ML17292B233: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/19/1998
| issue date = 01/19/1998
| title = Responds to NRC 971218 Ltr Re Violations Noted in Insp Rept 50-397/97-17.Corrective Actions:Technician Visually Verified Area to Be Clear of Personnel & Immediately Locked Gate & Performed Walkdown to Verify Locked Status of Similar Areas
| title = Responds to NRC 971218 Ltr Re Violations Noted in Insp Rept 50-397/97-17.Corrective Actions:Technician Visually Verified Area to Be Clear of Personnel & Immediately Locked Gate & Performed Walkdown to Verify Locked Status of Similar Areas
| author name = BEMIS P R
| author name = Bemis P
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000397/1997017]]


=Text=
=Text=
{{#Wiki_filter:CATEGORYj.REGULATORY
{{#Wiki_filter:CATEGORY j.
INFORMATION
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION
ACCESSION NBR:9801290057           DOC.DATE:   98/01/19 NOTARIZED: NO                  DOCKET FACIL:50-397   WPPSS  Nuclear Project, Unit 2, Washington Public              Powe    05000397 AUTH. NAME            AUTHOR AFFILIATION BEMIS,P.R.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SYSTEM(RIDS)ACCESSIONNBR:9801290057
 
DOC.DATE:
==SUBJECT:==
98/01/19NOTARIZED:
Responds      to NRC 971218 ltr re violations noted in insp rept 50-397/97-17.Corrective actions: technician visually verified area to be clear of personnel & immediately locked gate &
NODOCKETFACIL:50-397
performed walkdown to verify locked status of similar are s.
WPPSSNuclearProject,Unit2,Washington
DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR ( ENCL t SIZE:
PublicPowe05000397AUTH.NAMEAUTHORAFFILIATION
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response E
BEMIS,P.R.
NOTES:
Washington
RECIPIENT            COPIES              RECIPIENT            COPIES ID  CODE/NAME          LTTR ENCL        ID CODE/NAME         LTTR ENCL PD4-2 PD                  1    1        POSLUSNY,C               1    1 R
PublicPowerSupplySystemRECIP.NAME
INTERNAL: ACRS                        2    2      AEOD/SPD/RAB               1    1 AEOD                      1    1      DEDRO                      1    1 ILE  CENTER              1    1      NRR/DRCH/HHFB             1    1 NRR DRPM/PECB              1    1      NRR/DRPM/PERB             1    1 NUDOCS-ABSTRACT            1    1      OE  DIR                  1    1 OGC/HDS3                  1    1      RGN4      FILE  01        1    1 TERNAL: LITCO BRYCE,J H            1    1      NOAC                      1    1 NRC PDR                    1    1      NUDOCS FULLTEXT            1    1              D 0
RECIPIENT
U N
AFFILIATION
NOTE TO  ALL "RIDS" RECIPIENTS:
DocumentControlBranch(Document
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR              19  ENCL    19
ControlDesk)SUBJECT:RespondstoNRC971218ltrreviolations
 
notedininsprept50-397/97-17.Corrective
WASHIV>GTON PUBLIC POWER SUPPI.Y SYSTElvf I? O. Iiox 968 ~ Ri~%hniil, 11'ashiiigtow 99352-0968 January 19, 1998 G02-98-011 Docket No. 50-397 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
actions:technician
Subjec't:       WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION REPORT 97-19, RESPONSE TO NOTICE OF VIOLATION
visuallyverifiedareatobeclearofpersonnel
 
&immediately
==Reference:==
lockedgate&performed
Letter dated December 18, 1997, B Murray (NRC) to JV Parrish (SS), "NRC Inspection Report 50-397/97-19" The Supply System's response to the Notice Of Violation, pursuant to the provisions of Section 2.201, Title 10, Code of Federal Regulations, is enclosed as Attachment A.
walkdowntoverifylockedstatusofsimilarares.DISTRIBUTION
We acknowledge the additional concerns that were identified in the inspection report and the Supply System is taking steps to address the issues.
CODE:IEOIDCOPIESRECEIVED:LTR
Should you have any questions or desire additional information regarding this matter, please call Mr. PJ Inserra at (509) 377-4147.
(ENCLtSIZE:TITLE:General(50Dkt)-Insp
PR        is Vi resident, Nuclear Operations Mail Drop PE23 Attachment cc:       EW Merschoff - NRC RIV                              NRC Sr. Resident Inspector - 927N KE Perkins, Jr. - NRC RIV, WCFO                    DL Williams - BPA/399 C Poslusny, Jr. - NRR                              PD Robinson - Winston & Strawn 980i290057 980ii9                                    IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PDR    ADGCK      05000397 8                        PDR
Rept/Notice
 
