ML17292B233: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000397/1997017]]


=Text=
=Text=
{{#Wiki_filter:CATEGORY j.REGULATORY
{{#Wiki_filter:CATEGORY j.
INFORMATION
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION
ACCESSION NBR:9801290057           DOC.DATE:   98/01/19 NOTARIZED: NO                   DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public               Powe   05000397 AUTH. NAME           AUTHOR AFFILIATION BEMIS,P.R.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SYSTEM (RIDS)A CCESSION NBR:9801290057
 
DOC.DATE: 98/01/19 NOTARIZED:
==SUBJECT:==
NO DOCKET FACIL:50-397
Responds     to NRC 971218 ltr re violations noted in insp rept 50-397/97-17.Corrective actions: technician visually verified area to be clear of personnel & immediately locked gate &
WPPSS Nuclear Project, Unit 2, Washington
performed walkdown to verify locked status of similar are s.
Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION
DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR ( ENCL t SIZE:
BEMIS,P.R.
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response E
Washington
NOTES:
Public Power Supply System RECIP.NAME
RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME          LTTR ENCL PD4-2 PD                   1    1        POSLUSNY,C                1    1 R
RECIPIENT AFFILIATION
INTERNAL: ACRS                       2    2      AEOD/SPD/RAB              1     1 AEOD                      1     1       DEDRO                      1     1 ILE  CENTER              1     1       NRR/DRCH/HHFB              1     1 NRR DRPM/PECB              1     1       NRR/DRPM/PERB              1     1 NUDOCS-ABSTRACT            1    1       OE  DIR                  1    1 OGC/HDS3                  1    1      RGN4     FILE   01       1    1 TERNAL: LITCO BRYCE,J H            1     1       NOAC                      1     1 NRC PDR                    1     1       NUDOCS FULLTEXT            1     1               D 0
Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 971218 ltr re violations
U N
noted in insp rept 50-397/97-17.Corrective
NOTE TO ALL "RIDS" RECIPIENTS:
actions: technician
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               19   ENCL     19
visually verified area to be clear of personnel&immediately
 
locked gate&performed walkdown to verify locked status of similar are s.DISTRIBUTION
WASHIV>GTON PUBLIC POWER SUPPI.Y SYSTElvf I? O. Iiox 968 ~ Ri~%hniil, 11'ashiiigtow 99352-0968 January 19, 1998 G02-98-011 Docket No. 50-397 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
CODE: IEOID COPIES RECEIVED:LTR
Subjec't:       WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION REPORT 97-19, RESPONSE TO NOTICE OF VIOLATION
(ENCL t SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
 
of Violation Response NOTES: E RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD ILE CENTER NRR DRPM/PECB NUDOCS-ABSTRACT
==Reference:==
OGC/HDS3 TERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME POSLUSNY,C
Letter dated December 18, 1997, B Murray (NRC) to JV Parrish (SS), "NRC Inspection Report 50-397/97-19" The Supply System's response to the Notice Of Violation, pursuant to the provisions of Section 2.201, Title 10, Code of Federal Regulations, is enclosed as Attachment A.
AEOD/SPD/RAB
We acknowledge the additional concerns that were identified in the inspection report and the Supply System is taking steps to address the issues.
DEDRO NRR/DRCH/HHFB
Should you have any questions or desire additional information regarding this matter, please call Mr. PJ Inserra at (509) 377-4147.
NRR/DRPM/PERB
PR       is Vi resident, Nuclear Operations Mail Drop PE23 Attachment cc:       EW Merschoff - NRC RIV                             NRC Sr. Resident Inspector - 927N KE Perkins, Jr. - NRC RIV, WCFO                     DL Williams - BPA/399 C Poslusny, Jr. - NRR                               PD Robinson - Winston & Strawn 980i290057 980ii9                                   IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PDR     ADGCK     05000397 8                       PDR
OE DIR RGN4 FILE 01 NOAC NUDOCS FULLTEXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R D 0 U N NOTE TO ALL"RIDS" RECIPIENTS:
 
