

Responds to 901025 Generic Ltr 89-10 Suppl 3 re consideration of results of NRC sponsored tests of motor operated valves.RWCU valve not tested &,no deficiencies D identified in RCXC valves.

DISTRIBUTION CODE: A064D TITLE: Response COPIES RECEIVED:LTR to Generic Ltr 89-10, J ENCL "Safety-Related I

MOV SIZE:

Testing 6 Surveill S

/

NOTES RECXPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD5 LA 1 0 PD5 PD 1 1 ENG, P. L. 1 1 D INTERNAL: ACRS 1 1 BAER, B RES 1 1 NRR/DET~ 7E 1 1 NRR/LPEB/BC 1 1 EG- PTE& 1 1 RES/DSIR/EIB/B 1 1 EXTERNAL: NRC PDR NSIC D

'D D

NOTE TO ALL "RIDS" RECIPIENTS:,

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96B ~ 3000 George Washington Way ~ Richland, Washington 99352 March 12, 1991 G02-91"050 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 RESPONSE TO GENERIC LETlER 89-10, SUPPLEMENT 3 (TAC NOS. 75738 AND 77801)

Reference:

1. NRC Generic Letter 89-10, Supplement 3, "Consideration of the Results of NRC Sponsored Tests of Motor-Operated Valves", dated October 25, 1990
2. EPRI Report NP-7065, "Review of NRC/INEL Gate Valve Test Program", Prepublication Copy date January, 1991
3. Letter, G02-90-204, GC Sorensen (SS) to NRC, same subject, dated December 12, 1990 Generic Letter 89-10, Supplement 3 requires that BWR licensees provide a written response to Reporting Requirement number two within 120 days of their receipt of the letter. The Supply System received the reference letter November 12, 1990.

The purpose of this letter is to provide such response.

The 120 day reporting requirement requested:

a.) Criteria, reflecting operating experience and the latest test data, that were applied in determining whether deficiencies exist in the specified HPCI, RWCU and RCIC motor-operated valves and in any MOV's considered to be more safety significant; b.) The identification of any MOV's found to have deficiencies; and c.) A schedule for any necessary corrective action.

The 30 day response previously submitted (Reference 3) indicated that no MOV's have been identified with greater safety significance than those previously identified in IE Bulletin 85-03. Containment isolation valves in the steam supply lines of the High Pressure Coolant Injection (HPCI) system are not applicable to WNP-2 since we do not have a HPCI turbine. Following is the response for the RWCU and RCIC valves.

9 f 03 1 9 7 9/0312 PDR FIOOCK 0 5000397 PDR p

I ci C r>

t t'

V l

k

. ~

Page Two

)ESPONSE TO GENERIC LETTER 89-10, SUPPLEMENT 3 The Supply System is participating in the EPRI HOV Performance Prediction Program and other industry groups. Further review of these specific RWCU and RCIC valves will be completed as industry data becomes available.

RWCU Valves A detailed comparison of the RWCU isolation valves to the INEL test valves has been made in Table 1. The RWCU isolation valves at WNP-2 are deemed to be very similar to INEL valves "B" and "2" with the exception of motor size and stem thread lead. The motors are rated at 40 foot pounds starting torque versus 25 foot pounds for the INEL operators providing 60% to 90% higher motor pullout torque capability. The larger stem thread lead for the WNP-2 valves results in a higher speed valve with less thrust for a given motor size. However, the thrust is compensated for by the larger motor size for the WNP-2 valves.

A review of the first blowdown isolation test for the two INEL valves indicates a maximum apparent disk factor of 0.35 for flow isolation. This valve disk factor will be used to determine the thrust setpoints for the WNP-2 RWCU valves using the standard industry equations. It is also noted that the thrust capability of the RWCU operators with the torque switch bypassed exceeds the required closing thrust provided in Information Notice 90-40.

The RWCU valves have not yet been diagnostically tested due to inaccessibility during plant operation. The valves are currently scheduled to be tested during the 1991 Spring Refueling Outage. The identification of any deficiencies and a schedule for any potential corrective actions will be reported within 30 days following the completion of that outage if any deficiencies are identified.

RCIC Valves A detailed comparison of the RCIC inboard isolation valve at WNP-2, RCIC-V-63, to the INEL test valves has been made in Table 2. This valve is deemed to be similar to INEL valve "6" with the exception of operator size, unit ratio, stem thread lead, and motor speed.

After review of Reference 2, it appears all blowdown closure strokes for the test valve were performed with pre-existing damage to the body guide rails and the direct applicability of the apparent disk factor to the valve at WNP-2 is questionable.

RCIC-V-63 has been diagnostically tested as part of IE Bulletin 85-03. The torque switch has been verified to be bypassed for approximately 98% of valve stroke in the close direction. The thrust capability of the operator with the torque switch bypassed has been evaluated in response to Information Notice 90-

40. The thrust capability greatly exceeds the required thrust reported in Table 1 of Information Notice 90-40 thus providing a high degree of assurance of valve isolation.

The outboard isolation valve at WNP-2, RCIC-V-8, is a 4 inch Velan flexible wedge gate valve., No valves of this size were tested in the blowdown test research program, therefore a comparison of this valve to any test valve data is not made.