ofViolation
RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page  1 of 3 RESTATEMENT F VI LATIONA Technical Specification 5.7.2.a requires, in part, that each entryway to high radiation areas with dose rates greater than 1.0 rem/hour (at 30 centimeters from the radiation source or from any surface penetrated by the radiation) be provided with a locked door, gate, or guard that prevents unauthorized entry.
ResponseNOTES:ERECIPIENT
Contrary to the above, on October 6, 1997, an entryway to the radwaste liner storage room on the 437-foot elevation of the radwaste building, an area with dose rates greater than 1.0 rem/hour (at 30 centimeters from the radiation source or from any surface penetrated by the radiation) was not provided with a locked door, gate, or guard that prevented unauthorized entry.
IDCODE/NAME
This is a Severity Level  IV violation (Supplement IV) (50-397/9719-01).
PD4-2PDINTERNAL:
R    P  N ET VI LATI N The Supply System accepts the violation.
ACRSAEODILECENTERNRRDRPM/PECB
REA      N F RVI LATI N The Supply System agrees with the staff's characterization of the reason for this event given in the Report Details section of Inspection Report 50-397/97-19.
NUDOCS-ABSTRACT
The failure to properly secure a chain link gate to a high high radiation area (HHRA) was caused by human error on the part of a health physics technician. One condition that contributed to the event was the failure to perform a timely independent verification of the door's locked status. A second contributing condition was the use of a chain to secure the gate, rather than permanently installed padeyes.
OGC/HDS3TERNAL:LITCOBRYCE,JHNRCPDRCOPIESLTTRENCL112211111111111111RECIPIENT
RRE            A      N TAKEN AND R              TS A HIEVED Upon identification of the event a health physics technician responded, visually verified the area to be clear of personnel and immediately locked the gate. A walk-down was performed to verify the locked status of all other similar areas. No other doors were found to be improperly secured.
IDCODE/NAME
An additional walk-down was performed by Health Physics to identify any other HHRA or high radiation areas that were secured by means of chain and padlocks. One additional door (access hatch to the wetwell) was found to be secured in this manner. Supply System staff determined that this hatch did not require a padeye as it is bolted and secured with a heavy chain and padlock.
POSLUSNY,C
 
AEOD/SPD/RAB
RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page 2 of 3 A work request was issued to install lockable padeyes on the gate to the radwaste liner storage room on the 437'levation of the radwaste building. Work was completed December 10, 1997, Lessons learned from the event were discussed and documented in Health Physics Technician Continuing Training. This training was completed December 22, 1997.
DEDRONRR/DRCH/HHFB
The appropriate plant procedure was revised on December 15, 1997 to require performance of independent verification in a timely manner.
NRR/DRPM/PERB
Appropriate personnel actions were taken with the health physics technician who failed to properly secure the gate.
OEDIRRGN4FILE01NOACNUDOCSFULLTEXTCOPIESLTTRENCL111111111111111111RD0UNNOTETOALL"RIDS"RECIPIENTS:
RRE            TEP T BETAKENT AV                IDF        EVI LATI N All corrective actions have been completed.
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION
DATE F          L      MPLIAN E The gate was immediately locked on October 6, 1997 upon identification      of the event.
REMOVEDFROMDISTRIBUTION
R    TATEMENT F VI LATI NB 10 CFR 20. 1501(a) requires, in part, that each licensee make or cause to be made surveys that may be necessary for the licensee to comply with the regulations in 10 CFR Part 20 and are reasonable to evaluate the quantities of radioactive material and the potential radiological hazards that could be present.
LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION,
10 CFR 20. 1003 defines a survey as an evaluation of radiological conditions and potential hazards incident to the production, use, transfer, release, disposal, or presence of radioactive material or other sources of radiation.
CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION
10 CFR 20.1201 requires, in part, each licensee to control the occupational dose to individual adults to 5 rems for the total effective dose equivalent or (to) 50 rems for the sum of the deep-dose equivalent and the committed dose equivalent to any individual organ or tissue other than the lens of the eye.
415-2083TOTALNUMBEROFCOPIESREQUIRED:
Contrary to the above, the licensee did not make or cause to be made surveys necessary to comply with 10 CFR 20.1201. Specifically, on April 30, May 30, and July 2, 1997, the licensee failed to perform evaluations of the radiological hazards that could have been present when four individuals were identified to have potentially taken radioactive material internally.
LTTR19ENCL19
 
