ML17292B536: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/15/1999
| issue date = 01/15/1999
| title = Informs That Go Smith Has Been Appointed Vice President, Generation/Plant General Manager.Updated Distribution List for NRC Correspondence,Encl
| title = Informs That Go Smith Has Been Appointed Vice President, Generation/Plant General Manager.Updated Distribution List for NRC Correspondence,Encl
| author name = COLEMAN D W
| author name = Coleman D
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORYj.REGULATOYINFORMATION DISTRIBUTIO STEM(RIDS)ACCESSION NBR:9901260357 DOC.DATE:
{{#Wiki_filter:CATEGORY j.
99/01/15NOTARIZED:
REGULATO Y INFORMATION DISTRIBUTIO                 STEM (RIDS)
NOFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPoweAUTH.NAME,AUTHORAFFILIATION COLEMAN,D.W.
ACCESSION NBR:9901260357           DOC.DATE: 99/01/15 NOTARIZED: NO                      DOCKET FACIL:50-397   WPPSS  Nuclear Project, Unit 2, Washington Public                  Powe 05000397 AUTH. NAME,           AUTHOR  AFFILIATION COLEMAN,D.W.         Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION RecordsManagement Branch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
1nformsthatGOSmithhasbeenappointed VicePresident, Generation/Plant GeneralManager.Updateddistribution listforNRCcorrespondence, encl.DISTRIBUTION CODE:M006DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:ChangesofPersonnel/Address NOTES:DOCKET05000397RECIPIENT IDCODE/NAME PD4-2LAPOSLUSNY,C COPIESLTTRENCLRECIPXENT IDCODE/NAME PD4-2PDCOPIESLTTRENCLINTERNAL:
1nforms that GO Smith has been appointed Vice President, Generation/Plant General Manager. Updated distribution list for NRC correspondence, encl.
ACRSCAA-16B-13 OC/LFDCBOGC/HDS3SLB~0Q.OCIO/RDSS P1-33SECY/DSBEXTERNAL:
DISTRIBUTION CODE: M006D COPIES RECEIVED:LTR                     ENCL        SIZE:
NRCPDRD'~JIAitut'JLi I~ii>'I='-'I NOTETOALL"RIDS"REC1PIENTS:
TITLE: Changes of Personnel/Address NOTES:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
RECIPIENT            COPIES              RECIPXENT              COPIES ID  CODE/NAME          LTTR ENCL          ID CODE/NAME           LTTR ENCL PD4-2 LA                                PD4-2  PD POSLUSNY,C INTERNAL: ACRS                                        SLB CAA-16B-13                                             ~0Q.
LTTR12ENCL WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland, Washington 99352-0968 January15,1999G02-99-012 DocketNo.50-397U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Gentlemen:
OC/LFDCB                                OCIO/RDSS P1-33 OGC/HDS3                                SECY/DSB EXTERNAL: NRC PDR D
                                                                '~JIAitut'JLi ~ii>'I='-'I I
NOTE TO ALL "RIDS" REC1PIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR              12  ENCL
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 January 15, 1999 G02-99-012 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2,OP~<TINGLICENSENPF-21MANAGEMENT CHANGEANDCHANGEINDISTRIBUTION Asaresultoftherecentreorganization attheSupplySystem,Mr.GOSmithhasbecometheVicePresident, Generation/Plant GeneralManager.Attachedisanupdateddistribution listforNRCcorrespondence.
WNP-2, OP~<TING LICENSE NPF-21 MANAGEMENTCHANGE AND CHANGE IN DISTRIBUTION As a result of the recent reorganization at the Supply System, Mr. GO Smith has become the Vice President, Generation/Plant General Manager. Attached is an updated distribution list for NRC correspondence. Please distribute the attachment to those individuals in your organization who interface with the Supply System so that their records can be updated.
Pleasedistribute theattachment tothoseindividuals inyourorganization whointerface withtheSupplySystemsothattheirrecordscanbeupdated.Shouldyouhaveanyquestions orrequireadditional information, contactmeat(509)377-4342.
Should you have any questions or require additional information, contact me at (509) 377-4342.
Respectfully, 8R~~DWColemanManager,Regulatory AffairsMailDropPE200Attachment CC:EWMerschoff
Respectfully, 8R~~
-NRCRIVLJSmith-NRCRIVCPoslusny, Jr.-NRRNRCSr.ResidentInspector
DW Coleman Manager, Regulatory Affairs Mail Drop PE20                                                                                    0 Attachment CC:     EW Merschoff - NRC RIV LJ Smith - NRC RIV C Poslusny, Jr. - NRR NRC Sr. Resident Inspector - 927N DL Williams - BPA/1399, PD Robinson - Winston 8c Strawn DJ Ross - EFSEC 990i260357 9 70i i5 I  Da aDOCX 0S000S97, )
-927NDLWilliams-BPA/1399, PDRobinson-Winston8cStrawnDJRoss-EFSEC990i260357 970ii5IDaaDOCX0S000S97,
H                      PORE
)HPORE 0r lWashington PublicPowerSupplySystemNuclearProjectNo.2'cw/atts:Mr.GregO.Smith(MailDrop927M)VicePresident, Generation Washington PublicPowerSupplySystemP.O.Box968Richland, Washington 99352-0968 Mr.AlbertE.Mouncer(MailDrop1396)GeneralCounselWashington PublicPowerSupplySystemP.O.Box968Richland, Washington 99352-0968 Ms.DeborahJ.Ross,ChairmanEnergyFacilitySiteEvaluation CouncilP.O.Box43172Olympia,Washington 98504-3172 Mr.DouglasW,Coleman(MailDropPE20)Manager,Regulatory AffairsWashington PublicPowerSupplySystemP.O.Box968Richland, Washington 99352-0968 Mr.PerryD.Robinson, Esq.Winston8cStrawn1400LStreet,N.W.Washington, DC20005-3502 Mr.RodneyL.Webring(MailDropPE08)VicePresident, Operations Support/PIO Washington PublicPowerSupplySystemP.O.Box968Richland, Washington 99352-0968 Mr.PaulInserra(MailDropPE20)Manager,Licensing Washington PublicPowerSupplySystemP.O.Box968Richland, Washington 99352-0968 Mr.J.V,Parrish(MailDrop1023)ChiefExecutive OfficerWashington PublicPowerSupplySystemP.O.Box968Richland, Washington 99352-0968 0P0tP}}
 