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION
RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page   1 of 3 RESTATEMENT F VI LATIONA Technical Specification 5.7.2.a requires, in part, that each entryway to high radiation areas with dose rates greater than 1.0 rem/hour (at 30 centimeters from the radiation source or from any surface penetrated by the radiation) be provided with a locked door, gate, or guard that prevents unauthorized entry.
REMOVED FROM DISTRIBUTION
Contrary to the above, on October 6, 1997, an entryway to the radwaste liner storage room on the 437-foot elevation of the radwaste building, an area with dose rates greater than 1.0 rem/hour (at 30 centimeters from the radiation source or from any surface penetrated by the radiation) was not provided with a locked door, gate, or guard that prevented unauthorized entry.
LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19  
This is a Severity Level IV violation (Supplement IV) (50-397/9719-01).
WASHIV>GTON
R   P   N ET VI LATI N The Supply System accepts the violation.
PUBLIC POWER SUPPI.Y SYSTElvf I?O.Iiox 968~Ri~%hniil, 11'ashiiigtow
REA     N F RVI LATI N The Supply System agrees with the staff's characterization of the reason for this event given in the Report Details section of Inspection Report 50-397/97-19.
99352-0968
The failure to properly secure a chain link gate to a high high radiation area (HHRA) was caused by human error on the part of a health physics technician. One condition that contributed to the event was the failure to perform a timely independent verification of the door's locked status. A second contributing condition was the use of a chain to secure the gate, rather than permanently installed padeyes.
January 19, 1998 G02-98-011
RRE           A     N TAKEN AND R               TS A HIEVED Upon identification of the event a health physics technician responded, visually verified the area to be clear of personnel and immediately locked the gate. A walk-down was performed to verify the locked status of all other similar areas. No other doors were found to be improperly secured.
Docket No.50-397 U.S.Nuclear Regulatory
An additional walk-down was performed by Health Physics to identify any other HHRA or high radiation areas that were secured by means of chain and padlocks. One additional door (access hatch to the wetwell) was found to be secured in this manner. Supply System staff determined that this hatch did not require a padeye as it is bolted and secured with a heavy chain and padlock.
Commission
 
Document Control Desk Washington, DC 20555 Gentlemen:
RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page 2 of 3 A work request was issued to install lockable padeyes on the gate to the radwaste liner storage room on the 437'levation of the radwaste building. Work was completed December 10, 1997, Lessons learned from the event were discussed and documented in Health Physics Technician Continuing Training. This training was completed December 22, 1997.
Subjec't: WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION
The appropriate plant procedure was revised on December 15, 1997 to require performance of independent verification in a timely manner.
REPORT 97-19, RESPONSE TO NOTICE OF VIOLATION Reference:
Appropriate personnel actions were taken with the health physics technician who failed to properly secure the gate.
Letter dated December 18, 1997, B Murray (NRC)to JV Parrish (SS),"NRC Inspection
RRE           TEP T BETAKENT AV                 IDF         EVI LATI N All corrective actions have been completed.
Report 50-397/97-19" The Supply System's response to the Notice Of Violation, pursuant to the provisions
DATE F           L     MPLIAN E The gate was immediately locked on October 6, 1997 upon identification       of the event.
of Section 2.201, Title 10, Code of Federal Regulations, is enclosed as Attachment
R   TATEMENT F VI LATI NB 10 CFR 20. 1501(a) requires, in part, that each licensee make or cause to be made surveys that may be necessary for the licensee to comply with the regulations in 10 CFR Part 20 and are reasonable to evaluate the quantities of radioactive material and the potential radiological hazards that could be present.
A.We acknowledge
10 CFR 20. 1003 defines a survey as an evaluation of radiological conditions and potential hazards incident to the production, use, transfer, release, disposal, or presence of radioactive material or other sources of radiation.
the additional
10 CFR 20.1201 requires, in part, each licensee to control the occupational dose to individual adults to 5 rems for the total effective dose equivalent or (to) 50 rems for the sum of the deep-dose equivalent and the committed dose equivalent to any individual organ or tissue other than the lens of the eye.
concerns that were identified
Contrary to the above, the licensee did not make or cause to be made surveys necessary to comply with 10 CFR 20.1201. Specifically, on April 30, May 30, and July 2, 1997, the licensee failed to perform evaluations of the radiological hazards that could have been present when four individuals were identified to have potentially taken radioactive material internally.
in the inspection
 
