ML17324B048: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17324B048
| number = ML17324B048
| issue date = 12/06/2017
| issue date = 12/06/2017
| title = Shearon Harris Nuclear Plant, Unit 1 - Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program (CAC No. MD5802)
| title = Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program
| author name = Galvin D J
| author name = Galvin D
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Hamilton T
| addressee name = Hamilton T
Line 9: Line 9:
| docket = 05000400
| docket = 05000400
| license number = NPF-063
| license number = NPF-063
| contact person = Galvin D J DORL/LPL2-2 415-6256
| contact person = Galvin D DORL/LPL2-2 415-6256
| case reference number = CAC MD5802
| case reference number = CAC MD5802
| package number = ML17340B389
| package number = ML17340B389
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON.DC 20555-0001 Ms. Tanya Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165 December 6, 2017
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON.DC 20555-0001 December 6, 2017 Ms. Tanya Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165


==SUBJECT:==
==SUBJECT:==
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802)


SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802)
==Dear Ms. Hamilton:==


==Dear Ms. Hamilton:==
By letter dated June 12, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081430111 ), the U.S. Nuclear Regulatory Commission (NRG) issued Amendment No. 127 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris). The amendment relocated the lnservice Testing requirements to the administrative section of the Technical Specifications (TSs),
removed the lnservice Inspection requirements from the TSs, and established a TSs Bases Control Program. These changes were in response to the Duke Energy Progress, LLC (previously Carolina Power and Light Company) (the licensee) license amendment request dated June 15, 2007, as supplemented by letter dated March 6, 2008 (ADAMS Accession Nos.
ML071800018 and ML080720337).
This year, while periorming the acceptance review on a license amendment request submitted November 7, 2017, (ADAMS Accession No. ML17312A362), the NRG staff identified an error on TS pages 6-199 and 6-19h associated with Amendment No. 127. Specifically, the TS pages 6-19g and 6-19h were issued without the applicable headings, "ADMINISTRATIVE CONTROLS" and "PROCEDURES AND PROGRAMS (Continued)."
It appears that this error was introduced when the licensee submitted its markup and clean TS pages for Amendment No. 127, and because TS pages 6-19g and 6-19h were new pages to be added to the TS. The licensee submitted the markup pages as "inserts" without headings, while the clean pages were submitted with correct headings that were consistent with the Administrative Controls section of the Harris TS. The NRC inadvertently issued the pages without the headings. The corrected pages are enclosed.


By letter dated June 12, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081430111
T. Hamilton                                 If you have any questions, please contact me at (301) 415-6256 or by e-mail at Dennis.Galvin@nrc.gov.
), the U.S. Nuclear Regulatory Commission (NRG) issued Amendment No. 127 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris).
Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
The amendment relocated the lnservice Testing requirements to the administrative section of the Technical Specifications (TSs), removed the lnservice Inspection requirements from the TSs, and established a TSs Bases Control Program.
These changes were in response to the Duke Energy Progress, LLC (previously Carolina Power and Light Company)
(the licensee) license amendment request dated June 15, 2007, as supplemented by letter dated March 6, 2008 (ADAMS Accession Nos. ML071800018 and ML080720337).
This year, while periorming the acceptance review on a license amendment request submitted November 7, 2017, (ADAMS Accession No. ML 17312A362),
the NRG staff identified an error on TS pages 6-199 and 6-19h associated with Amendment No. 127. Specifically, the TS pages 6-19g and 6-19h were issued without the applicable
: headings, "ADMINISTRATIVE CONTROLS" and "PROCEDURES AND PROGRAMS (Continued)."
It appears that this error was introduced when the licensee submitted its markup and clean TS pages for Amendment No. 127, and because TS pages 6-19g and 6-19h were new pages to be added to the TS. The licensee submitted the markup pages as "inserts" without headings, while the clean pages were submitted with correct headings that were consistent with the Administrative Controls section of the Harris TS. The NRC inadvertently issued the pages without the headings.
The corrected pages are enclosed.
T. Hamilton If you have any questions, please contact me at (301) 415-6256 or by e-mail at Dennis.Galvin@nrc.gov.
Docket No. 50-400  


==Enclosure:==
==Enclosure:==


Corrected TS Pages 6-19g and 6-19h cc: Listserv Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation CORRECTION TO LICENSE AMENDMENT NO. 127 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the attached corrected pages. Remove 6-19g 6-19h Insert 6-19g 6-19h Enclosure ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)  
Corrected TS Pages 6-19g and 6-19h cc: Listserv
: m. lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components.
 