WASHIV>GTON
RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page3 of 3 This is a Severity Level IV violation (Supplement IV) (50-397/971942).
PUBLICPOWERSUPPI.YSYSTElvfI?O.Iiox968~Ri~%hniil,
R    P  NET VI      LATI N The Supply System accepts the violation.
11'ashiiigtow
REA      N F    RVI LATI N The Supply System agrees with the staff's characterization of the reason for this event given in the Report Details section of Inspection Report 50-397/97-19.
99352-0968
Briefly restated, the requirement to provide whole-body counts to personnel found with facial contamination was not clearly stated in the appropriate plant procedure.
January19,1998G02-98-011
RR            A      N TAKEN AND R              T A HIEVED Health Physics performed a comprehensive review of 1997 logs and determined that a total of six individuals with facial contamination were not immediately given whole-body counts. These individuals were contacted and whole-body counts were performed. No internal contamination was identified.
DocketNo.50-397U.S.NuclearRegulatory
The appropriate plant procedure was revised January 8, 1998 to clearly state the requirement that personnel found with facial contamination will receive a whole-body count.
Commission
TEP T BETAKENTOAV                IDF        EVI LATI N A review of the procedure will be incorporated into the Health Physics Quarterly Continuing Training to be completed by February 20, 1998.
DocumentControlDeskWashington,
DATE F F        L    MPLIAN E Full compliance was achieved by December 5, 1997 when affected personnel received whole-body counts.}}
DC20555Gentlemen:
Subjec't:
WNP-2,OPERATING
LICENSENPF-21NRCINSPECTION
REPORT97-19,RESPONSETONOTICEOFVIOLATION
Reference:
LetterdatedDecember18,1997,BMurray(NRC)toJVParrish(SS),"NRCInspection
Report50-397/97-19"
TheSupplySystem'sresponsetotheNoticeOfViolation,
pursuanttotheprovisions
ofSection2.201,Title10,CodeofFederalRegulations,
isenclosedasAttachment
A.Weacknowledge
theadditional
concernsthatwereidentified
intheinspection
reportandtheSupplySystemistakingstepstoaddresstheissues.Shouldyouhaveanyquestions
ordesireadditional
information
regarding
thismatter,pleasecallMr.PJInserraat(509)377-4147.
PRisViresident,
NuclearOperations
MailDropPE23Attachment
cc:EWMerschoff
-NRCRIVKEPerkins,Jr.-NRCRIV,WCFOCPoslusny,
Jr.-NRR980i290057
980ii9PDRADGCK050003978PDRNRCSr.ResidentInspector
-927NDLWilliams-BPA/399PDRobinson-Winston&StrawnIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
RESPONSETONOTICEOFVIOLATION
ININSPECTION
REPORT50-397/97-19
AppendixAPage1of3RESTATEMENT
FVILATIONATechnical
Specification
5.7.2.arequires,
inpart,thateachentrywaytohighradiation
areaswithdoseratesgreaterthan1.0rem/hour(at30centimeters
fromtheradiation
sourceorfromanysurfacepenetrated
bytheradiation)
beprovidedwithalockeddoor,gate,orguardthatpreventsunauthorized
entry.Contrarytotheabove,onOctober6,1997,anentrywaytotheradwastelinerstorageroomonthe437-footelevation
oftheradwastebuilding,
anareawithdoseratesgreaterthan1.0rem/hour(at30centimeters
fromtheradiation
sourceorfromanysurfacepenetrated
bytheradiation)
wasnotprovidedwithalockeddoor,gate,orguardthatprevented
unauthorized
entry.ThisisaSeverityLevelIVviolation
(Supplement
IV)(50-397/9719-01).
RPNETVILATINTheSupplySystemacceptstheviolation.
REANFRVILATINTheSupplySystemagreeswiththestaff'scharacterization
ofthereasonforthiseventgivenintheReportDetailssectionofInspection
Report50-397/97-19.
Thefailuretoproperlysecureachainlinkgatetoahighhighradiation
area(HHRA)wascausedbyhumanerroronthepartofahealthphysicstechnician.
Onecondition
thatcontributed
totheeventwasthefailuretoperformatimelyindependent
verification
ofthedoor'slockedstatus.Asecondcontributing