report and the Supply System is taking steps to address the issues.Should you have any questions or desire additional
RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page3 of 3 This is a Severity Level IV violation (Supplement IV) (50-397/971942).
information
R   P   NET VI       LATI N The Supply System accepts the violation.
regarding this matter, please call Mr.PJ Inserra at (509)377-4147.PR is Vi resident, Nuclear Operations
REA     N F     RVI LATI N The Supply System agrees with the staff's characterization of the reason for this event given in the Report Details section of Inspection Report 50-397/97-19.
Mail Drop PE23 Attachment
Briefly restated, the requirement to provide whole-body counts to personnel found with facial contamination was not clearly stated in the appropriate plant procedure.
cc: EW Merschoff-NRC RIV KE Perkins, Jr.-NRC RIV, WCFO C Poslusny, Jr.-NRR 980i290057
RR           A     N TAKEN AND R             T A HIEVED Health Physics performed a comprehensive review of 1997 logs and determined that a total of six individuals with facial contamination were not immediately given whole-body counts. These individuals were contacted and whole-body counts were performed. No internal contamination was identified.
980ii9 PDR ADGCK 05000397 8 PDR NRC Sr.Resident Inspector-927N DL Williams-BPA/399 PD Robinson-Winston&Strawn IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
The appropriate plant procedure was revised January 8, 1998 to clearly state the requirement that personnel found with facial contamination will receive a whole-body count.
RESPONSE TO NOTICE OF VIOLATION IN INSPECTION
TEP T BETAKENTOAV               IDF         EVI LATI N A review of the procedure will be incorporated into the Health Physics Quarterly Continuing Training to be completed by February 20, 1998.
REPORT 50-397/97-19
DATE F F         L   MPLIAN E Full compliance was achieved by December 5, 1997 when affected personnel received whole-body counts.}}
Appendix A Page 1 of 3 RESTATEMENT
F VI LATION A Technical Specification
5.7.2.a requires, in part, that each entryway to high radiation areas with dose rates greater than 1.0 rem/hour (at 30 centimeters
from the radiation source or from any surface penetrated
by the radiation)
be provided with a locked door, gate, or guard that prevents unauthorized
entry.Contrary to the above, on October 6, 1997, an entryway to the radwaste liner storage room on the 437-foot elevation of the radwaste building, an area with dose rates greater than 1.0 rem/hour (at 30 centimeters
from the radiation source or from any surface penetrated
by the radiation)
was not provided with a locked door, gate, or guard that prevented unauthorized
entry.This is a Severity Level IV violation (Supplement
IV)(50-397/9719-01).
R P N ET VI LATI N The Supply System accepts the violation.
REA N F RVI LATI N The Supply System agrees with the staff's characterization
of the reason for this event given in the Report Details section of Inspection
Report 50-397/97-19.
The failure to properly secure a chain link gate to a high high radiation area (HHRA)was caused by human error on the part of a health physics technician.
One condition that contributed
to the event was the failure to perform a timely independent
verification
of the door's locked status.A second contributing
condition was the use of a chain to secure the gate, rather than permanently
installed padeyes.RRE A N TAKEN AND R TS A HIEVED Upon identification
of the event a health physics technician
responded, visually verified the area to be clear of personnel and immediately
locked the gate.A walk-down was performed to verify the locked status of all other similar areas.No other doors were found to be improperly
secured.An additional
walk-down was performed by Health Physics to identify any other HHRA or high radiation areas that were secured by means of chain and padlocks.One additional
door (access hatch to the wetwell)was found to be secured in this manner.Supply System staff determined
that this hatch did not require a padeye as it is bolted and secured with a heavy chain and padlock.  
RESPONSE TO NOTICE OF VIOLATION IN INSPECTION
REPORT 50-397/97-19
Appendix A Page 2 of 3 A work request was issued to install lockable padeyes on the gate to the radwaste liner storage room on the 437'levation
of the radwaste building.Work was completed December 10, 1997, Lessons learned from the event were discussed and documented
in Health Physics Technician
Continuing
Training.This training was completed December 22, 1997.The appropriate
plant procedure was revised on December 15, 1997 to require performance
of independent
verification
in a timely manner.Appropriate
personnel actions were taken with the health physics technician
who failed to properly secure the gate.RRE TEP T BETAKENT AV IDF EVI LATI N All corrective
actions have been completed.
DATE F L MPLIAN E The gate was immediately
locked on October 6, 1997 upon identification
of the event.R TATEMENT F VI LATI NB 10 CFR 20.1501(a)requires, in part, that each licensee make or cause to be made surveys that may be necessary for the licensee to comply with the regulations
in 10 CFR Part 20 and are reasonable
to evaluate the quantities
of radioactive
material and the potential radiological
hazards that could be present.10 CFR 20.1003 defines a survey as an evaluation
of radiological
conditions
and potential hazards incident to the production, use, transfer, release, disposal, or presence of radioactive
material or other sources of radiation.
10 CFR 20.1201 requires, in part, each licensee to control the occupational
dose to individual
adults to 5 rems for the total effective dose equivalent
or (to)50 rems for the sum of the deep-dose equivalent
and the committed dose equivalent
to any individual
organ or tissue other than the lens of the eye.Contrary to the above, the licensee did not make or cause to be made surveys necessary to comply with 10 CFR 20.1201.Specifically, on April 30, May 30, and July 2, 1997, the licensee failed to perform evaluations
of the radiological
hazards that could have been present when four individuals
were identified
to have potentially
taken radioactive
material internally.  
RESPONSE TO NOTICE OF VIOLATION IN INSPECTION
REPORT 50-397/97-19
Appendix A Page3 of 3 This is a Severity Level IV violation (Supplement
IV)(50-397/971942).
R P NET VI LATI N The Supply System accepts the violation.
REA N F RVI LATI N The Supply System agrees with the staff's characterization
of the reason for this event given in the Report Details section of Inspection
Report 50-397/97-19.
Briefly restated, the requirement
to provide whole-body
counts to personnel found with facial contamination
was not clearly stated in the appropriate
plant procedure.
RR A N TAKEN AND R T A HIEVED Health Physics performed a comprehensive
review of 1997 logs and determined
that a total of six individuals
with facial contamination
were not immediately
given whole-body
counts.These individuals
were contacted and whole-body
counts were performed.
No internal contamination
was identified.
The appropriate
plant procedure was revised January 8, 1998 to clearly state the requirement
that personnel found with facial contamination
will receive a whole-body
count.TEP T BETAKENTOAV
IDF EVI LATI N A review of the procedure will be incorporated
into the Health Physics Quarterly Continuing
Training to be completed by February 20, 1998.DATE F F L MPLIAN E Full compliance
was achieved by December 5, 1997 when affected personnel received whole-body
counts.
}}