The program shall include the following:  
CORRECTION TO LICENSE AMENDMENT NO. 127 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the attached corrected pages.
Remove                             Insert 6-19g                             6-19g 6-19h                              6-19h Enclosure
 
ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)
: m. lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
: 1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows:
: 1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows:
ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days 2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the lnservice Testing Program for performing inservice testing activities,  
ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda               Required Frequencies for terminology for inservice testing           performing inservice testing activities                                 activities Weekly                        At least once per 7 days Monthly                        At least once per 31 days Quarterly or every 3 months              At least once per 92 days Semiannually or every 6 months            At least once per 184 days Every 9 months                    At least once per 276 days Yearly or annually                  At least once per 366 days Biennially or every 2 years              At least once per 731 days
: 3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and 4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification.
: 2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the lnservice Testing Program for performing inservice testing activities,
SHEARON HARRIS -UNIT 1 6-19g Amendment No. 127 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)
: 3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and
: n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.
: 4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification.
: 1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
SHEARON HARRIS - UNIT 1                       6-19g                     Amendment No. 127
: 2. Licensees may make changes to Bases without prior NRG approval provided the changes do not require either of the following:
: a. A change in the TS incorporated in the license, or b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59. 3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR 4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation.
Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e). SHEARON HARRIS -UNIT 1 6-19h Amendment No. 127 


==SUBJECT:==
ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)
: n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.
: 1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
: 2. Licensees may make changes to Bases without prior NRG approval provided the changes do not require either of the following:
: a. A change in the TS incorporated in the license, or
: b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
: 3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR
: 4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e).
SHEARON HARRIS - UNIT 1                      6-19h                    Amendment No. 127


SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802) DATED DECEMBER 6, 2017 DISTRIBUTION:
Package: ML173408389 Letter: ML173248048 Correction Panes: ML173248129 OFFICE   DORULPL2-2/PM   DORL/LPL2-2/LA   DORULPL2-2/PM DORULPL2 2/BC  DORL/LPL2 2/PM NAME     DGalvin         BClayton         MBarillas    UShoop PBuckbern for\ DGalvin DATE     12/01/17       11/30/17         12/04/17     12/05/17       12/06/17}}
PUBLIC PM Reading File RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrLABClayton Resource RidsNrrDorllp12-2 Resource RidsNrrPMShearonHarris Resource ADAMS Accession Nos.: Package:
ML 173408389 Letter: ML 173248048 Correction Panes: ML 173248129 OFFICE DORULPL2-2/PM DORL/LPL2-2/LA NAME DGalvin BClayton DATE 12/01/17 11/30/17 DORULPL2-2/PM MBarillas 12/04/17 OFFICIAL RECORD COPY DORULPL2 2/BC UShoop PBuckbern for\ 12/05/17 DORL/LPL2 2/PM DGalvin 12/06/17}}

Latest revision as of 07:04, 29 October 2019

Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program
ML17324B048
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/06/2017
From: Dennis Galvin
Plant Licensing Branch II
To: Hamilton T
Duke Energy Progress
Galvin D DORL/LPL2-2 415-6256
Shared Package
ML17340B389 List:
References
CAC MD5802
Download: ML17324B048 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON.DC 20555-0001 December 6, 2017 Ms. Tanya Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802)

Dear Ms. Hamilton:

By letter dated June 12, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081430111 ), the U.S. Nuclear Regulatory Commission (NRG) issued Amendment No. 127 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris). The amendment relocated the lnservice Testing requirements to the administrative section of the Technical Specifications (TSs),

removed the lnservice Inspection requirements from the TSs, and established a TSs Bases Control Program. These changes were in response to the Duke Energy Progress, LLC (previously Carolina Power and Light Company) (the licensee) license amendment request dated June 15, 2007, as supplemented by letter dated March 6, 2008 (ADAMS Accession Nos.

ML071800018 and ML080720337).

This year, while periorming the acceptance review on a license amendment request submitted November 7, 2017, (ADAMS Accession No. ML17312A362), the NRG staff identified an error on TS pages 6-199 and 6-19h associated with Amendment No. 127. Specifically, the TS pages 6-19g and 6-19h were issued without the applicable headings, "ADMINISTRATIVE CONTROLS" and "PROCEDURES AND PROGRAMS (Continued)."

It appears that this error was introduced when the licensee submitted its markup and clean TS pages for Amendment No. 127, and because TS pages 6-19g and 6-19h were new pages to be added to the TS. The licensee submitted the markup pages as "inserts" without headings, while the clean pages were submitted with correct headings that were consistent with the Administrative Controls section of the Harris TS. The NRC inadvertently issued the pages without the headings. The corrected pages are enclosed.

T. Hamilton If you have any questions, please contact me at (301) 415-6256 or by e-mail at Dennis.Galvin@nrc.gov.

Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

Corrected TS Pages 6-19g and 6-19h cc: Listserv

CORRECTION TO LICENSE AMENDMENT NO. 127 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the attached corrected pages.

Remove Insert 6-19g 6-19g 6-19h 6-19h Enclosure

ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)

m. lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows:

ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda Required Frequencies for terminology for inservice testing performing inservice testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the lnservice Testing Program for performing inservice testing activities,
3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and
4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification.

SHEARON HARRIS - UNIT 1 6-19g Amendment No. 127

ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)

n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.
1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
2. Licensees may make changes to Bases without prior NRG approval provided the changes do not require either of the following:
a. A change in the TS incorporated in the license, or
b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR
4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e).

SHEARON HARRIS - UNIT 1 6-19h Amendment No. 127

Package: ML173408389 Letter: ML173248048 Correction Panes: ML173248129 OFFICE DORULPL2-2/PM DORL/LPL2-2/LA DORULPL2-2/PM DORULPL2 2/BC DORL/LPL2 2/PM NAME DGalvin BClayton MBarillas UShoop PBuckbern for\ DGalvin DATE 12/01/17 11/30/17 12/04/17 12/05/17 12/06/17