condition
wastheuseofachaintosecurethegate,ratherthanpermanently
installed
padeyes.RREANTAKENANDRTSAHIEVEDUponidentification
oftheeventahealthphysicstechnician
responded,
visuallyverifiedtheareatobeclearofpersonnel
andimmediately
lockedthegate.Awalk-down
wasperformed
toverifythelockedstatusofallothersimilarareas.Nootherdoorswerefoundtobeimproperly
secured.Anadditional
walk-down
wasperformed
byHealthPhysicstoidentifyanyotherHHRAorhighradiation
areasthatweresecuredbymeansofchainandpadlocks.
Oneadditional
door(accesshatchtothewetwell)wasfoundtobesecuredinthismanner.SupplySystemstaffdetermined
thatthishatchdidnotrequireapadeyeasitisboltedandsecuredwithaheavychainandpadlock.  
RESPONSETONOTICEOFVIOLATION
ININSPECTION
REPORT50-397/97-19
AppendixAPage2of3Aworkrequestwasissuedtoinstalllockablepadeyesonthegatetotheradwastelinerstorageroomonthe437'levation
oftheradwastebuilding.
Workwascompleted
December10,1997,Lessonslearnedfromtheeventwerediscussed
anddocumented
inHealthPhysicsTechnician
Continuing
Training.
Thistrainingwascompleted
December22,1997.Theappropriate
plantprocedure
wasrevisedonDecember15,1997torequireperformance
ofindependent
verification
inatimelymanner.Appropriate
personnel
actionsweretakenwiththehealthphysicstechnician
whofailedtoproperlysecurethegate.RRETEPTBETAKENTAVIDFEVILATINAllcorrective
actionshavebeencompleted.
DATEFLMPLIANEThegatewasimmediately
lockedonOctober6,1997uponidentification
oftheevent.RTATEMENTFVILATINB10CFR20.1501(a)requires,
inpart,thateachlicenseemakeorcausetobemadesurveysthatmaybenecessary
forthelicenseetocomplywiththeregulations
in10CFRPart20andarereasonable
toevaluatethequantities
ofradioactive
materialandthepotential
radiological
hazardsthatcouldbepresent.10CFR20.1003definesasurveyasanevaluation
ofradiological
conditions
andpotential
hazardsincidenttotheproduction,
use,transfer,
release,disposal,
orpresenceofradioactive
materialorothersourcesofradiation.
10CFR20.1201requires,
inpart,eachlicenseetocontroltheoccupational
dosetoindividual
adultsto5remsforthetotaleffective
doseequivalent
or(to)50remsforthesumofthedeep-dose
equivalent
andthecommitted
doseequivalent
toanyindividual
organortissueotherthanthelensoftheeye.Contrarytotheabove,thelicenseedidnotmakeorcausetobemadesurveysnecessary
tocomplywith10CFR20.1201.Specifically,
onApril30,May30,andJuly2,1997,thelicenseefailedtoperformevaluations
oftheradiological
hazardsthatcouldhavebeenpresentwhenfourindividuals
wereidentified
tohavepotentially
takenradioactive
materialinternally.  
RESPONSETONOTICEOFVIOLATION
ININSPECTION
REPORT50-397/97-19
AppendixAPage3of3ThisisaSeverityLevelIVviolation
(Supplement
IV)(50-397/971942).
RPNETVILATINTheSupplySystemacceptstheviolation.
REANFRVILATINTheSupplySystemagreeswiththestaff'scharacterization
ofthereasonforthiseventgivenintheReportDetailssectionofInspection
Report50-397/97-19.
Brieflyrestated,
therequirement
toprovidewhole-body
countstopersonnel
foundwithfacialcontamination
wasnotclearlystatedintheappropriate
plantprocedure.
RRANTAKENANDRTAHIEVEDHealthPhysicsperformed
acomprehensive
reviewof1997logsanddetermined
thatatotalofsixindividuals
withfacialcontamination
werenotimmediately
givenwhole-body
counts.Theseindividuals
werecontacted
andwhole-body
countswereperformed.
Nointernalcontamination
wasidentified.
Theappropriate
plantprocedure
wasrevisedJanuary8,1998toclearlystatetherequirement
thatpersonnel
foundwithfacialcontamination
willreceiveawhole-body
count.TEPTBETAKENTOAV
IDFEVILATINAreviewoftheprocedure
willbeincorporated
intotheHealthPhysicsQuarterly
Continuing
Trainingtobecompleted
byFebruary20,1998.DATEFFLMPLIANEFullcompliance
wasachievedbyDecember5,1997whenaffectedpersonnel
receivedwhole-body
counts.
}}