Latest revision as of 13:01, 29 October 2019

Responds to NRC 971218 Ltr Re Violations Noted in Insp Rept 50-397/97-17.Corrective Actions:Technician Visually Verified Area to Be Clear of Personnel & Immediately Locked Gate & Performed Walkdown to Verify Locked Status of Similar Areas
ML17292B233
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/19/1998
From: Bemis P
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-397-97-17, GO2-98-011, GO2-98-11, NUDOCS 9801290057
Download: ML17292B233 (6)


Text

CATEGORY j.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9801290057 DOC.DATE: 98/01/19 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION BEMIS,P.R. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 971218 ltr re violations noted in insp rept 50-397/97-17.Corrective actions: technician visually verified area to be clear of personnel & immediately locked gate &

performed walkdown to verify locked status of similar are s.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR ( ENCL t SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response E

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 POSLUSNY,C 1 1 R

INTERNAL: ACRS 2 2 AEOD/SPD/RAB 1 1 AEOD 1 1 DEDRO 1 1 ILE CENTER 1 1 NRR/DRCH/HHFB 1 1 NRR DRPM/PECB 1 1 NRR/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN4 FILE 01 1 1 TERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NUDOCS FULLTEXT 1 1 D 0

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19

WASHIV>GTON PUBLIC POWER SUPPI.Y SYSTElvf I? O. Iiox 968 ~ Ri~%hniil, 11'ashiiigtow 99352-0968 January 19, 1998 G02-98-011 Docket No. 50-397 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

Subjec't: WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION REPORT 97-19, RESPONSE TO NOTICE OF VIOLATION

Reference:

Letter dated December 18, 1997, B Murray (NRC) to JV Parrish (SS), "NRC Inspection Report 50-397/97-19" The Supply System's response to the Notice Of Violation, pursuant to the provisions of Section 2.201, Title 10, Code of Federal Regulations, is enclosed as Attachment A.

We acknowledge the additional concerns that were identified in the inspection report and the Supply System is taking steps to address the issues.

Should you have any questions or desire additional information regarding this matter, please call Mr. PJ Inserra at (509) 377-4147.

PR is Vi resident, Nuclear Operations Mail Drop PE23 Attachment cc: EW Merschoff - NRC RIV NRC Sr. Resident Inspector - 927N KE Perkins, Jr. - NRC RIV, WCFO DL Williams - BPA/399 C Poslusny, Jr. - NRR PD Robinson - Winston & Strawn 980i290057 980ii9 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PDR ADGCK 05000397 8 PDR

RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page 1 of 3 RESTATEMENT F VI LATIONA Technical Specification 5.7.2.a requires, in part, that each entryway to high radiation areas with dose rates greater than 1.0 rem/hour (at 30 centimeters from the radiation source or from any surface penetrated by the radiation) be provided with a locked door, gate, or guard that prevents unauthorized entry.