Page Three e

RESPONSE TO GENERIC LETTER 89-10, SUPPLEMENT 3 RCIC-V-8 has been diagnostically tested as part of IE Bulletin 85-03. The thrust setpoint for RCIC-V-8 has been established using the standard industry equations with a valve factor of 0.3. The motor operator was set up and verified to meet the required thrust setpoint during diagnostic testing. In addition, the torque switch has been verified to be bypassed for approximately 98% of valve stroke in the close direction. This will allow full actuator stall torque capability during the bypass period thus maximizing the probability of valve isolation.

No deficiencies were identified for RCIC-V-63 or RCIC-V-8, and therefore no corrective actions are necessary.

As discussed above, we will inform the NRC of any deficiencies identified during diagnostic testing of the RWCU valves. This completes the Supply System's response to Generic Letter 89-10, Supplement 3.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs HLA/MRG/bk Attachments cc: JB Hartin - NRC RV NS Reynolds - Winston & Strawn PL Eng - NRC DL Williams - BPA/399 NRC Site Inspector - 901A

STATE OF WASHINGTON)

Subject:

GL 89-10, Sup lement 3

)

COUNTY OF BENTON I. A. G. HOSLER, being duly sworn, subscribe to and say that I am the Manager, WNP-2 Licensing, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

DATE 1991 A. G. Hosier, Manager WNP-2 Licensing On this date personally appeared before me A. G. HOSLER, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mention.ed GIVEN under my hand and seal this ~day of 1991.

No ry Public in and for the STATE OF WASHINGTON Residing at My Commission Expires

~ ~

/

0 j',".

'v p

gs

/ J P

>rag, tlggtv ~ ~ "

Table 1: RWCU Valve Comparison INEL Valve WNP-2 Valve WNP-2 Valve "B" and "2" RWCU-V-1 RWCU-V4 Item (Inboard Isolation) (Outboard Isolation)

Manufacturer Velan Veian Veian Drawin Number P2-70916-S01 P2-3311-N4 P24311-N4 Size in.

ANSI Class (lbs.) 900 900 900 Orifice Diameter fn.) 5.18 5.19 5.19 Disk Base Material A-105 SA-216 WCB SA-105 Disk Seat Material Stellite 6 Stellite 6 Stellite 6 Disk Guide Material Stellite 6 (B), A-1 05 (2) Stellite 6 or SA-105 Stellite 6 or SA-105 Body Guide Material A46 SA46 SA46 Seat Ring Base Material A-216 WCB SA-216 WCB or SA-105 SA-105 Seat Rin Material Stellite 6 Stellite 6 Stellite 6 Stroke Length (in.) 5.75 5.75 5.75 Stem Diameter (in.) 1.75 1.75 1.75 Thread T e Acme Acme Acme Thread Pitch (in.) 1/4 1/4 1/4 Thread Lead (in./rev.) 1/4 1/2 1/2 Operator Model SMB4 SMB4 SMB4 Unit Ratio 34.9 34.96 41.33 S rin PackNo. 0501-184 604004017-1 604004017-1 Motor Pullout Torque

@ Rated Voltage 314 ft-Ibs 503 ft-Ibs 595 ft-Ibs

@De raded Volta e 201 ft-Ibs 322 ft-Ibs 476 ft-Ibs MotorS eed 1800r m 1800r m 1900 r m Motor Voltage 460 VAC 460 VAC 240 VDC Motor Starting Torque 25 ft-Ibs 40 ft-Ibs 40 ft-Ibs 0 erator Rated Tor ue 500 ft-Ibs 500 ft-Ibs 500 ft-Ibs 0 erator Rated Thrust 24,000 Ibs 24,000 lbs 24,000 Ibs Valve Rated Thrust Not Available 25,516 Ibs 25,516 Ibs

la I

Table 2: RCIC Valve Comparison INEL Valve WNP-2 Valve "6" RCIC-V-63 Item (Inboard Isolation)

Manufacturer Velan Velan Drawin Number P2-72916-S01 P2-3311-N-1 4 Size ln. 10 10 ANSI Class (lbs.) 600 900 Orifice Diameter (in.) 7.87 Disk Base Material A-105 SA-105 Disk Seat Material Stelllte 6 Stellite 6 Disk Guide Material A-105 Stellite 6 or SA-105 Body Guide Material A46 SA46 Seat Ring Base Material A-105 SA-216 WCB or SA-105 Seat Rin Material Stelllte 6 Stellite 6 Stroke Length (ln.) 8.75 8.5 Stem Diameter (in.) 2.5 2.5 Thread T e Acme Acme Thread Pitch (in.) 1/3 1/3 Thread Lead (in./rev.) 2/3 1 Operator Model SMB-1 SMB-2 Unit Ratio 56.6 95.58 S rin PackNo. 0701-212 604004071-1 Motor Pullout Torque

@ Rated Voltage 1222 ft-Ibs 1806 ft-Ibs

@De raded Volta e 782 ft-Ibs 1156 ft-Ibs MotorS eed 1800r m 3600r m Motor Voltage 460 VAC 460 VAC Motor Starting Torque 60 ft-Ibs 60 ft-lbs 0 eratorRatedTor ue 850 ft-Ibs 1250 ft-Ibs 0 erator Rated Thrust 45,000 Ibs 70,000 1bs Valve Rated Thrust Not Available 57,782 Ibs

v lt

.C i