Latest revision as of 13:01, 29 October 2019

Responds to NRC 971218 Ltr Re Violations Noted in Insp Rept 50-397/97-17.Corrective Actions:Technician Visually Verified Area to Be Clear of Personnel & Immediately Locked Gate & Performed Walkdown to Verify Locked Status of Similar Areas
ML17292B233
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/19/1998
From: Bemis P
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-397-97-17, GO2-98-011, GO2-98-11, NUDOCS 9801290057
Download: ML17292B233 (6)


Text

CATEGORY j.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9801290057 DOC.DATE: 98/01/19 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION BEMIS,P.R. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 971218 ltr re violations noted in insp rept 50-397/97-17.Corrective actions: technician visually verified area to be clear of personnel & immediately locked gate &

performed walkdown to verify locked status of similar are s.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR ( ENCL t SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response E

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 POSLUSNY,C 1 1 R

INTERNAL: ACRS 2 2 AEOD/SPD/RAB 1 1 AEOD 1 1 DEDRO 1 1 ILE CENTER 1 1 NRR/DRCH/HHFB 1 1 NRR DRPM/PECB 1 1 NRR/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN4 FILE 01 1 1 TERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NUDOCS FULLTEXT 1 1 D 0

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19

WASHIV>GTON PUBLIC POWER SUPPI.Y SYSTElvf I? O. Iiox 968 ~ Ri~%hniil, 11'ashiiigtow 99352-0968 January 19, 1998 G02-98-011 Docket No. 50-397 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

Subjec't: WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION REPORT 97-19, RESPONSE TO NOTICE OF VIOLATION

Reference:

Letter dated December 18, 1997, B Murray (NRC) to JV Parrish (SS), "NRC Inspection Report 50-397/97-19" The Supply System's response to the Notice Of Violation, pursuant to the provisions of Section 2.201, Title 10, Code of Federal Regulations, is enclosed as Attachment A.

We acknowledge the additional concerns that were identified in the inspection report and the Supply System is taking steps to address the issues.

Should you have any questions or desire additional information regarding this matter, please call Mr. PJ Inserra at (509) 377-4147.

PR is Vi resident, Nuclear Operations Mail Drop PE23 Attachment cc: EW Merschoff - NRC RIV NRC Sr. Resident Inspector - 927N KE Perkins, Jr. - NRC RIV, WCFO DL Williams - BPA/399 C Poslusny, Jr. - NRR PD Robinson - Winston & Strawn 980i290057 980ii9 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PDR ADGCK 05000397 8 PDR

RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page 1 of 3 RESTATEMENT F VI LATIONA Technical Specification 5.7.2.a requires, in part, that each entryway to high radiation areas with dose rates greater than 1.0 rem/hour (at 30 centimeters from the radiation source or from any surface penetrated by the radiation) be provided with a locked door, gate, or guard that prevents unauthorized entry.