Contrary to the above, on October 6, 1997, an entryway to the radwaste liner storage room on the 437-foot elevation of the radwaste building, an area with dose rates greater than 1.0 rem/hour (at 30 centimeters from the radiation source or from any surface penetrated by the radiation) was not provided with a locked door, gate, or guard that prevented unauthorized entry.

This is a Severity Level IV violation (Supplement IV) (50-397/9719-01).

R P N ET VI LATI N The Supply System accepts the violation.

REA N F RVI LATI N The Supply System agrees with the staff's characterization of the reason for this event given in the Report Details section of Inspection Report 50-397/97-19.

The failure to properly secure a chain link gate to a high high radiation area (HHRA) was caused by human error on the part of a health physics technician. One condition that contributed to the event was the failure to perform a timely independent verification of the door's locked status. A second contributing condition was the use of a chain to secure the gate, rather than permanently installed padeyes.

RRE A N TAKEN AND R TS A HIEVED Upon identification of the event a health physics technician responded, visually verified the area to be clear of personnel and immediately locked the gate. A walk-down was performed to verify the locked status of all other similar areas. No other doors were found to be improperly secured.

An additional walk-down was performed by Health Physics to identify any other HHRA or high radiation areas that were secured by means of chain and padlocks. One additional door (access hatch to the wetwell) was found to be secured in this manner. Supply System staff determined that this hatch did not require a padeye as it is bolted and secured with a heavy chain and padlock.

RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page 2 of 3 A work request was issued to install lockable padeyes on the gate to the radwaste liner storage room on the 437'levation of the radwaste building. Work was completed December 10, 1997, Lessons learned from the event were discussed and documented in Health Physics Technician Continuing Training. This training was completed December 22, 1997.

The appropriate plant procedure was revised on December 15, 1997 to require performance of independent verification in a timely manner.

Appropriate personnel actions were taken with the health physics technician who failed to properly secure the gate.

RRE TEP T BETAKENT AV IDF EVI LATI N All corrective actions have been completed.

DATE F L MPLIAN E The gate was immediately locked on October 6, 1997 upon identification of the event.

R TATEMENT F VI LATI NB 10 CFR 20. 1501(a) requires, in part, that each licensee make or cause to be made surveys that may be necessary for the licensee to comply with the regulations in 10 CFR Part 20 and are reasonable to evaluate the quantities of radioactive material and the potential radiological hazards that could be present.

10 CFR 20. 1003 defines a survey as an evaluation of radiological conditions and potential hazards incident to the production, use, transfer, release, disposal, or presence of radioactive material or other sources of radiation.

10 CFR 20.1201 requires, in part, each licensee to control the occupational dose to individual adults to 5 rems for the total effective dose equivalent or (to) 50 rems for the sum of the deep-dose equivalent and the committed dose equivalent to any individual organ or tissue other than the lens of the eye.

Contrary to the above, the licensee did not make or cause to be made surveys necessary to comply with 10 CFR 20.1201. Specifically, on April 30, May 30, and July 2, 1997, the licensee failed to perform evaluations of the radiological hazards that could have been present when four individuals were identified to have potentially taken radioactive material internally.

RESPONSE TO NOTICE OF VIOLATIONIN INSPECTION REPORT 50-397/97-19 Appendix A Page3 of 3 This is a Severity Level IV violation (Supplement IV) (50-397/971942).

R P NET VI LATI N The Supply System accepts the violation.

REA N F RVI LATI N The Supply System agrees with the staff's characterization of the reason for this event given in the Report Details section of Inspection Report 50-397/97-19.

Briefly restated, the requirement to provide whole-body counts to personnel found with facial contamination was not clearly stated in the appropriate plant procedure.

RR A N TAKEN AND R T A HIEVED Health Physics performed a comprehensive review of 1997 logs and determined that a total of six individuals with facial contamination were not immediately given whole-body counts. These individuals were contacted and whole-body counts were performed. No internal contamination was identified.

The appropriate plant procedure was revised January 8, 1998 to clearly state the requirement that personnel found with facial contamination will receive a whole-body count.

TEP T BETAKENTOAV IDF EVI LATI N A review of the procedure will be incorporated into the Health Physics Quarterly Continuing Training to be completed by February 20, 1998.

DATE F F L MPLIAN E Full compliance was achieved by December 5, 1997 when affected personnel received whole-body counts.