0 r
 
l Washington Public Power Supply System      Nuclear Project No.
2'c w/atts:
Mr. Greg O. Smith (Mail Drop 927M)        Mr. J.V, Parrish (Mail Drop 1023)
Vice President, Generation                 Chief Executive Officer Washington Public Power Supply System      Washington Public Power Supply System P.O. Box 968                              P.O. Box 968 Richland, Washington 99352-0968            Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop    1396)
General Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Deborah J. Ross, Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 Mr. Douglas W, Coleman (Mail Drop PE20)
Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Perry D. Robinson, Esq.
Winston 8c Strawn 1400  L Street, N.W.
Washington, DC 20005-3502 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968
 
0    t 0
P P}}

Latest revision as of 12:59, 29 October 2019

Informs That Go Smith Has Been Appointed Vice President, Generation/Plant General Manager.Updated Distribution List for NRC Correspondence,Encl
ML17292B536
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/15/1999
From: Coleman D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-012, GO2-99-12, NUDOCS 9901260357
Download: ML17292B536 (5)


Text

CATEGORY j.

REGULATO Y INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESSION NBR:9901260357 DOC.DATE: 99/01/15 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME, AUTHOR AFFILIATION COLEMAN,D.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

1nforms that GO Smith has been appointed Vice President, Generation/Plant General Manager. Updated distribution list for NRC correspondence, encl.

DISTRIBUTION CODE: M006D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Changes of Personnel/Address NOTES:

RECIPIENT COPIES RECIPXENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA PD4-2 PD POSLUSNY,C INTERNAL: ACRS SLB CAA-16B-13 ~0Q.

OC/LFDCB OCIO/RDSS P1-33 OGC/HDS3 SECY/DSB EXTERNAL: NRC PDR D

'~JIAitut'JLi ~ii>'I='-'I I

NOTE TO ALL "RIDS" REC1PIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 January 15, 1999 G02-99-012 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2, OP~<TING LICENSE NPF-21 MANAGEMENTCHANGE AND CHANGE IN DISTRIBUTION As a result of the recent reorganization at the Supply System, Mr. GO Smith has become the Vice President, Generation/Plant General Manager. Attached is an updated distribution list for NRC correspondence. Please distribute the attachment to those individuals in your organization who interface with the Supply System so that their records can be updated.

Should you have any questions or require additional information, contact me at (509) 377-4342.

Respectfully, 8R~~

DW Coleman Manager, Regulatory Affairs Mail Drop PE20 0 Attachment CC: EW Merschoff - NRC RIV LJ Smith - NRC RIV C Poslusny, Jr. - NRR NRC Sr. Resident Inspector - 927N DL Williams - BPA/1399, PD Robinson - Winston 8c Strawn DJ Ross - EFSEC 990i260357 9 70i i5 I Da aDOCX 0S000S97, )

H PORE

0 r

l Washington Public Power Supply System Nuclear Project No.

2'c w/atts:

Mr. Greg O. Smith (Mail Drop 927M) Mr. J.V, Parrish (Mail Drop 1023)

Vice President, Generation Chief Executive Officer Washington Public Power Supply System Washington Public Power Supply System P.O. Box 968 P.O. Box 968 Richland, Washington 99352-0968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)

General Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Deborah J. Ross, Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 Mr. Douglas W, Coleman (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Perry D. Robinson, Esq.

Winston 8c Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968

0 t 0

P P