Contrary to the above, on October 6, 1997, an entryway to the radwaste liner storage room on the 437-foot elevation of the radwaste building, an area with dose rates greater than 1.0 rem/hour (at 30 centimeters from the radiation source or from any surface penetrated by the radiation) was not provided with a locked door, gate, or guard that prevented unauthorized entry.

This is a Severity Level IV violation (Supplement IV) (50-397/9719-01).

R P N ET VI LATI N The Supply System accepts the violation.

REA N F RVI LATI N The Supply System agrees with the staff's characterization of the reason for this event given in the Report Details section of Inspection Report 50-397/97-19.

The failure to properly secure a chain link gate to a high high radiation area (HHRA) was caused by human error on the part of a health physics technician. One condition that contributed to the event was the failure to perform a timely independent verification of the door's locked status. A second contributing condition was the use of a chain to secure the gate, rather than permanently installed padeyes.

RRE A N TAKEN AND R TS A HIEVED Upon identification of the event a health physics technician responded, visually verified the area to be clear of personnel and immediately locked the gate. A walk-down was performed to verify the locked status of all other similar areas. No other doors were found to be improperly secured.

An additional walk-down was performed by Health Physics to identify any other HHRA or high radiation areas that were secured by means of chain and padlocks. One additional door (access hatch to the wetwell) was found to be secured in this manner. Supply System staff determined that this hatch did not require a padeye as it is bolted and secured with a heavy chain and padlock.

RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page 2 of 3 A work request was issued to install lockable padeyes on the gate to the radwaste liner storage room on the 437'levation of the radwaste building. Work was completed December 10, 1997, Lessons learned from the event were discussed and documented in Health Physics Technician Continuing Training. This training was completed December 22, 1997.

The appropriate plant procedure was revised on December 15, 1997 to require performance of independent verification in a timely manner.

Appropriate personnel actions were taken with the health physics technician who failed to properly secure the gate.

RRE TEP T BETAKENT AV IDF EVI LATI N All corrective actions have been completed.

DATE F L MPLIAN E The gate was immediately locked on October 6, 1997 upon identification of the event.

R TATEMENT F VI LATI NB 10 CFR 20. 1501(a) requires, in part, that each licensee make or cause to be made surveys that may be necessary for the licensee to comply with the regulations in 10 CFR Part 20 and are reasonable to evaluate the quantities of radioactive material and the potential radiological hazards that could be present.

10 CFR 20. 1003 defines a survey as an evaluation of radiological conditions and potential hazards incident to the production, use, transfer, release, disposal, or presence of radioactive material or other sources of radiation.

10 CFR 20.1201 requires, in part, each licensee to control the occupational dose to individual adults to 5 rems for the total effective dose equivalent or (to) 50 rems for the sum of the deep-dose equivalent and the committed dose equivalent to any individual organ or tissue other than the lens of the eye.

Contrary to the above, the licensee did not make or cause to be made surveys necessary to comply with 10 CFR 20.1201. Specifically, on April 30, May 30, and July 2, 1997, the licensee failed to perform evaluations of the radiological hazards that could have been present when four individuals were identified to have potentially taken radioactive material internally.

RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page3 of 3 This is a Severity Level IV violation (Supplement IV) (50-397/971942).

R P NET VI LATI N The Supply System accepts the violation.

REA N F RVI LATI N The Supply System agrees with the staff's characterization of the reason for this event given in the Report Details section of Inspection Report 50-397/97-19.

Briefly restated, the requirement to provide whole-body counts to personnel found with facial contamination was not clearly stated in the appropriate plant procedure.

RR A N TAKEN AND R T A HIEVED Health Physics performed a comprehensive review of 1997 logs and determined that a total of six individuals with facial contamination were not immediately given whole-body counts. These individuals were contacted and whole-body counts were performed. No internal contamination was identified.

The appropriate plant procedure was revised January 8, 1998 to clearly state the requirement that personnel found with facial contamination will receive a whole-body count.

TEP T BETAKENTOAV IDF EVI LATI N A review of the procedure will be incorporated into the Health Physics Quarterly Continuing Training to be completed by February 20, 1998.

DATE F F L MPLIAN E Full compliance was achieved by December 5, 1997 when affected personnel received whole-body counts.